The provided document is a Building 62 Asbestos Final Report dated 07/30/2017. It is related to a federal contract opportunity for the renovation of Building 62 in Coral Gables, with Solicitation Number 12639524R0020.

The report summarizes the findings of an asbestos survey conducted on Building 62, which is part of the larger renovation project. Key details include the presence and location of asbestos-containing materials, recommendations for abatement, and cost estimates for the abatement work. The report provides a comprehensive assessment of the asbestos-related scope of work required for the Building 62 renovation project.

View the file

Other files for this federal contract opportunity

Other files attached to Building 62 Renovation, Coral Gables, newest first.
File Type Posted
12639524R0020-0004.pdf PDF
12639524R0020-0003.pdf PDF
12639524R0020-0002.pdf PDF
RFIs and Responses 2.docx DOCX document
12639524R0020-0001.pdf PDF
RFIs and responses.docx DOCX document
20240422_184353638_iOS.jpg JPG image
20240422_184332471_iOS.jpg JPG image
20240422_184140685_iOS.jpg JPG image
20240422_183955449_iOS.jpg JPG image
20240422_184119221_iOS.jpg JPG image
20240422_184050336_iOS.jpg JPG image
20240422_184244122_iOS.jpg JPG image
20240422_184002492_iOS.jpg JPG image
20240422_184000455_iOS.jpg JPG image
Atch 4_Federal Construction Wage Rates_Miami-Dade.pdf PDF
Atch 3_bldg 62 drawings.pdf PDF
Atch 1_SOW Coral Gable Bldg 62 construction 5-8-24.docx DOCX document
12639524R0020.pdf PDF
Atch 2_Bldg 62 specifications.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Coral Gables, Building 62 DEC Project No. 1707.001

BUILDING 62 SURVEY FOR ASBESTOS AND LEAD IN PAINT

S & T MODERNIZATION

U.S. DEPARTMENT OF AGRICULTURE (USDA)

ANIMAL AND PLANT HEALTH INSPECTION SERVICE (APHIS)

PLANT PROTECTION QUARANTINE (PPQ)

CENTER FOR PLANT, HEALTH, SCIENCE AND TECHNOLOGIES (CPHST)

13601 OLD CUTLER ROAD

CORAL GABLES, FL

Prepared for:

CLARKNEXSEN

440 MARTIN LUTHER KING, JR. BLVD.

MACON, GEORGIA 31201

Report Date:

July 30, 2017

Prepared by:

MICHAEL F. DURBIN, CIH, FLAC #IA0000055 (Expiration Date 11/30/2018)

DURBIN ENVIRONMENTAL CONSULTANTS, INC.

2201 POTOMAC PLACE

LAWRENCEVILLE, GEORGIA 30043

(678) 482-9917 OFFICE

(770) 601-7791 MOBILE

TABLE OF CONTENTS

PAGE

1. INTRODUCTION 3

2. DISCUSSION AND RESULTS 3

a. Asbestos

b. Lead

3. METHODOLOGY 5

Asbestos sampling protocol Lead-In-Paint (LBP) sampling protocol

4. OBSERVATIONS/CONCLUSIONS 7

5. RECOMMENDATIONS 7

6. REFERENCES 8

APPENDIX

A. Asbestos Bulk Sampling Summary followed by the Laboratory Report and

Representative Photographs of Suspect Asbestos Containing Materials

B. Paint Chip Sampling Summary followed by the Laboratory Report and Representative

Photographs of Paint Chip Samples

C. Sketch with Room Assignments

1. INTRODUCTION

Durbin Environmental Consultants, Inc. (DEC) was retained by CLARKNEXSEN to conduct an assessment for suspect asbestos containing materials and lead-in-paint (LBP) at the U.S.

Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Center for Plant, Health, Science and Technology (CPHST), located at 13601 Old Cutler Road, Miami, Florida 33158. The survey was limited to Building

62. Michael F. Durbin, CIH, FLAC #IA0000055 of Durbin Environmental Consultants, Inc., conducted the assessment on July 19, 2017. Mr. Durbin is currently accredited as an asbestos inspector through an Environmental Protection Agency (EPA) approved training provider. This report was reviewed by Michael F. Durbin, CIH, FLAC #IA0000055.

Bulk sample analysis for suspect asbestos containing materials was performed by Analytical Environmental Services, Inc., 3080 Presidential Drive, Atlanta, Georgia 30340. Analytical Environmental Services Inc. is accredited for asbestos fiber analysis through participation in the National Institute of Standards and Technology (NIST) National Voluntary Laboratory Accreditation Program (NVLAP) and is assigned NVLAP Lab Code 102082-0. Analytical Environmental Services Inc. utilized the analytical method: EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials” (polarized light microscopy in conjunction with dispersion staining).

Paint Chip Sample analysis was performed via Inductively Coupled Argon Plasma, Atomic Emission Spectroscopy following the NIOSH 7303 Method by Analytical Environmental Services, Inc. (AES), 3080 Presidential Drive, Atlanta, GA 30340. AES is accredited in the analysis of lead-based paint (LBP) samples via the Environmental Lead Laboratory Accreditation Program (#100671).

2. DISCUSSION AND RESULTS

a. Building #62 - Asbestos

The asbestos survey was conducted in accordance with the sampling protocol established in the Environmental Protection Agency’s Asbestos Hazard Emergency Response Act (AHERA 40 CFR, Part 763) for the materials included in this specific survey. The following provides general information and summarizes the potential impact of asbestos containing material during the scheduled renovation project.

Bulk samples were collected from the following suspect asbestos containing materials during this survey:

1. 12” X 12” Beige Mottled Floor Tile with Adhesive (HM #1)

2. 12” X 12” Dark Gray Floor Tile with Adhesive (HM #2)

3. Black Covebase with Adhesive (HM #3)

4. Tan Covebase with Adhesive (HM #4)

5. Drywall and Drywall Joint Compound (HM #5)

6. Foil Type Fiberglass Duct Insulation (HM #6)

7. Foil Type Fiberglass Duct Insulation with Beige Sealant (HM #7)

8. Beige Exterior Concrete Type Stucco (HM #8)

9. Brown Roof Shingles with Black Felt and Tar (HM #9)

10. Black Underneath Sink Coating (HM #10)

The following collected bulk sample materials contained non-friable asbestos by Polarized Light Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing Materials).

1. Brown Roof Shingles with Black Felt and Tar (HM #9)

2. Black Underneath Sink Coating (HM #10)

Note: There is a laboratory fume hood that is mobile in this building and it has a Transite-Type asbestos lining that should be assumed positive for asbestos.

b. Building #62 - Lead

Paint chip samples were collected from the following representative surfaces:

1. Beige Paint, Wood Wall, Bldg. 62, Corridor Between AHU Rm and Rm F (Sample # 62-PC-01)

2. Beige Paint, Metal Door, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-02)

3. Beige Paint, Metal Door Frame, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-03)

4. Beige Paint, CMU Wall, Bldg. 62, Rm J (Sample # 62-PC-04)

5. Gray Paint, Concrete Floor, Bldg. 62, Rm 1 (Sample # 62-PC-05)

Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead, based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities. The results of analysis indicated that all representative paint chip samples were below the analytical reporting limit for lead.

The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

Refer to Appendix B for the Paint Chip Sample Summary followed by Laboratory Data and Representative Photographs of Paint Chip Samples.

3. METHODOLOGY

Asbestos Sampling Protocol

The inspector sampled all suspect ACM in accessible areas. In order for a group of homogeneous materials to be considered as non-asbestos containing, all samples from that specific homogeneous material must be analyzed and determined to be non-asbestos containing or less than or equal to 1% asbestos.

Representative, randomly selected samples were collected from each homogeneous area of suspect asbestos-containing material. For purposes of this report, the homogeneous area is physically defined as all material with the same visual appearance, texture and hardness.

The minimum number of samples collected for each homogeneous area (or material) is as follows:

1. Friable Spray-applied or Trowel-applied Material

a. Less than or equal to 1000 square feet (S.F.) = 3 samples

b. Greater than 1000 S.F. and less than or equal to 5000 S.F. = 5 samples.

c. Greater than 5000 S. F. = 7 samples

2. Pipe and Duct Insulation

Three samples per homogeneous area of insulation were taken unless it was a confirmation sample.

3. Elbows, Valves, Fittings and Connection Mud

Three representative samples were taken from each representative type of insulated elbow, valve, fitting and connecting mud unless it was a confirmation sample.

4. Boiler, Tanks and Furnaces

A minimum of 3 samples per unit was collected.

5. Patchwork Patchwork is defined as a patch or repair to existing material based on the following quantities:

a. Surfacing material patches are limited to a maximum of 6 S. F.

b. Pipe and duct insulation patches are limited to a maximum of 6 L. F. or 6

S. F.

c. Boiler, tanks and furnace patches are limited to 6 S.F. maximum.

If the patchwork exceeded the limits prescribed above, the sampling protocol resorted back to the homogeneous area descriptions in items 1-4. If a material qualifies as patchwork, a single sample was collected per patch.

6. Ceiling or Acoustical Tile

a. Minimum of 3 Samples

7. Miscellaneous Friable Material

a. 2 Samples

8. Non-friable Material

Non-friable materials for purposes of this survey would include material such as floor tiles and mastic/adhesive, linoleum floor covering, interior/exterior caulks, flooring felt (if still under floor tile), roofing materials, miscellaneous cementitious material such as wall or ceiling panels, caulking or sealant, or window glazing.

a. Minimum of 3 samples

Lead-Based Paint (LBP) Sampling Protocol

Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities.

The inspector collected paint chip samples from representative surfaces and components likely to be impacted by this renovation project and compared them against the HUD definition for Lead- Based Paint (LBP) of 0.5 % by weight. Individual sample results are presented in tabular form in Appendix B.

The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

4. OBSERVATIONS/CONCLUSIONS

Building #62 - Asbestos

The following collected bulk sample materials contained non-friable asbestos by Polarized Light Microscopy (PLM) (reference Appendix A for the Asbestos Bulk Sampling Summary followed by the Laboratory Report and Representative Photographs of Suspect Asbestos Containing Materials).

1. Brown Roof Shingles with Black Felt and Tar (HM #9)

2. Black Underneath Sink Coating (HM #10)

Note: There is a laboratory fume hood that is mobile in this building and it has a Transite-Type asbestos lining that should be assumed positive for asbestos.

Building #62 - Lead

Paint chips containing lead concentrations at or above 0.5 percent by weight are considered positive for lead, based on EPA and Department of Housing and Urban Development (HUD) guidelines for Target Housing and Child Occupied Facilities. The results of analysis indicated that all representative paint chip samples were below the analytical reporting limit for lead.

Disturbance to any painted item/surface/component shall be done in compliance with the OSHA Construction Industry Standard for Lead (29 CFR 1926.62). The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the HUD definition for LBP. If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR

1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. The Contractor shall assume that all painted surfaces may contain detectable levels of lead for purposes of this project and demonstrate through personal air sampling that airborne lead levels will not exceed 30 micrograms (ug) lead per cubic meter (m3) of air determined as an 8-hour time-weighted average (TWA), for each representative task and trade that disturbs painted surfaces.

5. RECOMMENDATIONS

A. The asbestos containing material survey report should be maintained at the job site during performance of the renovation/demolition activities. At least ten (10) working days advanced written NESHAP Notification shall be provided to: Miami-Dade County, Division of Environmental Resources Management, 710 N.W. 1st Court, Suite 400, Miami, FL 33136.

Asbestos Contact: Mr. Steven Bedoya at Steven.Bedoya@miamidade.gov and Mr. Bedoya’s phone number is 305-372-6925 and the fax number is 305-372-6954.

B. Communication of this asbestos survey report results should be presented in accordance with the OSHA 29 CFR 1926.1101 Asbestos Standard to all personnel who may enter or perform work in the Building.

C. Disturbance of painted surfaces should be performed in accordance with the OSHA Lead

Standard (29 CFR 1926.62). Waste generated by disturbance of painted surfaces should be subjected to Toxicity Characteristic Leaching Procedure (TCLP) testing to determine leachable lead concentrations. If leachable concentrations of lead in construction waste are determined by TCLP testing, those materials should be disposed of or recycled in accordance with 40 CFR Part 260 to 271 and the State of Florida Solid Waste Management and State of Florida Hazardous Waste Management Rules and Regulations in addition to County and Regional authorities.

D. Verify that Vermiculite fill is not present in CMU wall cavities prior to CMU wall demolition.

6. REFERENCES

1. Guidance for Controlling Asbestos-Containing Materials in Buildings”

(Purple Book). EPA 560/5-85-024. Office of Pesticides and Toxic Substances Washington, DC 20460.

2. 40 CFR, Part 763, Asbestos Hazard Emergency Response Act

3. 40 CFR, Part 763, Asbestos School Hazard Abatement Reauthorization Act

4. 40 CFR, Part 61, Subpart M Asbestos

5. 29 CFR Part 1926.1101 Asbestos

6. 29 CFR Part 1926.62 Lead

7. HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing

8. 40 CFR Part 260 General Hazardous Waste Management.

9. 40 CFR Part 261 Identification and Listing of Hazardous Waste.

10. 40 CFR Part 262 Standards Applicable to Generators of Hazardous Waste.

11. 40 CFR Part 263 Standards Applicable to Transporters of Hazardous Waste.

12. 40 CFR Part 268 Land Disposal Restrictions.

13. State of Florida, Chapter 62-701 Solid Waste Management Facilities

14. State of Florida, Chapter 62-722 Regulations of Recovered Materials

15. State of Florida, Chapter 62-730 Hazardous Waste

16. State of Florida, Chapter 62-731 County and Regional Hazardous Waste Management

Programs

17. State of Florida, Department of Environmental Protection, Chapter 62-257, F.A.C.

If you have any questions or comments regarding this report, please do not hesitate to call.

Sincerely, Durbin Environmental Consultants, Inc.

Michael F. Durbin, CIH Michael F. Durbin, CIH, FLAC # IA0000055 (EPA-Accredited Asbestos Inspector/Management Planner, Certificate Number 19129/19131, Expiration Date: April 24, 2018) President

APPENDIX A

Asbestos Bulk Sampling Summary

Followed by the Laboratory Data and Representative Photographs of Suspect Asbestos Containing Materials

Sample Number

Description Asbestos Present

Friable Non- Asbestos Material Present

Sample Location

HM

62-FT1-01

12” X 12” Beige

Mottled Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Room 2

62-FT1-02

12” X 12” Beige

Mottled Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Room 2 1

62-FT1-03

12” X 12” Beige

Mottled Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Room 2

62-FT2-01

12” X 12” Dark Gray

Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Corridor

Outside Room 3

62-FT2-02

12” X 12” Dark Gray

Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Room E 2

62-FT2-03

12” X 12” Dark Gray

Floor Tile with Adhesive

NAD N/A See Lab Report

Building 62, Room F

62-CB1-01 Black Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room 5

62-CB1-02 Black Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room 5 3

62-CB1-03 Black Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room 5

62-CB2-01 Tan Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room A

62-CB2-02 Tan Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room B 4

Description Asbestos Present

Friable Non- Asbestos Material Present

Sample Location

HM

62-CB2-03 Tan Covebase with Adhesive NAD N/A See Lab

Report Building 62, Room F 4

62-DWJC-

Drywall and Drywall Joint Compound NAD N/A See Lab

Report Building 62, Room 1

62-DWJC-

Drywall and Drywall Joint Compound NAD N/A See Lab

Report Building 62, Room 2

62-DWJC-

Drywall and Drywall Joint Compound NAD N/A See Lab

Report Building 62, Room 1 5

62-DWJC-

Drywall and Drywall Joint Compound NAD N/A See Lab

Report Building 62, Room 1

62-DWJC-

Drywall and Drywall Joint Compound NAD N/A See Lab

Report Building 62, Room 1

62-DI1-01 Foil Type Fiberglass Duct Insulation NAD N/A See Lab

Report Building 62, Room 4

62-DI1-02 Foil Type Fiberglass Duct Insulation NAD N/A See Lab

Report Building 62, Room 4 6

62-DI1-03 Foil Type Fiberglass Duct Insulation NAD N/A See Lab

Report Building 62, Room 4

62-DI2-01

Foil Type Fiberglass Duct Insulation with

Beige Sealant NAD N/A See Lab

Report Building 62, AHU Room

62-DI2-02

Foil Type Fiberglass Duct Insulation with

Beige Sealant NAD N/A See Lab

Report Building 62, AHU Room 7

62-DI2-03

Foil Type Fiberglass Duct Insulation with

Beige Sealant NAD N/A See Lab

Report

AHU Room

Description Asbestos Present

Friable Non- Asbestos Material Present

Sample Location

HM

62-ES-01 Beige Exterior Concrete Type Stucco NAD N/A See Lab

Report Building 62

Exterior

62-ES-02 Beige Exterior Concrete Type Stucco NAD N/A See Lab

Report Building 62

Exterior

62-ES-03 Beige Exterior Concrete Type Stucco NAD N/A See Lab

Report Building 62

Exterior 8

62-ES-04 Beige Exterior Concrete Type Stucco NAD N/A See Lab

Report Building 62

Exterior

62-ES-05 Beige Exterior Concrete Type Stucco NAD N/A See Lab

Report Building 62

Exterior

62-RS-01

Brown Roof Shingles with Black Felt and

Tar

5% Chrysotile in Tar No See Lab

Report Building 62

Exterior

62-RS-02

Brown Roof Shingles with Black Felt and

Tar

5% Chrysotile in Tar No See Lab

Report Building 62

Exterior 9

62-RS-03

Brown Roof Shingles with Black Felt and

Tar

5% Chrysotile in Tar No See Lab

Report Building 62

Exterior

62-SC-01 Black Underneath Sink Coating

2% Chrysotile No See Lab

Report

Room 1 10

NAD – No Asbestos Detected; N/A – Not Applicable

Representative Photographs of Suspect Asbestos Containing

Materials

1. 12” X 12” Beige Mottled Floor Tile with Adhesive (HM #1)

2. 12” X 12” Dark Gray Floor Tile with Adhesive (HM #2)

3. Black Covebase with Adhesive (HM #3)

4. Tan Covebase with Adhesive (HM #4)

5. Drywall and Drywall Joint Compound (HM #5)

6. Foil Type Fiberglass Duct Insulation (HM #6)

7. Foil Type Fiberglass Duct Insulation with Beige Sealant (HM #7)

8. Beige Exterior Concrete Type Stucco (HM #8)

9. Brown Roof Shingles with Black Felt and Tar (HM #9)

10. Black Underneath Sink Coating (HM #10)

APPENDIX B

Paint Chip Sample Summary Table Followed by Laboratory Data and Representative Photographs of Paint Chip Samples

Collection Date

Sample Number

Description Location Analytical Method

Percent Lead by Weight

(wt%)

7/19/19 62-PC-01 Beige Paint, Wood Wall

Bldg. 62, Corridor

Between AHU Rm and Rm F

ICP BRL

7/19/19 62-PC-02 Beige Paint, Metal Door

Bldg. 62, Entrance to Rm

ICP BRL

7/19/19 62-PC-03

Beige Paint, Metal Door

Frame

Bldg. 62, Entrance to Rm

ICP BRL

7/19/19 62-PC-04 Beige Paint, CMU Wall Bldg. 62, Rm J ICP BRL

7/19/19 62-PC-05 Gray Paint, Concrete Floor Bldg. 62, Rm 1 ICP BRL

BRL: Not Detected at the Reporting Limit

Representative Photographs of Paint Chip Samples

1. Beige Paint, Wood Wall, Bldg. 62, Corridor Between AHU Rm and Rm F (Sample # 62-PC-01)

3. Beige Paint, Metal Door, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-02)

4. Beige Paint, Metal Door Frame, Bldg. 62, Entrance to Rm 1 (Sample # 62-PC-03)

5. Beige Paint, CMU Wall, Bldg. 62, Rm J (Sample # 62-PC-04)

6. Gray Paint, Concrete Floor, Bldg. 62, Rm 1 (Sample # 62-PC-05)

APPENDIX C

Sketch with Room Assignments

181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 305
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 306
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 307
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 308
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 309
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 310
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 311
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 312
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 313
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 314
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 315
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 316
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 317
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 318
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 319
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 320
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 321
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 322
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 323
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 324
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 325
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 326
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 327
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 328
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 329
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 330
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 331
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 332
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 333
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 334
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 335
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 336
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 337
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 338
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 339
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 340
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 341
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 342
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 343
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 344
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 345
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 346
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 347
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 348
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 349
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 350
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 351
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 352
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 353
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 354
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 355
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 356
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 357
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 358
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 359
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 360
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 361
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 362
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 363
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 364
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 365
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 366
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 367
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 368
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 369
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 370
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 371
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 372
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 373
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 374
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 375
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 376
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 377
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 378
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 379
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 380
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 381
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 382
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 383
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 384
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 385
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 386
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 387
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 388
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 389
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 390
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 391
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 392
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 393
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 394
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 395
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 396
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 397
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 398
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 399
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 400
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 401
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 402
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 403
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 404
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 405
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 406
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 407
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 408
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 409
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 410
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 411
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 412
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 413
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 414
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 415
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 416
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 417
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 418
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 419
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 420
181214_POR_Coral Gables_S&T Modern_Complete - Clark Nexsen 421

File details come from the government source that posted it. Updated .