ATT B Plans.pdf - Bridge Creek Wildlife Area Bridge Abutment Repairs
This file contains technical planning documents and exhibits for an Invitation to Bid (ITB) issued by the Oregon Department of Fish and Wildlife (ODFW) for bridge abutment repairs and road maintenance at the Bridge Creek Wildlife Area, located approximately 4 miles south of Ukiah in Union County, Oregon. The project scope includes concrete formwork installation, stabilization of the bridge's north side footing, reinforcing material additions, wing wall extensions, new concrete wall installations, and access road preparation involving a 6-inch compacted rock lift across approximately 1.25 linear feet. A mandatory pre-bid conference is scheduled for July 17, 2025, with sealed bid submissions due by August 5, 2025, at 2:00 PM Pacific time through the OregonBuys system. The project is scheduled to commence upon Notice to Proceed, with substantial completion required by September 28, 2025, and final completion by September 30, 2025.
The total project estimate is $125,000, with bid items structured across mobilization/permits/bonding, de-mobilization, bridge abutment repair, and access road repair categories. Funding is provided by the US Department of Fish and Wildlife Service and the Pittman-Robertson Wildlife Restoration Act. Contractors must comply with the Build America, Buy America Act, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. The project is subject to prevailing wage rates, including Davis-Bacon wages, and federal requirements for equal employment opportunity and debarment compliance. Liquidated damages of $500 per calendar day will apply for failure to meet the substantial completion deadline. Contractors must demonstrate environmental compliance capabilities, particularly regarding fish habitat protection, and utilize biodegradable and non-toxic materials with comprehensive erosion control and site restoration measures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .