This appendix outlines additional scope information for a dam removal and stream restoration project involving coordination with the Barry County Road Commission and multiple state and federal agencies including EGLE (Michigan Department of Environment, Great Lakes, and Energy), USACE (U.S. Army Corps of Engineers), DNR (Department of Natural Resources), SHPO (State Historic Preservation Office), and THPO (Tribal Historic Preservation Office). The project deliverables include removal of an existing dam control structure and replacement with an uncontrolled outlet pipe to restore natural stream flow, a detailed project plan, required topographic and bathymetric surveys, permit applications and associated investigations, and design/planning documents for dam outlet structure removal and stream restoration with a new outlet culvert. The contract will be executed in phases, with Phase 400 (Preliminary Design) to be issued first for review of plans and opinion of probable cost to allow the owner to decide whether to proceed with dam decommissioning. The proposal must include phases 500, 600, and 700 as part of the evaluation and selection process. Additional services include contract administration, project oversight, construction inspection, and warranty follow-up.

The scope acknowledges that costs and effort required for DNR coordination with site permissions and investigations are unknown and directs bidders to include a reimbursable expense line item for this effort that can be adjusted as necessary. Road closure and reconstruction permitting will require coordination with the Barry County Road Commission. The phased approach allows the owner to make a go/no-go decision after Phase 400 completion before committing to subsequent design phases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A – Additional Scope Information

1. Remove Existing Dam Control Structure and replace the outlet with an uncontrolled outlet pipe to restore natural stream flow.

2. Coordination with Barry County Road Commission for road closure and reconstruction (permitting).

3. The direct deliverables would contain a detailed project plan.

4. Include required topographic/bathymetric survey.

5. Other work as necessary for design/planning of removal of the dam outlet structures and stream restoration and new outlet culvert.

6. Prepare applications and associated required investigations to secure the required permits/approvals for the removal.

a. EGLE/USACE – Work as required to secure an application for review/approval.

i. Including Dam Safety.

b. DNR Submittal for permission to conduct investigation for SHPO/THPO work on the site. Report preparation and application preparation for

SHPO/THPO.

1. Cost and effort required for DNR coordination with site permissions and investigation is unknown. Include a Reimbursable expense line item for this effort and if necessary can be adjusted.

7. Design contract execution will be in phases with the first contract to be issued for Phase 400 – Preliminary Design for review of plans and Opinion of Probable Cost for the owner decision to decide to proceed further with the work towards decommissioning of the dam. The proposal must still include Phases 500, 600 & 700, which will be part of the evaluation/selection.

8. Include Contract Administration/project oversight/construction inspection and warranty follow up.