ATT 13- KTR Work Surveillance Checklist - Placement or Removal Empty ROB or Vac Box.pdf

PDF 13 KB Posted

Attached to
Hazardous Waste Removal and Disposal at Camp Pendleton, CA Federal contract opportunity
Solicitation number
SP450020R0019
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to Hazardous Waste Removal and Disposal at Camp Pendleton, CA, newest first.
File Type Posted
ATT 1- Camp Pendleton PS AFFF CLINs 7.9.2020.xlsx XLSX spreadsheet
ATT 1- Camp Pendleton PS AFFF CLINs 7.6.2020.xlsx XLSX spreadsheet
ATT 1- Camp Pendleton PS AFFF CLINs 7.6.2020.xlsx XLSX spreadsheet
Pendleton Solicitation Questions 07.06.2020.docx DOCX document
ATT 1 - Camp Pendleton PS 6.26.20.xlsx XLSX spreadsheet
ATT 1 - Camp Pendleton PS 6.26.20.xlsx XLSX spreadsheet
ATT 16- UPDATED Master CLIN Catalog 6.19.2020.xlsx XLSX spreadsheet
ATT 1- UPDATED Camp Pendleton Price Schedule 6.19.2020.xlsx XLSX spreadsheet
ATT 1- Camp Pendleton PS 6.4.2020.xlsx XLSX spreadsheet
ATT 1- Camp Pendleton PS 6.3.2020.xlsx XLSX spreadsheet
Contractor Questions 6.2.2020.pdf PDF
ATT 16- Master CLIN Catalog 27 Jan 2020.xlsx XLSX spreadsheet
Responses to Questions 5.22.2020.docx DOCX document
ATT 15- 16D06 ERS EB Waste Disposal Tracking Detail.xls XLS spreadsheet
ATT 1- Camp Pendleton Price Schedule 5.22.20.xlsx XLSX spreadsheet
Responses to Questions 5.12.2020.docx DOCX document
ATT 11- Updated 30 Month Ordering History- SP450016D0006.xls XLS spreadsheet
ATT 11- 30 Month Order Summary Pendleton.rtf RTF text file
ATT 14- KTR Work Surveillance Checklist - ICS Work.pdf PDF
ATT 10- Facility-CLIN Assignment Sheet.xlsx XLSX spreadsheet
ATT 7- RejectedCylinders.pdf PDF
ATT 6- DISP_CylinderReferenceList_150701.xlsx XLSX spreadsheet
ATT 8- DL2511.pdf PDF
ATT 3- Certificate_of_Recycling.doc DOC document
ATT 1- Camp Pendleton Price Schedule.xlsx XLSX spreadsheet
ATT 4- WD 1996-0223 2.26.2020.pdf PDF
ATT 5- Compressed_Gas_Cylinders.doc DOC document
Solicitation SP450020R0019.pdf PDF
ATT 2-DL2505.pdf PDF
ATT 12- Pendleton Pick up Points.docx DOCX document
ATT 9- PPI Offeror Questionnaire Pendleton.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Placement or Removal of Empty Rented Rolloff Box (ROB) or Vacuum Box

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Contract Number: SP4500-______-D-___________ TO #: ________________ CLIN: ______________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) _______-___________ Ext.______

Yes No N/A Description of Contractor Work Surveillance: [ROB] or [Vac Box] (Circle one)

Did the truck driver arrive on site at the scheduled time and date?

Did the driver arrive on site with all of the requisite equipment, including

- One ROB or Vacuum Box container of the appropriately ordered size, with

- One plastic liner of sufficient size and thickness to adequately contain the waste for which it was intended (ROB only), and

- One watertight tarp cover that was generally free of rips and tears (ROB only)?

Did the driver provide a weight ticket showing the empty (tare) weight of the container prior to placement?

Was the container inspected by a Designated Government Representative upon arrival at the designated location?

Was the container of acceptable appearance and integrity, with minimal evidence of corrosion, visibly void of waste residue and legible/offensive graffiti upon delivery?

Was the ROB, bows and cover free of any defects or damage, other than those attributable to normal wear and tear, and determined acceptable for Government use? Please document below any noteworthy defects or damage and have driver initial for acknowledgment. Note: Failure of the driver to acknowledge any existing noteworthy defects or damage will be cause for rejection of the ROB and liner.

Did the equipment operate properly without causing a delay in work?

Was the work performed and did the equipment meet the satisfaction of the

Designated Government Representative?

Comments:

Signature of Designated Government Representative Date

File details come from the government source that posted it. Updated .