Atch 9_ Floor Photos.pdf

PDF 15 MB Posted

Attached to
Epoxy Floor Coating Repair, Ames Federal contract opportunity
Solicitation number
12639525Q0164
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

About this file

The document is a PDF containing six images documenting floor and drain conditions in Rooms 108 and 106 prior to and after epoxy paint application. The photos show detailed views of floor drains, epoxy coating issues, and surface conditions, including:

Room 108 images reveal:

  • A drain prior to epoxy paint application
  • Entry area with scattered debris and equipment
  • Peeling epoxy paint with visible damage and deterioration

Room 106 images demonstrate:

  • Floor drain with surrounding surface details
  • Integral base with dark material along wall edges
  • Corner floor drain showing similar surface conditions

These photographic documentation images appear to be supporting evidence for the USDA's National Centers for Animal Health epoxy flooring repair project, illustrating the current state of floors that require refinishing in Building 520.

View the file

Other files for this federal contract opportunity

Other files attached to Epoxy Floor Coating Repair, Ames, newest first.
File Type Posted
12639525Q0164-0001.pdf PDF
Site visit sign-in sheet.pdf PDF
Atch 1_SOW Building 520 Floor Coating Repair.doc DOC document
Atch 7_StoncladGS PDS.pdf PDF
12639525Q0164.pdf PDF
Atch 5_Specification Section 096723 Resinous Flooring.docx DOCX document
Atch 8_ Stonkote HT4 Product Data.pdf PDF
Atch 6_Stonchem 441 Product Data.pdf PDF
Atch 4_G001 Title Page Building 520 Floor Coating Repair.pdf PDF
Atch 3_Bldg 520 A 2.0 with Blue Beam Markups.pdf PDF
Atch 2_Federal Construction Wage Rates_Story Cty.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Katherine.Madson Text Box

ROOM 108 DRAIN PRIOR TO EPOXY PAINT

ROOM 108 ENTRY PRIOR TO EPOXY PAINT

ROOM 108 PEELING EPOXY PAINT

ROOM 106 FLOOR DRAIN

ROOM 106 INTEGRAL BASE

ROOM 106 CORNER FLOOR DRAIN

File details come from the government source that posted it. Updated .