Building 62 Asbestos Final Report 07302017.pdf
PDF 21 MB Posted
- Attached to
- Building 62 Renovation, Coral Gables Federal contract opportunity
- Solicitation number
- 12639524R0020
About this file
The provided document is a Building 62 Asbestos Final Report dated 07/30/2017. It is related to a federal contract opportunity for the renovation of Building 62 in Coral Gables, with Solicitation Number 12639524R0020.
The report summarizes the findings of an asbestos survey conducted on Building 62, which is part of the larger renovation project. Key details include the presence and location of asbestos-containing materials, recommendations for abatement, and cost estimates for the abatement work. The report provides a comprehensive assessment of the asbestos-related scope of work required for the Building 62 renovation project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12639524R0020-0004.pdf | ||
| 12639524R0020-0003.pdf | ||
| 12639524R0020-0002.pdf | ||
| RFIs and Responses 2.docx | DOCX document | |
| 12639524R0020-0001.pdf | ||
| RFIs and responses.docx | DOCX document | |
| 20240422_184353638_iOS.jpg | JPG image | |
| 20240422_184332471_iOS.jpg | JPG image | |
| 20240422_184140685_iOS.jpg | JPG image | |
| 20240422_183955449_iOS.jpg | JPG image | |
| 20240422_184119221_iOS.jpg | JPG image | |
| 20240422_184050336_iOS.jpg | JPG image | |
| 20240422_184244122_iOS.jpg | JPG image | |
| 20240422_184002492_iOS.jpg | JPG image | |
| 20240422_184000455_iOS.jpg | JPG image | |
| Atch 4_Federal Construction Wage Rates_Miami-Dade.pdf | ||
| Atch 3_bldg 62 drawings.pdf | ||
| Atch 1_SOW Coral Gable Bldg 62 construction 5-8-24.docx | DOCX document | |
| 12639524R0020.pdf | ||
| Atch 2_Bldg 62 specifications.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Coral Gables, Building 62 DEC Project No. 1707.001
BUILDING 62 SURVEY FOR ASBESTOS AND LEAD IN PAINT
S & T MODERNIZATION
U.S. DEPARTMENT OF AGRICULTURE (USDA)
ANIMAL AND PLANT HEALTH INSPECTION SERVICE (APHIS)
PLANT PROTECTION QUARANTINE (PPQ)
CENTER FOR PLANT, HEALTH, SCIENCE AND TECHNOLOGIES (CPHST)
13601 OLD CUTLER ROAD
CORAL GABLES, FL
Prepared for:
CLARKNEXSEN
440 MARTIN LUTHER KING, JR. BLVD.
MACON, GEORGIA 31201
Report Date:
July 30, 2017
Prepared by:
MICHAEL F. DURBIN, CIH, FLAC #IA0000055 (Expiration Date 11/30/2018)
DURBIN ENVIRONMENTAL CONSULTANTS, INC.
2201 POTOMAC PLACE
LAWRENCEVILLE, GEORGIA 30043
(678) 482-9917 OFFICE
(770) 601-7791 MOBILE
TABLE OF CONTENTS
PAGE
1. INTRODUCTION 3
2. DISCUSSION AND RESULTS 3
a. Asbestos
b. Lead
3. METHODOLOGY 5
Asbestos sampling protocol Lead-In-Paint (LBP) sampling protocol
4. OBSERVATIONS/CONCLUSIONS 7
5. RECOMMENDATIONS 7
6. REFERENCES 8
APPENDIX
A. Asbestos Bulk Sampling Summary followed by the Laboratory Report and
Representative Photographs of Suspect Asbestos Containing Materials
B. Paint Chip Sampling Summary followed by the Laboratory Report and Representative
Photographs of Paint Chip Samples
C. Sketch with Room Assignments
1. INTRODUCTION
Durbin Environmental Consultants, Inc. (DEC) was retained by CLARKNEXSEN to conduct an assessment for suspect asbestos containing materials and lead-in-paint (LBP) at the U.S.
Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Center for Plant, Health, Science and Technology (CPHST), located at 13601 Old Cutler Road, Miami, Florida 33158. The survey was limited to Building
62. Michael F. Durbin, CIH, FLAC #IA0000055 of Durbin Environmental Consultants, Inc., conducted the assessment on July 19, 2017. Mr. Durbin is currently accredited as an asbestos inspector through an Environmental Protection Agency (EPA) approved training provider. This report was reviewed by Michael F. Durbin, CIH, FLAC #IA0000055.
Bulk sample analysis for suspect asbestos containing materials was performed by Analytical Environmental Services, Inc., 3080 Presidential Drive, Atlanta, Georgia 30340. Analytical Environmental Services Inc. is accredited for asbestos fiber analysis through participation in the National Institute of Standards and Technology (NIST) National Voluntary Laboratory Accreditation Program (NVLAP) and is assigned NVLAP Lab Code 102082-0. Analytical Environmental Services Inc. utilized the analytical method: EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials” (polarized light microscopy in conjunction with dispersion staining).
Paint Chip Sample analysis was performed via Inductively Coupled Argon Plasma, Atomic Emission Spectroscopy following the NIOSH 7303 Method by Analytical Environmental Services, Inc. (AES), 3080 Presidential Drive, Atlanta, GA 30340. AES is accredited in the analysis of lead-based paint (LBP) samples via the Environmental Lead Laboratory Accreditation Program (#100671).
2. DISCUSSION AND RESULTS
a. Building #62 - Asbestos
The asbestos survey was conducted in accordance with the sampling protocol established in the Environmental Protection Agency’s Asbestos Hazard Emergency Response Act (AHERA 40 CFR, Part 763) for the materials included in this specific survey. The following provides general information and summarizes the potential impact of asbestos containing material during the scheduled renovation project.
Bulk samples were collected from the following suspect asbestos containing materials during this survey:
1. 12” X 12” Beige Mottled Floor Tile with Adhesive (HM #1)
2. 12” X 12” Dark Gray Floor Tile with Adhesive (HM #2)
3. Black Covebase with Adhesive (HM #3)
4. Tan Covebase with Adhesive (HM #4)
5. Drywall and Drywall Joint Compound (HM #5)
6. Foil Type Fiberglass Duct Insulation (HM #6)
7. Foil Type Fiberglass Duct Insulation with Beige Sealant (HM #7)
8. Beige Exterior Concrete Type Stucco (HM #8)
9. Brown Roof Shingles with Black Felt and Tar (HM #9)
10. Black Underneath Sink Coating (HM #10)
The following collected bulk sample materials contained non-friable asbestos by Polarized Light Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing Materials).
1. Brown Roof Shingles with Black Felt and Tar (HM #9)
2. Black Underneath Sink Coating (HM #10)
Note: There is a laboratory fume hood that is mobile in this building and it has a Transite-Type asbestos lining that should be assumed positive for asbestos.
b. Building #62 - Lead
Paint chip samples were collected from the following representative surfaces:
1. Beige Paint, Wood Wall, Bldg. 62, Corridor Between AHU Rm and Rm F (Sample # 62-PC-01)
2. Beige Paint, Metal Door, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-02)
3. Beige Paint, Metal Door Frame, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-03)
4. Beige Paint, CMU Wall, Bldg. 62, Rm J (Sample # 62-PC-04)
5. Gray Paint, Concrete Floor, Bldg. 62, Rm 1 (Sample # 62-PC-05)
Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead, based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities. The results of analysis indicated that all representative paint chip samples were below the analytical reporting limit for lead.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
Refer to Appendix B for the Paint Chip Sample Summary followed by Laboratory Data and Representative Photographs of Paint Chip Samples.
3. METHODOLOGY
Asbestos Sampling Protocol
The inspector sampled all suspect ACM in accessible areas. In order for a group of homogeneous materials to be considered as non-asbestos containing, all samples from that specific homogeneous material must be analyzed and determined to be non-asbestos containing or less than or equal to 1% asbestos.
Representative, randomly selected samples were collected from each homogeneous area of suspect asbestos-containing material. For purposes of this report, the homogeneous area is physically defined as all material with the same visual appearance, texture and hardness.
The minimum number of samples collected for each homogeneous area (or material) is as follows:
1. Friable Spray-applied or Trowel-applied Material
a. Less than or equal to 1000 square feet (S.F.) = 3 samples
b. Greater than 1000 S.F. and less than or equal to 5000 S.F. = 5 samples.
c. Greater than 5000 S. F. = 7 samples
2. Pipe and Duct Insulation
Three samples per homogeneous area of insulation were taken unless it was a confirmation sample.
3. Elbows, Valves, Fittings and Connection Mud
Three representative samples were taken from each representative type of insulated elbow, valve, fitting and connecting mud unless it was a confirmation sample.
4. Boiler, Tanks and Furnaces
A minimum of 3 samples per unit was collected.
5. Patchwork Patchwork is defined as a patch or repair to existing material based on the following quantities:
a. Surfacing material patches are limited to a maximum of 6 S. F.
b. Pipe and duct insulation patches are limited to a maximum of 6 L. F. or 6
S. F.
c. Boiler, tanks and furnace patches are limited to 6 S.F. maximum.
If the patchwork exceeded the limits prescribed above, the sampling protocol resorted back to the homogeneous area descriptions in items 1-4. If a material qualifies as patchwork, a single sample was collected per patch.
6. Ceiling or Acoustical Tile
a. Minimum of 3 Samples
7. Miscellaneous Friable Material
a. 2 Samples
8. Non-friable Material
Non-friable materials for purposes of this survey would include material such as floor tiles and mastic/adhesive, linoleum floor covering, interior/exterior caulks, flooring felt (if still under floor tile), roofing materials, miscellaneous cementitious material such as wall or ceiling panels, caulking or sealant, or window glazing.
a. Minimum of 3 samples
Lead-Based Paint (LBP) Sampling Protocol
Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities.
The inspector collected paint chip samples from representative surfaces and components likely to be impacted by this renovation project and compared them against the HUD definition for Lead- Based Paint (LBP) of 0.5 % by weight. Individual sample results are presented in tabular form in Appendix B.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
4. OBSERVATIONS/CONCLUSIONS
Building #62 - Asbestos
The following collected bulk sample materials contained non-friable asbestos by Polarized Light Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing Materials).
1. Brown Roof Shingles with Black Felt and Tar (HM #9)
2. Black Underneath Sink Coating (HM #10)
Note: There is a laboratory fume hood that is mobile in this building and it has a Transite-Type asbestos lining that should be assumed positive for asbestos.
Building #62 - Lead
Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead, based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities. The results of analysis indicated that all representative paint chip samples were below the analytical reporting limit for lead.
Disturbance to any painted item/surface/component shall be done in compliance with the OSHA Construction Industry Standard for Lead (29 CFR 1926.62). The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR
1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.
5. RECOMMENDATIONS
A. The asbestos containing material survey report should be maintained at the job site during performance of the renovation/demolition activities. At least ten (10) working days advanced written NESHAP Notification shall be provided to: Miami-Dade County, Division of Environmental Resources Management, 710 N.W. 1st Court, Suite 400, Miami, FL 33136.
Asbestos Contact: Mr. Steven Bedoya at Steven.Bedoya@miamidade.gov and Mr. Bedoya’s phone number is 305-372-6925 and the fax number is 305-372-6954.
B. Communication of this asbestos survey report results should be presented in accordance with the OSHA 29 CFR 1926.1101 Asbestos Standard to all personnel who may enter or perform work in the Building.
C. Disturbance of painted surfaces should be performed in accordance with the OSHA Lead
Standard (29 CFR 1926.62). Waste generated by disturbance of painted surfaces should be subjected to Toxicity Characteristic Leaching Procedure (TCLP) testing to determine leachable lead concentrations. If leachable concentrations of lead in construction waste are determined by TCLP testing, those materials should be disposed of or recycled in accordance with 40 CFR Part 260 to 271 and the State of Florida Solid Waste Management and State of Florida Hazardous Waste Management Rules and Regulations in addition to County and Regional authorities.
D. Verify that Vermiculite fill is not present in CMU wall cavities prior to CMU wall demolition.
6. REFERENCES
1. Guidance for Controlling Asbestos-Containing Materials in Buildings”
(Purple Book). EPA 560/5-85-024. Office of Pesticides and Toxic Substances Washington, DC 20460.
2. 40 CFR, Part 763, Asbestos Hazard Emergency Response Act
3. 40 CFR, Part 763, Asbestos School Hazard Abatement Reauthorization Act
4. 40 CFR, Part 61, Subpart M Asbestos
5. 29 CFR Part 1926.1101 Asbestos
6. 29 CFR Part 1926.62 Lead
7. HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing
8. 40 CFR Part 260 General Hazardous Waste Management.
9. 40 CFR Part 261 Identification and Listing of Hazardous Waste.
10. 40 CFR Part 262 Standards Applicable to Generators of Hazardous Waste.
11. 40 CFR Part 263 Standards Applicable to Transporters of Hazardous Waste.
12. 40 CFR Part 268 Land Disposal Restrictions.
13. State of Florida, Chapter 62-701 Solid Waste Management Facilities
14. State of Florida, Chapter 62-722 Regulations of Recovered Materials
15. State of Florida, Chapter 62-730 Hazardous Waste
16. State of Florida, Chapter 62-731 County and Regional Hazardous Waste Management
Programs
17. State of Florida, Department of Environmental Protection, Chapter 62-257, F.A.C.
If you have any questions or comments regarding this report, please do not hesitate to call.
Sincerely, Durbin Environmental Consultants, Inc.
Michael F. Durbin, CIH Michael F. Durbin, CIH, FLAC # IA0000055 (EPA-Accredited Asbestos Inspector/Management Planner, Certificate Number 19129/19131, Expiration Date: April 24, 2018) President
APPENDIX A
Asbestos Bulk Sampling Summary
Followed by the Laboratory Data and Representative Photographs of Suspect Asbestos Containing Materials
Sample Number
Description Asbestos Present
Friable Non- Asbestos Material Present
Sample Location
HM
62-FT1-01
12” X 12” Beige
Mottled Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Room 2
62-FT1-02
12” X 12” Beige
Mottled Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Room 2 1
62-FT1-03
12” X 12” Beige
Mottled Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Room 2
62-FT2-01
12” X 12” Dark Gray
Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Corridor
Outside Room 3
62-FT2-02
12” X 12” Dark Gray
Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Room E 2
62-FT2-03
12” X 12” Dark Gray
Floor Tile with Adhesive
NAD N/A See Lab Report
Building 62, Room F
62-CB1-01 Black Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room 5
62-CB1-02 Black Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room 5 3
62-CB1-03 Black Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room 5
62-CB2-01 Tan Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room A
62-CB2-02 Tan Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room B 4
Description Asbestos Present
Friable Non- Asbestos Material Present
Sample Location
HM
62-CB2-03 Tan Covebase with Adhesive NAD N/A See Lab
Report Building 62, Room F 4
62-DWJC-
Drywall and Drywall Joint Compound NAD N/A See Lab
Report Building 62, Room 1
62-DWJC-
Drywall and Drywall Joint Compound NAD N/A See Lab
Report Building 62, Room 2
62-DWJC-
Drywall and Drywall Joint Compound NAD N/A See Lab
Report Building 62, Room 1 5
62-DWJC-
Drywall and Drywall Joint Compound NAD N/A See Lab
Report Building 62, Room 1
62-DWJC-
Drywall and Drywall Joint Compound NAD N/A See Lab
Report Building 62, Room 1
62-DI1-01 Foil Type Fiberglass Duct Insulation NAD N/A See Lab
Report Building 62, Room 4
62-DI1-02 Foil Type Fiberglass Duct Insulation NAD N/A See Lab
Report Building 62, Room 4 6
62-DI1-03 Foil Type Fiberglass Duct Insulation NAD N/A See Lab
Report Building 62, Room 4
62-DI2-01
Foil Type Fiberglass Duct Insulation with
Beige Sealant NAD N/A See Lab
Report Building 62, AHU Room
62-DI2-02
Foil Type Fiberglass Duct Insulation with
Beige Sealant NAD N/A See Lab
Report Building 62, AHU Room 7
62-DI2-03
Foil Type Fiberglass Duct Insulation with
Beige Sealant NAD N/A See Lab
Report
AHU Room
Description Asbestos Present
Friable Non- Asbestos Material Present
Sample Location
HM
62-ES-01 Beige Exterior Concrete Type Stucco NAD N/A See Lab
Report Building 62
Exterior
62-ES-02 Beige Exterior Concrete Type Stucco NAD N/A See Lab
Report Building 62
Exterior
62-ES-03 Beige Exterior Concrete Type Stucco NAD N/A See Lab
Report Building 62
Exterior 8
62-ES-04 Beige Exterior Concrete Type Stucco NAD N/A See Lab
Report Building 62
Exterior
62-ES-05 Beige Exterior Concrete Type Stucco NAD N/A See Lab
Report Building 62
Exterior
62-RS-01
Brown Roof Shingles with Black Felt and
Tar
5% Chrysotile in Tar No See Lab
Report Building 62
Exterior
62-RS-02
Brown Roof Shingles with Black Felt and
Tar
5% Chrysotile in Tar No See Lab
Report Building 62
Exterior 9
62-RS-03
Brown Roof Shingles with Black Felt and
Tar
5% Chrysotile in Tar No See Lab
Report Building 62
Exterior
62-SC-01 Black Underneath Sink Coating
2% Chrysotile No See Lab
Report
Room 1 10
NAD – No Asbestos Detected; N/A – Not Applicable
Representative Photographs of Suspect Asbestos Containing
Materials
1. 12” X 12” Beige Mottled Floor Tile with Adhesive (HM #1)
2. 12” X 12” Dark Gray Floor Tile with Adhesive (HM #2)
3. Black Covebase with Adhesive (HM #3)
4. Tan Covebase with Adhesive (HM #4)
5. Drywall and Drywall Joint Compound (HM #5)
6. Foil Type Fiberglass Duct Insulation (HM #6)
7. Foil Type Fiberglass Duct Insulation with Beige Sealant (HM #7)
8. Beige Exterior Concrete Type Stucco (HM #8)
9. Brown Roof Shingles with Black Felt and Tar (HM #9)
10. Black Underneath Sink Coating (HM #10)
APPENDIX B
Paint Chip Sample Summary Table Followed by Laboratory Data and Representative Photographs of Paint Chip Samples
Collection Date
Sample Number
Description Location Analytical Method
Percent Lead by Weight
(wt%)
7/19/19 62-PC-01 Beige Paint, Wood Wall
Bldg. 62, Corridor
Between AHU Rm and Rm F
ICP BRL
7/19/19 62-PC-02 Beige Paint, Metal Door
Bldg. 62, Entrance to Rm
ICP BRL
7/19/19 62-PC-03
Beige Paint, Metal Door
Frame
Bldg. 62, Entrance to Rm
ICP BRL
7/19/19 62-PC-04 Beige Paint, CMU Wall Bldg. 62, Rm J ICP BRL
7/19/19 62-PC-05 Gray Paint, Concrete Floor Bldg. 62, Rm 1 ICP BRL
BRL: Not Detected at the Reporting Limit
Representative Photographs of Paint Chip Samples
1. Beige Paint, Wood Wall, Bldg. 62, Corridor Between AHU Rm and Rm F (Sample # 62-PC-01)
3. Beige Paint, Metal Door, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-02)
4. Beige Paint, Metal Door Frame, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-03)
5. Beige Paint, CMU Wall, Bldg. 62, Rm J (Sample # 62-PC-04)
6. Gray Paint, Concrete Floor, Bldg. 62, Rm 1 (Sample # 62-PC-05)
APPENDIX C
Sketch with Room Assignments
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 305 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 306 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 307 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 308 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 309 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 310 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 311 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 312 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 313 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 314 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 315 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 316 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 317 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 318 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 319 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 320 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 321 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 322 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 323 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 324 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 325 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 326 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 327 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 328 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 329 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 330 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 331 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 332 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 333 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 334 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 335 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 336 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 337 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 338 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 339 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 340 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 341 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 342 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 343 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 344 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 345 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 346 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 347 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 348 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 349 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 350 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 351 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 352 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 353 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 354 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 355 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 356 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 357 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 358 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 359 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 360 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 361 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 362 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 363 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 364 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 365 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 366 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 367 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 368 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 369 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 370 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 371 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 372 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 373 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 374 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 375 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 376 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 377 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 378 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 379 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 380 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 381 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 382 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 383 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 384 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 385 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 386 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 387 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 388 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 389 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 390 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 391 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 392 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 393 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 394 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 395 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 396 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 397 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 398 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 399 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 400 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 401 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 402 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 403 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 404 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 405 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 406 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 407 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 408 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 409 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 410 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 411 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 412 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 413 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 414 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 415 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 416 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 417 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 418 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 419 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 420 |
| 181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 421 |
File details come from the government source that posted it. Updated .