Att_4_-_Delivery Schedule.XLS
XLS spreadsheet 28 KB Posted
- Attached to
- Workboat Docking
- Solicitation number
- N00024-21-R-2250
About this file
This draft solicitation and attachments provide details for a potential workboat contract opportunity with the Department of the Navy Naval Sea Systems Command. The draft solicitation indicates the Navy is seeking industry feedback on a draft RFP and attachments for the procurement of Harbor Security Boats. The attached delivery schedule outlines the required delivery timelines for the base contract and six option periods, specifying whether production would continue without interruption or include a break between the contract and option periods. Delivery is required within 330 days of contract award for the base order and initial option periods, and 60 days after the last boat for follow-on options. The schedule also provides standard definitions distinguishing uninterrupted production from periods requiring a break.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 10 Heeling Moment Calculation 17Sep2020.xlsx | XLSX spreadsheet | |
| Att 1 WBD CNRNW Spec 10Dec2020.pdf | ||
| Att 3 - WBD Vendor Provided Spare Parts List.xlsx | XLSX spreadsheet | |
| Att_8_-_CLIN Pricing Chart.xls | XLS spreadsheet | |
| Att_6_-_Unique_Item_Identification_(UID).doc | DOC document | |
| Att_5_- Technical Data Rights Assertion.doc | DOC document | |
| DRAFT N0002421R2250 Workboat Docking.pdf | ||
| Att 2 WBD Specification Response Matrix 7Dec2020.xlsx | XLSX spreadsheet | |
| Ref e_Att_1_WBD_CNRNW_Spec_DRAFT_for TWH review_12Nov2020.docx | DOCX document | |
| Att_7_-_Warranty Terms.doc | DOC document | |
| Att 11 - Past_Performance_Questionnaire.doc | DOC document | |
| Attachment Index.docx | DOCX document | |
| Att_9_-_Past_Performance_Information.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Delivery Schedule
| ATTACHMENT 4 | ||||
| Proposed Delivery Schedule Form | ||||
| BASE CONTRACT CLIN 1001 | ||||
| No. Boats | Destination | Required Delivery Schedule | Proposed Delivery Schedule | |
| 1 | TBD | 330 DAYS AFTER CONTRACT | ||
| 2 | TBD | 60 DAYS AFTER LAST BOAT | ||
| OPTION CLIN 2001 | ||||
| No. Boats | Destination | Required Delivery Schedule | ||
| NO BREAK in Production | Proposed Delivery Schedule |
NO BREAK in Production
| 1 | TBD | 30 DAYS AFTER LAST BOAT | |
| No. Boats | Destination | Required Delivery Schedule | |
| BREAK in Production | Proposed Delivery Schedule |
BREAK in Production
| 1 | TBD | 330 DAYS AFTER OPTION EXERCISE | |
| OPTION CLIN 3001 | |||
| No. Boats | Destination | Required Delivery Schedule | |
| NO BREAK in Production | Proposed Delivery Schedule |
NO BREAK in Production
| 1 | TBD | 30 DAYS AFTER LAST BOAT | |
| 2 | TBD | 30 DAYS AFTER LAST BOAT | |
| No. Boats | Destination | Required Delivery Schedule | |
| BREAK in Production | Proposed Delivery Schedule |
BREAK in Production
| 1 | TBD | 330 DAYS AFTER OPTION EXERCISE | |
| 2 | TBD | 60 DAYS AFTER LAST BOAT | |
| OPTION CLIN 4001 | |||
| No. Boats | Destination | Required Delivery Schedule | |
| NO BREAK in Production | Proposed Delivery Schedule |
NO BREAK in Production
| 1 | TBD | 30 DAYS AFTER LAST BOAT | |
| 2 | TBD | 30 DAYS AFTER LAST BOAT | |
| No. Boats | Destination | Required Delivery Schedule | |
| BREAK in Production | Proposed Delivery Schedule |
BREAK in Production
| 1 | TBD | 330 DAYS AFTER OPTION EXERCISE | |
| 2 | TBD | 60 DAYS AFTER LAST BOAT | |
| OPTION CLIN 5001 | |||
| No. Boats | Destination | Required Delivery Schedule | |
| NO BREAK in Production | Proposed Delivery Schedule |
NO BREAK in Production
| 1 | TBD | 30 DAYS AFTER LAST BOAT | |
| 2 | TBD | 30 DAYS AFTER LAST BOAT | |
| No. Boats | Destination | Required Delivery Schedule | |
| BREAK in Production | Proposed Delivery Schedule |
BREAK in Production
| 1 | TBD | 330 DAYS AFTER OPTION EXERCISE | |
| 2 | TBD | 60 DAYS AFTER LAST BOAT | |
| OPTION CLIN 6001 | |||
| No. Boats | Destination | Required Delivery Schedule | |
| NO BREAK in Production | Proposed Delivery Schedule |
NO BREAK in Production
| 1 | TBD | 30 DAYS AFTER LAST BOAT | |
| 2 | TBD | 30 DAYS AFTER LAST BOAT | |
| No. Boats | Destination | Required Delivery Schedule | |
| BREAK in Production | Proposed Delivery Schedule |
BREAK in Production
| 1 | TBD | 330 DAYS AFTER OPTION EXERCISE |
| 2 | TBD | 60 DAYS AFTER LAST BOAT |
| DEFINITIONS: | ||
| NO BREAK in Production: If an option is exercised before 120 days prior to delivery date of the last boat on contract. (Example: Last boat on current contract: 15 July 2019, option exercised any time before 15 April 2019 would be defined as a NO BREAK in production.) | ||
| BREAK in Production: If an option is exercised after 120 days prior to the delivery date of the last boat on contract (Example: Last boat on current contract delivery date is 15 July 2019, exercise of option any time after 14 April 2019 would be defined as a BREAK in production. Boat 1 of the new option would have a delivery date of 330 days after option exercise) |