Attach 7_ ISRL 1659482 REPLACE POWER PLANT UPS.pdf
PDF 90 KB Posted
- Attached to
- Replace Power Plant UPS Federal contract opportunity
- Solicitation number
- N4008520B2527
About this file
This document outlines requirements for replacing the power plant uninterruptible power supply (UPS) system at Building 72 of the Portsmouth Naval Shipyard in Kittery, Maine. The project scope includes removing the existing UPS system and automatic transfer switch, and providing all labor, equipment, materials and supervision to install a new Eaton 9315 series UPS and matching automatic transfer switch. The Department of the Navy Naval Facilities Engineering Command issued solicitation number N4008520B2527 for this work. The contractor must submit an inventory of all other systems and equipment in the building to the government no less than 90 days before occupancy.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2_ PNSYDIV1 Specs 1282019.pdf | ||
| Attach 8_ Electrical Systems and Construction Standards PNSY.pdf | ||
| N40085-20-B-2527.pdf | ||
| Attach 5 1659482_B72_DBB Replace Power Plant UPS drawings signed.pdf | ||
| encl a-SOW Replace Power Plant UPS B72 1659482.pdf | ||
| Attach 3_ Tech Specs DIV 26 1659482.pdf | ||
| Attach 1_ Bid Form 1659482.pdf | ||
| Attach 6_ eOMSI WORKBOOK 1659482 REPLACE POWER PLANT UPS.pdf | ||
| Attach 4_ Submittal Reg 1659482.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT quantity INFORMATION / LOCATION removed replaced new to building not part of scope notes EQUIPMENT quantity
Powerware UPS System 1 UPS System in B72 Power Plant X Scheduled to be replaced (Eaton 9315) UPS Systems Automatic Transfer Switch UPS System 1 UPS System in B72 Power Plant X Replacing existing w/ new version. Sewage Lift Stations Catch Basins
NAVFAC Internal Services Requirements List Project Name (include BLDG#): Replace Power Plant UPS, Building 72 e‐Project# 1659482
Include in this report are Systems and Equipment not listed above including but not limited to;
**** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy***
CURRENT INVENTORY ‐ FILLED OUT BY GOVERNMENT INFORMATION ONLY FILLED OUT BY CONTRACTOR