This federal contract opportunity notice is for a design/build project to construct a Test, Measurement, and Diagnostic Equipment (TMDE) lab space at the Rock Island Arsenal in Rock Island, Illinois. The United States Army Contracting Command - Rock Island is requesting proposals for the project, which includes designing and building the TMDE lab in accordance with the provided Scope of Work, specifications, and drawings. The project has a total estimated value between $1,000,000 and $5,000,000, requires performance and payment bonds, and has been set aside as 100% small business. Proposals are due in accordance with DFARS 252.236-7001. The Department of the Army Materiel Command Joint Munitions Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21R5008 -- TMDE Lab -- Questions and Responses-2-REVISED.pdf | ||
| Amendment -- 21R5008-0004.pdf | ||
| Amendment -- 21R5008-0003.pdf | ||
| Amendment -- 21R5008-0002.pdf | ||
| 21R5008 -- TMDE Lab -- Questions and Responses-2.pdf | ||
| Amendment -- 21R5008-0001.pdf | ||
| 21R5008 -- TMDE Lab -- Questions and Responses.pdf | ||
| 21R5008 -- Site Visit Attendee List.pdf | ||
| Attachment 0007 -- 21R5008 -- Contract Vendor Guide.pdf | ||
| Attachment 0001 -- 21R5008 -- SOW.pdf | ||
| Attachment 0003 -- 21R5008 -- APPENDIX B PLANS.pdf | ||
| Attachment 0005 -- 21R5008 -- Site Visit Map.pdf | ||
| Attachment 0004 -- 21R5008 -- Davis Bacon Wage Determinations.pdf | ||
| Solicitation -- 21R5008.pdf | ||
| Attachment 0006 -- 21R5008 -- Access Control Record Check Request Form.pdf | ||
| Attachment 0007 -- 21R5008 -- Contract Vendor Guide.pptx | PPTX presentation |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rock Island Arsenal Specifications
PR #2020-5169
CONSTRUCT TMDE LAB SPACE
5 March 2021
APPENDIX A
US Army Garrison‐Rock Island Arsenal
Directorate of Public Works Engineering and Services Division
IMRI‐RIA‐PWF
1 Rock Island Arsenal
Rock Island, IL 61299‐5000
PR2020- 5169 CONSTRUCT TMDE LAB SPACE
APPENDI X A
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 45 00. 10 20 QUALI TY CONTROL FOR MI NOR CONSTRUCTI ON
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 73 29 CUTTI NG AND PATCHI NG
01 78 00 CLOSEOUT SUBMI TTALS
01 91 00. 15 10 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 83 13. 00 20 LEAD I N CONSTRUCTI ON
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
DI VI SI ON 09 - FI NI SHES
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 00. 00 40 FI RE- SUPPRESSI ON SPRI NKLER SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 15 COMMON PI PI NG FOR HVAC
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATI ON FOR HVAC CONTROL
23 11 20 FACI LI TY GAS PI PI NG
23 21 13. 00 20 LOW TEMPERATURE WATER ( LTW) HEATI NG SYSTEM
23 25 00 CHEMI CAL TREATMENT OF WATER FOR MECHANI CAL SYSTEMS
23 30 00 HVAC AI R DI STRI BUTI ON
23 31 13. 00 40 METAL DUCTS
23 36 00. 00 40 AI R TERMI NAL UNI TS
23 52 43. 00 20 LOW PRESSURE WATER HEATI NG BOI LERS ( UNDER 800, 000 BTU/ HR
OUTPUT)
23 64 26 CHI LLED, CHI LLED- HOT, AND CONDENSER WATER PI PI NG SYSTEMS
23 73 13. 00 40 MODULAR I NDOOR CENTRAL- STATI ON AI R- HANDLI NG UNI TS
PROJECT TABLE OF CONTENTS Page 1
23 82 00. 00 20 TERMI NAL HEATI NG UNI TS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS
25 08 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM TESTI NG
25 10 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM ( UMCS) FRONT END
AND I NTEGRATI ON
DI VI SI ON 26 - ELECTRI CAL
26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL
26 05 19. 10 10 I NSULATED WI RE AND CABLE
26 05 26. 00 40 GROUNDI NG AND BONDI NG FOR ELECTRI CAL SYSTEMS
26 05 71. 00 40 LOW VOLTAGE OVERCURRENT PROTECTI VE DEVI CES
26 09 23. 00 40 LI GHTI NG CONTROL DEVI CES
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 16. 00 40 PANELBOARDS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS UNDER 600 VOLTS
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 70 I NTERI OR FI RE ALARM SYSTEM, ADDRESSABLE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
05/11
PART 1 GENERAL
1. 1 SUMMARY
The Cont r act i ng Of f i cer may r equest submi t t al s i n addi t i on t o t hose speci f i ed when deemed necessar y t o adequat el y descr i be t he wor k cover ed i n t he r espect i ve sect i ons.
Uni t s of wei ght s and measur es used on al l submi t t al s ar e t o be t he same as t hose used i n t he cont r act dr awi ngs.
Each submi t t al i s t o be compl et e and i n suf f i c i ent det ai l t o al l ow r eady det er mi nat i on of compl i ance wi t h cont r act r equi r ement s.
The Cont r act or wi l l check and appr ove al l i t ems pr i or t o submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken. Pr oposed devi at i ons f r om t he cont r act r equi r ement s ar e t o be c l ear l y i dent i f i ed. I ncl ude wi t hi n submi t t al s i t ems such as: Cont r act or ' s, manuf act ur er ' s, or f abr i cat or ' s dr awi ngs; descr i pt i ve l i t er at ur e i ncl udi ng ( but not l i mi t ed t o) cat al og cut s, di agr ams, oper at i ng char t s or cur ves; t est r epor t s; t est cyl i nder s;
sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ; cer t i f i cat i ons; war r ant i es;
and ot her such r equi r ed submi t t al s.
Submi t t al s r equi r i ng Gover nment appr oval ar e t o be schedul ed and made pr i or t o t he acqui s i t i on of t he mat er i al or equi pment cover ed t her eby. Pi ck up and di spose of sampl es not i ncor por at ed i nt o t he wor k i n accor dance wi t h manuf act ur er ' s Mat er i al Saf et y Dat a Sheet s ( MSDS) and i n compl i ance wi t h exi st i ng l aws and r egul at i ons.
A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or when submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as " Appendi x A - Submi t t al Regi st er " .
1. 2 DEFINITIONS
1. 2. 1 Submi t t al Descr i pt i ons ( SD)
Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.
Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al s whi ch ar e r equi r ed pr i or t o or t he st ar t of t he next maj or phase of t he const r uct i on on a mul t i - phase cont r act , i ncl udes schedul es, t abul ar l i s t of dat a, or t abul ar l i s t i ncl udi ng l ocat i on, f eat ur es, or ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.
SD- 02 Shop Dr awi ngs
Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e
SECTI ON 01 33 00 Page 1 some por t i on of t he wor k.
Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .
Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.
SD- 03 Pr oduct Dat a
Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.
Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.
SD- 04 Sampl es
Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be judged.
Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .
Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds by whi ch t he ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es whi ch ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose whi ch wi l l be r emoved at concl usi on of t he wor k.
SD- 05 Desi gn Dat a
Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.
SD- 06 Test Repor t s
Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .
Repor t whi ch i nc l udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.
Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.
SD- 07 Cer t i f i cat es
SECTI ON 01 33 00 Page 2
St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .
Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qualifications.
SD- 08 Manuf act ur er ' s I nst r uct i ons
Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and ( MSDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.
SD- 10 Oper at i on and Mai nt enance Dat a
Dat a t hat i s f ur ni shed by t he manuf act ur er , or t he syst em pr ovi der , t o t he equi pment oper at i ng and mai nt enance per sonnel , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on necessar y t o mai nt ai n and i nst al l equi pment . Thi s dat a i s needed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.
Thi s dat a i s i nt ended t o be i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.
SD- 11 Cl oseout Submi t t al s
Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.
Submi t t al s r equi r ed f or Gui di ng Pr i nci pl e Val i dat i on ( GPV) or Thi r d Par t y Cer t i f i cat i on ( TPC) .
Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .
1. 2. 2 Appr ovi ng Aut hor i t y
Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .
1. 2. 3 Work
As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, except t hose SD- 01 Pr e- Const r uct i on Submi t t al s not ed above, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such construction.
SECTI ON 01 33 00 Page 3
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y.
Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al Regi st er ; G
1. 4 PREPARATION
1. 4. 1 Tr ansmi t t al For m
Use ENG For m 4025- R t o el ect r oni cal l y submi t bot h Gover nment appr oved and i nf or mat i on onl y submi t t al s i n accor dance wi t h i nst r uct i ons i n t hi s sect i on and t he i nst r uct i ons on t he r ever se s i de of t he f or m. These f or ms wi l l be f ur ni shed t o t he Cont r act or . Pr oper l y compl et e t hi s f or m by f i l l i ng out al l t he headi ng bl ank spaces and i dent i f y i ng each i t em submi t t ed. Exer ci se speci al car e t o ensur e pr oper l i s t i ng of t he speci f i cat i on par agr aph and sheet number of t he cont r act dr awi ngs per t i nent t o t he dat a submi t t ed f or each i t em. For m i s pr ovi ded at t he end of t hi s sect i on.
1. 4. 2 Sour ce Dr awi ngs f or Shop Dr awi ngs
The ent i r e set of Sour ce Dr awi ng f i l es wi l l not necessar i l y be pr ovi ded t o t he Cont r act or . Request s can be made, but f ul l f i l l ment of r equest ' s i s at t he gover nment ' s opt i on. Sour ce dr awi ngs r equi r e t he Cont r act or t o s i gn a non- di scl osur e agr eement .
1. 4. 2. 1 Ter ms and Condi t i ons
Dat a cont ai ned on t hese el ect r oni c f i l es must not be used f or any pur pose ot her t han as a conveni ence i n t he pr epar at i on of const r uct i on dat a f or t he r ef er enced pr oj ect . Any ot her use or r euse shal l be at t he sol e r i sk of t he Cont r act or and wi t hout l i abi l i t y or l egal exposur e t o t he Gover nment .
The Cont r act or must make no c l ai m and wai ves t o t he f ul l est ext ent per mi t t ed by l aw, any c l ai m or cause of act i on of any nat ur e agai nst t he Gover nment , i t s agent s or sub consul t ant s t hat may ar i se out of or i n connect i on wi t h t he use of t hese el ect r oni c f i l es. The Cont r act or must , t o t he f ul l est ext ent per mi t t ed by l aw, i ndemni f y and hol d t he Gover nment har ml ess agai nst al l damages, l i abi l i t i es or cost s, i ncl udi ng r easonabl e at t or ney' s f ees and def ense cost s, ar i s i ng out of or r esul t i ng f r om t he use of t hese el ect r oni c f i l es.
These el ect r oni c Sour ce Dr awi ng f i l es ar e not const r uct i on document s.
Di f f er ences may exi st bet ween t he Sour ce Dr awi ng f i l es and t he cor r espondi ng const r uct i on document s. The Gover nment makes no r epr esent at i on r egar di ng t he accur acy or compl et eness of t he el ect r oni c Sour ce Dr awi ng f i l es, nor does i t make r epr esent at i on t o t he compat i bi l i t y of t hese f i l es wi t h t he Cont r act or har dwar e or sof t war e. I n t he event t hat a conf l i c t ar i ses bet ween t he s i gned and seal ed const r uct i on document s pr epar ed by t he Gover nment and t he f ur ni shed Sour ce Dr awi ng f i l es, t he s i gned and seal ed const r uct i on document s gover n. The Cont r act or i s r esponsi bl e f or det er mi ni ng i f any conf l i c t exi st s. Use of t hese Sour ce Dr awi ng f i l es does not r el i eve t he Cont r act or of dut y t o f ul l y compl y wi t h t he cont r act document s, i ncl udi ng and wi t hout l i mi t at i on, t he need t o check, conf i r m and coor di nat e t he wor k of al l cont r act or s f or t he pr oj ect .
I f t he Cont r act or uses, dupl i cat es or modi f i es t hese el ect r oni c Sour ce
SECTI ON 01 33 00 Page 4
Dr awi ng f i l es f or use i n pr oduci ng const r uct i on dat a r el at ed t o t hi s cont r act , r emove al l pr evi ous i ndi c i a of owner shi p ( seal s, l ogos, s i gnat ur es, i ni t i al s and dat es) .
1. 5 QUANTI TY OF SUBMI TTALS
1. 5. 1 Number of Sampl es SD- 04 Sampl es
a. Submi t at l east t wo sampl es, or at l east t wo set s of sampl es showi ng r ange of var i at i on, of each r equi r ed i t em. One appr oved sampl e or set of sampl es wi l l be r et ai ned by appr ovi ng aut hor i t y and one wi l l be r et ur ned t o Cont r act or .
b. Submi t one sampl e panel or pr ovi de one sampl e i nst al l at i on wher e di r ect ed. I ncl ude component s l i s t ed i n t echni cal sect i on or as directed.
c. Submi t one sampl e i nst al l at i on, wher e di r ect ed.
d. Submi t one sampl e of non- sol i d mat er i al s.
1. 6 I NFORMATI ON ONLY SUBMI TTALS
Nor mal l y submi t t al s f or i nf or mat i on onl y wi l l not be r et ur ned. Appr oval of t he Cont r act i ng Of f i cer i s not r equi r ed on i nf or mat i on onl y submi t t al s.
The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o r esubmi t any i t em f ound not t o compl y wi t h t he cont r act . Thi s does not r el i eve t he Cont r act or f r om t he obl i gat i on t o f ur ni sh mat er i al conf or mi ng t o t he pl ans and speci f i cat i ons; wi l l not pr event t he Cont r act i ng Of f i cer f r om r equi r i ng r emoval and r epl acement of nonconf or mi ng mat er i al i ncor por at ed i n t he wor k;
and does not r el i eve t he Cont r act or of t he r equi r ement t o f ur ni sh sampl es f or t est i ng by t he Gover nment l abor at or y or f or check t est i ng by t he Gover nment i n t hose i nst ances wher e t he t echni cal speci f i cat i ons so pr escr i be.
1. 7 SUBMI TTAL REGI STER
The Cont r act or shoul d not e t hat pr oduct s r equi r i ng submi t t al s may al so be i ncl uded wi t hi n t he pl ans and SOW. Submi t t al i t ems i ncl uded on t he pl ans and SOW shal l be i ncor por at ed i nt o t he submi t al r egi st er . Pr epar e and mai nt ai n a submi t t al r egi st er pr i or t o wor k commenci ng, and updat e as t he wor k pr ogr esses. Do not change dat a whi ch i s out put i n col umns ( c) , ( d) , ( e) , and ( f ) as del i ver ed by Gover nment ; r et ai n dat a whi ch i s out put i n col umns ( a) , ( g) , ( h) , and ( i ) as appr oved. A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or whi ch submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as an at t achment . Thi s l i s t may not be al l i ncl usi ve and addi t i onal submi t t al s may be r equi r ed. The Gover nment wi l l pr ovi de t he i ni t i al submi t t al r egi st er i n el ect r oni c f or mat .
Ther eaf t er , t he Cont r act or i s t o t r ack al l submi t t al s by mai nt ai ni ng a compl et e l i s t , i ncl udi ng compl et i on of al l dat a col umns, i ncl udi ng dat es on whi ch submi t t al s ar e r ecei ved and r et ur ned by t he Gover nment .
1. 7. 1 Use of Submi t t al Regi st er
Submi t submi t t al r egi st er . Submi t wi t h QC pl an and pr oj ect schedul e.
Ver i f y t hat al l submi t t al s r equi r ed f or pr oj ect ar e l i s t ed and add mi ssi ng submi t t al s. Coor di nat e and compl et e t he f ol l owi ng f i el ds on t he r egi st er
SECTI ON 01 33 00 Page 5 submi t t ed wi t h t he QC pl an and t he pr oj ect schedul e:
Col umn ( a) Act i v i t y Number : Act i v i t y number f r om t he pr oj ect schedule.
Col umn ( g) Cont r act or Submi t Dat e: Schedul ed dat e f or appr ovi ng aut hor i t y t o r ecei ve submi t t al s.
Col umn ( h) Cont r act or Appr oval Dat e: Dat e Cont r act or needs appr oval of submi t t al .
Col umn ( i ) Cont r act or Mat er i al : Dat e t hat Cont r act or needs mat er i al del i ver ed t o Cont r act or cont r ol .
1. 7. 2 Cont r act or Use of Submi t t al Regi st er
Updat e t he f ol l owi ng f i el ds wi t h each submi t t al t hr oughout cont r act .
Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.
Col umn ( j ) Act i on Code ( k) : Dat e of act i on used t o r ecor d Cont r act or ' s r evi ew when f or war di ng submi t t al s t o QC.
Col umn ( l ) Li st dat e of submi t t al t r ansmi ssi on.
Col umn ( q) Li st dat e appr oval r ecei ved.
1. 7. 3 Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er
Updat e t he f ol l owi ng f i el ds.
Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.
Col umn ( l ) Li st dat e of submi t t al r ecei pt .
Col umn ( m) t hr ough ( p) Li st Dat e r el at ed t o r evi ew act i ons.
Col umn ( q) Li st dat e r et ur ned t o Cont r act or .
1. 7. 4 Copi es Del i ver ed t o t he Gover nment
Del i ver one copy of submi t t al r egi st er updat ed by Cont r act or t o Gover nment wi t h each i nvoi ce r equest .
1. 8 VARIATIONS
Var i at i ons f r om cont r act r equi r ement s r equi r e bot h Desi gner of Recor d ( DOR) and Gover nment appr oval wi l l be consi der ed wher e advant ageous t o Government.
1. 8. 1 Consi der i ng Var i at i ons
Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on, af t er consul t i ng wi t h t he DOR, wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s. When cont empl at i ng a var i at i on whi ch r esul t s i n l ower cost , consi der submi ssi on of t he var i at i on as a Val ue Engi neer i ng Change Pr oposal ( VECP) .
SECTI ON 01 33 00 Page 6
Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he Government.
1. 8. 2 Pr oposi ng Var i at i ons
When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on and why t he var i at i on i s desi r abl e and benef i c i al t o Gover nment , i ncl udi ng t he DOR' s wr i t t en anal ysi s and appr oval . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em.
Cl ear l y mar k t he pr oposed var i at i on i n al l document at i on.
Check t he col umn " var i at i on" of ENG For m 4025 f or submi t t al s whi ch i ncl ude pr oposed devi at i ons r equest ed by t he Cont r act or . Set f or t h i n wr i t i ng t he r eason f or any devi at i ons and annot at e such devi at i ons on t he submi t t al .
The Gover nment r eser ves t he r i ght t o r esci nd i nadver t ent appr oval of submi t t al s cont ai ni ng unnot ed devi at i ons.
1. 8. 3 War r ant i ng t hat Var i at i ons ar e Compat i bl e
When del i ver i ng a var i at i on f or appr oval , Cont r act or , i ncl udi ng i t s Desi gner ( s) of Recor d, war r ant s t hat t hi s cont r act has been r evi ewed t o est abl i sh t hat t he var i at i on, i f i ncor por at ed, wi l l be compat i bl e wi t h ot her el ement s of wor k.
1. 8. 4 Revi ew Schedul e Ext ensi on
I n addi t i on t o nor mal submi t t al r evi ew per i od, a per i od of 45 cal endar days wi l l be al l owed f or consi der at i on by t he Gover nment of submi t t al s wi t h variations.
1. 9 SCHEDULING
Schedul e and submi t concur r ent l y submi t t al s cover i ng component i t ems f or mi ng a syst em or i t ems t hat ar e i nt er r el at ed. I ncl ude cer t i f i cat i ons t o be submi t t ed wi t h t he per t i nent dr awi ngs at t he same t i me. No del ay damages or t i me ext ensi ons wi l l be al l owed f or t i me l ost i n l at e submi t t al s.
a. Coor di nat e schedul i ng, sequenci ng, pr epar i ng and pr ocessi ng of submi t t al s wi t h per f or mance of wor k so t hat wor k wi l l not be del ayed by submi t t al pr ocessi ng. Al l ow f or pot ent i al r esubmi t t al of r equi r ement s.
b. Submi t t al s cal l ed f or by t he cont r act document s wi l l be l i s t ed on t he r egi st er . I f a submi t t al i s cal l ed f or but does not per t ai n t o t he cont r act wor k, t he Cont r act or i s t o i ncl ude t he submi t t al i n t he r egi st er and annot at e i t " N/ A" wi t h a br i ef expl anat i on. Appr oval by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of suppl y i ng submi t t al s r equi r ed by t he cont r act document s but whi ch have been omi t t ed f r om t he r egi st er or mar ked " N/ A. "
c. Re- submi t r egi st er and annot at e mont hl y by t he Cont r act or wi t h act ual submi ssi on and appr oval dat es. When al l i t ems on t he r egi st er have been f ul l y appr oved, no f ur t her r e- submi t t al i s r equi r ed.
SECTI ON 01 33 00 Page 7
d. Car ef ul l y cont r ol pr ocur ement oper at i ons t o ensur e t hat each i ndi v i dual submi t t al i s made on or bef or e t he Cont r act or schedul ed submi t t al dat e shown on t he appr oved " Submi t t al Regi st er . "
1. 10 GOVERNMENT APPROVI NG AUTHORI TY
When appr ovi ng aut hor i t y i s Cont r act i ng Of f i cer , t he Gover nment wi l l :
a. Not e dat e on whi ch submi t t al was r ecei ved.
b. Revi ew submi t t al s f or appr oval wi t hi n schedul i ng per i od speci f i ed and onl y f or conf or mance wi t h pr oj ect desi gn concept s and compl i ance wi t h cont r act document s.
c. I dent i f y r et ur ned submi t t al s wi t h one of t he act i ons def i ned i n par agr aph REVI EW NOTATI ONS and wi t h mar ki ngs appr opr i at e f or act i on indicated.
Upon compl et i on of r evi ew of submi t t al s r equi r i ng Gover nment appr oval , st amp and dat e submi t t al s. A copy of t he submi t t al wi l l be r et ur ned t o t he Contractor.
1. 10. 1 Revi ew Not at i ons
Cont r act i ng Of f i cer r evi ew wi l l be compl et ed wi t hi n 14 cal endar days af t er dat e of submi ssi on. Submi t t al s wi l l be r et ur ned t o t he Cont r act or wi t h t he f ol l owi ng not at i ons:
a. Submi t t al s mar ked " appr oved" or " accept ed" aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed.
b. Submi t t al s mar ked " appr oved as not ed" or " appr oved, except as not ed, r esubmi t t al not r equi r ed, " aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed pr ovi ded he t akes no except i on t o t he cor r ect i ons.
c. Submi t t al s mar ked " not appr oved" or " di sappr oved, " or " r evi se and r esubmi t , " i ndi cat e noncompl i ance wi t h t he cont r act r equi r ement s or desi gn concept , or t hat submi t t al i s i ncompl et e. Resubmi t wi t h appr opr i at e changes. No wor k shal l pr oceed f or t hi s i t em unt i l r esubmi t t al i s appr oved.
d. Submi t t al s mar ked " not r evi ewed" wi l l i ndi cat e submi t t al has been pr evi ousl y r evi ewed and appr oved, i s not r equi r ed, does not have evi dence of bei ng r evi ewed and appr oved by Cont r act or , or i s not compl et e. A submi t t al mar ked " not r evi ewed" wi l l be r et ur ned wi t h an expl anat i on of t he r eason i t i s not r evi ewed. Resubmi t submi t t al s r et ur ned f or l ack of r evi ew by Cont r act or or f or bei ng i ncompl et e, wi t h appr opr i at e act i on, coor di nat i on, or change.
1. 11 DI SAPPROVED OR REJECTED SUBMI TTALS
Make cor r ect i ons r equi r ed by t he Cont r act i ng Of f i cer . I f t he Cont r act or consi der s any cor r ect i on or not at i on on t he r et ur ned submi t t al s t o const i t ut e a change t o t he cont r act dr awi ngs or speci f i cat i ons; not i ce as r equi r ed under t he FAR cl ause ent i t l ed CHANGES, i s t o be gi ven t o t he Cont r act i ng Of f i cer . Cont r act or i s r esponsi bl e f or t he di mensi ons and desi gn of connect i on det ai l s and const r uct i on of wor k. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at t he Cont r act or ' s expense.
SECTI ON 01 33 00 Page 8
I f changes ar e necessar y t o submi t t al s, make such r evi s i ons and submi ssi on of t he submi t t al s i n accor dance wi t h t he pr ocedur es above. No i t em of wor k r equi r i ng a submi t t al change i s t o be accompl i shed unt i l t he changed submi t t al s ar e appr oved.
1. 12 APPROVED/ ACCEPTED SUBMI TTALS
The Cont r act i ng Of f i cer ' s appr oval or accept ance of submi t t al s i s not t o be const r ued as a compl et e check, and i ndi cat es onl y t hat t he gener al met hod of const r uct i on, mat er i al s, det ai l i ng and ot her i nf or mat i on ar e satisfactory.
Appr oval or accept ance wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or any er r or whi ch may exi st , as t he Cont r act or under t he Cont r act or Qual i t y Cont r ol ( CQC) r equi r ement s of t hi s cont r act i s r esponsi bl e f or di mensi ons, t he desi gn of adequat e connect i ons and det ai l s , and t he sat i sf act or y const r uct i on of al l wor k.
Af t er submi t t al s have been appr oved or accept ed by t he Cont r act i ng Of f i cer , no r esubmi t t al f or t he pur pose of subst i t ut i ng mat er i al s or equi pment wi l l be consi der ed unl ess accompani ed by an expl anat i on of why a subst i t ut i on i s necessary.
1. 13 APPROVED SAMPLES
Appr oval of a sampl e i s onl y f or t he char act er i st i cs or use named i n such appr oval and i s not be const r ued t o change or modi f y any cont r act r equi r ement s. Bef or e submi t t i ng sampl es, t he Cont r act or t o assur e t hat t he mat er i al s or equi pment wi l l be avai l abl e i n quant i t i es r equi r ed i n t he pr oj ect . No change or subst i t ut i on wi l l be per mi t t ed af t er a sampl e has been appr oved.
Mat ch t he appr oved sampl es f or mat er i al s and equi pment i ncor por at ed i n t he wor k. I f r equest ed, appr oved sampl es, i ncl udi ng t hose whi ch may be damaged i n t est i ng, wi l l be r et ur ned t o t he Cont r act or , at hi s expense, upon compl et i on of t he cont r act . Sampl es not appr oved wi l l al so be r et ur ned t o t he Cont r act or at i t s expense, i f so r equest ed.
Fai l ur e of any mat er i al s t o pass t he speci f i ed t est s wi l l be suf f i c i ent cause f or r ef usal t o consi der , under t hi s cont r act , any f ur t her sampl es of t he same br and or make of t hat mat er i al . Gover nment r eser ves t he r i ght t o di sappr ove any mat er i al or equi pment whi ch pr evi ousl y has pr oved unsat i sf act or y i n ser vi ce.
Sampl es of var i ous mat er i al s or equi pment del i ver ed on t he s i t e or i n pl ace may be t aken by t he Cont r act i ng Of f i cer f or t est i ng. Sampl es f ai l i ng t o meet cont r act r equi r ement s wi l l aut omat i cal l y voi d pr evi ous appr oval s.
Cont r act or t o r epl ace such mat er i al s or equi pment t o meet cont r act requirements.
Appr oval of t he Cont r act or ' s sampl es by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of hi s r esponsi bi l i t i es under t he cont r act .
1. 14 WI THHOLDI NG OF PAYMENT
Payment f or mat er i al s i ncor por at ed i n t he wor k wi l l not be made i f r equi r ed appr oval s have not been obt ai ned.
SECTI ON 01 33 00 Page 9
1. 15 STAMPS
St amps used by t he Cont r act or on t he submi t t al dat a t o cer t i f y t hat t he submi t t al meet s cont r act r equi r ement s i s t o be s i mi l ar t o t he f ol l owi ng:
SECTI ON 01 33 00 Page 10
| CONTRACTOR |
| ( Fi r m Name) | | _____ Appr oved | | _____ Appr oved wi t h cor r ect i ons as not ed on submi t t al dat a and/ or | | at t ached sheet s( s) |
| SI GNATURE: __________________________________________________________ |
| TI TLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
SECTI ON 01 33 00 Page 11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 26 PAGES
PR 2020-5169 CONSTRUCT TMDE LAB SPACE APPENDIX A
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.9 GNotifications and Reports
1.9.2 GAccident Reports
1.9.3 GLHE Inspection Reports
SD-07 Certificates
1.5.1.5 GCrane Operators/Riggers
1.7 GActivity Hazard Analysis (AHA)
1.9.4 GCertificate of Compliance
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.2 GConstruction Site Plan
3.3.1 GTraffic Control Plan
01 73 29 SD-01 Preconstruction Submittals
1.4 GApproval Request
01 78 00 SD-03 Product Data
1.4.1 GWarranty(s)
SD-10 Operation and Maintenance Data
3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 26 PAGES
01 78 00 3.1 GAs-Built Drawings
3.3 GFinal DD FORM 1354
3.3 GChecklist for DD FORM 1354
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
1.7.1 GLead Commissioning Specialist
1.7.2 GTechnical Commissioning
Specialists
1.7 GCommissioning Firm's Contract
SD-06 Test Reports
3.1.4.2 GPre-Functional Checklists
1.8 FIOIssues Log
3.2 GCommissioning Report
3.3.1 GPost-Construction Trend Log
Report SD-07 Certificates
1.9 GCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.5 GSystems Manual
3.1.6 FIOMaintenance and Service Life
Plans SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
3.1.2.1 SFinal Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 26 PAGES
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
02 83 13.00 20 SD-01 Preconstruction Submittals
1.4.2.1 GLead Compliance Plan
1.4.1.1 GCompetent Person
SD-11 Closeout Submittals
3.4.2.1 Ghazardous waste manifest
03 30 00 SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.1 FIOFormwork Materials
2.3.1 FIOCementitious Materials
2.5 FIOReinforcement
2.3.3 FIOAdmixtures
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1 FIOFly Ash
1.6.3.1 FIOPozzolan
1.6.3.2 FIOSlag Cement
1.6.3.3 FIOAggregates
07 84 00 SD-03 Product Data
2.1 GFirestopping Materials
SD-07 Certificates
1.5.2 FIOInspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 26 PAGES
07 84 00 2.1 FIOFirestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 FIOPrimers
2.3 FIOBond Breakers
2.4 FIOBackstops
09 90 00 SD-03 Product Data
2.1 GCoating
SD-04 Samples
1.6 GColor
SD-08 Manufacturer’s Instructions
3.2.1 FIOApplication Instructions
3.3.2 FIOMixing
1.4.1 FIOManufacturer's Safety Data
Sheets 21 13 00.00 40 SD-02 Shop Drawings
2.2.2 GSupporting Elements
2.2.3 GSprinkler Heads
SD-03 Product Data
2.2.1 GAboveground Piping Materials
2.2.3 GSprinkler Heads
2.3 GMaterials
2.2.2 GSupporting Elements
2.1 GEquipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 26 PAGES
21 13 00.00 40 SD-05 Design Data Part 2 GDesign Analysis and Calculations
SD-06 Test Reports
3.3.6 GPressure Tests
3.3.3 GAir Tests
3.3.3 GDrainage Tests
22 00 00 SD-03 Product Data
3.5.1.1 GBackflow Prevention Assemblies
3.5.1 FIOPlumbing System
SD-06 Test Reports
3.5 FIOTests, Flushing and Disinfection
3.5.1.1 GTest of Backflow Prevention
Assemblies 23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GCoordination Drawings
SD-03 Product Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.4 GMiscellaneous Materials
2.5 GSupporting Elements
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 26 PAGES
23 05 15 3.1 GHydrostatic Tests
3.1 GAir Tests
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.3 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.5.2 GTAB Report for Season 1
1.5.5.2 GTAB Report for Season 2
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 26 PAGES
23 05 93 1.5.1 GIndependent TAB Agency and Personnel Qualifications
1.6.1 GDALT and TAB Submittal and
Work Schedule
1.6.1.2 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
1.6.1.1 GPre-field DALT Preliminary
Notification
1.6.1 GAdvanced Notice for Season 1
TAB Field Work
1.6.1 GPrerequisite HVAC Work Check
Out List For Season 1
1.6.1 GAdvanced Notice for Season 2
TAB Field Work
1.6.1 GPrerequisite HVAC Work Check
Out List For Season 2 23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3 FIOPipe Insulation Systems
3.2 FIOPipe Insulation Systems
3.3 FIODuct Insulation Systems
3.4 FIOEquipment Insulation Systems
2.3.1 SRecycled content for insulation
materials SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 26 PAGES
23 07 00 2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 26 PAGES
23 09 00 1.9.1 GPre-Construction Quality Control (QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
(O&M) Instructions
SD-11 Closeout Submittals
2.4 GEnclosure Keys
1.9.3 GCloseout Quality Control (QC)
Checklist 23 11 20 SD-03 Product Data
GPipe and Fittings
2.2 GGas Piping System
2.5 GPressure Regulators
2.3 GValves
SD-06 Test Reports
3.15 GTesting
3.15.1 GPressure Tests
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol 23 21 13.00 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 26 PAGES
23 21 13.00 20 1.3.1 FIOHot water heating system SD-03 Product Data
2.3.1 FIOPumps
2.3.2 FIOExpansion tanks
2.3.4 FIOBackflow preventers
2.3.3 FIOExternal air separation tanks
2.1.1 FIOHot water heating pipe
SD-06 Test Reports
3.3.1 FIOHydrostatic test of piping system
3.3.2 FIOAuxiliary equipment and
accessory tests SD-07 Certificates
1.5.3 FIOBackflow preventer certification
23 25 00 SD-03 Product Data
GWater Treatment System
2.3 GWater Analysis
1.6 FIOSpare Parts
FIOField Instructions
3.4 GTests
SD-10 Operation and Maintenance Data
FIOWater Treatment System 23 30 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 26 PAGES
23 30 00 2.8.1.1 FIOInsulated Nonmetallic Flexible Duct Runouts
2.8.1.1 FIODuct Connectors
2.8.2 GDuct Access Doors
2.8.3 GManual Balancing Dampers
2.8.5.1 FIODiffusers
2.8.5.2 FIORegisters and Grilles
2.8.6 FIOAir Vents, Penthouses, and
Goosenecks
2.8.1 FIOIndoor Air Quality for Duct
Sealants SD-06 Test Reports
3.11 GPerformance Tests
SD-08 Manufacturer’s Instructions
3.2 FIOManufacturer's Installation
Instructions
SD-11 Closeout Submittals
3.12 SIndoor Air Quality During
Construction 23 31 13.00 40 SD-01 Preconstruction Submittals
Part 2 GMaterial, Equipment, and Fixture Lists
SD-02 Shop Drawings
2.2.1 GOffset Fitting Configurations
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 26 PAGES
23 31 13.00 40 2.3.1 GGalvanized Steel Ductwork Materials
2.3.2 FIOBrazing Materials
2.3.3 FIOMill-Rolled Reinforcing and
Supporting Materials
2.2.1 GRound Sheet Metal Duct Fittings
2.2.2 GRound and Oval, High-Pressure, Double-Wall Sheet Metal Ducts
2.2.5 GTurning Vanes
2.2.7 GFlexible Connectors
2.2.10 FIOFlexible Duct Materials
2.2.11 GManual Volume Dampers
SD-06 Test Reports
3.4.1 GDuctwork Leakage Tests
SD-07 Certificates
2.3.1 FIOGalvanized Steel Ductwork
Materials
2.3.2 FIOBrazing Materials
2.3.3 FIOMill-Rolled Reinforcing and
Supporting Materials
2.2.1 FIORound Sheet Metal Duct Fittings
2.2.2 FIORound and Oval, High-Pressure, Double-Wall Sheet Metal Ducts
2.2.5 FIOTurning Vanes
2.2.6 FIODampers
2.2.7 FIOFlexible Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 26 PAGES
23 31 13.00 40 SD-11 Closeout Submittals
3.5.1 GRecord Drawings
23 36 00.00 40 SD-02 Shop Drawings
2.1.2 GFan-Powered Air Terminal Units
2.1.3 GShutoff Single-Duct Air Terminal
Units SD-03 Product Data
2.1.2 GFan-Powered Air Terminal Units
2.1.3 GShutoff Single-Duct Air Terminal
Units SD-07 Certificates
1.2.1 FIOList of Spare Parts
SD-10 Operation and Maintenance Data
3.3.1 FIOOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.3.1 FIORecord Drawings
23 52 43.00 20 SD-02 Shop Drawings
1.3.2.2 FIOFuel Train
1.3.2.2 FIOWiring Diagram
SD-03 Product Data
2.1 FIOBoilers
2.3 FIOBoiler Trim and Control
Equipment
2.2 FIOBurners and Control Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 26 PAGES
23 52 43.00 20 SD-06 Test Reports
3.3.1 FIOOperational Tests
SD-07 Certificates
2.1 FIOBoilers
2.2 FIOBurners and Control Equipment
2.3 FIOBoiler Trim and Control
Equipment SD-08 Manufacturer’s Instructions
2.1 FIOBoilers
SD-10 Operation and Maintenance Data
2.1 FIOBoilers
SD-11 Closeout Submittals
2.1 FIOBoilers
23 64 26 SD-03 Product Data
2.2.2.4 GGrooved Mechanical Connections
For Steel
2.3.3 GGrooved Mechanical Connections
For Copper
2.4.3 GCalibrated Balancing Valves
SD-06 Test Reports
3.3.2 GPressure Tests Reports
23 73 13.00 40 SD-03 Product Data
2.1 GEquipment and Performance
Data
1.3.2 GSample Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 26 PAGES
23 73 13.00 40 2.2.6.4 GAir Filter Gauges
3.3.2 GFinal Test Reports
SD-07 Certificates
1.3.1 GCertificates of Conformance
2.2.2 FIOUnit Cabinet
2.2.3 FIOFan
2.2.4 FIODrain Pans
2.1 FIOSpare Parts
SD-10 Operation and Maintenance Data
3.4.1 FIOOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.5 FIOWarranty
23 82 00.00 20 SD-03 Product Data
2.1 FIOUnit Heaters
SD-10 Operation and Maintenance Data
2.1 FIOUnit Heaters
25 05 11 SD-01 Preconstruction Submittals
3.1.2.2 GDevice Account Lock Exception
Request
1.8.1.4 GContractor Computer
Cybersecurity Compliance Statements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 26 PAGES
25 05 11 1.8.6 GContractor Temporary Network Cybersecurity Compliance Statements
SD-02 Shop Drawings
3.1.3.1 GUser Interface Banner Schedule
1.6.2 GNetwork Communication Report
1.6.5 GCybersecurity Riser Diagram
1.6.3 GControl System Inventory Report
1.6.1 GCybersecurity Interconnection
Schedule SD-03 Product Data
1.6.6 GControl System Cybersecurity
Documentation
SD-07 Certificates
1.7 GSoftware Licenses
SD-11 Closeout Submittals
3.5.2.2.4 GPassword Summary Report
1.6.4 GSoftware Recovery And
Reconstitution Images
3.2.2.1 GDevice Audit Record Upload
Software 25 08 10 SD-06 Test Reports
3.1 FIOUMCS and Building Level DDC
Testing Sequence
3.5 GPerformance Verification Test
3.6 FIOEndurance Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .