Attachment 06 Acknowledgment of Stormwater Control Measure (SCM) Maintenance Responsibilities.pdf

PDF 77 KB Posted

Attached to
7840610000, Maintenance, SCM Bucks
Solicitation number
6100066473
Issued by
Montgomery County, Pennsylvania

About this file

This is an acknowledgment form for Stormwater Control Measure (SCM) maintenance responsibilities required by the Pennsylvania Department of Transportation (PennDOT) for the procurement of routine maintenance services of SCMs in Bucks County, District 6-0. The form must be completed and returned to the PennDOT Purchasing Agent within three days of receiving notice of apparent low bidder status. Bidders must demonstrate familiarity with PennDOT Publication 888—Stormwater Control Measures Maintenance Manual, which specifies allowable equipment, SCM types, and maintenance procedures. At minimum, one individual responsible for supervising work crew activities must have reviewed and be familiar with the contents of PennDOT Publication 888.

The form requires the bidder's company name, the print and signature of the person completing the form, and the date of submission. This acknowledgment serves as confirmation that the bidder possesses the requisite knowledge and understands the specific requirements for performing SCM maintenance work according to PennDOT standards before contract award.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6- Acknowledgement of Stormwater Control Measure (SCM)

Maintenance Responsibilities

This page is to be completed and returned to the PennDOT Purchasing Agent within 3 days of notice of apparent low bidder status.

Our company has reviewed the current version of PennDOT Publication 888- Stormwater Control

Measures Maintenance Manual and understand the specifics regarding allowable equipment, SCM types, and procedures to conduct SCM Maintenance.

We will have at least one individual who is responsible for the work crew activity who has reviewed and is familiar with PennDOT Publication 888 and its contents.

Completed By Print: __________________________

Completed By Signature:_______________________

Date: _____________

Name of Company: _____________________

File details come from the government source that posted it. Updated .