Attachment 0003 -- 21R5008 -- APPENDIX B PLANS.pdf
PDF 18 MB Posted
- Attached to
- CONSTRUCT TMDE LAB -- USAG-RIA -- BLDG 332 Federal contract opportunity
- Solicitation number
- W52P1J-21-R-5008
About this file
This solicitation requests proposals for the design and construction of a Test, Measurement, and Diagnostic Equipment lab at the Rock Island Arsenal in Rock Island, Illinois. The project involves building a new lab space in accordance with specifications and drawings. As a 100% small business set aside, only small businesses may submit proposals. The performance period is estimated between $1,000,000 to $5,000,000. Proposals are due by May 2021 and performance and payment bonds are required. The United States Army Contracting Command - Rock Island and Department of the Army Materiel Command Joint Munitions Command are the contracting agencies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21R5008 -- TMDE Lab -- Questions and Responses-2-REVISED.pdf | ||
| Amendment -- 21R5008-0004.pdf | ||
| Amendment -- 21R5008-0003.pdf | ||
| Amendment -- 21R5008-0002.pdf | ||
| 21R5008 -- TMDE Lab -- Questions and Responses-2.pdf | ||
| 21R5008 -- TMDE Lab -- Questions and Responses.pdf | ||
| 21R5008 -- Site Visit Attendee List.pdf | ||
| Amendment -- 21R5008-0001.pdf | ||
| Attachment 0007 -- 21R5008 -- Contract Vendor Guide.pdf | ||
| Attachment 0004 -- 21R5008 -- Davis Bacon Wage Determinations.pdf | ||
| Attachment 0001 -- 21R5008 -- SOW.pdf | ||
| Attachment 0005 -- 21R5008 -- Site Visit Map.pdf | ||
| Solicitation -- 21R5008.pdf | ||
| Attachment 0002 -- 21R5008 -- APPENDIX A SPECIFICATIONS.pdf | ||
| Attachment 0006 -- 21R5008 -- Access Control Record Check Request Form.pdf | ||
| Attachment 0007 -- 21R5008 -- Contract Vendor Guide.pptx | PPTX presentation |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
2 3
C
4 5
A
B
ROCK ISLAND ARSENAL
U S
ARMY ARRISON
ROCKISA DARS
A
EN
L
G
LN
U B
E PL
RI
U S
U N
UM
R O
C K
IS
LAND
A
R S
E N
A L
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
IN
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
APPENDIX B
BLDG 332 CONSTRUCT TMDE LAB
PROJECT:
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
C O
V E
R S
H E
E T
G-001
2 3
C
4 5
A
B
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
A1
INDEX OF DRAWINGS
GENERAL
TITLE OF DRAWING
ID.
SHEET
ID.
SHEET
TITLE OF DRAWING
ID.
SHEET
TITLE OF DRAWING
ID.
SHEET
TITLE OF DRAWING
ARCHITECTURAL
COVER SHEETG-001
PROJECT LOCATION AND DRAWING INDEXG-002
C1
VICINITY MAP
D R
A W
IN
G I
N D
E X
A N
D
P R
O J E
C T L
O C
A T
IO
N
C2
AERIAL MAP OF ROCK ISLAND ARSENAL
NOT TO SCALE (NTS)NOT TO SCALE (NTS)
ARSENAL
ROCK ISLAND
ILLINOIS
IOWA
INDIANA
KENTUCKY
MISSOURI
WISCONSIN
CHICAGO
ST. LOUIS
G-002G-002
GENERAL LOCATION OF THE PROJECT
DEMOLITION PLANA-101
NEW WORK PLANA-102
REFLECTED CEILING PLANA-103
ELECTRICAL
FIRE PROTECTION
DOOR, WINDOW, AND WALL DETAILS A-501 MECHANICAL EQUIPMENT SCHEDULES NEW WORKM-016
MECHANICAL EQUIPMENT SCHEDULES NEW WORKM-015
MECHANICAL DDC AND EQUIPMENT SCHEDULES NEW WORKM-014
MECHANICAL DDC SCHEDULES NEW WORKM-013
MECHANICAL DETAILS NEW WORKM-012
MECHANICAL DETAILS NEW WORKM-011
MECHANICAL DETAILS NEW WORKM-010
MECHANICAL DETAILS NEW WORKM-009
MECHANICAL BUILDING SECTIONS NEW WORKM-008
MECHANICAL PIPING ENLARGED MECHANICAL ROOM NEW WORKM-007
MECHANICAL SHEETMETAL ENLARGED MECHANICAL ROOM NEW WORKM-006
MECHANICAL PIPING FIRST FLOOR PLAN NEW WORKM-005
MECHANICAL SHEETMETAL FIRST FLOOR PLAN NEW WORKM-004
MECHANICAL PIPING FIRST FLOOR PLAN DEMOLITIONM-003
MECHANICAL SHEETMETAL FIRST FLOOR PLAN DEMOLITIONM-002
MECHANICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTESM-001
PLUMBING FIRST FLOOR PLAN DEMOLITION / NEW WORKP-002
UNDERFLOOR PLUMBING FIRST FLOOR PLAN DEMOLITION / NEW WORKP-001
ABBREVATIONS, SYMBOLS, AND GENERAL SHEET NOTESG-003
GENERAL SPECIFICATIONS AND NOTESG-004
PROJECT LOCATION AND EQUIPMENT MOVING REQUIREMENTSG-005
LIST OF EQUIPMENT, FURNITURE, AND ITEMS TO BE MOVEDG-006
HAZARDOUS MATERIALS PLAN
HAZARDOUS MATERIALS PLANH-101
STRUCTURAL PLAN
STRUCTURAL PLANS-101
PROPOSED EQUIPMENT PLACEMENT PLANA-104
WALL TYPES AND DOOR DETAILSA-501
BLDG 332 PHOTOS IA-902
BLDG 332 PHOTOS IIA-903
BLDG 332 PHOTOS IIIA-904
PHOTO KEY BLDG 131 SECOND FLOORA-905
PHOTO KEY BLDG 332A-901
ARCHITECTURAL
BLDG 131 PHOTOS I A-906
BLDG 131 PHOTOS IIA-907
BLDG 131 PHOTOS IIA-907
PLUMBING
MECHANICAL
FIRE PROTECTION FIRST FLOOR PLAN DEMOLITION / NEW WORK FP-002
ELECTRICAL EQUIPMENT SCHEDULES NEW WORKE-014
ELECTRICAL ONE LINE DIAGRAM NEW WORKE-013
ELECTRICAL PANEL SCHEDULE NEW WORKE-012
ELECTRICAL PANEL SCHEDULE NEW WORKE-011
ELECTRICAL PANEL SCHEDULE NEW WORKE-010
ELECTRICAL DETAILS NEW WORKE-009
ELECTRICAL SYSTEMS FIRST FLOOR PLAN NEW WORKE-008
ELECTRICAL LIGHTING FIRST FLOOR PLAN NEW WORKE-007
ELECTRICAL POWER ENLARGED MECHANICAL ROOM NEW WORKE-006
ELECTRICAL POWER FIRST FLOOR PLAN NEW WORKE-005
ELECTRICAL POWER FIRST FLOOR PLAN NEW WORKE-004
ELECTRICAL LIGHTING FIRST FLOOR PLAN DEMOLITIONE-003
ELECTRICAL POWER FIRST FLOOR PLAN DEMOLITIONE-002
ELECTRICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTESE-001
FIRE PROTECTION FIRST FLOOR PLAN EXISTING WORKFP-001
2 3
C
4 5
A
B
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
GENERAL NOTES
A-000
A-000
A-000
SECTION NUMBER
SECTION IS DRAWN
DWG. NO. WHERE
SECTION MARK
A-000
ELEVATION NUMBER
ELEVATION IS DRAWN
DWG. NO. WHERE
BUILDING ELEVATION MARK
NUMBER (TYP.)
ELEVATION
ELEVATION IS DRAWN
DWG. NO. WHERE
INTERIOR ELEVATION MARK
DETAIL IS DRAWN
DWG. NO. WHERE
CALLOUT HEAD
NUMBER (TYP.)
DETAIL
AREA COVERED BY DETAIL
DOOR TAG WINDOW TAG
TAG
KEYNOTE
SCALE
DETAIL IDENTIFIER (MODULE LETTER AND NUMBER)
A1
PLAN, ELEVATION, SECTION, OR DETAIL NAME
PLAN, ELEVATION, SECTION, OR DETAIL VIEW TITLE
PLAN SYMBOLS:
SYMBOLS:
VIEW TITLES:
CL
A N
D G
E N
E R
A L S
H E
E T N
O T
E S
A B
B R
E V
A T
IO
N S S
Y M
B O
L S
FE
FT
FDC
FAC
ETD
EXT
EXP TO STRUCT
EJ (EXP JT)
EXP
EXIST
EQ
EQUIP
ENGR
EP
ERD
EL
ELEC
EA
DWG
DESC
DS
DN
DR
DISP
DIM
DIA
DET
CY
CJ
CONTR
CONT
CONST
CMU
COR
COOR
CONC
COL
CO
CLOS
CO
CLR
CT
C TO C
CTR
CLG HT
CLG
CPT
CH
CFCI
BLDG
BTM
BD
BLKG
BM
BHMA
AWI
AVG
ATFP
ARCH
APPROX
APP
L
AL / ALUM
AC
ANOD
AB
ACOUST.
ADJ
ACCESS
ADAAG
ACC DR
AFF
FIRE EXTINGUISHER
FEET
FIRE DEPARTMENT CONNECTION
FACTORY
ESTIMATED TRAVEL DISTANCE
EXTERIOR
EXPOSED TO STRUCTURE
EXPANSION JOINT
EXPANSION / EXPOSED
EXISTING
EQUAL
EQUIPMENT
ENGINEER
EPOXY PAINT
EMERGENCY ROOF DRAIN
ELEVATION
ELECTRICAL OR ELECTRIC
EACH
DRAWING
DESCRIPTION
DOWNSPOUT
DOWN
DOOR
DISPENSER
DIMENSION
DIAMETER
DETAIL
CUBIC YARD
CONTROL JOINT
CONTRACTOR
CONTINUOUS
CONSTRUCTION
CONCRETE MASONRY UNIT
REPRESENTATIVE
CONTRACTING OFFICER'S
CORRIDOR
CONCRETE
COLUMN
COMPANY
CLOSET
CLEANOUT
CLEAR
CERAMIC TILE
CENTER TO CENTER
CENTER LINE
CENTER
CEILING HEIGHT
CEILING
CARPET
CHANNEL
INSTALLED
CONTRACTOR FURNISHED CONTRACTOR
BUILDING
BOTTOM
BOARD
BLOCKING
BEAM
ASSOCIATION, INC.
BUILDER'S HARDWARE MANUFACTURER'S
ARCHITECTURAL WOODWORK INSTITUTE
AVERAGE
ANTI TERRORISM / FORCE PROTECTION
AT
ARCHITECTURAL
APPROXIMATE
APPROVED
ANGLE
AND
ALUMINUM
AIR CONDITIONING
ANODIZED
ANCHOR BOLT
ACOUSTICAL
ADJUST/ ADJUSTABLE
ACCESSORIES
ACCESSIBILITY GUIDELINES
AMERICAN WITH DISABILITIES
ACCESS DOOR / PANEL
ABOVE FINISHED FLOOR
HEALTH ACT
OCCUPATIONAL SAFETY AND
OUTSIDE DIAMETER
OPPOSITE
OPEN WEB
OPENING
OPPOSITE HAND
GOVERNMENT INSTALLED
OWNER FURNISHED
CONTRACTOR INSTALLED
OWNER FURNISHED
ON CENTER
ASSOCIATION
NATIONAL FIRE PROTECTION
NOT TO SCALE
NUMBER
NOT IN CONTRACT
MISCELLANEOUS
MINIMUM
METAL WALL PANEL
METAL
MECHANICAL
MAXIMUM
MATERIAL
MANUFACTURER
MANAGER
MASONRY OPENING
MASONRY
LOW POINT
LOUVER
LONGITUDINAL
LIGHTING
LIGHT
LEFT HAND REVERSE
LEFT HAND
LAVATORY
LANDING
LAMINATE
KICK PLATE
JOIST
JOINT
CODE
INTERNATIONAL RESIDENTIAL
INTERIOR
INSULATION
INSIDE DIAMETER
INCH
CONDITIONING
HEATING VENTILATION & AIR
HOSE BIBB
HORIZONTAL
HOLLOW METAL
HIGH POINT
HIGH
HEIGHT
HARDWARE
HANDRAIL
HOOKS
GYPSUM BOARD
GYPSUM
GOVERNMENT
GLASS
GLOSSY PAINT
GOVERNMENT INSTALLED
GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GOVERNMENT FURNISHED
GYPSUM BOARD FURRING
GALVANIZED
GAGE OR GAUGE
FIELD VERIFY
FOUNDATION
FOOTING
FLUORESCENT
FLOOR DRAIN
FLOOR
FINISHED FLOOR
FLAT PAINT
FINISH
YARD
WINDOW ROUGH OPENING
WEATHERSTRIPPING
WATER RESISTANT GYPSUM BOARD
WITHOUT
WINDOW
WOOD
WALL CLEAN OUT
WATER CLOSET
WITH
WIDTH
VENT THRU ROOF
VINYL COVE BASE
VINYL COMPOSITION TILE
VESTIBULE
VERTICAL
UNLESS NOTED OTHERWISE
UNFINISHED
UNDERWRITERS LABORATORIES
UNIFIED FACILITIES CRITERIA
TYPICAL
TOUCH-UP
TOP OF WALL
TOP OF STEEL
TOP OF CURB
TOP OF CONCRETE
TOP OF BEAM
TOP OF
TEMPERED GLASS
THRESHOLD
THICK
TELEPHONE
TOILET
SUSPENDED
STRUCTURAL
STORAGE
STEEL
STANDARD
STAINLESS STEEL
STAIN
SQUARE
SPRAYED FIRE RESISTIVE MATERIAL
SPECIFICATION
SOUND TRANSMISSION CLASS
SIMILAR
SHEET METAL
SEMI-GLOSS PAINT
SECTION
SCHEDULE
SOLID CORE WOOD
SEALED CONCRETE
RUBBER BASE
ROUGH OPENING
ROOM
RIGHT HAND REVERSE
RIGHT HAND
ROOF DRAIN
REVISIONS / REVISED
REQUIRED
REINFORCEMENT
REFERENCE
QUARRY TILE
PREFABRICATED
PRE-MOLDED JOINT FILLER
POUNDS / SQUARE INCH
POUNDS / SQUARE FOOT
POUNDS
PLYWOOD
PLATE
PLASTER OR PLASTIC
PARTITION
PANEL
PAIR
PAINT OR PRESSURE TREATED
POWER DISTRIBUTION UNIT
OVERHEAD
OSHA
OD
OPP
OW
OPNG
OH
OFGI
OFCI
OC
NFPA
NTS
NO (#)
NIC
MISC
MIN
MWP
MTL
MECH
MAX
MATL
MANUF
MGR
MO
MAS
LP
LVR
LONG
LTG
LT
LHR
LH.
LAV
LDG
LAM
KP
JST
JT
IRC
INT
INSUL
ID
IN
HVAC
HB
HORIZ
HM
HP
H
HGT
HDW
HR
HKS
GYP BD (GWB)
GYP
GOVT
GL
GP
GFGI
GFCI
GBF
GALV
GA
FV
FDN
FTG
FLUOR
FD
FLR
FF
FP
FIN
YD
WRO
WS
WRGB
W/O
WDW
WD
WCO
WC
W/
W
VTR
VCB
VCT
VEST
VERT
UNO
UNFIN
UL
UFC
TYP
TU
T/W
TOW
T/C
TOC
TOB
T/
TG
T'HOLD
THK
TEL
TOIL / TLT
SUSP
STRUCT
STOR
STL
STD
SS
ST
SQ
SFRM
SPEC(S)
STC
SIM
SHT MET
SGP
SECT
SCHED
SCW
SC
RB
RO
RM
RHR
RH
RD
REV
REQ'D
REINF
REF
QT
PRE-FAB
PMJF
PSI
PSF
LBS OR #
PLYWD
PL
PLAS
PART
PNL
PR
PT
PDU
OVHD
G-003
MAY BE REQUIRED FOR WORK TO BE PERFORMED.
DEMOLITION OR NEW WORK MAY NOT BE SOLELY INDICATED ON THEIR CORRESPONDING SHEETS, BUT 16.
LISTED ON DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS.
GOVERNMENT APPROVAL. CONTRACTOR SHALL ADD THESE TO THEIR SUBMITTAL REGISTER. PRODUCTS ALL PRODUCTS LISTED ON DRAWINGS AND NOT INDICATED IN SPECIFICATIONS SHALL BE SUBMITTED FOR 15.
PERSONS AND PROPERTY AS NECESSARY.
PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER TO AVOID ANY HAZARD TO THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND 14.
SPECIFICALLY NOTED OR SHOWN ON DRAWINGS.
DO NOT CUT INTO, REMOVE, OR ALTER ANY STRUCTURAL MEMBER OR FLOOR SYSTEM UNLESS IT IS 13.
ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.12.
MANUFACTURER'S STANDARDS.
PROVIDE THE MINIMUM EXPANSION, CONTRACTION, AND CONTROL JOINTS IN ALL WORK PER PRODUCT 11.
APPLIED.
NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION OPERATIONS SHALL BE 10.
DO NOT SCALE DRAWINGS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. 9.
AS ACCURATE. VERIFY EXISTING CONDITIONS THAT MAY AFFECT THE WORK PRIOR TO BID.
THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. DIMENSIONS AND PLANS ARE NOT WARRANTED 8.
MATERIALS AND RUBBISH.
THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF 7.
AGREEMENT.
ALL WORK NOTED "N.I.C." IS NOT MEANT TO BE PART OF THE CONSTRUCTION SCOPE OF WORK 6.
THE CONTRACTOR SHALL PROTECT ANY EXISTING, IN-PLACE, AND/OR NEW WORK.5.
WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION.
THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO 4.
SHALL NOT BE CONSTRUED TO EXCLUDE OTHER ITEMS NECESSARY OR IMPLIED THEREFROM.
THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS 3.
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO 2.
KEYNOTES APPLY TO ELEMENTS ON THE SHEET AS INDICATED, UNLESS NOTED OTHERWISE.
ALL PLANS, ELEVATIONS, SECTIONS, AND DETAILS FOR THAT SHEET, UNLESS NOTED OTHERWISE.
THE COMPLETE PLAN SET AND SPECIFICATIONS, UNLESS NOTED OTHERWISE. SHEET NOTES APPLY TO NOTES FOUND ON G-SHEETS, ARE GENERAL NOTES AND APPLY TO THE ENTIRE PROJECT TO INCLUDE 1.
RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE RESISTIVENESS, FIRE ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK THAT PENETRATE FLOORS, WALLS, OR ROOFING 29.
SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING.
ELECTRICAL AND PLUMBING WORK. ALL ACCESS PANELS SHALL BE CONCEALED AND LOCATIONS
PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, 28.
A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL INDICATED. 27.
DETAILS.
REVIEWED AND NOTES ON INDIVIDUAL SHEETS SHALL BE APPLIED TO RELATED DRAWINGS AND
NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE 26.
AND REGULATORY AGENCIES.
THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, 25.
THE CONTRACTOR SHALL COMPLY WITH INSTALLATION POLICIES AND PROCEDURES.24.
AUTHORITIES HAVING JURISDICTION.
THE CONTRACTOR SHALL OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM THE INSTALLATION 23.
IMMEDIATELY RESTORE POWER ONCE WORK IS COMPLETE AND SAFE CONDITIONS EXIST.
FOR BUILDING OCCUPANTS DURING NORMAL WORKING HOURS. THE CONTRACTOR SHALL
EXIST FOR BOTH THE CONTRACTOR AND BUILDING OCCUPANTS, THEN POWER SHALL BE RESTORED OUTSIDE NORMAL INSTALLATION WORKING HOURS WHEN POSSIBLE. IF SAFE WORKING CONDITIONS SPECIFICATIONS. ALL WORK REQUIRING POWER REMOVAL SHALL BE DONE IN A TIMELY MANNER AND
THE CONTRACTOR SHALL MAKE REQUESTS TO DISCONNECT POWER OR UTILITIES PER 22.
CLOSED ON GOVERNMENT HOLIDAYS. CONTACT THE C.O.R. FOR A LIST OF GOVERNMENT HOLIDAYS.
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) TWO WEEKS PRIOR. THE FACILITY WILL BE
HOURS OUTSIDE THE NORMAL RANGE REQUIRES COORDINATION AND APPROVAL FROM THE
NORMAL INSTALLATION WORKING HOURS WILL BE BETWEEN 0700-1700, MONDAY THROUGH FRIDAY. 21.
DRAWINGS AND REQUEST ADDITIONAL INFORMATION PRIOR TO BIDDING.
EXCEPTIONS TO THIS RULE AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW
LINE WORK. GRAY SCALE LINE WORK DENOTES EXISTING CONDITIONS. NOTE: THERE ARE
BEING INCLUDED IN THE WORK ARE GENERALLY SHOWN IN HEAVY (BOLD) LINE WEIGHT AND BLACK IN ORDER TO MORE CLEARLY DEPICT WORK BEING IDENTIFIED ON A DRAWING, ITEMS NOTED AS 20.
STRUCTURES AS NECESSARY TO FACILITATE THE WORK.
CONTRACTOR SHALL EITHER PROTECT OR RELOCATE ADJACENT ITEMS, EQUIPMENT, AND
TO PERFORM THE WORK AS AWARDED BY THE BASE BID, OPTION, OR CONTRACT MODIFICATION, THE 19.
DISPOSE OF DEMOLISHED AND WASTE MATERIALS OFF POST UNLESS OTHERWISE NOTED.18.
WITH C.O.R. AND FACILITY MANAGER.
CONTRACTOR SHALL COORDINATE PARKING, JOB TRAILER, STAGING AND OTHER NECESSARY SPACES 17.
ABBREVIATIONS
GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED
101 A AA 1
TYPE
WALL/ PARTITION
WARRANTY INFORMATION, FINISH SAMPLES, AND COLOR SAMPLES.
PRODUCT SPECIFICATIONS, INSTALLATION INSTRUCTIONS, ANY RELATED SHOP DRAWINGS,
APPROVAL. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING TYPES OF SUBMITTALS AT A MINIMUM:
PRODUCTS AND MATERIALS LISTED IN DRAWINGS SHALL BE SUBMITTED FOR GOVERNMENT 33.
INSTRUCTIONS. STORE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
INSTRUCTIONS. REQUIRED PREPARATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S PRODUCTS SHALL BE INSTALLED AND/OR APPLIED ACCORDING TO THE MANUFACTURER'S PRINTED 32.
STORAGE LOCATION AT THE END OF THE WORK DAY.
BUILDING AT THE END OF EACH WORKING DAY. THE C.O.R. WILL DETERMINED THE DUMPSTER
BUILDINGS AT THE START OF THE WORKING DAY. DUMPSTERS WILL BE MOVED AWAY FROM THE
PRIOR TO THE REQUIREMENT. DUMPSTERS WILL BE EMPTY EACH TIME THEY ARE PLACED NEAR
REQUEST. THE CONTRACTOR WILL MAKE REQUESTS IN WRITING TO THE C.O.R. AT LEAST TWO WEEKS
BUILDINGS. DUMPSTERS CAN BE LOCATED ALONG THE BUILDING DURING WORKING HOURS UPON
DUMPSTERS MUST COMPLY WITH UFC 4-010-01 DoD MINIMUM ANTI-TERRORISM STANDARDS FOR 31.
ATTENTION OF THE C.O.R. PRIOR TO PROCEEDING WITH THE WORK.
CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE
WORKMANSHIP, AS WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY
INDUSTRY OR MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND
ALL WORK SHALL BE DONE IN A WORKMAN LIKE MANNER. WORK SHALL CONFORM TO APPLICABLE 30.
G-004
A N
D S
H E
E T N
O T
E S
G E
N E
R A
L S
P E
C
IF
IC
A T
IO
N S
DOOR HARDWARE SPECIFICATIONS
PAINTING
ACOUSTICAL CEILING TILE
METAL SUSPENSION SYSTEM
COLD FORMED STRUCTURAL STEEL
SEALANTS
REQUIREMENTS.
PREPARE SURFACES AND INSTALL SEALANT PER MANUFACTURER'S 2.
SURFACES APPLIED, DEPTH OF JOINTS, AND WIDTH OF JOINTS.
SEALANTS SHALL BE APPROVED BY THE MANUFACTURER FOR THE TYPE OF 1.
FINISHES SHALL BE SELECTED BY C.O.R.7.
WITH TB SPLINE.
TYPE WITH INSTALLATION LOCK AND SAFE. CYLINDER TYPE SHALL BE YALE
PROVIDE CYLINDERS, CORES, AND KEYS (3) FOR NEW LOCKS. COORDINATE 6.
DOOR HANDLES SHALL BE LEVER TYPE AND BE ADA APPROVED.5.
HINGES SHALL BE SECURITY TYPE WITH NON -REMOVABLE PINS.4.
FEATURES AND COMPONENTS.
DOOR HARDWARE SHALL MEET OR EXCEED BHMA GRADE 1 FOR ALL 3.
DOOR HARDWARE SHALL BE STAINLESS STEEL. 2.
ALL DOOR HARDWARE SPECIFICATIONS SHALL BE SUBMITTED FOR APPROVAL. 1.
MILDEW. INCLUDES SAG RESISTANCE PERFORMANCE.
PANEL THAT PROVIDES RESISTANCE AGAINST THE GROWTH OF MOLD AND
SPECTRUM ANTIMICROBIAL ADDITIVE ON THE FACE AND BACK OF THE
30 YEAR LIMITED SYSTEM WARRANTY PERFORMANCE: CONTAINS A BROAD 14.
WITH A SOFT BRUSH & VACUUMED.
ABUSE RESISTANT, HIGH DURABILITY AND CAN BE CLEANED EASILY B.
BIOBASED PRODUCT THAT IS USDA CERTIFIED. A.
PANEL FEATURES: 13.
01350).
PUBLIC HEALTH’S (CDPH) STANDARD METHOD V1.1-2010 (CA SECTION
LOW-EMITTING PERFORMANCE, MEETS CALIFORNIA DEPARTMENT OF
VOC EMISSIONS: THIRD PARTY (GREENGUARD GOLD) CERTIFIED FOR 12.
RECYCLED CONTENT: UP TO 59%.11.
MODULAR SIZE: 24 BY 24 INCHES.10.
PANEL THICKNESS: 5/8 INCH.9.
SUSPENSION GRID/WIDTH: DX/DXL 15/16 INCH.8.
EDGE/JOINT DETAIL: SLT BEVELED REVEAL.7.
CAC: NOT LESS THAN 33.6.
NRC: NOT LESS THAN 0.55.5.
LR: NOT LESS THAN 0.84.4.
COLOR: FLAT WHITE 050.3.
PATTERN: LIGHT TEXTUREC.
FORM: 2, WATER FELTEDB.
TYPE: III, MINERAL BASE WITH PAINTED FINISHA.
FOR TYPE, FORM AND PATTERN AS FOLLOWS:
CLASSIFICATION: PROVIDE CEILING PANELS COMPLYING WITH ASTM E 1264 2.
“RADAR”.
BASIS OF DESIGN IS BASED ON THE FOLLOWING: USG INTERIORS, LLC, 1.
INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS.14.
SYSTEM CONSISTENT WITH INDUSTRY STANDARDS.
PROVIDE ALL ACCESSORIES NECESSARY FOR A COMPLETE AND USABLE 13.
PROVIDE SHADOW LINE WALL ANGLE MOLDING.12.
PROVIDE 4' HANGER SPACING.11.
PRE-STRETCHED, NOT LESS THAN 12-GAUGE.
HANGER WIRE: GALVANIZED CARBON STEEL, SOFT TEMPER, 10.
COLOR SHALL BE FLAT WHITE.9.
CLASS A FIRE RATING MINIMUM.8.
CROSS TEE HEIGHT: 1". 7.
".2
1MAIN TEE HEIGHT: 1 6.
" WIDE.16
15TEE PROFILE: NARROW FACE 5.
FINISH.
STANDARD CORROSION RESISTANT BAKED ON POLYESTER ENAMEL PAINT
AND CAP, EXPOSED SURFACES PREFINISHED IN MANUFACTURER'S
GALVANIZED COLD-ROLLED STEEL, MINIMUM G30 GALVANIZED STEEL BODY
COMMERCIAL QUALITY PRETREATED AND PAINTED HOT-DIPPED
DOUBLE WEB, MAIN AND CROSS TEES AS DEFINED BY ASTM C635,
COLD ROLLED STEEL SUSPENSION SYSTEM: NARROW FACE, CAPPED, 4.
STRUCTURE.
ENGINEERS 7-10: MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
CEILING SHALL COMPLY WITH ASCE/SEI AMERICAN SOCIETY OF CIVIL 3.
APPROVED ALTERNATE METHODS).
INSTALLED IN ACCORDANCE TO ASTM C636, ASTM E580 (INCLUDING
SEISMIC PERFORMANCE: SUSPENDED GRIDS AND CEILING PANELS SHALL BE 2.
“USG DONN BRAND DX/DXL 15/16" ACOUSTICAL SUSPENSION SYSTEM”.
THE BASIS OF DESIGN: IS BASED ON THE FOLLOWING: USG INTERIORS, LLC, 1.
ATTENUATION BATTS
FIBERGLASS INSULATION AND SOUND
RUBBER WALL BASE
ASTM E 662 SMOKE - 450 OR LESS4.
RUBBER, GROUP 1 -- SOLID, STYLE B - COVE
PRODUCTS SHALL MEET: ASTM F 1861 RESILIENT WALL BASE, TYPE TP 3.
" THICK. 8
1COLOR INTERGRATED RUBBER SHALL BE 2.
WALL BASE.
THE BASIS OF DESIGN FOR RUBBER WALL BASE IS ARMSTRONG 4" RUBBER 1.
PERCENT.
WATER VAPOR SORPTION, MAXIMUM BY WEIGHT: NOT MORE THAN 5 6.
ICC BUILDING CODE CONSTRUCTION CLASSIFICATION: ALL TYPES. 5.
ASTM E84.
FLAMESPREAD LESS THAN 25, SMOKE DEVELOPED LESS THAN 50 PER 4.
NONCOMBUSTIBLE PER ASTM E 136. 3.
SOUND ATTENUATION BATTS.
GLASS FIBER BATT TYPE, UNFACED. INCLUDES UNFACED SONOBATTS AND
BATT INSULATION: ASTM C 665, TYPE I, PREFORMED FORMALDEHYDE FREE 2.
CORNING ECOTOUCH KRAFT FACED BATT INSULATION.
THE BASIS OF DESIGN FOR FIBERGLASS INSULATION PANELS IS OWEN 1.
HM DOOR & DOOR FRAME SPECIFICATIONS
COLOR SELECTED BY CUSTOMER.
CONFORM TO ANSI A250.10. SITE PAINT DOORS WITH TWO FINISH COATS.
DOORS SHALL BE PRE-PRIMED BY THE MANUFACTURER. PRIMER SHALL 12.
DOORS AND FRAMES SHALL HAVE A G90 COATING.11.
WITH A SLIM STEEL TRIM.
GLAZING SHALL BE SECURITY TYPE. GLAZING POCKET SHALL BE 3/8" WIDE 10.
TO WALL FRAMING.
STUFF FRAMES FULL WITH MINERAL WOOL BEFORE PERMANENTLY SECURING 9.
INDICATED OTHERWISE.
DOORS SHALL BE 1 3/4" THICK. FRAMES SHALL BE 2" WITH A 2" HEAD UNLESS 8.
ACCORDANCE WITH SDI/DOOR A250.8.
INSTALL FRAMES IN ACCORDANCE WITH SDI/DOOR A250.11. HAND DOORS IN 7.
APPLICABLE REQUIREMENTS OF SDI/DOOR A250.8 AND SDI/DOOR A250.6.
PREPARE DOORS AND FRAMES FOR HARDWARE IN ACCORDANCE WITH THE
PROVIDE HARDWARE REINFORCING GAGES AS SPECIFIED IN SDI/DOOR A250.6. 6.
ANCHORS PER JAMB. SECURE FRAMES IN ACCORDANCE WITH SDI/DOOR 111.
CONSTRUCTION. PROVIDE HEAVY DUTY ANCHORS. PROVIDE AT LEAST 4
PROVIDE ANCHORS TO SECURE THE FRAME TO THE ADJOINING 5.
METAL.
WELDING CODE AND THE PRACTICE SPECIFIED BY THE PRODUCER OF THE
ACCORDANCE WITH THE RECOMMENDED PRACTICE OF THE STRUCTURAL
WELD STOPS AND RABBETS. GRIND WELDS SMOOTH. WELD FRAMES IN
CONTINUOUSLY WELD FRAME FACES AT CORNER JOINTS. CONTINUOUSLY 4.
SHAPES INDICATED, WITH WELDED CORNERS.
A250.8, LEVEL 4, EXCEPT OTHERWISE SPECIFIED. FORM FRAMES TO SIZES AND
PROVIDE STEEL FRAMES FOR DOORS. DOOR FRAMES SHALL MEET SDI/DOOR 3.
AND BOTTOM CAPS.
REINFORCEMENT. PROVIDE 7 GAUGE HINGE REINFORCEMENT. PROVIDE TOP
MEET DOOR PERFORMANCE LEVEL. PROVIDE 14 GAUGE CLOSER
FOAMED IN PLACE POLYURETHANE. PROVIDE STIFFENERS AS REQUIRED TO
PHYSICAL PERFORMANCE LEVEL A, MODEL 2 WITH CORE CONSTRUCTION OF
PROVIDE EXTRA HEAVY DUTY DOORS THAT MEET SDI/DOOR A250.8, LEVEL 3, 2.
POLYURETHANE CORE DOOR BY CECO.
" IMPERIAL 4
3APPROVAL. THE BASIS OF DESIGN FOR DOORS IS THE 1
ALL DOOR AND FRAME SPECIFICATIONS LISTED SHALL BE SUBMITTED FOR 1.
GYPSUM WALL BOARD (GWB) DRYWALL
DRYWALL SHALL HAVE A LEVEL 4 FINISH.6.
CHARACTERISTICS AND CORE COMBUSTIBILITY.
UL CLASSIFICATION AS TO FIRE RESISTANCE, SURFACE-BURNING 5.
THE INTERNATIONAL BUILDING CODE (IBC).
CLASSIFIED AS A CLASS A INTERIOR FINISH MATERIAL PER SECTION 803.1 OF 4.
MEET ASTM C1629 CLASSIFICATION FOR ABUSE-RESISTANT GYPSUM PANELS3.
" AND TYPE X GYPSUM WALLBOARD.8
5COMPLY WITH ASTM C1396 FOR 2.
BRAND AR FIRECODE X PANEL.
" THICK USG SHEETROCK 8
5THE BASIS OF DESIGN FOR DRYWALL SHALL BE 1.
SYSTEM CONSISTENT WITH INDUSTRY STANDARDS.
PROVIDE ALL ACCESSORIES NECESSARY FOR A COMPLETE AND USABLE 6.
JOINTS INDEPENDENTLY.
NON-LOAD-BEARING STEEL FRAMING MEMBERS. FRAME BOTH SIDES OF
DO NOT BRIDGE BUILDING CONTROL AND EXPANSION JOINTS WITH F.
INSTALL BRACING AT TERMINATIONS IN ASSEMBLIES.E.
ACCESSORIES, FURNISHINGS, OR SIMILAR CONSTRUCTION.
FIXTURES, EQUIPMENT SERVICES, HEAVY TRIM, GRAB BARS, TOILET
INSTALL SUPPLEMENTARY FRAMING, AND BLOCKING TO SUPPORT D.
LINE, WITH CONNECTIONS SECURELY FASTENED.
INSTALL FRAMING AND ACCESSORIES PLUMB, SQUARE, AND TRUE TO C.
C840 THAT APPLY TO FRAMING INSTALLATION.
GYPSUM BOARD ASSEMBLIES: COMPLY WITH REQUIREMENTS IN ASTM B.
STANDARD: ASTM C754.
INSTALL ACCORDING TO MANUFACTURER REQUIREMENTS AND A.
GENERAL INSTALLATION5.
INSTRUCTIONS.
SUBSTRATE CONDITIONS, AND MANUFACTURER'S WRITTEN INSTALLATION
CONDUCT PREINSTALLATION MEETING TO VERIFY PROJECT REQUIREMENTS,
AND REGULATIONS OF GOVERNMENT AGENCIES HAVING JURISDICTION.
OVER ALL FABRICATION AND ERECTION COMPLYING WITH PERTINENT CODES
CONTRACTOR PROVIDES EFFECTIVE, FULL-TIME QUALITY CONTROL B.
A VERIFIABLE CODE-COMPLIANCE PROGRAM.
INDUSTRY ASSOCIATION (SFIA) OR A SIMILAR ORGANIZATION THAT PROVIDES
WITH THE PRODUCT-CERTIFICATION PROGRAM OF THE STEEL FRAMING
DOCUMENTATION THAT FRAMING MEMBERS ARE CERTIFIED IN ACCORDANCE
CODE-COMPLIANCE CERTIFICATION OF STUDS AND TRACKS: PROVIDE A.
QUALITY ASSURANCE4.
WEB DEPTH: 3-5/8" AND 6". 3.
FLANGE SIZE: 1-1/4 INCHES .2.
KSI.
BASIS-OF-DESIGN PRODUCT: CLARKDIETRICH; PROSTUD/PROTRAK 33 MILS 33 1.
FIBERGLASS INSULATION BOARD
PLASTIC VAPOR BARRIER
SUBSTITUTE PRODUCTS SHALL MEET OR EXCEED BASIS OF DESIGN. 5.
APPROVED SEAM TAPE.
USE PRODUCTS FROM ONE MANUFACTURER AND MANUFACTURER 4.
A, B, & C.
PRODUCT MEETS OR EXCEEDS ALL REQUIREMENTS OF ASTM E1745 CLASS 3.
PRODUCT SHALL BE 10 MIL THICK AND MINIMUM 15'-0" WIDE. 2.
PRODUCTS MUST MEET REQUIREMENTS LISTED BELOW.
THE BASIS OF DESIGN SHALL BE THE PERMINATOR BY W.R. MEADOWS. 1.
VINYL COMPOSITE TILE (VCT)
STEEL BRIDGE CRANE SYSTEM
STEEL STORAGE CAGE
FINISH SHALL BE GRAY ACRYLIC ENAMEL.6.
VERTICAL STIFFENERS.
CONSTRUCTED OF SAME WIRE AS PANELS, BUT WITH HORIZONTAL AND
DOOR SHALL BE 5'- 0" WIDE WITH 8'-0" HEIGHT. STANDARD PADLOCK LUG. 5.
ANCHORS.
ALL ERECTION HARDWARE SHALL BE SUPPLIED TO INCLUDE FLOOR 4.
BASE PLATES.
POSTS SHALL BE 2" X 2" X 14 GAUGE STEEL TUBING WELDED TO 2" X 7" X 1/4" 3.
STEEL ANGLE FRAME.
X 1" RECTANGULAR MESH AND SECURELY WELDED TO A 1-1/4" X 1-1/4" X 1/8"
PANELS SHALL BE CONSTRUCTED OF 10 GAUGE STEEL WIRE WOVEN INTO 2" 2.
STYLE 840 PANELS AND DOORS.
THE BASIS OF DESIGN FOR THE STEEL STORAGE SYSTEM IS WIRE CRAFTERS 1.
MEASURED FROM THE FLOOR TO THE HOIST TROLLEY SHALL BE 10'-0".
POSTS. THE RUNWAY LENGTH SHALL BE 30'-0" MINIMUM. THE CLEARANCE AS
THE BRIDGE LENGTH SHALL BE 15'-0" AND FIT BETWEEN THE EXISTING WOOD 10.
OPERATED WITHIN THE SPACE.
CRANE MANUFACTURER PRIOR TO ASSURE SYSTEM WILL FIT AND CAN BE
CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS WITH BRIDGE 9.
TROLLEY TRACK AND INSTALL POWER TO HOIST.
NOTE: CUSTOMER WILL RE-USE EXISTING HOISTS. MOUNT ONE HOIST ON 8.
SECURE THREADED ROD INTO CONC WITH HILTI HIT-RE.
NUTS. EMBEDDED THREADED ROD A MIN. OF 6" INTO EXISTING CONCRETE.
INSTALL STRUCTURAL POSTS WITH 3/4" THREADED ROD, WASHERS, AND 7.
RUNWAY LENGTH.
INCLUDE ENOUGH FLAT ELECTRIC CABLE FOR BOTH THE BRIDGE AND 6.
OR MH27.2 BY AN INDEPENDENT THIRD PARTY PROFESSIONAL ENGINEER.
SYSTEM SHALL BE MMA-CERTIFIED THAT MEETS OR EXCEEDS ANSI MH27.1 5.
SYSTEM SHALL BE A FREE STANDING THAT MEETS OR EXCEEDS ANSI B30.11.4.
ON ROLLING SURFACES.
ENCLOSED TRUSSED STEEL TRACK DESIGN TO ELIMINATE DIRT AND DUST 3.
ACCESSORIES FOR A COMPLETE AND USABLE SYSTEM.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ITEMS AND 2.
THE GORBEL GLCS-FS-2000-15-S-43-10.
THE BASIS OF DESIGN FOR THE STEEL CRANE BRIDGE SYSTEM SHALL BE 1.
TAPE JOINTS IN PANELS FOR A CONTINUOUS VAPOR BARRIER.6.
INSTALL SECURING PINS ACCORDING TO MANUFACTUER'S INSTRUCTION. 5.
SPREAD INDEX 25 AND SMOKE DEVELOPED INDEX 50.
SURFACE BURNING CHARACTERISTICS PER UL 723 ASTM E84: FLAME 4.
SUPPORT MOLD GROWTH.
CLEANABLE, WRINKLE-RESISTANT, RESISTS WATER STAINING, AND DOESN'T
PANELS SHALL HAVE A POLYMER FILM JACKET THAT IS SMOOTH, DURABLE, 3.
PANELS SHALL BE 4" THICK.2.
MANVILLE INSUL-SHIELD I/S 300 WITH FSK FACE..
THE BASIS OF DESIGN FOR FIBERGLASS INSULATION PANELS IS JOHNS 1.
EXISTING ROOF SYSTEM
INSTALL ACCORDING TO MANUFACTURER'S PRINTED INSTRUCTIONS.8.
MANUFACTURER'S APPROVED PRODUCTS.
PREPARATION PRODUCTS FROM ONE MANUFACTURER OR
USE A FLOOR SYSTEM TO INCLUDE TILES, ADHESIVES AND FLOORING 7.
INSTALLED ACCORDING TO FLOOR MANUFACTURER'S INSTRUCTIONS.
PRODUCT SHALL HAVE A 10 YEAR COMMERCIAL WARRANTY WHEN 6.
TESTED BY ASTM D2047/ UL 410.
STATIC COEFFICIENT OF FRICTION IS GREATER THAN OR EQUAL TO 0.5 AS 6.
TILE MEETS ASTM E 648 FOR CLASS 1 FLAME SPREAD. 5.
TILE MEETS ASTM E 662 WITH 450 OR LESS SMOKE EVOLUTION.4.
TILE MEETS OR EXCEED ASTM F 1066.3.
TILE DIMENSIONS SHALL BE 12" X 24".2.
RAFFIA STREAM WITH DIAMOND 10 TECHNOLOGY VCT.
THE BASIS OF DESIGN SHALL BE ARMSTRONG FLOORING PREMIUM EXCELON 1.
INSTALL ACCORDING TO MANUFACTURER'S PRINTED INSTRUCTIONS. 6.
COMPLETION.
LEAKS FOR NO LESS THAN 3 YEARS FROM THE DATE OF SUBSTANTIAL
THE CONTRACTOR SHALL WARRANT ROOF TOP PENETRATIONS AGAINST 5.
ROOF TOP HOODS, INTAKES, EXHAUSTS, UNITS, ETC.
CONTRACTOR SHALL PROVIDE A MINIMUM OF A 6" CURB HEIGHT FOR ALL
REGARDLESS OF THE ROOFING MANUFACTURER'S STANDARD DETAILS, THE 4.
PRODUCTS ACCEPTABLE FOR USE WITH A 25 YEAR WARRANTY SYSTEM.
FLASHING SHALL BE THE EPDM MANUFACTURER'S STANDARD DETAILS AND 3.
FLASHING, ETC.
MANUFACTURER'S 90 MIL EPDM, TAPES, ADHESIVES, PRE-FORMED
PENETRATIONS SHALL BE APPROPRIATELY FLASHED USING A SINGLE 2.
COVER BOARD.
6" OF INSULATION WITH A VAPOR BARRIER AGAINST THE ROOF DECK AND A
THE EXISTING ROOF SYSTEM IS A 90 MIL EPDM ROOF OVER APPROXIMATELY 1.
REINSTALLED AND THEIR LOCATIONS.
FOR REINSTALLATION. THE CUSTOMER WILL DIRECT WHICH ITEMS WILL BE
WALLS (PICTURES, POSTERS, SIGNAGE, TACKBOARDS, ETC). STORE ITEMS
THE CONTRACTOR SHALL REMOVE ITEMS NOT PERMANENTLY MOUNTED TO 6.
AND PAINT PEELING SURFACES.
COATINGS ARE APPLIED THEN THE CONTRACTOR SHALL RE-SCRAPE, PRIME
IF EXISTING PAINTED SURFACES PEEL BACK AFTER NEW PRIMER OR PAINT 5.
PAINTING.
PREPARATION SHALL BE INSPECTED BY THE C.O.R. PRIOR TO PRIMING AND
ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS. SURFACE
THE CONTRACTOR SHALL PREPARE SURFACES AND APPLY PAINT 4.
THE APPLICATION TYPE.
SHALL MEET MASTER PAINTERS INSTITUTE (MPI) NUMBER ACCORDING TO
UNLESS SPECIFICALLY NOTED IN PLANS OR SPECIFICATIONS, THEN PAINTS 3.
CATALOG AND SHEEN TYPES TO THE C.O.R. FOR SELECTION.
THE CONTRACTOR SHALL PROVIDE MANUFACTURER'S STANDARD COLOR 2.
INDICATED ON PLANS UNLESS STATED OTHERWISE.
SHALL APPLY A MINIMUM OF TWO TOPCOATS OF PAINT TO SURFACES
PAINTED SURFACES WHERE BARE MATERIAL IS SHOWING. THE CONTRACTOR
PRIME BARE SURFACES TO RECIEVE PAINT. SPOT PRIME PREVIOUSLY 1.
D
2 3
C
4 5
A
B
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
G-005
SCALE : N.T.S.
N
A1
PROJECT LOCATION: BLDG 332
C O
V E
R E
D D
O C
K
ROOM 5 ROOM 4 ROOM 3 ROOM 2 ROOM 1
MOVING NOTES SPECIAL MOVING INSTRUCTIONS- OGP PRODUCTS
M O
V
IN
G R
E Q
U
IR
E M
E N
T S
A N
D E
Q U
IP
M E
N T
P R
O J E
C T L
O C
A T
IO
N ft -2 /4 i n
499ft-10 1/2 in
OFFICE. RESTROOM FACILITIES ARE AVAILABLE IN ROOM 2.
NOTE: SPACE IS AVAILABLE IN ROOM 3 FOR THE CONTRACTOR TO HAVE A FIELD
SPECIAL MOVING INSTRUCTIONS- MAHR PRODUCTS
D
2 3
C
4 5
A
B
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
ENTRANCE CAPABILITY. CONTAINER SIZE SHALL BE 40" X 48" X 45".
ATTACHED, PLASTIC TOP, AND PLASTIC PALLET/BASE WITH FOUR-WAY
CORRUGATED, Z-FOLD SLEEVE WITH 8 LOCKING CLIPS CONVENIENTLY
S.U.R.E. PAK COMPONENTS INCLUDE A HEAVY-DUTY TRIPLE WALL
CONTAINERS TO BUILDING 332 AND THE CUSTOMER WILL UNPACK THEM.
CUSTOMER TO PACK. THE CONTRACTOR WILL MOVE THE PACKED
THE CONTRACTOR SHALL PROVIDE (10) S.U.R.E. PAK CONTAINERS FOR 9.
PROCESS.
SHALL INSURE ALL ITEMS AGAINST DAMAGE DURING THE MOVING
DOCUMENT THE CONDITION OF ITEMS TO BE MOVED. THE CONTRACTOR
MISCELLANEOUS ITEMS WITH CARE. THE CONTRACTOR SHOULD
THE CONTRACTOR SHALL MOVE EQUIPMENT, FURNITURE, AND 8.
CARRIED DOWN THE STAIRS TO GET THEM OUT OF THE BUILDING.
ARE FIVE 12'-0" LONG TABLE TOPS THAT WILL NEED TO BE HAND
THE MAJORITY OF EQUIPMENT WILL FIT INTO THE ELEVATORS. THERE 7.
THAT RANGE IN WEIGHT FROM 1,000-4,000 LBS.
THERE ARE APPROXIMATELY 20 PIECES OF FURNITURE OR EQUIPMENT 6.
WITH AN OVERHEAD ROLL-UP FOR ACCESS.
BLDG 131 HAS A VEHICULAR RAMP DOWN TO THE BASEMENT LEVEL 5.
THE INTERNAL CAB HEIGHT GREATER THAN 8'-0".
4'-0" WIDE X 7'-0" HEIGHT. THE DEPTH OF THE ELEVATOR IS 8'-0" WITH
5,000 LB WEIGHT LIMIT. THE ELEVATOR DOOR OPENING CLEARANCES:
TO INCLUDE THE BASEMENT. THE ELEVATOR IS A KONE BRAND WITH A
131. THERE IS ONE CENTRAL ELEVATOR THAT ACCESSES ALL FLOORS
THE CURRENT ITEMS ARE LOCATED ON THE SECOND FLOOR OF BLDG 6.
332.
BLDG 131 IS APPROXIMATELY 0.75 MILES (LESS THAN 1 MILE) FROM BLDG 5.
AND THE NEW HVAC SYSTEM HAS PASSED ALL TESTING REQUIREMENTS.
ITEMS SHALL NOT BE MOVED UNTIL ALL CONSTRUCTION IS COMPLETE 4.
EQUIPMENT FLOOR PLAN FOR ADDITIONAL DETAILS.
SOME EQUIPMENT LOCATIONS HAVE BEEN PRE -DETERMINED. SEE
THE FINAL ITEM LOCATIONS WITHIN BLDG 332 WILL TBD BY CUSTOMER. 3.
BLDG 332.
AND MISCELLANEOUS LISTED IN THIS PROJECT FROM BUILDING 131 TO
THE CONTRACTOR IS REQUIRED TO MOVE THE EQUIPMENT, FURNITURE, 2.
BLDG 332.
CONSTRUCTION WORK IS PRIMARILY LOCATED IN ROOMS 2 & 3 WITHIN 1.
EQUIPMENT WITH THE ORIGINAL MANUFACTURER.
MOVING TRUCK OR VEHICLE CAPABLE OF HANDLING THESE TYPES OF
THE CONTRACTOR COORDINATE THE CORRECT TYPE OF CUSHIONED 10.
CALIBRATE AND VERIFY THE GAGE AT THE NEW LOCATION.9.
UNINSTALL THE LOCKS/SHIPPING HARDWARE.8.
RECONNECT MACHINE CONTROL CABINET.7.
LAB SPACE.
AID IN THE POSITIONING AND LEVELING OF THE EQUIPMENT IN THE NEW 6.
LOCK DOWN AND SECURE X/Y/Z AXIS FOR MOVING.5.
DISCONNECT WIRING TO REMOVE CONTROL CABINET.4.
DATA RUN OFF ON THE SYSTEM IN THE PRESENT LOCATION.
PERFORM A2LA CALIBRATION, MAINTENANCE, AND A FOUND ARTIFACT 3.
THE FOLLOWING STEPS ON THE OGP QUEST 600 AND OGP QL-20 CMM.
MANUFACTURER OR THEIR DESIGNATED REPRESENTATIVE, TO PERFOR
THE CONTRACTOR SHALL HIRE THE ORIGINAL EQUIPMENT 2.
SETUP THE EQUIPMENT IN THE NEW LOCATION.
THE OGP QUEST 600 REQUIRES ADDITIONAL STEPS TO MOVE AND 1.
ITEMS AND HAVE THEM READY FOR THE CUSTOMER'S USE.
CONTRACTOR WILL HAVE ONLY 4 DAYS TO COMPLETE THE MOVE OF THESE
BE OUT OF SERVICE AND/OR USE FOR A TOTAL OF 4 DAYS. THE
THE OGP REQUIREMENTS NOTED ON THIS SHEET. THESE ITEMS SHALL ONLY
THE IN LAB SPACE SECOND. MOVING THESE ITEMS INCLUDES PERFORMING
THE CONTRACTOR WILL MOVE THE OGP PIECES OF EQUIPMENT INTO NOTE!18.
OF THESE ITEMS AND HAVE THEM READY FOR THE CUSTOMER'S USE.
4 DAYS. THE CONTRACTOR WILL HAVE ONLY 4 DAYS TO COMPLETE THE MOVE
THESE ITEMS SHALL ONLY BE OUT OF SERVICE AND/OR USE FOR A TOTAL OF
INCLUDES PERFORMING THE MAHR REQUIREMENTS NOTED ON THIS SHEET.
THE GRANITE TABLES INTO THE IN LAB SPACE FIRST. MOVING THESE ITEMS
THE CONTRACTOR WILL MOVE THE MAHR PIECES OF EQUIPMENT AND NOTE!17.
EQUIPMENT THAT WILL GET CALIBRATED IN PLACE.
SPACE. THE CUSTOMER INTENDS TO VERIFY THE FINAL LOCATIONS OF
COMPLETION, AND AT LEAST 4 WEEKS PRIOR TO MOVING ITEMS INTO THE
THE CUSTOMER REQUESTS ACCESS TO THE LAB SPACE AFTER SUBSTANTAIL 16.
BLDG 332. THE CUSTOMER WILL UNPACK SELF PACKED ITEMS.
INTO THE S.U.R.E. PAK CONTAINERS FOR THE CONTRACTOR TO MOVE TO
THE CUSTOMER WILL PACK PERSONAL ITEMS AND COMPUTERS FROM DESKS 15.
THE S.U.R.E. PAK CONTAINERS FOR THE CONTRACTOR TO MOVE.
THE CUSTOMER WILL PACK OPEN STORAGE FURNITURE LIKE SHELVING INTO 14.
FROM THE ELEVATOR TO THE OVERHEAD DOOR.
THE ELEVATOR THERE IS APPROXIMATELY ANOTHER 50' TO MOVE THE ITEMS
THE ELEVATOR FROM THE SECOND FLOOR IS APPROXIMATELY 160'. ONCE IN
THE MAXIMUM DISTANCE THE CONTRACTOR WILL HAVE TO MOVE ITEMS TO 13.
GAGE EQUIPMENT.
ON SIGHT DURING THE MOVING TO HELP DIRECT PLACEMENT OF SENSITIVE
CONDITIONS AND STEPS PRIOR TO RELOCATION. THE CUSTOMER MUST BE
IN ADVANCE. COORDINATION INCLUDES ITEMS REQUIRING SPECIAL MOVING
THE CONTRACTOR SHALL COORDINATE THE MOVE WITH THE C.O.R. 8 WEEKS 12.
MOVE.
TRACK ALL PIECES REMOVED, AND RE-ASSEMBLE FURNITURE AFTER THE
ELEVATOR. THE CONTRACTOR WILL DISASSEMBLE FURNITURE AS REQUIRED,
SOME OF THE FURNITURE WILL REQUIRE DISASSEMBLY TO FIT IN THE 11.
OPENING DURING MOVING AND MOVE THESE ITEMS FULLY BURDENED.
REMAIN FULL. THE CONTRACTOR WILL SECURE STORAGE FURNITURE FROM
FURNITURE PRIOR TO MOVING. MOST OF THE STORAGE FURNITURE WILL
ETC. NOTE: THE CUSTORMER WILL NOT REMOVE ALL ITEMS FROM STORAGE
STORAGE FURNITURE WILL DRAWERS THAT SECURE LIKE CABINETS, FILES,
THE CUSTOMER WILL REMOVE FRAGILE ITEMS AND EQUIPMENT FROM 10.
CUSTOMER DOES NOT NEED TO KEEP THE LOCKS.
MANUFACTURER WILL NEED TO SUPPLY REPLACEMENT MOVING LOCKS.
NOTE: THE MOVING LOCKS ARE MISSING. THE EQUIPMENT 12.
EQUIPMENT WITH THE ORIGINAL MANUFACTURER.
MOVING TRUCK OR VEHICLE CAPABLE OF HANDLING THESE TYPES OF
THE CONTRACTOR COORDINATE THE CORRECT TYPE OF CUSHIONED 11.
CALIBRATE AND VERIFY THE GAGE AT THE NEW LOCATION.10.
UNINSTALL THE LOCKS/SHIPPING HARDWARE.9.
RECONNECT MACHINE CONTROL CABINET.8.
SPACE.
AID IN THE POSITIONING AND LEVELING OF THE GAGE IN THE NEW LAB 7.
LOCK DOWN THE HEADSTOCK AND TAILSTOCK.6.
LOCK DOWN PARALLELOGRAM INSIDE THE HEADSTOCK.5.
DISCONNECT WIRING TO REMOVE CONTROL CABINET.4.
MOVE.
EQUIPMENT READINGS SHALL BE TAKEN ON BOTH GAGES BEFORE 3.
PLM600-2, (1) MAHR 8375, (2) MAHR 130B-24, AND (1) 130B-16.
PERFORM THE FOLLOWING STEPS ON THE (3) MAHR 828CiM, (1) MAHR
MANUFACTURER OR THEIR DESIGNATED REPRESENTATIVE, TO
THE CONTRACTOR SHALL HIRE THE ORIGINAL EQUIPMENT 2.
MOVE AND SETUP THE EQUIPMENT IN THE NEW LOCATION.
THE MAHR 828Cim AND MAHR PLM600-2 REQUIRE ADDITIONAL STEPS TO 1.
G-006
EQUIPMENT, FURNITURE, AND MISCELLANEOUS ITEMS TO BE MOVED FROM BLDG 131 TO BLDG 332
T O B
E M
O V
E D
F U
R N
IT
U R
E
A N
D I T
E M
S
IS
T O
F E
Q U
IP
M E
N T
D
2 3
C
4 5
A
B
D A
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J S
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
2 3
C
4 5
B
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G J
P R
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
SHEETNOTES
"=1'-0"8
1SCALE :
LEGEND
A1
HAZARDOUS MATERIAL PLAN
M A
T E
R
IA
L S P
L A
N
H A
Z A
R D
O U
S
N
H-101
LEAD BASED PAINT
WOOD POSTS.
SEE PHOTOS FOR AN EXAMPLE OF PEALING PAINT ON THE 3.
PAINT.
BASES FOR THE WOOD POSTS HAVE PEALING LEAD BASED
THE PAINTED METAL CORNER PROTECTOR'S AND THE METAL 2.
THE WOOD POSTS HAVE LEAD BASED PAINT ON THE WOOD. 1.
THEM THAT IS LEAD BASED PAINT.
WOOD POSTS ALSO HAVE PAINT ON
DETERIORATED. SEVERAL OF THE
PROTECTORS IS SEVERELY
THE PAINT ON THE METAL
PROTECTORS AND BASE PLATES.
ON THE METAL CORNER
LAB AREA HAVE LEAD BASED PAINT
27 WOOD POSTS WITHIN THE NEW
USED DAILY AS ACTIVE STORAGE AND WORK SHOP SPACE.
NOTE: THE ROOM IS ENTIRELY OPEN AND THE WESTERN PORTION IS
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
SHEETNOTES
S-101"=1'-0"8
1SCALE :
N
" WOOD POST2
1" X 72
" DEEP ROOF JOIST2
1" WIDE X 82
" DEEP BEAM2
1" WIDE X 112
A3
ELEVATION: TYPICAL POST, BEAM, AND ROOF JOIST
"=1'-0"2
1SCALE : 1
ELEVATION VIEW OF 8"X6" LLV ANGLEPLAN VIEW OF 8"X6" LLV ANGLE
" WOOD POST2
1" X 72
2 1/2 "
SHALL BE HOT DIPPED GALVANIZED
" X 7" LAG BOLTS. LAG BOLTS 8
3INSTALL (4)
GALVANIZED. SEE PLAN AND ELVATION FOR BOLT PLACEMENT.
8" X 6" LLV A36 STEEL ANGLE. STEEL SHALL BE HOT DIPPED
16'-0"
APPROXIMATELY 16'-0" FROM POST TO POST.
" DEEP BEAM; BEAMS SPANE2
1" WIDE X 112
A1
REINFORCEMENTS
PLAN: ROOM 3 STRUCTURAL
APPROXIMATELY 16' IN LENGTH.
SPAN ONLY FROM BEAM TO BEAM AND ARE
" DEEP ROOF JOIST. JOISTS2
1" WIDE X 82
ROOF JOIST. SECURE ROOF JOIST TO BEAM.
INSTALL (2) HTS16 SIMPSON TWIST STRAPS PER
EMBEDDED INTO A MASONRY POCKET
ALONG THE MASONRY WALL. JOISTS ARE
ROOF JOISTS DO NOT REQUIRE CONNECTORS
" 2"
/2
EXISTING STEEL BASE PLATE POST. SHIMS SHALL BE A36 GALVANIZED STEEL.
PLACE A FULL WIDTH SHIM BETWEEN ANGLE AND
45°
EXISTING ROOF DECK
WITH EPOXY ADHESIVE SUCH AS HILTI HIT-RE 500 V3
EMBED A MIN OF 4" INTO EXISTING CONCRETE. SECURE ROD
" HOT DIPPED GALVANIZED THREAD ALL ROD,4
3INSTALL (2)
STRAPS NOT SHOWN IN THIS DETAIL.
FRONT AND (2) STRAPS ON THE BACK. NOTE: BACK
CONNECTION. (2) STRAPS SHALL BE INSTALLED ON THE
INSTALL (4) MSTA18 STRAPS AT EACH BEAM AND POST
INSTALL STRUCTURAL CONNECTORS WITH ALL FASTENERS.5.
PRIME AND PAINT STRUCTURAL CONNECTORS.4.
LOAD RESISTANCE FACTORS OF THE LISTED CONNECTOR.
MUST MEET OR EXCEED THE UPLIFT, LATERAL, TENSION, ETC
CONNECTORS CAN BE SUBSTITUTED, BUT SUBSTITITIONS
STRUCTURAL CONNECTORS REPRESENT A BASIS OF DESIGN. 3.
MATERIALS.
SEE G-SHEETS FOR SPECIFICATION REQUIREMENTS OF 2.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS.1.
(4) KBS1Z SIMPSON KNEE BRACES.
NEW TIMBER TO EXISTING POST & BEAM WITH
S4S DOUGLAS FIR HEAVY TIMBER. CONNECT
CONDITIONS. INSTALL NEW 4"x8" #1 & BETTER
NOT SHOWN SEE PHOTO SHEETS FOR EXISTING
DEMOLISH EXISTING WOOD LATERAL BRACES;
FLOOR. SHIMS SHALL BE A36 GALVANIZED STEEL
PLACE A FULL WIDTH SHIM BETWEEN ANGLE AND
NEW LAB AREA.
JOISTS THAT WILL BE OUTSIDE THE
LINE. THIS INCLUDES THE ROOF
ON THE BEAMS FOR THIS COLUMN
SECURE ALL ROOF JOISTS RESTING
R E
IN
F O
R C
E M
E N
T S
S T
R U
C T
U R
A L
RESET POST TO PLUMB POSITION
POST HAS BEEN KNOCKED OUT OF PLUMB;
CONNECTORS ACCORDING DETAIL THIS SHEET.
11'-10". INSTALL A FOAM SILL AT BASE OF POST. INSTALL
DEPTH 24F-V4 GLULAM. POST HEIGHT IS APPROXIMATELY
" 2
1" WIDE X 72
1DEMOLISH EXISTING POST. INSTALL A NEW 5
POSITION
PLUMB; RESET POST TO PLUMB
POST HAS BEEN KNOCKED OUT OF
FROM THE MIDDLE OF ONE SUPPORT BEAM TO THE NEXT.
STRUCTURAL OR BETTER. ROOF JOISTS SHALL BE 16'-0" MINIMUM AND SPAN
NEW ROOF JOIST MATERIAL SHALL BE SOUTHERN YELLOW PINE DENSE SELECT
2X ROOF JOIST TO EXISTING ROOF JOIST WITH (3) #10 FASTENERS @ 16" O.C.
OF JOIST TO FIT ONTO BEAM AND SECURE WITH JOIST HANGER. SECURE NEW
INSTALL NEW JOISTS TIGHT AGAINST EXISTING ROOF JOISTS. NOTCH BOTTOM
INSTALL (4) 2X10 ROOF JOISTS FOR EACH EXISTING ROOF JOIST INDICATED.
FOR 2X10 CONNECTIONS
SECURED AT ALL JOINTS WITH SIMPSON WOOD STRUCTURAL CONNECTORS SIZED
2X10 MATERIAL TO MATCH NEW ROOF JOISTS. FRAMING CONNECTIONS SHALL BE
ROOF DECK SUPPORT FRAMING FOR HVAC ROOF TOP HOODS SHALL BE DOUBLED UP
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
KEYNOTES
SHEETNOTES
A-101"=1'-0"8
1SCALE :
D E
M O
L
IT
IO
N P
L A
N
C1
PLAN: DEMOLITION
N
TYP
TYP
HATCHED ROOMS ON PLAN ARE N.I.C. 2.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS.1.
7'-5 3/4 "
6'-0"
9'-3"
NEW LAB/STORAGE AREA.
HOUR FIRE WALL BETWEEN THE OFFICE SPACE AND THE
NOTE THAT THE EXISTING MASONRY WALL SERVES AS A 3 10.
DEMOLISH DOOR AND FRAME.9.
FOR NEW ADA RAMP.
DEMOLISH 4" OF EXISTING CONC SLAB IN PREPARATION 8.
DEMOLISH LOAD BEARING COLUMN. 7.
DEMOLISH NON-LOAD BEARING COLUMN.6.
DEMOLISH GYPSUM WALL SYSTEM.5.
104.
AND ADHESIVE BACK TO CONCRETE IN ROOMS 101, 103, &
DEMOLISH APPROXIMATELY 2900 SF OF 2' x 2' CARPET TILE 4.
IS 15'-0"
DEMOLISH CHAIN LINK CAGE MATERIAL. HEIGH OF FENCING 3.
ADDITIONAL REQUIREMENTS.
(6'-0" WIDE X 7'-0" HEIGHT). SEE SHEET A-102 FOR
DEMOLISH LOAD BEARING MASONRY WALL FOR NEW DOOR 2.
9'-5" HEIGHT).
DEMOLISH STORE FRONT WINDOW SYSTEM (7'-5" WIDE x 1.
IS USED DAILY AS ACTIVE STORAGE AND WORK SHOP SPACE.
NOTE: THE ROOM IS ENTIRELY OPEN AND THE WESTERN PORTION
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
KEYNOTES
SHEETNOTES
A-102"=1'-0"8
1SCALE :
N
N E
W W
O R
K P
L A
N
105106A
106B
A1
A
A
A
A4
A1
7'-10 3/4 "
14'-7 3/4 "
48'-1 3/4 "
/4
A1
PLAN: NEW WORK
6'-0"
TYP
A5
R00MS 100, 101, 103, & 104
FINISH AND NEW WORK NOTES
R00M 105 & 106
FINISH AND NEW WORK NOTES
TYP
R00M 107
FINISH AND NEW WORK NOTES
/2
A6
B2
A-501
DN
5'-0"
5'-6"
DN
INSTALLED IN ACCORDANCE WITH THE NFPA 101.
NEW PENETRATIONS THROUGH THE EXISTING FIRE WALL SHALL BE SEALED AND 4.
SEE SHEET A-501 FOR WALL TYPES.3.
SEE G-SHEETS FOR SPECIFICATION REQUIREMENTS OF MATERIALS. 2.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS.1.
SPACES AND THE LAB/STORAGE AREA.
EXISTING MASONRY WALL SERVES AS A 3 HOUR FIRE WALL BETWEEN THE OFFICE 7.
THE PRIMARY BACK UP WALL. SEE SECTION ON A-501 FOR DETAILS.
INSTALL WALL CHASE FOR RETURN AIR DUCTS AS AN INDEPENDENT WALL TYPE FROM 6.
DOOR. SEE G-SHEETS FOR SYSTEM REQUIREMENTS.
INSTALL A 12'-0" TALL SECURE STORAGE CAGE SYSTEM. PROVIDE A SLIDING TYPE 5.
THAN 4" MAX. FROM WOOD POSTS. SEE G SHEET FOR FULL CRANE SPECIFICATIONS.
STRUCTURAL POSTS WITH EXISTING WOOD POSTS. SET CRANE POSTS NO FURTHER
INSTALL 2-TON FREE STANDING STEEL BRIDGE CRANE SYSTEM. ALIGN CRANE 4.
STEEL STUD INFILL @ 16" O.C. PROVIDE R-11 SOUND ATTENUATION BATTS.
FILL OPENING TO MATCH EXISTING ADJACENT WALL. MATCH PAINT COLOR. SPACE 3.
#61 AND TWO TOP COATS OF PAINT.
MPI PATCH AND PROVIDE A LEVEL 4 FINISH ON THE EXISTING GWB. PRIME GWB WITH 2.
HOT DIPPED GALVANIZED SCHEDULE 80 PIPE.
STEEL AND MOUNTED TO THE WALL. HANDRAILS IN THE STORAGE AREA SHALL BE
HANDRAILS ON BOTH SIDES. HANDRAILS IN VESTIBULE 105 SHALL BE STAINLESS
A SMOOTH HARD TROWELLED FINISH. PROVIDE NFPA, ADA, AND IBC COMPLIANT
REINFORCED WITH 6 X 6 W2.1 X W2.1 WELDED WIRE FABRIC. CONCRETE SHALL HAVE
INSTALL ADA COMPLIANT LANDING AND RAMP. CONCRETE SHALL BE 3000 PSI AND 1.
DESIGN AND REQUIREMENTS.
INSTALL APPROXIMATELY 2,900 SF OF 12" X 24" VCT TILE. SEE G SHEETS FOR BASIS OF 1.
PRIME WALL WITH VAPOR BARRIER PAINT. APPLY TWO TOP COATS OF PAINT.3.
UNDERSIDE OF THE ROOF DECK BETWEEN THE ROOF JOISTS.
INSTALL APPROXIMATELY 750 SF OF 4" THICK FIBERGLASS INSULATION PANEL ON THE 2.
BEAMS, ROOF JOISTS, AND MISC. STRUCTURAL WOOD MEMBERS.
PRIME AND APPLY TWO TOP COATS OF PAINT TO UNDERSIDE OF ROOF DECK, POSTS, 1.
INSTALL 4" TALL RUBBER WALL BASE ON ALL WALLS.7.
PRIME WALLS WITH VAPOR BARRIER PAINT AND APPLY TO TOP COATS OF PAINT. 6.
FLOORING COLOR SHALL BE LIGHT GRAY WITH BLACK AND BLUE FLECKS.
OF EXISTING CONC FLOOR. SEE EPOXY FLOOR SYSTEM DESIGN BASIS THIS SHEET.
INSTALL AN INDUSTRIAL EPOXY TYPE FLOOR COATING TO APPROXIMATERLY 3,900 SF 5.
LESS THAN 2". SEE PHOTOS.
AND DAMAGE. THE AVERAGE REPAIR DEPTH FOR REPAIRS TO EXISITNG CONCRETE IS
MANUFACTURER'S PUBLISHED STANDARDS FOR THE TYPE OF EXISTING CONCRETE
INTERNATIONAL CONCRETE REPAIR INSTITUTES STANDARDS OR THE EPOXY FLOORING
CONCRETE FLOORING, ETC. REPAIRS SHALL BE MADE IN ACCORDANCE WITH THE
THE CONTRACTOR SHALL REPAIR 500 SF OF CHIPPED, CRACKED AND SPALLED 4.
CONCRETE.
BROOM FINISH TO MATCH THE HARD TROWELLED SURFACE OF THE ADJACENT
THE CONTRACTOR SHALL GRIND SMOOTH 1,000 SF OF EXISTING CONCRETE WITH A 3.
UNDERSIDE OF THE ROOF DECK BETWEEN THE ROOF JOISTS.
INSTALL APPROXIMATELY 3,900 SF OF 4" THICK FIBERGLASS INSULATION PANEL ON THE 2.
BEAMS, ROOF JOISTS, AND MISC. STRUCTURAL WOOD MEMBERS.
PRIME AND APPLY TWO TOP COATS OF PAINT TO UNDERSIDE OF ROOF DECK, POSTS, 1.
EPOXY FLOOR COATING SYSTEM BASIS OF DESIGN
MIN. TOP COAT DFT: 10 MIL.6.
MIN. PRIMER DFT: 8 MIL.5.
DECORATIVE BROADCAST COLOR QUARTZ SYSTEM.
PRIMER UNDER AN ARMOUR SEAL 650 SL/RC TOP COAT WITH ARMORQUARTZ
BASIS OF DESIGN FOR EPOXY FLOORING SHALL BE SHERWIN-WILLIAMS ARMORSEAL 33 4.
SUBSTRATES AND INSTALL ACCORDING OT MANUFACTURER'S INSTRUCTIONS.
STORE MATERIALS ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PREPARE 3.
APPROVED SYSTEM.
EPOXY FLOOR SYSTEM SHALL BE FROM ONE MANUFACTURER OR MANUFACTURER'S 2.
DECORATIVE QUARTZ AGGREGATE.
OF A TWO-PART EPOXY BASE PRIMER AND A TWO-PART EPOXY BASE TOP COAT WITH
THE CONTRACTOR SHALL INSTALL AN EPOXY FLOOR COATING SYSTEM THAT CONSISTS 1.
30'- 1/4 "
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
SHEETNOTES
A-103"=1'-0"8
1SCALE :
N
48'-1 3/4 "
/4
A1
PLAN: NEW WORK
/2
KEYNOTES
LISTED OTHERWISE.
SET SUSPENDED CEILING HEIGHTS AT 9'-0" AFF UNLESS 4.
AS INDICATED ON PLANS.
INSTALL A SUSPENDED CEILING SYSTEM IN ROOMS 100 & 106 3.
MATERIALS.
SEE G-SHEETS FOR SPECIFICATION REQUIREMENTS OF 2.
CONTRACTOR SHALL FIELD VERIFY DIMENSIONS.1.
FRONT SYSTEM MEETS THE INTERIOR DRYWALL.
SET THE SUSPENDED CEILING HEIGHT WHERE THE STORE 2.
CRANE SYSTEM.
TOP OF THE STRUCTURAL SUPPORTS FOR THE BRIDGE
THE SUSPENDED CEILING SHALL BE SET TIGHT AGAINST THE
LENGTH AND WIDTH OF THIS ENTIRE BAY. THE BOTTOM OF
ABOVE THE FINAL CRANE SYSTEM FOR THE RUN WAY
THE SUSPENDED CEILING SYSTEM WILL HAVE TO BE SET 1.
R E
F L E
C T
E D C
E
IL
IN
G P
L
N
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
A-104"=1'-0"8
1SCALE :
N
106A
106B
A1
PLAN: NEW WORK
EQUIPMENT NAME
1 2
WOOD WORK BENCH (34" X 60")10.
WOOD WORK BENCH (34" X 72")9.
MAHR 8375 (30" X 50")8.
MAHR PLM 600 (42" X 96")7.
BLACK GRANITE TABLE (48" X 72")6.
PINK GRANITE TABLE (48" X 72")5.
MAHR CiM 828 (130" x 64")4.
MAHR 437 PC (29" X 69")3.
OGP COMPARATOR (42" x 94")2.
OGP QUEST 600 (44" X 68") WITH WORK STATION (30"X38").1.
3'-0"
2'-0"
P L
A C
E M
E N
T P
L A
N
P R
O P
O S
E D E
Q U
IP
M E
N T
SHEET NOTES
CHANGE.
EQUIPMENT LOCATIONS WITHIN THE ROOM ARE SUBJECT TO 3.
MOVE TO VERIFY FINAL ITEM LOCATIONS.
THE CUSTOMER REQUIRES ACCESS TO SITE PRIOR TO THE 2.
PLAN FOR EQUIPMENT.
THE FOLLOWING PLAN REPRESENTS A PROPOSED FLOOR 1.
AS POSSIBLE TO THE CRANE POSTS
PLACE GRANITE TABLE CORNERS AS CLOSE
2 3
C
4 5
T E
A P
P R
M A
R K
D E
S C
R
IP
T
IO
N U
S
ARMY ARRISON
ROCKISA DARS
A
U B
E PL
RI
U S
U N
UM
S U
B M
IT
T E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
H J J
G
O J E
C T N
O
D R
A W
IN
G N
O
R O
C K I S
L A
N D
IL
-5
D
IR
E C
T O
R A
T E O
F P
U B
L
IC
W
O R
K S
U .S
A R
M Y G
A R
R
IS
O N R
O C
K I S
L A
N D A
R S
E N
A L
H J
U S
T
IC
E
R A
41 2 3 5
A
B
C
D
D R
A W
N B
Y
C H
E C
K E
D B
Y
-0
S
B A
C H
C H
IE
F O
F E
N G
IN
E E
R
-5
G
K O
S K I, A
C T
IN
G D
IR
E C
T O
R O
F P
U B
L
IC
W
O R
K S
A P
P R
O V
E D B
Y
T M
D E L
A B
C O
N S
T R
U C
T
B L
D G
M
A R
A-501
SHEETNOTES
KEY NOTES
"=1'-0"2
1SCALE :1
C1
SECTION: WALL TYPES A1-A5
B1
PLAN: WALL TYPE A1
CEILINGS SHALL BE SET AT 10'-0" AFF.3.
THE PEAK TO 13-10" NEAR THE SOUTH WALL.
THE INTERIOR ROOF DECK HEIGHT SLOPES FROM 15'-7" AT 2.
SEE G-SHEETS FOR PRODUCT SPECIFICATIONS. 1.
B1
A-501
B4
PLAN: DOOR DETAIL
"=1'-0"2
1SCALE :1 "=1'-0"2
1SCALE :1 "=1'-0"2
1SCALE :1
B4
A-501
B2
SECTION: DOOR DETAIL
D O
O R D
E T
A
IL
S
W A
L L T
Y P
E S A
"=1'-0"2
1SCALE :1
FOR THE RETURN AIR DUCT
PLACE (2) KICKERS, ONE AT THE CORNER OF THE CHASE 21.
12" TALL X 24" WIDE RETURN AIR GRILL20.
SEAL VAPOR BARRIER TO MASONRY WALL.
ATTACH VAPOR TO STUDS VIA DOUBLE SIDED BUTYL TAPE.
INSULATION TO SECURE TO EXISTING MASONRY WALL.
" STEEL STUD. CUT BACK EXISTING GWB AND 8
52" OR 319.
FINISHED VINYL J TRIM 18.
FLUSH TO MATCH THE INTERIOR WALL OF ROOM 102.
USE SALVAGED BRICK TO FINISH MASONRY DOOR OPENING 17.
AROUND STRUCTURAL MEMBERS.
OF 6" INTO EXISTING WALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .