Atch 3_bldg 62 drawings.pdf
PDF 28 MB Posted
- Attached to
- Building 62 Renovation, Coral Gables Federal contract opportunity
- Solicitation number
- 12639524R0020
About this file
The document provided is a set of building drawings for Building 62 Renovation, Coral Gables, related to Solicitation Number 12639524R0020. This solicitation is being issued by the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services. The solicitation is for the renovation of Building 62 and includes detailed architectural and engineering drawings. The drawings cover floor plans, elevations, structural details, and mechanical, electrical, and plumbing systems. This document provides the technical specifications and requirements for the construction and renovation work. No additional high-level details about the scope of work, pricing, or timeline are included in this specific document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12639524R0020-0004.pdf | ||
| 12639524R0020-0003.pdf | ||
| 12639524R0020-0002.pdf | ||
| Building 62 Asbestos Final Report 07302017.pdf | ||
| RFIs and Responses 2.docx | DOCX document | |
| 12639524R0020-0001.pdf | ||
| RFIs and responses.docx | DOCX document | |
| 20240422_184244122_iOS.jpg | JPG image | |
| 20240422_184002492_iOS.jpg | JPG image | |
| 20240422_184000455_iOS.jpg | JPG image | |
| 20240422_184119221_iOS.jpg | JPG image | |
| 20240422_184050336_iOS.jpg | JPG image | |
| 20240422_184353638_iOS.jpg | JPG image | |
| 20240422_184332471_iOS.jpg | JPG image | |
| 20240422_184140685_iOS.jpg | JPG image | |
| 20240422_183955449_iOS.jpg | JPG image | |
| Atch 2_Bldg 62 specifications.pdf | ||
| Atch 1_SOW Coral Gable Bldg 62 construction 5-8-24.docx | DOCX document | |
| 12639524R0020.pdf | ||
| Atch 4_Federal Construction Wage Rates_Miami-Dade.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Macon, Georgia 31201 440 Martin Luther King Jr Blvd
478·743·8415
WWW.CLARKNEXSEN.COM
1 2 3 4 5 6
A
B
C
D
E
DESIGN:
DRAWN:
REVIEW:
SHEET
KEY PLAN
SUBMITTAL
SEALS
CONSULTANT
DESIGNER
FINAL - FOR CONSTRUCTION
08/14/2023
Animal and Plant Health Inspection Service (APHIS)
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Building #62 Renovation
Old Cutler Road Coral Gables, FL 33158
REVISIONS
C R e v it P ro je c ts
\9
A
P H
IS
B ld g
A k b a u m a n
.r v t
/1
/2
:2
:0
P
M
GI001
TITLE SHEET / SHEET INDEX /
CODE SUMMARY
KSB
KSB
CN 9930
N
UNITED STATES DEPARTMENT OF AGRICULTURE
ANIMAL AND PLANT HEALTH INSPECTION SERVICE
AGRICULTURAL RESEARCH SERVICE
BUILDING 62 RENOVATION
CORAL GABLES, FLORIDA
CONTRACT NUMBER: 12639521D0050
CODES / STANDARDS
APPLICABLE CODES: 2020 FLORIDA BUILDING CODE (2018 IBC W/ AMENDMENTS)
2020 FLORIDA EXISTING BUILDING CODE (2018 IEBC W/ AMENDMENTS)
2020 FLORIDA PLUMBING CODE (2018 IPC W/ AMENDMENTS)
2020 FLORIDA MECHANICAL CODE (2018 IMC W/ AMENDMENTS)
2020 NPFA 70 - NATIONAL ELECTRIC CODE
ASHRAE 90.1-2019
ASHRAE 62.1-2019
2020 NFPA 45 -
ACCESSIBILITY GUIDELINES: 2020 FLORIDA ACCESSIBILITY CODE
2010 AMERICANS WITH DISABILITIES ACT (ADA)
ANSI A117.1 - AMERICAN NATIONAL STANDARD
ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
SITE MAP:
INDEX OF DRAWINGS
SHT. NO. SHEET TITLE
GENERAL
GI001 TITLE SHEET / SHEET INDEX / CODE SUMMARY
GI010 LEGENDS, NOTES, AND ABBREVIATIONS
GI020 LIFE SAFETY PLANS & FLOOD ZONE MAP
GI021 RATED ASSEMBLIES
CIVIL
C-010 GENERAL NOTES, UTILITY DETAILS, AND LEGEND
C-011 DETAILS AND ABBREVIATIONS
C-100 MASTER SITE PLAN
C-101 SITE UTILITY PLAN
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES, LEGEND AND
ABBREVIATIONS
S-002 SCHEDULE OF SPECIAL INSPECTIONS
SF101 FRAMING PLAN, SECTIONS, AND DETAILS
ARCHITECTURAL
AD101 DEMOLITION PLANS
AE101 FLOOR PLAN - LEVEL 1
AE102 REFLECTED CEILING PLAN & ATTIC PLAN
AE103 ROOF PLAN & DETAILS
AE201 EXTERIOR ELEVATIONS
AE202 INTERIOR ELEVATIONS
AE203 3D VIEWS
AE301 BUILDING SECTIONS & WALL SECTIONS
AE601 DOOR / WINDOW SCHEDULES & DETAILS
AG101 EQUIPMENT & SIGNAGE PLAN
FIRE PROTECTION
FD101 FIRE PROTECTION DEMOLITION FLOOR PLAN
FP101 FIRE PROTECTION FLOOR PLAN
2020 FLORIDA BUILDING CODE
CODE SUMMARY
Name of Project: ___________________________________________________________ Address:_____________________________________________________Zip Code:_____ Proposed Use:______________________________________________ Owner/Agent:____________________Phone #:___________Email:__________________
LEAD DESIGN PROFESSIONAL: __________________________________________
Code Enforcement Jurisdiction:
Designer Architectural
2020 FLORIDA BUILDING CODE:
EXISTING:
CONSTRUCTED: (date)_____________ RENOVATED: (date)_______________
BASIC BUILDING DATA
Civil
Electrical
Fire Alarm
Plumbing
Mechanical
Sprinkler-Standpipe
Structural
Retaining Walls >5'
Landscape Arch.
Non-Combustible Construction Type: I-B
Sprinklers:
Standpipes:
Fire District:
Building Area (502.1):
FLOOR EXISTING (SQ FT) NEW (SQ FT) SUBTOTAL
4th Floor 3rd Floor 2nd Floor
Basement
TOTAL
ALLOWABLE AREA
Primary Occupancy:
Assembly (303) Business (304) Educational (305) Factory (306) High-Hazard (307) Institutional (308)
Mercantile (309) Residential (310) Storage (311)
Special Uses (Ch 4):
Mixed Occupancy:
Incidental Use Separation (509) This separation is not exempt as a Non-Separated Use (see exceptions) Non-Separated Mixed Use (508.3.)
Separated Mixed Use (508.4) - See below for area calculations
Actual Area of Occupancy A Allowable Area of Occupancy A
Actual Area of Occupancy B Allowable Area of Occupancy B f 1 f 1.00=
STORY
NO. AND
PRIMARY
OCCUPANCY
FLOOR
DESCRIPTION
AND USE(S)
BLDG AREA
PER STORY
(ACTUAL)
ALLOWABLE
AREA FROM
TABLE 506.2
FRONTAGE
INCREASE
TOTAL
ALLOWABLE
AREA
ALLOWABLE
BUILDING
AREA
506.2.1-506.2.4
New Construction
FIRE PROTECTION REQUIREMENTS
ALLOWABLE HEIGHT
ALLOWABLE
BUILDING HT.
(TABLE 504.3)
* Indicate section number permitting reduction
LIFE SAFETY SYSTEM REQUIREMENTS
Emergency Lighting: (1008) Exit Signs: (1013) Fire Alarm: (907, NFPA 72)
Smoke Detection Systems: (907) Panic Hardware: (1010.1.10)
THERMAL ENVELOPE
Method of Compliance:
Roof/Ceiling Assembly (each assembly)
Exterior Walls (each assembly)
Walls below grade (each assembly)
Floors over unconditioned space (each assembly)
Floors slab on grade (each assembly)
Addition Upfit Alteration - Level:
II-B III-B V-B
I-A II-A III-A V-AIV
No Partial Yes NFPA 13 NFPA 13R NFPA 13D No Yes Class I Class II Class III Wet Dry
No Yes Flood Hazard Area: No Yes
I-1 I-2 I-3
A1 A2 A3
F-1 Moderate F-2 Low
H-1 Detonate H-2 Deflagrate
I-4
H-3 Combust H-4 Health H-5 HPM
R-1 R-2 R-3 R-4
S-1 Moderate S-2 Low High-Piled
Utility/Misc. (312)
No Yes Separation: _____ Hr Exception: _____________
City/County Private State
StateCity _____________ County _________
No Yes No Yes No Yes
No Yes No Yes
Prescriptive (Energy Code)
Performance (Energy Code)
Description of assembly ___________________________________________ U-Value of total assembly ___________________________________________ R-Value of insulation ___________________________________________ Skylights in each assembly ___________________________________________
U-Value of skylight ___________________________________________ Total square footage of skylights in each assembly _____________________
Fenestration U-Value of assembly ___________________________________________
SHGC ___________________________________________
Projection factor ___________________________________________ Low-E ___________________________________________
Door U-Value ___________________________________________
Horizontal / vertical requirement ______________________________________ Slab heated ____________________________________________________
Firm Name Lic. # EmailPhone #
I-2/I-3 Condition: 1 2 3 4 5
A4 A5
Partial ____
Accessory Occupancies:
S-2 Parking Garage: Open Enclosed Repair Garage
Incidental Uses Furnace room where any piece of equipment is over 400,000 Btu per hour input Rooms with boilers where the largest piece of equipment is over 15 psi and 10 horsepower Refrigerant machine room Hydrogen cut off rooms, not classified as Group H Incinerator rooms Paint shops, not classified as Group H, located in occupancies other than Group F In Group E occupancies, laboratories and vocational shops not classified as Group H.
Laundry rooms over 100 square feet
Group I-3 cells and Group I-2 patient rooms equipped with padded surfaces In Group I-2, physical plant maintenance shops
Stationary storage battery systems having a liquid electrolyte capacity of more than 50 gallons for flooded lead-acid, nickel cadmium or VRLA, or more than 1,000 pounds for lithium-ion and lithium metal polymer used for facility standby power, emergency power or uninterrupted power supplies
(Table 509):
LIFE SAFETY PLAN REQUIREMENTS
Life Safety Plan Sheet #: ______________________
Fire and/or smoke rated wall locations (Chapter 7) Assumed and real property line locations Exterior wall opening area with respect to distance to assumed property lines (705.8) Existing structures within 30' of the proposed building Occupancy types for each area as it relates to occupant load calculation (Table 1004.1.2) Occupant loads for each area Exit access travel distance (1016) Common path of travel distances (1014.3 & 1028.8) Dead end lengths (1018.4) Clear exit widths for each exit door Maximum calculated occupant load capacity each exit door can accomodate based on egress width (1005.1) Actual occupant load for each exit door A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation Location of doors with panic hardware (1008.1.10) Location of doors with delayed egress locks and the amount of delay (1008.1.9.7) Location of doors with electromagnetic egress locks (1008.1.9.8) Location of doors equipped with hold-open devices Location of emergency escape windows (1029) The square footage of each fire area (902) The square footage of each smoke compartment (407.4) Note any code exceptions or table notes that may have been utilized regarding the items above
ACCESSIBLE PARKING
LOT OR
PARKING AREA
TOTAL # OF
PARKING
SPACES
# OF ACCESSIBLE SPACES PROVIDED
STANDARD WITH
5' ACCESS AISLE 8' ACCESS AISLE
TOTAL #
ACCESSIBLE
PROVIDED
TOTAL
(SECTION 1106)
Climate Zone:
Prescriptive (ASHRAE 90.1)
Performance (ASHRAE 90.1)
USDA - APHIS - Agricultural Research Service (ARS) Building #62 Renovation
Old Cutler Road, Coral Gables, Florida
Laboratory & Storage
Woodward D Bailey, Ph.D (305) 278-4881 woodward.d.bailey@usda.gov
Clark Nexsen Jason H. Jones AR96212 (704) 377-8800 jjones@clarknexsen.com
Gmuer Engineering
Clark Nexsen
Clark Nexsen
Clark Nexsen 5B
33158
GI002
36,000
3,036Lab/StorageLevel 1 - B
CLARK NEXSEN, INC.
N/A
ORIGINAL USE(S)________________________
CURRENT USE(S)________________________
PROPOSED USE(S)_______________________
Owned By:
Type of Construction:______
60'
THIS SECTION REQUIRED TO BE COMPLETED FOR ALL PROJECTS
Life safety systems generator: (2702) No Yes
11' ACCESS AISLE
VAN SPACES WITH:
3,036
7.5'
Smoke Barrier Separation
Party/Fire Wall Separation
Corridor Ratings (1020.1)
Other
Interior
South
West
East
North
N on be ar in g
Interior
South
West
East
North
Primary Structural Frame
Building Element Rating
Required Provided Reduct*
FIRE RATED CONSTRUCTION SCHEDULE
Exit/Elevator
W al ls a nd
E xt er io r E xt er io r
Fire Sep. Dist: ___
Detail # &
Sheet #
Assembly
Design #
Penetration
Design #
Joint
Design #
Shaft Enclosures (713)
P ar tit io ns
B ea rin g
W al ls a nd P ar tit io ns
Horizontal
VerticalOccupancy
Separation (508.4)
Horizontal
VerticalTenant/Unit
Separation (708.1)
Supporting Structure
Roof Construction
Supporting Structure
Floor Construction
Roofs
Horizontal
VerticalIncidental Use
Separation (509.4)
Floors Above Grade
N/A Completed
Unused
Laboratory & Storage
Clark Nexsen
1st Floor
3,036
XX+XX+XX=XX
36,000 36,000N/A
** FIRE PROTECTION SCHEDULE NOTES:
1. EXISTING EXTERIOR WALL CALCULATED FIRE RESISTANCE OF 2-HOUR PER TABLE 722.3.2
2. TYPICAL INTERIOR PARTITIONS ARE NOT REQUIRED TO BE RATED. GAS CYLINDER STORAGE ROOM
WALLS ARE RATED PER OSHA REQUIREMENTS TO 2-HOUR RESISTANCE PER UL ASSEMBLY U403
Voice Communication System: (907) No Yes
Attic insulation = R-38 (R-38 minimum req)
N/A
N/A
N/A
Description of assembly ___________________________________________ U-Value of total assembly ___________________________________________ R-Value of insulation ___________________________________________
Description of assembly ___________________________________________ U-Value of total assembly ___________________________________________ R-Value of insulation ___________________________________________
Description of assembly ___________________________________________ U-Value of total assembly ___________________________________________ R-Value of insulation ___________________________________________
Description of assembly ___________________________________________ U-Value of total assembly ___________________________________________ R-Value of insulation ___________________________________________
N/A
N/A
N/A
N/A
No
Insulated hollow metal = U-0.36 (U-0.37 max req)
Clark Nexsen
Chris Gmuer 71599 (352) 593-3134 chrisg@gmuereng.com
In Group I-2 occupancies, laboratories not classified as Group H.
In ambulatory care facilities, laboratories not classified as Group H.
In Group I-2, laundry rooms over 100 square feet
In ambulatory care facilities or Group I-2 occupancies, waste and linen collection rooms with containers that have an aggregate volume of 10 cubic feet or greater In other than ambulatory care facilities or Group I-2 occupancies, waste and linen collection rooms over 100 square feet In ambulatory care facilities or Group I-2 occupancies, storage rooms greater than 100 square feet
PLANNED
BUILDING HT.
14'
Non-Sprinklered (NS) Sprinklered NFPA 13 (S)
Sprinklered NFPA 13R (S13R)
ALLOWABLE
NO. OF STORIES
(TABLE 504.4)
PLANNED
NO. OF STORIES
-- -- NOTE 1** -- --
-- -- NOTE 2** -- --
Assembly (303) Business (304) Educational (305) Factory (306) High-Hazard (307) Institutional (308)
Mercantile (309) Residential (310) Storage (311)
I-1 I-2 I-3
A1 A2 A3
F-1 Moderate F-2 Low
H-1 Detonate H-2 Deflagrate
I-4
H-3 Combust H-4 Health H-5 HPM
R-1 R-2 R-3 R-4
S-1 Moderate S-2 Low High-Piled
Utility/Misc. (312)
I-2/I-3 Condition: 1 2 3 4 5
A4 A5
S-2 Parking Garage: Open Enclosed Repair Garage
T A
B L
E
Fire Sep. Dist: ___
Fire Sep. Dist: ___
Fire Sep. Dist: ___
Fire Sep. Dist: ___
Fire Sep. Dist: ___
Fire Sep. Dist: ___
Fire Sep. Dist: ___
5th Floor
Actual Area of Occupancy C Allowable Area of Occupancy C
Area =
Laboratory & Office
Unknown
Combustible Construction Type:
Basement: No YesBuilding Height: ____14' Number of Stories: ____1
Wood trusses with asphalt shingles (add alt. for standing seam metal)
+30'
+30'
N/A -- -- -- --
Clark Nexsen
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
24"/54" = 0.44
U-0.23 (U-0.23 max req)
Fixed aluminum w/ insulated glazing units = U-0.50 (U-0.50 max req)
Required
Existing concrete slab on grade
N/A - Existing assembly
(Queuing area only)
N/A
N/A
N/A
0 3,036
N/A
N/A
N/A
N/A
N/A
3,036
0&2
N/A
0&2
Edward Westerman 64410 (757) 961-7872 ewesterman@clarknexsen.com
Christopher Born 65399 (757) 961-7933 cborn@clarknexsen.com
Wade Williams 79612 (478) 743-8415 wwilliams@clarknexsen.com
Wade Williams 79612 (478) 743-8415 wwilliams@clarknexsen.com
Matthew Samson 87742 (757).961-7705 matthew.samson@clarknexsen.com
Addition Change of use I II III
N/A
Special Provisions (Ch 5): N/A
+30'
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NOTE: ALL PARKING IS EXISTING - NO NEW PARKING
PLUMBING FIXTURE REQUIREMENTS
LEVEL 1 - B OCC.
USE
QTY PROVIDED:
WATER CLOSETS
OR URINALS
MALE FEMALE
LAVATORIES
MALE FEMALE
SHOWERS
/ TUBS
TOTAL REQUIRED:
DRINKING
FOUNTAINS
SERVICE
SINKS
CLOTHES
WASHER
CONNECT.
0 0101111
NOTE 2
SEE NOTE 1
PLUMBING FIXTURE TABLE NOTES:
1. TOTAL OCCUPANT LOAD OF BUILDING IS LESS THAN 25 (15 TOTAL OCCUPANTS). PER FLORIDA
PLUMBING CODE SECTION 403.2 EXCEPTION 4 SEPARATE FACILITIES ARE NOT REQUIRED. ONE
WATER CLOSET AND ONE LAVATORY IS ALL THAT IS REQUIRED FOR THE BUILDING.
2. PER FLORIDA PLUMBING CODE SECTION 403.2 DRINKING FOUNTAINS ARE NOT REQUIRED FOR
AN OCCUPANT LOAD OF 15 OR FEWER.
3. PER FLORIDA PLUMBING CODE TABLE TABLE 403.1 FOOTNOTE 'e' SERVICE SINKS ARE NOT
REQUIRED FOR AN OCCUPANT LOAD OF 15 OR FEWER.
SEE NOTE 1
NOTE 3
ENERGY CODE REQUIREMENTS
1A
0.48 (0.58 max req)
N/A
Mass wall = 8" CMU with three coat stucco
N/A
N/A - Existing assembly
N/A - Existing assembly
N/A
Federal
STORY
NO.
PROPOSED USE USE TYPE
TBL 1004.5
AREA NET/GROSS
AREA
NO. OF
OCCUPANTS
BusinessLaboratory1
150 Gross1,278
Acc. Stor.Storage (S-2) 300 Gross1,758
SF/PER OCC.
TBL 1004.5
OCCUPANT LOADS
STORY OCC.
LOAD
TOTAL BUILDING OCCUPANT LOAD:
Christopher Born 65399 (757) 961-7933 cborn@clarknexsen.com
VICINITY MAP:
N
PROJECT SITE
PROJECT
SITE
PLUMBING
P-001 PLUMBING LEGEND
PD101 PLUMBING - FOUNDATION & PLAN - DEMOLITION
PD102 PLUMBING - FIRST FLOOR - DEMOLITION
PF101 PLUMBING - FOUNDATION PLAN - NEW WORK
PP101 PLUMBING - FIRST FLOOR - DOMESTIC NEW WORK
PP102 PLUMBING - FIRST FLOOR - GAS NEW WORK
PP103 PLUMBING - ROOF PLAN
P-501 DETAILS
P-601 SCHEDULES
P-701 PIPING DIAGRAMS
MECHANICAL
M-001 MECHANICAL LEGEND
MD101 MECHANICAL DEMOLITION FLOOR PLAN
MH101 MECHANICAL NEW WORK FLOOR PLAN
MH102 MECHANICAL NEW WORK ROOF PLAN
M-501 DETAILS
M-601 SCHEDULES
M-801 CONTROLS
M-802 SEQUENCE OF OPERATIONS
ELECTRICAL
E-001 ELECTRICAL LEGEND, NOTES AND ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN
ED101 ELECTRICAL DEMOLITION PLAN - LEVEL 1
EG101 LIGHTNING PROTECTION PLAN
EG501 LIGHTNING PROTECTION DETAILS
EL101 LIGHTING PLAN - LEVEL 1
EP101 POWER PLAN - LEVEL 1
EP102 MECHANICAL POWER PLAN - LEVEL 1
EP501 POWER DETAILS
EP601 PANELBOARD SCHEDULES
EP701 POWER RISER DIAGRAM
ET101 TELECOMMUNICATIONS PLAN - LEVEL 1
ET501 TELECOM DETAILS
SHT. NO. SHEET TITLE
SEALSEALS
50680
NORTH CAROL I NA
RE
G
I S
TE
RE
D ARCH I TECTURAL CORPORAT
IONC
L A
RK
NEX S EN ,
I N C
C
HA R L O T T E , N . C
2023.08.11 16:10:46-04'00'
Solicitation 12639524R0020, Attachment 3
AND&
EXIST EXISTING
VINYL COMPOSITION TILEVCT
AFS
ADJ
AT
APPROX
AFF
BD
ALUM
APPROXIMATE
BOARD
ABOVE FINISH FLOOR
ABOVE FINISH SLAB
ALUMINUM
ADJUSTABLE, ADJUST
CEILING
COL
CLG
DIA
CMU
CONC
DOWNDN
EQUIP
ELEC
ELEV
EQUIPMENT
ELECTRIC
ELEVATION
CONCRETE MASONRY UNIT
CONCRETE
DIAMETER
COLUMN
FLOOR
FO
FLR
GWB
HC
GYPSUM WALL BOARD
HANDICAPPED
FACE OF
EQ EQUAL
CENTER LINE
HORIZ HORIZONTAL
TYPICALTYP
TOC TOP OF CONCRETE
WIDTH / WASHER
VERT
W
VERTICAL
UNLESS OTHERWISE NOTEDUON
HOLLOW METALHM
VIF VERIFY IN FIELD
CL
ALT ALTERNATE
APC ARCHITECTURAL PRECAST
ACT ACOUSTICAL CEILING TILE
BLDG BUILDING
BLKG BLOCKING
BRG BEARING
BUR BUILT-UP ROOFING
CORNER GUARDCG
CONTROL JOINTCJ
CLEARCL
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
D DEPTH / DRYER
DBL DOUBLE
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DOWNSPOUTDS
DRAWINGDWG
EACHEA
EXPANSION JOINTEJ
EDGE OF SLABEOS
EPS EXPANDED POLYSTYRENE
EXP EXPANSION / EXPOSED
EXT EXTERIOR
FD FLOOR DRAIN
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FGL FIBERGLASS
FF FINISH FLOOR
FIN FINISH
FRT FIRE RETARDANT TREATED
GA GAUGE
GALV GALVANIZED
GFRG GLASS FIBER REINFORCED
GL GLASS
GYP GYPSUM
HDW HARDWARE
HDWD HARDWOOD
HT HEIGHT
HVAC HEATING, VENTILATION, & AIR
CONDITIONING
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
JT JOINT
KO KNOCK OUT
L LENGTH / LONG
MATL MATERIAL
SUSPENDEDSUSP
THR THRESHOLD
TOW TOP OF WALL
TP TOILET PARTITION
TOP & BOTTOMT & B
VINYL BASEVB
VTR VENT THRU ROOF
CONCRETE
GYPSUM
WITHW/
WITHOUTW/O
WALLCOVERINGWC
WOODWD
WINDOWWDW
WINDOW OPENINGWO
WORK POINTWP
WEIGHTWT
EXTRUDED POLYSTYRENEXPS
METALMTL
NIC
MISC
OC
MISCELLANEOUS
ON CENTER
NOT IN CONTRACT
ROOM
SIMILAR
R
RM
REF
SIM
RO
SS
RADIUS
STAINLESS STEEL
ROUGH OPENING
REFRIGERATOR
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MO MASONRY OPENING
MTG MOUNTING
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
OFOI OWNER FURNISHED
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PL PLATE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PR PAIR
PTD PAINTED
RD ROOF DRAIN
REINF REINFORCING
REQ'D REQUIRED
RWL RAIN WATER LEADER
SAFB SOUND ATTENUATING FIRE
SF SQUARE FEET
SQUARESQ
STRUCTURALSTRUCT
STD STANDARD
STL STEEL
BLANKETS
CONTRACTOR INSTALLED
OWNER INSTALLED
BOD BASIS-OF-DESIGN
RCP REFLECTED CEILING PLAN
GYPSUM WALLBOARD / PLASTER / GROUT /
SPRAY FOAM INSULATION / SPRAY FIREPROOFING
CONCRETE
INTERRUPTED WOOD BLOCKING
BRICK
CONCRETE MASONRY UNIT
(CMU)
ACOUSTICAL TILE / CERAMIC
TILE
BATT / LOOSE / BLANKET INSULATION
CONTINUOUS WOOD BLOCKING /
FRAMING
PLYWOOD / MDF
FINISHED WOOD
CARPET
RIGID INSULATION
EARTH
POROUS FILL
MINERAL WOOL INSULATION
A1
AE201
A1
AE20
A3
A2A4
NEW WORK NOTE
PARTITION / WALL TYPE
DETAIL / PLAN NUMBER
SHEET WHERE SHOWN
ELEVATION NUMBER
SHEET WHERE SHOWN
TRUE NORTH INDICATOR
PLAN NORTH INDICATOR
XX.X
A
DEMOLITION NOTE
WINDOW DESIGNATION
L1
LOUVER DESIGNATION
COLUMN GRID LINE ELEVATION DATUM
+12'-0"
FIRST FLOOR
ROOM DESIGNATION SPECIALTY ITEM DESIGNATION
SPACE NAME
DIRECTION OF SLOPE ROOF SLOPE
FLOOR DRAIN MATCH LINE
FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER BRACKET
FD
DETAIL, SECTION,
ELEVATION TITLE
NAM
E
SCALE:A1
DETAIL / ENLARGED PLAN
PLAN TITLE
AND NORTH ARROWNAM
E
SCALE:
INTERIOR ELEVATION
EXTERIOR ELEVATION
ELEVATION NUMBER
SHEET WHERE SHOWN
BUILDING SECTION
SECTION NUMBER
SHEET WHERE SHOWN
DETAIL / WALL SECTION
SECTION NUMBER
SHEET WHERE
SHOWN
DOOR NUMBER12
ACCESSIBLE BEDROOMS -
COMMUNICATION FEATURES
ACCESSIBLE BEDROOMS -
MOBILITY FEATURES
W1
AE301
A1
AE301
A1
AE301
A1
A1
AE101
BUILDING
FEC FEB
GENERAL DEMOLITION NOTES:
1. CARE IS TO BE TAKEN TO DIVERT AS MUCH WASTE AS POSSIBLE FROM
LANDFILL DISPOSAL. DUE DILIGENCE IS TO BE EXERCISED TO RECYCLE
ITEMS REMOVED FROM THE BUILDING DURING DEMOLITION.
2. TWO MEANS OF EGRESS SHALL BE MAINTAINED IN THE BUILDING
THROUGHOUT ALL PHASES OF DEMOLITION. AT NO TIME SHOULD AN
EGRESS DOOR/ACCESS BE BLOCKED OR LOCKED TO SLOW OR PREVENT
EXIT.
3. DEMOLITION PLANS INDICATE THE GENERAL EXTENTS OF DEMOLITION.
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND
SUPERVISION OF THE WORK ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REMOVE ALL ASSOCIATED FASTENERS AND ACCESSORY
PARTS FOR ELEMENTS/SYSTEMS BEING REMOVED.
4. EXERCISE CARE DURING DEMOLITION. DAMAGE CAUSED TO THE EXISTING
STRUCTURE SHALL BE REPAIRED OR REPLACED AT NO COST TO THE
OWNER.
5. UNLESS OTHERWISE NOTED, ALL EXISTING CONCRETE COLUMNS, BEAMS,
SLABS, AND CMU WALLS SHALL REMAIN.
6. CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL
EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. THE
CONTRACTOR SHALL REPORT DISCREPANCIES BETWEEN THE CONTRACT
DOCUMENTS AND THE EXISTING CONDITIONS TO THE ARCHITECT PRIOR
TO BEGINNING WORK IN AREAS THAT WILL BE AFFECTED.
7. PROVIDE ALL TEMPORARY SHORING, GUYING AND BRACING REQUIRED TO
HOLD THE STRUCTURE IN PROPER ALIGNMENT DURING DEMOLITION AND
SUBSEQUENT CONSTRUCTION. ANALYSIS, DESIGN, SAFETY, ADEQUACY
AND INSPECTION OF ERECTION BRACING, SHORING, AND OTHER
TEMPORARY SUPPORTS ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
8. WHERE ITEMS ARE REMOVED FROM WALLS, FLOORS, OR CEILINGS WHICH
MIGHT HAVE BEEN AFFECTED DEMOLITION, THE AREAS ARE TO BE
PATCHED AND REPAIRED WITH THE SAME MATERIALS TO CREATE A
UNIFORM SUBSTRATE.
9. DEMOLISH/REMOVE RELATED UTILITIES WHEN REMOVING EXISTING
EQUIPMENT.
10. WHERE CONCRETE IS CUT/REMOVED ANY REBAR WHICH IS EXPOSED
SHALL BE CUT BACK TO A DEPTH OF 1" INTO THE CONCRETE AND PATCHED
WITH THE APPROPRIATE COMPOUND/FILLER.
11. WHERE DIMENSIONS ARE SHOWN ON THE DEMOLITION PLANS THE
DISTANCES INDICATED SHALL BE VERIFIED TO BE CONSISTENT WITH THE
EXISTING CONSTRUCTION PRIOR TO ANY WORK. INCORRECT DEMOLITION
PERFORMED BASED ON DIMENSIONS WITHOUT VERIFICATION WILL BE
CORRECTED AT THE CONTRACTOR'S EXPENSE.
PLUMBING SYSTEM DEMOLITION NOTES
1. EXISTING PLUMBING FIXTURES REMOVED WILL HAVE ALL ASSOCIATED
PIPING DEMOLISHED AS WELL. WHERE THE EXISTING PLUMBING ENTERS
EXISTING CONSTRUCTION TO REMAIN, IT WILL BE PROPERLY CAPPED AT
THE POINT NEAREST TO THE SUPPLY SIDE OF THE PIPING. ACCESS MUST
BE PROVIDED TO ANY CAPPED PIPING LOCATIONS FOR FUTURE
INSPECTION.
2. SELECTIVE DEMOLITION OF THE EXISTING SLAB ON GRADE WILL BE
REQUIRED TO ROUTE NEW UNDERGROUND WASTE LINES. COORDINATE
THE LOCATION AND EXTENT OF BELOW SLAB WORK WITH THE
APPROPRIATE CONSTRUCTION DRAWINGS FOR NEW WORK.
3. FLOOR DRAINS AND FLOOR CLEANOUTS INSTALLED IN THE SLAB-ON-
GRADE ARE TO REMAIN DURING THE DEMOLITION PHASE. MODIFICATIONS
TO THE FLOOR DRAINS AND FLOOR CLEANOUTS WILL OCCUR IN THE NEW
WORK PHASE.
4. REMOVE ALL FIXTURES AND ASSOCIATED WATER, WASTE, AND VENT
PIPING. ASSOCIATED WASTE PIPING TO BE REMOVED TO BELOW THE
SLAB-ON-GRADE.
5. ALL REMOVED EQUIPMENT AND PIPING TO BE DISPOSED OF OFFSITE.
MECHANICAL SYSTEM DEMOLITION NOTES
1. EXISTING FAN COILS AND AIR HANDLERS ARE TO BE REMOVED
THROUGHOUT THE BUILDING. ALL ASSOCIATED DUCTWORK IS TO BE
REMOVED AS WELL.
2. EXISTING EXHAUST FANS ON THE ROOF AND ELSEWHERE ARE TO BE
REMOVED. ALL ASSOCIATED DUCTWORK IS TO BE REMOVED AS WELL.
ELECTRICAL SYSTEMS DEMOLITION NOTES
1. PROVIDE ELECTRICAL DEMOLITION WORK AS INDICATED AND AS
NECESSARY TO INSTALL NEW WORK.
2. REMOVE AND DISPOSE OF ALL ELECTRICAL DEVICES AND ASSOCIATED
CONDUCTORS, UNLESS OTHERWISE NOTED.
3. WHERE EQUIPMENT OR DEVICES ARE NOTED TO BE REMOVED, REMOVE
ASSOCIATED CONDUCTORS BACK TO THE LAST ACTIVE DEVICE OR BACK
TO SOURCE. NO EXISTING WIRING/CONDUCTORS ARE TO BE ABANDONED
IN PLACE.
4. EXISTING CONDUITS NOT SCHEDULED TO BE REUSED SHALL BE REMOVED
WHERE THEY WILL BECOME EXPOSED DURING CONSTRUCTION AND
REMOVED FROM ABOVE HUNG CEILINGS. CONDUITS CONCEALED IN
REMAINING WALLS OR FLOOR SLABS SHALL BE CUT BACK FLUSH WITH
FINISHED SURFACES AND ABANDONED IN PLACE. VOIDS IN WALLS OR
FLOOR SLABS LEFT BY THE REMOVAL OF ELECTRICAL EQUIPMENT SHALL
BE PATCHED AND REPAIRED FLUSH WITH ADJACENT SURFACES.
5. PROVIDE A BLANK PLATE FOR JUNCTION BOXES IN EXISTING WALLS FOR
DEVICES THAT ARE INDICATED FOR REMOVAL AND ARE NOT BEING
REUSED.
6. CONFIRM THE LOCATIONS OF EXISTING UTILITIES. REPAIR ANY DAMAGE TO
EXISTING UTILITIES CAUSED BY CONSTRUCTION INSIDE AND OUTSIDE THE
BUILDING.
GENERAL CONSTRUCTION NOTES:
1. ALL MATERIALS USED IN THE PROJECT SHALL BE NEW AND PROVIDED BY
THE CONTRACTOR UNLESS SPECIFICALLY INDICATED OTHERWISE.
2. SOME ITEMS TO BE INSTALLED BY THE CONTRACTOR WILL BE
GOVERNMENT FURNISHED EQUIPMENT.
3. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE
DESIGNER OF RECORD PRIOR TO INSTALLATION. ACQUISITION OF
MATERIALS PRIOR TO SHOP DRAWING APPROVALS ARE AT THE
CONTRACTOR'S RISK.
4. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS OR SIZES OF
BUILDING ELEMENTS.
5. THE TERM "DESIGNER" REFERENCED IN THE DRAWINGS REFERS TO THE
ARCHITECT/ENGINEER/INTERIOR DESIGNER WHICH HAS PRODUCED THE
DOCUMENTATION.
6. NOTIFY ARCHITECT OF ANY DISCREPANCY BETWEEN DRAWINGS,
SPECIFICATIONS AND/OR EXISTING CONDITIONS.
7. ALL SPECIFIED ITEMS WHICH ARE A "BASIS-OF-DESIGN" SHALL BE
PERMITTED TO BE SUPPLIED WITH AN EQUAL OR EQUIVALENT OF THE
SAME OR BETTER QUALITY THAN THE ITEM INDICATED. WHERE THE TERM
"OR EQUAL", "OR EQUIVALENT", ETC. IS USED THE RELEVANT DECISION TO
WHAT WOULD BE CONSIDERED EQUAL OR EQUIVALENT IS SOLELY
DETERMINED BY THE DESIGNER. PROPOSED SUBSTITUTIONS OR
REPLACEMENTS WILL ONLY BE APPROVED FOR INSTALLATION AFTER
REVIEW AND ACCEPTANCE BY THE DESIGNER. ANY WORK WHICH HAS NOT
RECEIVED PRIOR APPROVALS WILL BE SUBJECT TO REMOVAL AND
REPLACEMENT AT THE CONTRACTOR'S EXPENSE.
8. ALL BUILDING ELEMENTS ON THE EXTERIOR MUST HAVE A CURRENT
NOTICE OF ACCEPTANCE (NOA) BY THE MIAMI-DADE COUNTY DEPARTMENT
OF REGULATORY AND ECONOMIC RESOURCES (RER), BOARD AND CODE
ADMINISTRATION DIVISION, PRODUCT CONTROL SECTION FOR USE IN HIGH
VELOCITY HURRICANE ZONE.
9. TWO MEANS OF EGRESS SHALL BE MAINTAINED THROUGHOUT ALL
PHASES OF CONSTRUCTION. AT NO TIME SHOULD AN EGRESS
DOOR/ACCESS BE BLOCKED OR LOCKED TO SLOW OR PREVENT EXIT.
10. NEW MASONRY WORK IS TO BE TOOTHED INTO EXISTING MASONRY,
UNLESS OTHERWISE NOTED.
11. KEYNOTE BOXES WHICH DO NOT SPECIFICALLY POINT TO ITEMS SHALL BE
CONSIDERED TO INCLUDE ALL MATERIALS REFERENCED WITHIN THE
ROOM IN WHICH THEY OCCUR.
12. THE CONTRACTOR SHALL VERIFY ALL ELEVATIONS AND DIMENSIONS AND
SHALL HAVE ANY DISCREPANCIES BROUGHT TO THE ARCHITECT'S
ATTENTION PRIOR TO COMMENCEMENT OF CONSTRUCTION.
13. ALL DIMENSIONS ARE TO THE FACE OF STUD OR FACE OF MASONRY
UNLESS OTHERWISE INDICATED.
14. ELEVATIONS ARE REFERENCED FROM THE GROUND FLOOR SLAB AT 0'-0",
OR TO THE ASSOCIATED FINISH FLOOR LEVEL.
15. WHERE A RATED WALL MEETS AN NON-RATED WALL, THE STUDS SHALL BE
OFFSET SO THE FACES OF THE GYPSUM WALL BOARD ALIGN.
16. AREAS OF CMU WHICH WERE NOT PREVIOUSLY FINISHED AND AREAS OF
NEW CMU ARE TO RECEIVE A COAT OF BLOCK FILLER PRIOR TO PAINTING.
17. EXISTING PENETRATIONS THROUGH THE BUILDING EXTERIOR WHICH ARE
NO LONGER IN USE AFTER RENOVATION (CONDENSATE DRAINS, JUNCTION
BOXES, DRYER VENTS, HOSE BIBBS, ETC.) ARE TO BE FILLED AS FOLLOWS:
HOLES 2" OR SMALLER ARE TO BE FILLED WITH MORTAR TO MATCH THE
EXISTING EXTERIOR STUCCO FINISH; OPENINGS LARGER THAN 2" IN ANY
DIMENSION WILL REQUIRE NEW, MATCHING MASONRY TO BE TOOTHED
INTO PLACE.
18. EXISTING FLOOR PENETRATIONS AND RELATED SLOPING DEPRESSIONS
WHICH ARE NOT TO BE RE-USED FOR NEW WORK ARE TO BE INFILLED
WITH FLOWABLE GROUT AND FEATHERED TO BE FLUSH WITH THE
LEVELED FINISH FLOOR.
19. LOCATE ALL INTERIOR DOOR FRAMES A DISTANCE OF 4" (FOUR INCHES)
FROM THE FRAME TO THE CLOSEST ADJACENT PERPENDICULAR
PARTITION, UNLESS OTHERWISE NOTED.
20. USE PRESERVATIVE-TREATED WOOD PRODUCTS FOR ALL WOOD
BLOCKING IN CONTACT WITH EXTERIOR MASONRY OR CONCRETE
ELEMENTS, AND FOR ALL WOOD BLOCKING IN CONTACT WITH CONCRETE
SLABS ON GRADE.
21. PROVIDE WOOD OR METAL BLOCKING BEHIND GYPSUM BOARD AT THE
FOLLOWING LOCATIONS:
A. ALL WALL-MOUNTED OR CEILING-MOUNTED DOOR STOPS, DOOR HOLD-
OPEN DEVICES, AND OTHER HARDWARE.
B. ALL WALL-MOUNTED TOILET ACCESSORIES. AT GRAB BARS, PROVIDE
BLOCKING CAPABLE OF RESISTING A MINIMUM LOAD OF 250 POUNDS
APPLIED VERTICALLY OR HORIZONTALLY AT ANY POINT ON THE GRAB
BAR.
C. ALL WALL-MOUNTED PLUMBING FIXTURES, INCLUDING BUT NOT
LIMITED TO LAVATORIES, SINKS, URINALS, WATER CLOSETS, AND
WATER COOLERS. PROVIDE BLOCKING CAPABLE OF RESISTING A
MINIMUM LOAD OF 400 POUNDS APPLIED VERTICALLY AT ANY POINT ON
THE PLUMBING FIXTURE.
D. ALL WALL-MOUNTED CABINETRY, SHELVING, AND SIMILAR ITEMS.
ONE HALF HOUR FIRE RATING
ONE HOUR FIRE RATING
TWO HOUR FIRE RATING
THREE HOUR FIRE RATING
FOUR HOUR FIRE RATING
SMOKE BARRIER (SB), SMOKE
PARTITION (SP), OR PARTITION
CAPABLE OF RESISTING THE
PASSAGE OF SMOKE (S), AS NOTED
(SB)
2' X 2' ACOUSTICAL TILE LAY-IN CEILING
GWB CEILING / SOFFIT
WOOD CEILING
METAL PANEL CEILING / SOFFIT
4' X 4' ACOUSTICAL TILE LAY-IN CEILING
OSS
H P
10'-0"
EXP
MECHANICAL EQUIPMENT LIGHT FIXTURES
EXIT LIGHTS STROBE LIGHT
SPEAKERS OCCUPANCY SENSOR
CARBON MONOXIDE SENSOR HEAT / PHOTO SENSOR
SMOKE DETECTOR CEILING HEIGHT
EXPOSED CEILING SPRINKLER HEAD
CEILING MOUNTED PROJECTOR CEILING MOUNTED RECEPTACLE
CO
= EGRESS TRAVEL PATH AND DISTANCE
= FIRE EXTINGUISHER ON BRACKET
FEC = FIRE EXTINGUISHER CABINET
'P' INDICATES PANIC HARDWARE
NO 'P' INDICATES STANDARD HARDWARE
OCCUPANT CAPACITY OF EGRESS
120'
FE
P
MAX: 220
533"
= EXIT SIGN
EGRESS WIDTH (INCHES)
# OF OCCUPANTS EGRESS SERVES
EGRESS OPENING TAG
EXISTING DOOR TO REMAIN
EXISTING WALL TO REMAIN
EXISTING DOOR , FRAME,
AND HARDWARE TO BE
REMOVED
EXISTING WALL TO BE REMOVED
EXISTING ITEM TO BE REMOVED
EXISTING PLUMBING
FIXTURES TO BE REMOVED
Macon, Georgia 31201 440 Martin Luther King Jr Blvd
478·743·8415
WWW.CLARKNEXSEN.COM
1 2 3 4 5 6
A
B
C
D
E
DESIGN:
DRAWN:
REVIEW:
SHEET
KEY PLAN
SUBMITTAL
SEALS
CONSULTANT
DESIGNER
FINAL - FOR CONSTRUCTION
08/14/2023
Animal and Plant Health Inspection Service (APHIS)
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Building #62 Renovation
Old Cutler Road Coral Gables, FL 33158
REVISIONS
C R e v it P ro je c ts
\9
A
P H
IS
B ld g
A k b a u m a n
.r v t
/1
/2
:2
:0
P
M
GI010
LEGENDS, NOTES, AND
ABBREVIATIONS
KSB
KSB
CN 9930
ARCHITECTURAL GENERAL NOTESMATERIALS LEGENDARCHITECTURAL SYMBOLOGYARCHITECTURAL ABBREVIATIONS
RATED PARTITION LEGEND
REFLECTED CLG PLAN LEGEND
DEMOLITION SYMBOLS LEGEND
LIFE SAFETY PLAN LEGEND
SEALSEALS
50680
NORTH CAROL I NA
RE
G
IS
TE
RE
D ARCH I TECTURAL CORPORAT
I ONC
LA
RK
NEX S EN , I N
C
C
HA R L O T T E , N . C
2023.08.11 16:10:47-04'00'
F.E.
F.E.
F .E
F .E
UTILITY
ELEC/TELECOM
LABORATORY
CORRIDOR
OFFICE
PREP ROOM
01A
STORAGE
CYLINDER STOR.
MECHANICAL
TOILET
EGRESS DEMARCATION
PATHS PAINTED ON
CONCRETE SLAB -
MINIMUM 48" WIDE
TRAVEL DIST: 58'
SPRINKLERED = 1/3 DIAGONAL = 35' MIN. SEPARATION REQ.
EGRESS REMOTENESS DIAGONAL = 99' - 8"
BUILDING DIAGONAL = 104'
(DIVIDED BY 3 = 35')
UNSHADED AREAS = B BUSINESS
OCCUPANCY - 1,278 SF
@150 SF/OCC = 9 OCCUPANTS
TRAVEL DIST: 78'
300' MAX.300' MAX.
P
MAX: 220
633"
P
MAX: 220
533"
P
MAX: 220
533"
SHADED AREAS = S-2 STORAGE
OCCUPANCY - 1,758 SF
@300SF/OCC = 6 OCCUPANTS
ADA ACCESSIBLE PRIMARY BUILDING ENTRY
SECONDARY
BUILDING ENTRY
EXIT ONLY DOORS
7'
7'
IMAGINARY PROPERTY LINE FOR
FIRE SEPARATION DISTANCE (FSD)FIRE SEPARATION DISTANCE 5 f X < 10 = 1 HOUR EXTERIOR WALL
RATING WITH 25% MAXIMUM UNPROTECTED OPENINGS. EXISTING
CONCRETE MASONRY EXTERIOR WALL CONSTRUCTION PROVIDES
CALCULATED FIRE RESISTANCE OF 2-HOUR PER TABLE 722.3.2. WALL
OPENINGS ARE LESS THAN 25% MAXIMUM ALLOWED (15%)
FIRE SEPARATION DISTANCE 10 f X < 30 = 0
HOUR EXTERIOR WALL. NO OPENINGS PLANNED
IN WALL AREA FACING EXISTING BUILDING.
NO STRUCTURES WITHIN FSD
30' - 0"
NO STRUCTURES WITHIN FSD
30' - 0"
N O
S T
R U
C T
U R
E S
W
IT
H
IN
F S
D
EXISTING BUILDING
EXISTING BUILDING
EXISTING BUILDING
ASHPALT DRIVE
IMAGINARY PROPERTY LINE FOR
FIRE SEPARATION DISTANCE (FSD)
EGRESS PATH
ADA EGRESS PATH
ADA EGRESS PATH ADA ACCESSIBLE PRIMARY
BUILDING ENTRY
GENERATOR PAD
CL
INFORMATION PROVIDED FROM FEMA FLOOD MAP SERVICE CENTER, DATE: 1/23/2023
Macon, Georgia 31201 440 Martin Luther King Jr Blvd
478·743·8415
WWW.CLARKNEXSEN.COM
1 2 3 4 5 6
A
B
C
D
E
DESIGN:
DRAWN:
REVIEW:
SHEET
KEY PLAN
SUBMITTAL
SEALS
CONSULTANT
DESIGNER
FINAL - FOR CONSTRUCTION
08/14/2023
Animal and Plant Health Inspection Service (APHIS)
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Building #62 Renovation
Old Cutler Road Coral Gables, FL 33158
REVISIONS
C R e v it P ro je c ts
\9
A
P H
IS
B ld g
A k b a u m a n
.r v t
/1
/2
:2
:1
P
M
GI020
LIFE SAFETY PLANS & FLOOD
ZONE MAP
KSB
KSB
CN 9930
1/8" = 1'-0"
LIFE SAFETY PLAN
1" = 10'-0"
LIFE SAFETY SITE PLAN
N
PLAN NORTH
MAGNETIC
NORTH
NOT TO SCALE
FLOOD ZONE MAP
SEALSEALS
50680
NORTH CAROL I NA
RE
G
IS
TE
RE
D ARCH I TECTURAL CORPORAT
I ONC
LA
RK
NEX S EN , I N
C
C
HA R L O T T E , N . C
2023.08.11 16:10:47-04'00'
Macon, Georgia 31201 440 Martin Luther King Jr Blvd
478·743·8415
WWW.CLARKNEXSEN.COM
1 2 3 4 5 6
A
B
C
D
E
DESIGN:
DRAWN:
REVIEW:
SHEET
KEY PLAN
SUBMITTAL
SEALS
CONSULTANT
DESIGNER
FINAL - FOR CONSTRUCTION
08/14/2023
Animal and Plant Health Inspection Service (APHIS)
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Building #62 Renovation
Old Cutler Road Coral Gables, FL 33158
REVISIONS
C R e v it P ro je c ts
\9
A
P H
IS
B ld g
A k b a u m a n
.r v t
/1
/2
:2
:1
P
M
GI021
RATED ASSEMBLIES
KSB
KSB
CN 9930
NOTE: TESTED FIRE-RATED ASSEMBLY DETAILS SHOWN IN THESE DRAWINGS ARE
EXAMPLES OF APPROVED ASSEMBLIES USED AS A BASIS OF DESIGN AND COULD BE
PROPRIETARY TO A SINGLE MANUFACTURER. WHATEVER MANUFACTURER(S) ARE
AWARDED ON THE PROJECT MUST PROVIDE LABORATORY TESTED DESIGN ASSEMBLIES
THE SAME OR SIMILAR TO THE DETAILS SHOWN AS PART OF THE SUBMITTAL REVIEW
PROCESS. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER APPLICATION AND
INSTALLATION OF ALL FIRESTOPPING/FIRE-RESISTANCE MATERIALS IN ACCORDANCE
WITH THE MANUFACTURERS' APPROVED INSTALLATION INSTRUCTIONS AND DETAILS.
SEALSEALS
50680
NORTH CAROL I NA
RE
G
IS
TE
RE
D ARCH I TECTURAL CORPORAT
I ONC
LA
RK
NEX S EN , I N
C
C
HA R L O T T E , N . C
2023.08.11 16:10:48-04'00'
1 2 3 4 5 6
A
B
C
D
E
Macon, Georgia 31201 440 Martin Luther King Jr Blvd
478·743·8415
WWW.CLARKNEXSEN.COM
CAG
AG
CAG
DESIGN:
DRAWN:
REVIEW:
SHEET
KEY PLAN
SUBMITTAL
SEALS
CONSULTANT
DESIGNER
CN 9930
FINAL - FOR CONSTRUCTION
8/14/2023
Animal and Plant Health Inspection Service (APHIS)
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Building #62 Renovation
Old Cutler Road Coral Gables, FL 33158
ENGINEER OF RECORD :
CHRISTOPHER A. GMUER
FL PE # 71599
2023-08-11
7/
/2
8:
:0
PM
G :\E
N G
IN
EE
R
IN
G \P
R O
JE
C
TS
\2
2-
C
O R
AL
G
AB
LE
S U
SD
A
BL
D
G
2\
PL
AN
S\
-0
3- C
-B
AS
E.
D
W G
FL CA # 31533 gmuereng.com (352) 281-4928 2603 NW 13th ST, Box 314 Gainesville, FL 32609
GEng Project # 22-0063
C-010
GENERAL NOTES AND
LEGEND
DESIGN ELEMENTS AND INFORMATION FURNISHED BY
OTHERS
1. THE ENGINEER AND ITS CONSULTANTS PREPARED THESE PLANS AND DESIGN DOCUMENTS THROUGH THE USE OR
RELIANCE UPON DESIGN ELEMENTS AND INFORMATION ORDINARILY OR CUSTOMARILY FURNISHED BY OTHERS, INCLUDING, BUT NOT LIMITED TO, SURVEYORS, GEOTECHNICAL ENGINEERS, ENVIRONMENTAL CONSULTANTS, ARCHITECTS, BUILDING SYSTEMS ENGINEERS, SPECIALTY CONTRACTORS, MANUFACTURERS, SUPPLIERS, AND THE PUBLISHERS OF TECHNICAL STANDARDS. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR DESIGN ERROR
AND OMISSIONS RESULTING FROM THE QUALITY OF THIS INFORMATION.
2. ALL POINTS OF COORDINATION OR INTERFACE BETWEEN THESE PLANS AND DESIGN DOCUMENTS AND THE PLANS
AND DESIGN DOCUMENTS OF OTHERS MUST BE COMPARED BY THE CONTRACTOR.
3. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE PROCURING MATERIALS AND
INSTALLATION.
UTILITY LOCATES, RELOCATION, PROTECTION, AND
TERMINATION
1. UTILITY LOCATES SHALL BE COMPLETED BY THE CONTRACTOR PRIOR TO THE INITIATION OF SITE CONSTRUCTION.
2. PROPOSED UTILITY TAPS AND CROSSINGS SHALL BE PHYSICALLY LOCATED AND VERIFIED BY THE CONTRACTOR AS
SOON AS PRACTICABLE AND SHALL CONTACT THE ENGINEER IMMEDIATELY WITH ANY DISCREPANCIES OR
CONFLICTS.
3. UTILITY RELOCATION, SUPPORT, PROTECTION, TERMINATION, CAPPING, AND REMOVAL SHALL BE COORDINATED BY THE CONTRACTOR WITH UTILITY COMPANIES. ADEQUATE TIME SHALL BE PROVIDED FOR PROPER COORDINATION
AND TO MINIMIZE SERVICE INTERRUPTIONS.
4. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES TO THE UTILITY COMPANY FOR THEIR
SERVICES.
SAFETY AND TEMPORARY TRAFFIC CONTROL
(MAINTENANCE OF TRAFFIC)
1. ALL SAFETY REGULATIONS AND PRACTICES SHALL BE ENFORCED BY THE CONTRACTOR THROUGHOUT THE
DURATION OF THIS PROJECT. THIS ALSO INCLUDES THE TRAVELING PUBLIC. THE FOLLOWING IS A NOTICE TO THE CONTRACTOR AND DOES NOT IMPLY THAT THE OWNER OR ENGINEER WILL INSPECT OR ENFORCE SAFETY
REGULATIONS.
2. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS.
3. ALL SUBSURFACE CONSTRUCTION SHALL CONFORM TO THE PROVISIONS SET FORTH BY THE "TRENCH SAFETY ACT".
4. TEMPORARY TRAFFIC CONTROL (TTC) IS REQUIRED FOR ALL WORKS ON HIGHWAYS, ROADS, STREETS, BIKE LANES, SIDEWALKS AND SHALL HAVE A TTC PLAN. THE PLAN SHALL BE PREPARED BY A PROFESSIONAL ENGINEER THAT IS FDOT ADVANCED MOT CERTIFIED AT THE COST OF THE CONTRACTOR. ALL WORK SHALL BE EXECUTED UNDER THE ESTABLISHED TTC PLAN AND THE REVIEWING AGENCY'S APPROVED PROCEDURES. THE PLAN AND WORK SHALL BE
AT THE CONTRACTOR'S EXPENSE.
GENERAL AND MISCELLANEOUS NOTES
1. THESE PLANS, DESIGN DOCUMENTS, AND NOTES ARE NOT EXHAUSTIVE. ALL THE APPLICABLE CONSTRUCTION
STANDARDS AND DETAILS THAT ARE LISTED, REFERENCED, OR IMPLIED ARE INCLUDED IN THE CONTRACT
DOCUMENTS BY REFERENCE.
2. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE REVIEWING AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
3. THE REPAIR OF DAMAGE EITHER ABOVE OR BELOW GROUND BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DAMAGE WILL BE IN THE OPINION OF THE OWNER, APPLICABLE AGENCY, OR ENGINEER. ALL REPAIRS SHALL BE MADE AT CONTRACTOR EXPENSE IN A MANNER SPECIFIED BY THE
PARTICULAR ENTITY.
4. CONTRACTOR IS RESPONSIBLE FOR GRADING ALL PAVEMENT, SIDEWALKS, AND GRADING AROUND BUILDINGS TO DRAIN POSITIVELY. INTERSECTIONS SHALL BE TRANSITIONED TO PROVIDE SMOOTH DRIVING SURFACE WHILE
MAINTAINING POSITIVE DRAINAGE.
5. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY OBSERVED AREAS OF POOR DRAINAGE PRIOR TO PLACEMENT
OF CURBS OR PAVEMENT COURSES.
6. ALL UNDERGROUND UTILITIES MUST BE INSTALLED, INSPECTED, AND TESTED PRIOR TO PAVEMENT BASE OR
SIDEWALK INSTALLATION.
EROSION CONTROL AND STABILIZATION
1. CONTRACTOR IS REQUIRED TO SUBMIT A COMPLETE NOI AND APPROPRIATE FEE TO SECURE A FDEP GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (CGP) AT LEAST TWO DAYS BEFORE CONSTRUCTION BEGINS. A PERMIT IS REQUIRED FOR CONSTRUCTION ACTIVITIES THAT DISTURB ONE OR MORE ACRES OR IF THE PROJECT IS PART OF A LARGER DEVELOPMENT THAT WILL ULTIMATELY DISTURB ONE
OR MORE ACRES.
2. PROJECTS THAT DISCHARGE STORMWATER TO AN MS4, A COPY OF THE NOI MUST ALSO BE SUBMITTED TO THE
OPERATOR OF THE MS4.
3. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR OBTAINING PERMIT COVERAGE AND IMPLEMENTING APPROPRIATE POLLUTION PREVENTION TECHNIQUES TO MINIMIZE EROSION AND SEDIMENTATION FROM STORMWATER DISCHARGES DURING CONSTRUCTION. THE ENGINEER SHOULD NOT BE LISTED AS THE OPERATOR
AS THEY DO NOT HAVE OPERATIONAL CONTROL OVER THE PROJECT.
4. WHEN THE OPERATOR CHANGES, THE NEW OPERATOR SHOULD OBTAIN PERMIT COVERAGE AT LEAST 2 DAYS BEFORE ASSUMING CONTROL OF THE PROJECT, AND THE PREVIOUS OPERATOR SHOULD FILE AN NPDES STORMWATER NOTICE OF TERMINATION WITHIN 14 DAYS OF RELINQUISHING CONTROL OF THE PROJECT TO A NEW
OPERATOR.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION AND SEDIMENTATION CONTROLS UNTIL
THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED.
6. ALL DISTURBED AND OPEN AREAS OF THE SITE SHALL BE SODDED WITH ST AUGUSTINE GRASS PER FDOT
STANDARDS UNLESS INDICATED OTHERWISE.
TREE PRESERVATION AND DEMOLITION
1. CONTRACTOR SHALL VERIFY AND PROTECT ALL EXISTING TREES AND NATURAL VEGETATION THAT ARE INDICATED
TO REMAIN UNDISTURBED ON THE PLANS.
2. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY DEMOLITION.
3. ALL TREES NOT SPECIFICALLY SHOWN TO BE PRESERVED OR REMOVED SHALL BE CONFIRMED WITH THE
REVIEWING AGENCY AND THE OWNER. THE PROTECTION OR REMOVAL IS AT THE COST OF THE CONTRACTOR.
4. CONTRACTOR SHALL SUBMIT DEMOLITION SCHEDULE TO OWNER PRIOR TO PROCEEDING WITH DEMOLITION
ACTIVITIES.
5. DISTURBED AREAS SHALL BE CLEARED AND GRUBBED TO REMOVE ALL ROOTS, MISCELLANEOUS VEGETATION, DELETERIOUS MATERIAL, DEBRIS, ETC.
6. SOME ITEMS TO BE REMOVED OR SALVAGED MAY NOT BE DEPICTED ON THE PLANS OR SURVEY. CONTRACTOR
SHALL BE AWARE OF ALL EXISTING IMPROVEMENTS WITHIN THE CONSTRUCTION LIMITS AND CONFIRM AN
INVENTORY WITH THE OWNER.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OR SALVAGE OF ALL EXISTING BUILDINGS, STRUCTURES, SLABS, CONCRETE, ASPHALT, DEBRIS PILES, SIGNS, ETC., AND THEIR APPURTENANCES UNLESS
OTHERWISE NOTED. ALL ITEMS SHALL BE PROPERLY DISPOSED IN A LEGAL MANNER.
8. PROVIDE PROTECTION AS NECESSARY TO PREVENT DAMAGE TO EXISTING IMPROVEMENTS SHOWN IN THE PLANS
TO REMAIN.
PERMITTING, CONSTRUCTION STANDARDS, SUBMITTALS,
REQUESTS FOR INFORMATION, INSPECTIONS, TESTING,
PUNCH LISTS, RECORD DRAWINGS, AND AS-BUILTS
1. SITE CLEARING AND DEMOLITION MAY NOT BE ABLE TO BEGIN UNTIL CERTAIN PERMITS HAVE BEEN ISSUED AND MAY
REQUIRE PRE-CONSTRUCTION MEETINGS, INSPECTIONS, CLEARANCES. THESE PERMITS ARE TYPICALLY ISSUED BY
THE APPLICABLE WATER MANAGEMENT DISTRICT AND THE MUNICIPALITY.
2. OTHER PERMITS ARE REQUIRED PRIOR TO COMPLETING OTHER SITE COMPONENTS SUCH AS THE UTILITY
CONSTRUCTION PERMITS, DRIVEWAY CONNECTION PERMITS, ROW USE PERMITS, ETC.
3. CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH AND OBTAINING ALL REQUIRED PERMITS, BONDS, TESTING, INSPECTIONS, CERTIFICATIONS, ETC. PRIOR TO AND DURING CONSTRUCTION (E.G. FDEP CGP, DEWATERING, MOT, WATER/SEWER INSPECTIONS).
4. A COMPLETE SET OF PERMITTED DRAWINGS AND SPECIFICATIONS MUST BE MAINTAINED ON SITE AT ALL TIMES
THAT THE CONTRACTOR IS PERFORMING WORK.
5. THE CONTRACTOR IS RESPONSIBILITY FOR VERIFYING THE CONSTRUCTION STANDARDS APPLICABLE TO EACH PORTION OF THE PROJECT. A SUGGESTED LIST OF APPLICABLE STANDARDS TYPICALLY ACCOMPANY THIS NOTE ON
THIS PLAN SHEET.
6. CONTRACTOR SHALL FURNISH SHOP DRAWINGS TO THE ENGINEER INDICATING MATERIALS AND MANNER OF INSTALLATION FOR ALL COMPONENTS OF THE PROJECT PRIOR TO PROCUREMENT OF MATERIALS AND INSTALLATION (E.G. PRECAST STRUCTURES, MANUFACTURED ITEMS). FAILURE TO OBTAIN APPROVAL BEFORE
INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE
7. ALL REQUESTS FOR INFORMATION SHALL BE SUBMITTED TO THE ENGINEER FOR RESPONSE BEFORE COMMENCING THE RELATED WORK VIA THE OWNER'S CONSTRUCTION DOCUMENTATION PROCESS. RFIs AND SUBMITTALS SHALL
HAVE A TRACKING NUMBER WITH RESUBMITTAL TRACKING NUMBERS CHANGED TO 1A, 1B…..
8. CONTRACTOR IS RESPONSIBLE FOR COMPILING A LIST OF INSPECTIONS AND FIELD VISITS DESIRED BY THE OWNER AND THE ENGINEER AND REASONABLY SCHEDULING THOSE INSPECTIONS. THESE SHALL INCLUDE AT A MINIMUM, TRENCH BACKFILL INSPECTION, PRESSURE TESTS, BAC-T SAMPLE COLLECTION, OPENING VALVES TO ACTIVATE
WATER SERVICE.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND COORDINATING ALL INSPECTIONS REQUIRED BY THE REVIEWING AGENCIES AS LISTED IN THE PERMITS, INSPECTOR'S REQUEST, OR IMPLIED BY THE DESIGN STANDARDS.
10. CONTRACTOR SHALL CONTRACT WITH AN INDEPENDENT TESTING LABORATORY TO PERFORM TESTING OF MATERIALS, SOILS, UTILITIES, ETC. THE TESTING SHALL BE IN ACCORDANCE WITH THE APPROVED PERMITS, CONSTRUCTION STANDARDS, INSPECTOR'S REQUEST, DESIGN REPORTS, AND STANDARD PAVING AND GRADING TESTING. THIS SHALL INCLUDE DENSITY TESTING IN ALL PAVEMENT AREAS, UTILITY TRENCH COMPACTION ESPECIALLY UNDER ROADS AND OTHER PAVED AREAS, CONCRETE, AND OTHER MATERIALS TESTING.
11. SHOULD ANY RETESTING BE REQUIRED DUE TO THE FAILURE OF ANY TESTS TO MEET THE REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR ALL RETESTING COSTS AND ANY RECONSTRUCTION REQUIRED TO MEET THE
TESTING REQUIREMENTS.
12. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE SCHEDULE OF PUNCH LIST SITE VISITS WITH THE CONSTRUCTION SCHEDULE TO AVOID REPEAT VISITS. A TIMELINE OF ADDRESSING THE PUNCH LIST ITEMS SHALL BE PROVIDED IN A TIMELY MANNER. ANY DISPUTES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE
ENGINEER.
13. RECORD DRAWINGS ARE DEFINED AS NOTES AND OTHER DOCUMENTATION COLLECTED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION AS IT RELATES TO INSTALLATION PROGRESS, FIELD CONDITIONS, MEANS, METHODS, DEVIATIONS, AND OTHER VARIATIONS FROM THE CONTRACT DOCUMENTS. THE DOCUMENTATION MUST BE MADE AVAILABLE TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES UPON REQUEST. RECORD DRAWINGS ARE NOT INTENDED TO BE EXHAUSTIVE, HOWEVER, VERIFICATION OF INSTALLED CONDITIONS CAN BE REQUESTED AT THE
COST OF THE CONTRACTOR UTILIZING STANDARD METHODS.
14. CONTRACTOR SHALL CONFIRM REQUIREMENTS TO PROVIDE COMPLETE AS-BUILT INFORMATION TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES AT THE COST OF THE CONTRACTOR.
15. AS-BUILTS ARE DEFINED AS A DRAWING PRODUCED BY A REGISTERED LAND SURVEYOR BASED ON FIELD MEASUREMENTS OF THE FINISHED SITE IMPROVEMENTS WITH LOCATIONS, ELEVATIONS, AND DESCRIPTION OF IMPROVEMENTS. THEY SHOULD MEET REVIEWING AGENCIES REQUIREMENTS PER PERMIT AND CLOSEOUT REQUIREMENTS. THEY SHOULD ALSO MEET THE OWNER'S NEED FOR LENDING, WARRANTY, AND OTHER
REQUIREMENTS.
16. AS-BUILTS CONTAIN AT A MINIMUM: BUILDING LOCATION AND FINISHED FLOOR ELEVATIONS, ACCESSIBLE ROUTE AND PARKING GRADES, PAVEMENT GRADE BREAKS, GRAVITY STRUCTURE TOP ELEVATIONS AND PIPE SIZES AND INVERTS, PRESSURE SYSTEM FITTINGS AND VALVES, SAMPLING POINTS, STORMWATER FACILITY TOP AND BOTTOM PERIMETERS AND OTHER FEATURES, OUTFALL STRUCTURE DETAILS, ETC. AND OTHER LOCATIONS WHERE FIELD
CONDITIONS DO NOT MATCH THE CONTRACT DOCUMENTS.
17. ADDITIONAL AS-BUILT INFORMATION MAY BE REQUIRED DURING CONSTRUCTION INSTALLATIONS AT CRITICAL AREAS. THIS INCLUDES BUT IS NOT LIMITED TO PIPE CROSSINGS OF WATER MAINS WITH LESS THAN 18 INCHES OF CLEARANCE OR WHEN PARALLEL UTILITIES WITH WATER MAINS HAVE LESS THAN 10 FEET OF CLEARANCE.
WARRANTIES
1. IF NOT SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS, ALL IMPROVEMENTS SHALL BE WARRANTED BY
THE CONTRACTOR TO THE OWNER FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE BY THE OWNER. THIS WARRANTY WILL ALSO EXTEND TO THE MAINTENANCE ENTITY OF ANY OTHER IMPROVEMENTS INCLUDING ROADS, SIDEWALKS, UTILITIES, STORM PIPING, ETC. OR TO THE EXTENT REQUIRED BY THEIR APPLICABLE DESIGN
STANDARDS.
GENERAL LEGEND - SEE PLANS FOR ADDITIONAL CALLOUTS
EXISTING CABLE
EXISTING COMMUNICATIONS
EXISTING ELECTRIC OVERHEAD
EXISTING ELECTRIC UNDERGROUND
EXISTING FIBER OPTIC
EXISTING FIRE
EXISTING FORCEMAIN
EXISTING GAS
EXISTING RECLAIMED WATER
EXISTING STORM
EXISTING TELEPHONE
EXISTING WATER
PROPOSED CABLE
PROPOSED COMMUNICATIONS
PROPOSED ELECTRIC OVERHEAD
PROPOSED ELECTRIC UNDERGROUND
PROPOSED FIBER OPTIC
PROPOSED FIRE
PROPOSED FORCEMAIN
PROPOSED GAS
PROPOSED RECLAIMED WATER
PROPOSED STORM
PROPOSED TELEPHONE
PROPOSED WATER
EXISTING ELEVATION CONTOUR
PROPOSED ELEVATION CONTOUR
SWALE CENTERLINE
PROPOSED GRADE SPOT ELEVATION
SILT FENCE
TREE BARRICADE
SETBACK
BUFFER
PROPERTY BOUNDARY
EXISTING FENCE
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WMWM
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WWWW
SILTSILT
TREETREE
WATER CONSTRUCTION
STANDARDS
SCOPE
1. THE PURPOSE AND INTENT OF THESE GENERAL NOTES AND THE
ACCOMPANYING CONSTRUCTION DETAILS IS TO PROVIDE FOR THE
FURNISHING AND INSTALLATION OF A WATER TRANSMISSION AND
DISTRIBUTION SYSTEM.
2. ENGINEERS, CONTRACTORS, INSPECTORS, AND OTHERS
CONCERNED WITH WATER CONSTRUCTION SHALL PERFORM ALL
WORK IN ACCORDANCE WITH THESE REQUIREMENTS. ANY
MODIFICATIONS TO THESE STANDARDS SHALL REQUIRE APPROVAL
FROM THE DIRECTOR OF THE UTILITIES AND PUBLIC WORKS
DEPARTMENT.
3. ALL WATER MAIN CONSTRUCTION METHODS AND MATERIALS,
INCLUDING PIPING, VALVES, FIRE HYDRANTS ETC., AND
ASSOCIATED APPURTENANCES SHALL CONFORM TO MATERIALS
SCHEDULE AND AWWA STANDARDS.
INSPECTION AND DISPOSITION OF
MATERIALS
1. MATERIAL DELIVERED TO THE JOB SITE SHALL BE INSPECTED.
MATERIALS FOUND DURING INSPECTION OR DURING THE
PROGRESS OF THE WORK TO HAVE CRACKS, FLAWS, SURFACE
ABRASIONS, CRACKED LININGS, OR OTHER DEFECTS SHALL BE
REJECTED AND REMOVED FROM THE JOB SITE WITHOUT DELAY.
ALL MATERIALS DELIVERED TO THE JOB SITE SHALL BE IN
ACCORDANCE WITH THE MATERIALS SCHEDULE.
2. PIPE DELIVERED TO THE JOB SITE SHALL BE UNLOADED OPPOSITE
OR NEAR THE PLACE WHERE IT IS TO BE INSTALLED. MATERIALS
SHALL BE LOADED AND UNLOADED BY LOADER, LIFTING HOISTS, OR
SKIDDING SO AS TO AVOID SHOCK AND PREVENT DAMAGE.
MATERIALS UNLOADED BY SKIDWAYS SHALL NOT BE SKIPPED OR
ROLLED AGAINST MATERIALS ALREADY ON THE GROUND.
3. PROTECTION OF PROPERTY AND OBSTRUCTIONS:
3.1. TEMPORARY SUPPORTS AND/OR ADEQUATE PROTECTION
SHALL BE INSTALLED AND MAINTAINED ON ALL UNDERGROUND
AND SURFACE STRUCTURES ENCOUNTERED IN THE PROGRESS
OF THE WORK. STRUCTURES THAT HAVE BEEN DISTURBED
SHALL BE RESTORED UPON COMPLETION OF THE WORK.
3.2. UNDERGROUND UTILITIES SHALL BE NOTIFIED AND UTILITY
LOCATES PERFORMED (CALL 811) PRIOR TO BEGINNING
CONSTRUCTION. ANY KNOWN OBSTRUCTIONS SHALL BE
SHOWN ON THE DRAWINGS. THE UTMOST CAUTION SHALL BE
TAKEN IN ALL OPERATIONS TO AVOID DAMAGE TO EXISTING
OBSTRUCTIONS (FOR EXAMPLE, PIPES, CABLES, CONDUIT,
UTILITY POLES, STRUCTURES, ETC.) WHETHER OR NOT SHOWN
ON THE DRAWINGS.
3.3. EXISTING UTILITIES SHALL BE KEPT IN OPERATION BY
TEMPORARY LINES, TEMPORARY PUMPS, OR OTHER MEANS
PROVIDED FOR CONTINUOUS OPERATION OF UTILITIES. ALL
THIS WORK SHALL BE INSTALLED, MAINTAINED, OPERATED, AND
REMOVED UPON COMPLETION OF THE JOB.
TRENCH PREPARATION
1. THE TRENCH SHALL BE OPENED SO THAT THE PIPE CAN BE
INSTALLED TO THE ALIGNMENT AND DEPTH REQUIRED. THE
TRENCH SHALL BE EXCAVATED ONLY SO FAR IN ADVANCE OF PIPE
INSTALLATION AS TO INSURE PROPER INSTALLATION IN
ACCORDANCE WITH THE CONSTRUCTION DETAILS AND THESE
PLANS.
2. THE TRENCH SHALL BE EXCAVATED TO THE DEPTH REQUIRED SO
AS TO PROVIDE A UNIFORM AND CONTINUOUS BEARING SUPPORT
FOR THE PIPE ON UNDISTURBED GROUND. BELL HOLES SHALL BE
PROVIDED AT EACH JOINT TO PERMIT JOINTING TO BE MADE
PROPERLY AND INSPECTED.
3. EXCAVATED MATERIAL SHALL BE PILED IN SUCH A MANNER THAT IT
WILL NOT ENDANGER THE WORK, OBSTRUCT NATURAL WATER
COURSES, SIDEWALKS, OR DRIVEWAYS. FIRE HYDRANTS UNDER
PRESSURE, VALVE PIT COVERS, VALVE BOXES, FIRE AND POLICE
CALL BOXES, OR OTHER UTILITY CONTROLS SHALL BE LEFT
UNOBSTRUCTED AND ACCESSIBLE AT ALL TIMES. GUTTERS SHALL
BE KEPT CLEAR OR OTHER SATISFACTORY PROVISIONS MADE FOR
STREET DRAINAGE. ALL SURFACE MATERIALS WHICH ARE SUITABLE
FOR REUSE IN RESTORING THE SURFACE SHALL BE KEPT
SEPARATE FROM ANY UNACCEPTABLE EXCAVATED MATERIAL.
4. WATER SHALL NOT BE ALLOWED IN THE TRENCH AT ANY TIME. AN
ADEQUATE SUPPLY OF WELL POINTS, HEADERS, AND PUMPS, ALL IN
FIRST CLASS OPERATING CONDITION, MAY BE USED TO REMOVE
THE WATER. THE USE OF GRAVEL AND PUMPS SHALL ALSO BE AN
ACCEPTABLE MEANS OF REMOVING THE WATER. THE TRENCH
SHALL BE EXCAVATED NO MORE THAN THE AVAILABLE PUMPING
FACILITIES ARE CAPABLE OF HANDLING. THE DISCHARGE FROM
PUMPS SHALL BE ROUTED TO NATURAL DRAINAGE CHANNELS OR
EMPTIED INTO DRAINS OR STORM SEWERS, OR AS REQUIRED BY
EPA, FDEP, WATER MANAGEMENT DISTRICT, OR OTHER AGENCIES.
HANDLING AND CUTTING…