This is a project specifications document from the Illinois Department of Natural Resources (IDNR), Office of Mines and Minerals, Abandoned Mined Lands Reclamation Division for the Arundel Place Sag Subsidence Project (AML-IScE-2504) located at 4103 Arundel Place in Swansea, St. Clair County, Illinois. The project addresses mine subsidence impacts affecting a residential structure through installation of a foundation wall anchor system to brace three concrete basement walls spanning approximately 141 linear feet at a wall height of 8 feet 8 inches. Work shall commence within 30 calendar days of notice to proceed, with substantial completion required by May 31, 2026. The contract term is one year from execution date. The primary deliverables include furnishing and installing a ground bolt style wall anchor system with interior wall plates, exterior soil anchors, connecting steel rods, and associated hardware to stabilize lateral foundation deformations, along with mobilization, demobilization, site restoration including seeding and mulching at specified rates (100 lbs Kentucky Blue Grass, 60 lbs Perennial Rye, and 40 lbs Creeping Red Fescue per acre with 100 lbs Nitrogen, 200 lbs Phosphorus, and 300 lbs Potassium per acre fertilization and 2 tons per acre mulch). The contractor must cooperate with owner occupancy during the entire construction period.

Pricing for all work is established on a lump sum basis for both the foundation wall anchor system installation and mobilization/demobilization activities. The contractor must obtain comprehensive insurance coverage including Workers Compensation, Commercial General Liability with $2,000,000 general aggregate limit and $1,000,000 per occurrence limit, Owners and Contractor's Protective Liability coverage for one property owner at $1,000,000 combined single limit, Commercial Automobile Liability at $1,000,000 per occurrence, and Umbrella Liability coverage, with all insurance companies rated B+ or higher by Best's Key Rating Guide. All insurance must be maintained throughout the performance period and thereafter during any corrective work, with certified copies filed before contract execution. The contractor is responsible for all costs associated with insurance, and failure to maintain required coverage mandates cessation of operations. Standard Specifications from the Illinois Department of Transportation (IDOT) adopted January 1, 2022, as amended by Supplemental Specifications effective January 1, 2025, are incorporated by reference with modifications specific to IDNR operations.

View the file

Other files

File Type Posted
Updated Change Order Notice.pdf PDF
standard terms and conditions 2023~50.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES (IDNR)

PROJECT REQUIREMENTS, SPECIAL PROVISIONS, & SPECIFICATIONS

Project Name: Arundel Place Sag Subsidence

Project Number: AML-IScE-2504

Project Location: The Arundel Place Sag Subsidence reclamation project is located at 4103 Arundel Place in Swansea in Section 3, T1N, R8W, in St. Clair County, Illinois.

SCOPE OF WORK

The project consists of a sag type mine subsidence impacting an elliptical area along Lyonshall Blvd, Charlton Place, and Arundel Place in Swansea. This project will address subsidence related issues impacting the residential structure at 4103 Arundel Place.

STARTING DATE OF THE CONTRACT

Weather permitting, work on the project shall commence within 30 calendar days of notice to proceed. The Contractor shall contact the Department to notify the Department of the anticipated construction schedule.

CONSTRUCTION ENDING DATE

Work on this project shall be substantially completed by May 31, 2026.

Final clean-up, final inspection, any alterations, repair, remedial or holdover work, reseeding, and submission of the final pay request shall be completed prior to the contract ending date.

CONTRACT ENDING DATE

This contract shall end one year after the contract execution date.

Project Requirements:

OWNER OCCUPANCY

Owners will occupy premises during entire construction period. The Contractor shall cooperate with Owners in scheduling operations to minimize conflict and to facilitate Owner's usage.

Project Special Provisions:

The work to be accomplished is described in the following paragraphs, and accompanying drawings and documents:

1) Furnish & Install Foundation Wall Anchor System (Lump Sum) – Furnish and install a foundation wall anchor system to brace 3 concrete basement walls of the home at 4103 Arundel Place. The walls requiring bracing are indicated on the attached Figure

1. The contractor shall install ground bolt style wall anchors to stabilize lateral foundation deformations and prevent collapse. The wall anchor system shall consist of interior wall plates, exterior soil anchors, connecting steel rods, and associated hardware to tie back the bowing basement walls. Approximately 141 linear feet of wall will require bracing. The wall height is approximately 8 feet, 8 inches measured from the concrete floor slab to the top of wall. The contractor shall install either a pre-engineered system according to the manufacturer design specifications or supply engineering calculations showing adequacy for any non-pre-engineered system.

Foundation walls shall remain intact and any holes made in the walls for installation of the system shall be sealed against water infiltration. Structural components installed on the interior of the walls shall not protrude more than 4 inches from the interior foundation wall face. Wall anchor systems shall be subject to the project manager’s approval. All exterior work shall be cleaned up, with excess soil and concrete disposed of, sod replaced, or barren earth raked, seeded and mulched as specified in item 2 below. All work described in this item will be paid for at the Lump Sum price for Furnish & Install Foundation Wall Anchor System.

2) Mobilization/Demobilization (Lump Sum) – This work item shall include all costs incurred by the contractor during the project necessary to facilitate material and equipment transport to the project site and repair any damages caused by the contractor related to project implementation. All disturbed areas shall be seeded, fertilized, and mulched as appropriate. Seeding shall be with a lawn mix at the rate of 100 lbs per acre Kentucky Blue Grass, 60 lbs per acre of Perennial Rye, and 40 1bs per acre of Creeping Red Fescue. Seeded areas shall be fertilized at the rate of 100 lbs of Nitrogen, 200 lbs of Phosphorus, and 300 lbs of Potassium per acre, and mulched at the rate of 2 tons per acre. All work described in this item will be paid for at the Lump Sum price for Mobilization /Demobilization.

Project Specifications:

Those Sections and Articles of the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, by the Illinois Department of Transportation (IDOT); as amended and supplemented by the "Supplemental Specifications and Recurring Special Provisions," adopted January 1, 2025 (hereinafter referred to collectively as "Standard Specifications"), that are referenced in these bid documents are incorporated by reference. (The Standard Specifications are available on-line at IDOT’s web site or can be purchased from IDOT.)

In the application of the Standard Specifications to this Contract, references to the Department of Transportation shall be interpreted to mean the Illinois Department of Natural Resources;

Office of Mines and Minerals; Abandoned Mined Lands Reclamation Division (AMLRD).

The following Sections of the IDOT Standard Specifications have been modified for this project by the AMLRD and are included below and on the following pages and govern contract work at or on this project:

SECTION 101 – Definition of Terms SECTION 107 – Legal Regulations and Responsibility to Public

AMLRD SUPPLEMENTAL SPECIFICATION FOR

SECTION 101. DEFINITION OF TERMS

Whenever in these specifications or in other contract documents the following terms or pronouns in place of them are used, the intent of meaning shall be interpreted as follows:

101.03 Award. Revise as indicated:

The decision of the Illinois Department of Natural Resources; Office of Mines and Minerals;

Division of Abandoned Mined Lands Reclamation to accept the proposal of the lowest responsible bidder for the work, subject to the execution and approval of a satisfactory contract therefore and bond to secure the performance thereof, and to such other conditions as may be specified or otherwise required by law.

101.14 Department. Revise as indicated:

The Department of Natural Resources of the State of Illinois with its principal offices of business at Springfield.

101.16 Engineer. Revise as indicated:

The Director of the Department of Natural Resources of the State of Illinois; or his authorized representative limited by the particular duties entrusted to him.

101.35 Right of Way. Revise as indicated:

Right of way shall be replaced by construction limits, except when used in conjunction with right of way markers or highways.

101.39 Roadway. Revise as indicated:

Roadway shall be replaced by site. Slope limits of embankments will be replaced by proposed lines and grades.

101.56 Gob. Add the following:

Coarse textured mine waste material, generally acidic, from a coal cleaning process. This material is composed of rock, shale, pyritic material and varying amounts of coal. The material varies considerably in its moisture content, texture, stable angle of repose and bearing capacity.

101.57 Mine Spoil. Add the following:

A mixture of various soil and rock material as a result of the removal of overburden to expose the coal in surface mining. The material varies considerably in its' moisture content, texture, stable angle of repose and bearing capacity.

End of Revisions to SECTION 101.

AMLRD SUPPLEMENTAL SPECIFICATION FOR

SECTION 107. LEGAL REGULATIONS AND RESPONSIBILTY TO PUBLIC

Article 107.27 Insurance. (delete and replace with the following)

The Contractor shall obtain and thereafter keep in force the following insurance coverage provided by insurance companies acceptable to the Department and authorized to transact business under the laws of the State of Illinois. The insurance companies providing coverage shall be rated in the Best's Key Rating Guide. The Department will accept companies with a rating not lower than B+ provided the financial size category is VII or larger. Companies rated A- or better shall have a financial size category of not less than VI. Coverage limits shall be written at not less than the minimum specified in this Article. Higher minimum limits and additional coverage may be specified by a special provision elsewhere in the contract. Whether stated in this Article or elsewhere, the Department does not warrant the adequacy of the types of insurance coverage or the limits of liability specified.

(a) Workers Compensation and Employers Liability.

(1) Workers compensation shall be provided in accordance with the provisions of the Illinois Worker's Compensation Act, as amended. Notwithstanding the rating and financial size categories stated in this Article, coverage may be provided by a group self-insurer authorized in Section 4(a) of the Act and approved pursuant to the rules of the Illinois Department of Insurance.

(2) Employers Liability

a. Each Accident $500,000

b. Disease - policy limit $500,000

c. Disease - each employee $500,000

(b) Commercial General Liability.

Required liability insurance coverage shall be written in the occurrence form and shall provide coverage for operations of the Contractor; operations of Sub-Contractors (contingent or protective liability); completed operations; broad form property damage and hazards of explosion, collapse and underground; and contractual liability. The general aggregate limit shall be endorsed on a per project basis.

(1) General Aggregate Limit $2,000,000

(2) Products - Completed Operation Aggregate Limit $2,000,000

(3) Each Occurrence Limit $1,000,000

The coverage shall provide by an endorsement in the appropriate manner and form, the Department, to its officers, agents and employees shall be named as additional insureds with respect to the policies and any umbrella excess liability coverage for occurrences arising in whole or in part out of the work and operations performed. The Department may accept a separate owner's protective liability policy in lieu of the Department, it's officers, and employees being insured on the Contractor's policy.

(c) Owners and Contractor’s Protective (OCP) Liability.

The Contractor shall provide an OCP policy covering the property owner(s) of the site where the work is to be performed. In the case of multiple owners, all the landowners may be listed as additional insurers on the same policy.

This project will require OCP Policy coverage for _1_ property owners.

If the Contractor chooses to put the Department on an OCP (in lieu of placing the Department as an additional insured on the Commercial General Liability - see (b) above), then the Department should be listed as the insured, with all landowners listed as additional insured(s). The amounts of insurance shall be as follows:

BODILY INJURY LIABILITY PROPERTY DAMAGE LIABILITY

Each Occurrence Each Occurrence Aggregate $1,000,000 $500,000 $1,000,000 or

COMBINED SINGLE LIMIT $1,000,000

The required OCP policy shall contain the following endorsement:

"Each named insured shall be provided full coverage under this policy without regard to the fact that such named insured is not in contractual privity with the Contractor. It is understood that the construction operations are performed for and on behalf of the Department, with the consent of the property owner(s)-insured(s). Coverage under this policy with respect to liability arising out of operations shall not be denied to any named-insured because of his passive relationship to the Contractor".

When any named insured is a corporation, insurance coverage under the OCP policy shall extend to the Corporation, its officers, agents, and employees.

(d) Commercial Automobile Liability.

The policy shall cover owned, non-owned and hired vehicles.

BODILY INJURY & PROPERTY DAMAGE LIABILITY

Each Occurrence $1,000,000

(e) Umbrella Liability.

Any policy shall provide excess limits over and above the other insurance limits stated in this Article. The Contractor may purchase insurance for the full limits required or by a combination of primary policies for lesser limits and remaining limits provided by the umbrella policy.

When work is to be performed within railroad right-of-ways, the requirements of Article 107.11 of the Standard Specifications will also apply.

All insurance shall remain in force during the period covering occurrences happening on or after the effective date and remaining in effect during performance of the work and at all times thereafter when the Contractor may be correcting, removing or replacing defective work until notification of the date of final inspection. Termination or refusal to renew shall not be made without 30 days prior written notice to the Department by the insured(s) and the policies shall be endorsed so as to remove any language restricting or limiting liability concerning this obligation.

Certified copies of the original policies or certificate(s) of insurance by the insurer(s) issuing the policies and endorsements setting forth the coverage, limits and endorsements shall be filed with the Department before the Department will execute the contract. A certificate of insurance shall include a statement that, "the coverage and limits conform to the minimums required by Article

107.27 of the Standard Specifications for the Road and Bridge Construction". Any exception or deviation shall be brought to the attention of the Department for a ruling of acceptability. In no event shall any failure of the Department to receive polices or certificates or to demand receipt be construed as a waiver of the Contractor's obligation to obtain and keep in force the required insurance.

All costs for insurance as specified herein will be considered as included in the cost of the contract. The Contractor shall, at its own expense and risk of delay, cease operations if the insurance required is terminated or reduced below the required amounts of coverage. Coverage in the minimum amounts set forth herein shall not be construed to relieve the Contractor from its obligation to indemnify in excess of the coverage in accordance with the contract.

End of Revisions to SECTION 107

Arundel Place Sag Subsidence AML-IScE-2504 4103 Arundel Place, Swansea, IL 62226 Figure 1

Foundation Wall Anchor System – West, North, and East Walls (141 Linear Feet Total)

Approximate Wall Height = 8’-8”

Electrical Panel