These are design drawings and technical specifications for the Hall Lake Dam Rehabilitation project owned by the Michigan Department of Natural Resources (MDNR) and Michigan Department of Technology, Management, and Budget (MDTMB), located near Middleville, Michigan in Barry County. The project scope includes installing a temporary excavation support system using steel sheet piling, constructing a new spillway drop inlet with precast stormwater manhole components and a 24-inch HDPE pipe barrel, building a reinforced concrete baffled spillway chute with training walls and stilling basin, abandoning the existing 24-inch CMP culvert using flowable fill (CLSM), constructing a graded seepage filter blanket along the downstream toe of the embankment, installing permanent sheet pile cutoff through the abandoned barrel, and completing downstream channel restoration with riprap and embankment fill. The project also includes roadway reconstruction, reinstallation of guardrails, seeding, mulching, and erosion control measures. The design drawings were issued for permit on May 19, 2023, by GEI Consultants of Michigan, P.C.
The specifications establish comprehensive requirements for materials including 4,500 psi cast-in-place concrete with air entrainment, PVC waterstops, hot-dipped galvanized structural steel, ASTM A328 grade 50 sheet piling, HDPE pipe conforming to ASTM D3350-21, flowable fill with maximum 250 psi compressive strength, precast manhole structures, and graded filter materials meeting MDOT specifications. Quality control and assurance protocols require contractor-performed testing with a designated QA Manager overseeing construction, mandatory pre-construction meetings, submittal reviews within seven business days, and compaction testing at one set per 50 cubic yards of fill minimum. A professional engineer licensed in Michigan must stamp the cofferdam installation plan. The contractor assumes full responsibility for site safety, water control maintaining permitted baseflows up to 12 cfs, protection of a fiber optic cable within five feet of the excavation, erosion and sediment control compliance, and disposal of all waste materials at approved off-site locations. The contractor must provide detailed work plans addressing staffing, project schedules, spill prevention, site safety, quality control, traffic control, site staging, water control, demolition, cofferdam installation, excavation, spillway construction, barrel abandonment, and filter construction prior to the pre-construction meeting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL SECTIONS
AND DETAILS 1
S-1.0 If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \S
TR
U
C
TU
R
AL
D
ET
AI
LS
.d w g
/1
3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
#5 BAR 12" OC, EW, T&B
TYP.
CJ
SEE NOTE 1
WATERSTOP
TYP.
#5 BAR 12" OC
#5 HOOK 12" OC
TYP.
#5 BAR
TYP. BAFFELS
#5 BAR 12" OC, EW, T&B
CJ
SEE NOTE 1
#5 HOOKS
TYP.
#5 BAR 12" OC
3" CLR
TYP.
2" CLR
TYP. BAFFLES
3" CLR
TYP.
#5 BAR 12" OC, EW, T&B
CREST CONTRACTION JOINT
DETAIL
SCALE: 1-1/2" = 1'-0"
C-6.0
CENTER CONTRACTION JOINT
DETAIL
SCALE: 1-1/2" = 1'-0"
C-6.0
END SILL
DETAIL
SCALE: 1-1/2" = 1'-0"
C-6.0
4' #5 DIAGONAL BARS 3" OC
TYP.
2' #5 DIAGONAL BARS 3" OC
TYP.
#5 BAR 12"
OC, EW, EF
TYP.
8'
7'
HEADWALL
SECTION
SCALE: 1"=1'
A
C-6.0
STILLING BASIN SLAB
BARS TO HOOK INTO SLAB
KEYWAYMAINTAIN 3" CLR
#5 BAR 12" OC, EW, EF
TYP. ALL WALLS
CJ
CJ
CJ
TRAINING WALLS
SECTION
SCALE: 1/2" = 1'-0"
B
C-6.0
WATERSTOP
TYP.
3" CLR
TYP.
2' -6
1'
3" CLR
TYP.
1.5H:1V
1'
TYP. ALL SLABS
1' TYP.
ALL WALLS
6"
TYP.
1'
1'-9"
1'-3"
8"
TYP.
WATERSTOP
TYP.
NOTES:
1. ALLOW 48 HOUR CURE TIME BETWEEN CASTING OF ADJACENT
CONCRETE CONTRACTION JOINTS.
3' D/S OF CREST
2' 1'-10 3/4"
2'
5' -6
7'
4'
1'
1'
9"
9"9"
#5 BAR 12" OC, EW, EF
TYP.
R1'
28'
10'
9'
2"
#5 BAR 12" OC, EW, EF
TYP. ALL SLABS
#5X12" SIKA SPEED DOWEL
OR APPROVED EQUAL
#5X12" SIKA SPEED DOWEL
OR APPROVED EQUAL
AND DETAILS 2If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \S
TR
U
C
TU
R
AL
D
ET
AI
L
2.
dw g
/1
3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
TYPICAL SPILLWAY CHUTE
SECTION
SCALE: 1"=1'
A
C-6.0
END SILL AND WING WALLS
SECTION
SCALE: 1"=1'
B
C-6.0
#5 BAR 12" OC, EW, EF
TYP. WING WALLS
& END SILL
#5 BAR 12" OC, EW, T&B
TYP.
END SILL
WING WALLS
3" CLR
TYP. ALL WALLS
3" CLR
TYP. ALL SLABS
3" CLR
TYP. END SILL
BAFFLE BLOCK
TYP.
#5 BAR 12" OC, EW, EF
TYP.
#5 BAR 12" OC, EW, T&B
TYP.
1'-2"
KEYWAY
2' WIDE X 1' THICK
WING WALL FOOTING
8'
4'
1'
6'
4' 1'
S-2.0
TYPICAL KEY TRENCH
AND WATERSTOP
DETAIL
SCALE: 1-1/2" = 1'-0"
S-2.0
4"
2"
PVC WATERSTOP
4" MINIMUM
1'
1'
TRAINING WALL
CHUTE SLAB
BAFFLE BLOCK
HOOK BARS INTO WALL
TYP.
S-2.0
WING WALL
WING WALL SLAB
FOUNDATION DRAINS TO
PENETRATE WING WALLS
TYP.
1' -3
4'-6"FOUNDATION DRAIN
AND DETAILS 3If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \S
TR
U
C
TU
R
AL
S
EC
TI
O
N S
AN
D
D
ET
AI
LS
.d w g
/1
3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
A S-3.0
6'
PLAN
SCALE: 3/4" = 1'-0"INTAKE STRUCTURE AND TRASHRACK
TRASHRACK CENTER
SECTION
SCALE: 1"=1'
A
S-3.0 TRASHRACK END
SECTION
SCALE: 1"=1'
B
S-3.0
RAILING TO CONCRETE
CONNECTION
DETAIL
SCALE: 3" = 1'-0"
C-9.0
4"
8" 6"1" 1"
3" 3"
5"
1/
2"
1/ 2"
EDGE OF CONCRETE
POST INSTALLED
1/2" A36
THREADED ROD
EPOXY WITH HILTI
HIT HY-200
5/16
TYPPIPE TOPIPECONNECTIONS
6"
RAILING
DETAIL
SCALE: 1"=1'
C-6.0
1-1/2" HDG RAILING
3' -6
5'
SEE DETAIL 4 BELOW
2" X 3/8"
RECTANGULAR
BAR @ 4" O.C.
L2X2X3/8 STRUT
TYP.
CONTINUOUS BENT L 3X3X3/8
AS BEARING SURFACE
MH LID
60" I.D. PRECAST MANHOLE
26" Ø NEENAH TYPE G
SLOTTED COVER
L 5X3X3/8
MH WALL
CONTINUOUS BENT 6"X3/8" PL
CONTINUOUS BENT
4"X3/8" PL
2" X 3/8"
RECTANGULAR
BAR @ 4" O.C.
1/4 TYP.
L 5X3X3/8
POST INSTALLED 3/8" A36 ROD
CENTERED IN ANGLE
EPOXIED WITH HILTI HIT HY 200
1/4 TYP.
NOTCH 3"
TYP.
1/4TYP.
WELDS
SECTION
SCALE: 3" = 1'-0"
S-3.0
2'-2"
S-3.0
S-3.0
WELDS
SECTION
SCALE: 3" = 1'-0"
S-3.0
L3X3X3/8
S-3.0
1/4 TYP.
WELDS
SECTION
SCALE: 3" = 1'-0"
S-3.0
3"
EL. 774.9
4' -2
4"
1/4 TYP.
98°
3/8" Ø BAR
3/8" Ø BAR
1/4TYP.
1/4 TYP.
1/4TYP.
4"
3 5/8"
1/4TYP.
NOTCH 3"
TYP.
1/4TYP.
S-3.0
TRASHRACK NOTES:
1. THE TRASHRACK IS SHOWN AS A
CIRCULAR ARC, HOWEVER CAN BE
FABRICATED AS A 3 CHORD SYSTEM
TANGENT TO THE ARC PROVIDED, OR
FABRICATORS PREFERENCE WHILE
ABIDING TO THE LINES AND DIMENSIONS
PROVIDED HEREIN.
B S-3.0 file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
FIBR
FIBR
FIBR
FIBR
STM STM STM STM STM
1+
LO
C
LO
C
LO
C
LOC
LOC
SF
SF
SF
SF
SF
FI
BR
FI
BR
1+
1+00
0+00
1+60
FI
BR
FI
BR
FI
BR
1+
0+25 0+50
0+75 1+00
1+25 1+50
0+00
1+60
7.
5'
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1+12.62
WATER SURFACE EL. 774.94
WATERLINE SURVEYED 4/12/2022
FIBER OPTIC CABLE
APPROXIMATE LOCATION
SEE NOTE 2
2' Ø
50 40 30 20 10 0 10 20 30 40 50 60 70
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \D
EM
O
LI
TI
O N
P
LA
N .d w g
/1 3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
DEMOLITION PLAN
C-7.0
PLAN
DEMOLITION
SCALE, FEET
8' 16'
DEMOLITION KEY PLAN
1 REINSTALL GUARDRAIL AND POSTS.
2 ABANDON EXISTING BARREL IN PLACE WITH FLOWABLE FILL
3 UTILIZE EXTRACTED SSP FROM COFFERDAM TO DRIVE PERMANENT
SHEET PILE CUTOFF THROUGH ABANDONED BARREL.
4 REMOVE TOP PORTION OF RISER
A C-7.0
NOTES:
1. PERFORM LOCALIZED EXCAVATION AS NECESSARY TO FACILITATE
ABANDONMENT OF THE EXISTING BARREL.
2. HAND EXCAVATE WITHIN 5-FEET OF FIBER OPTIC CABLE TO
EXPOSE ACTUAL LOCATION. PROTECT CABLE AS NECESSARY
DURING EXCAVATION AND CONSTRUCTION OF THE FILTER
BLANKET.
3. CONTRACTOR SHALL PROVIDE SPILLWAY BARREL ABANDONMENT
PLAN.
4. THE PROPOSED SPILLWAY INCLUDING BAFFLED CHUTE AND
RIPRAP CHANNEL SHALL BE CONSTRUCTED AND FUNCTIONAL
BEFORE FULL ABANDONMENT OF THE EXISTING BARREL MAY
COMMENCE.
5. EXECUTION OF THE EXISTING BARREL ABANDONMENT AND
CONSTRUCTION OF THE PERMANENT SHEET PILE CUT OFF SHALL
OCCUR IN SEQUENCE ONCE THE WORK IS READY TO BE
COMPLETED.
6. USE FILTER SAND AS FILL AROUND THE ABANDONED SPILLWAY
BARREL. FILL APPROXIMATELY THREE (3) FEET IN ALL DIRECTIONS
SURROUNDING THE ABANDONED BARREL AND INTEGRATE WITH
THE FILTER BLANKET.
A
C-7.0 BARREL ABANDONMENT
SECTION
SCALE: 1"=8'
REINSTALL GUARDRAIL
TYP.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
ESTIMATED
PHREATIC SURFACE
TERMINATE EXISTING BARREL IN
FILTER SAND
SEE NOTE 6
LOCALIZED EXCAVATION AS
NECESSARY FOR ABANDONMENT
SEE NOTE 1
SPILLWAY ALIGNMENT
EXISTING GROUT BAG IN BARREL
LIMITS OF
CONSTRUCTION
TYP.
PROPOSED FILTER
BAFFLED CHUTE
PERMENANT SSP CUTOFF
MIN 12" FILL OVER SSP
REMOVE SSP COFFERDAM
ABANDON BARREL
VIA FLOWABLE FILL
REGRADE EXISTING
STREAM EXTENTS
WITH EMBANKMENT
FILL
WATERLINE SURVEYED 4/12/2022
RIPRAP BANKS
AND CHANNELFILTER DIAPHRAGM
SPILLWAY DROP INLET
SUGGESTED CONSTRUCTION SEQUENCE
1 MOBILIZE TO SITE
2 STAKE AND LAYOUT SPILLWAY ALIGNMENT, AN PERFORM SITE PREP
AS DESCRIBED ON SHEET C-3.0
3 INSTALL TEMPORARY COFFERDAM.
4 FUSION WELD 24" HDPE PIPE DOWNSTREAM OF EMBANKMENT.
5 PERFORM OPEN CUT EXCAVATION AND PREPARE SUBGRADE TO
APPROXIMATE STATION 0+25 to 0+60.
6 INSTALL DROP INLET STRUCTURE AND FUSION WELDED 24" HDPE
BARREL.
BACKFILL COMPLETED 24" HDPE TO APPROXIMATE ROAD
CENTERLINE BEFORE EXCAVATING FOR APPROXIMATE STATION
0+60 TO 0+90 FOR THE CONSTRUCTION OF THE BAFFLED CHUTE
AND REMAINING 24" HDPE.
CONSTRUCT FILTER DIAPHRAGM AND BACKFILL OPEN CUT
EXCAVATION ACCORDING TO PROJECT DRAWINGS AND
SPECIFICATIONS.
9 CONSTRUCT BAFFLED CHUTE STRUCTURE AND RIPRAP CHANNEL.
AFTER DROP INLET, 24" HDPE BARREL, BAFFLED CHUTE, AND
RIPRAP CHANNEL ARE CONSTRUCTED WITH APPROVAL FROM THE
ENGINEER, REMOVE THE TEMPORARY COFFERDAM.
11 SEAL OFF EXISTING RISER TO PASS BASE FLOWS THROUGH THE
NEW SPILLWAY.
ABANDON EXISTING BARREL AND LOWER PORTION OF RISER IN
PLACE WITH FLOWABLE FILL. (DEMO KEY PLAN 2)
ALLOW 24-48 HOUR CURE TIME, AND INSTALL PERMENANT
SEEPAGE CUTOFF THROUGH ABANDONED BARREL. (DEMO KEY
PLAN 3)
CUT RISER ONE (1) FOOT BELOW EXISTING GRADE. (DEMO KEY
PLAN 4)
15 CONSTRUCT GRADED FILTER BLANKET.
16 RESTORE DISTURBED AREAS.
17 DEMOBILIZE
FIBR
FIBR
FIBR
2+00
1+
1+
FIBR FIBR
FIBR
N: 407320.8831 E: 12822736.5156 771.00
GP-1
N: 407296.6565 E: 12822870.5835 771.00
GP-2
0+
0+
0+
0+
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1.
0+00
4.
0+20
6.
0+40 0+600+600+00 0+20
9.
0+40 0+600+60
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
0.
0+00
5.
0+20
8.
0+40
5.
0+60
5.
0+600+00 0+20
0.
0+40 0+600+60
GRADING PLAN
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \G
R
AD
IN
G
P
LA
N .d w g
/1 3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
PLAN
SCALE: 1" = 8'GRADING
A C-8.0
A C-8.0
B C-8.0
B C-8.0
A TYPICAL FILL
SECTION
SCALE: 1" = 8'
B TYPICAL CUT
SECTION
SCALE: 1" = 8'
C-9.0
VARY THICKNESS OF EMBANKMENT
FILL TO MATCH EXISTING GROUND
EXCAVATE AS NECESSARY TO CONSTRUCT
CONSISTENT FILTER THROUGHOUT
EXISTING GROUND
TYP.
PROPOSED FILTER
TYP.
BAFFLED CHUTE
FILTER DIAPHRAGM
24" HDPE
GRADING HINGE POINT
SEE NOTE 1
GRADING HINGE POINT
SEE NOTE 1
NOTES:
1. THE PROPOSED GRADING HINGE POINT IS DEFINED BY POINTS
GP-1 AND GP-2.
GRADE 1-2%
DOWNSTREAM
FOR DRAINAGE
C-8.0 file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
GEOTEXTILE
EMBANKMENT
FILL SEE
FILTER NOTE 1
TOP OF FILTER BLANKET
ELEV. 770.0
XXX
XXX
8"
8" 8"
TOP OF EMBANKMENT FILL
ELEV. 771.0
WATERSTOP NOTES:
1. ALL FIELD WELDS SHALL BE MADE PER WATERSTOP MANUFACTURER'S RECOMMENDATIONS.
ENGINEER SHALL INSPECT ALL FIELD WELDS FOR ACCEPTANCE PRIOR TO CONCRETE PLACEMENT
OR WALL FORM PLACEMENT
2. USE 6 INCH WATERSTOPS IN ALL CONSTRUCTION JOINTS UNLESS SPECIFALLY SHOWN OTHERWISE
3. FOR WALLS WITH SINGLE MAT OF REINFORCING LOCATE WATERSTOP ON LIQUID FACE 1" CLEAR OF
REINFORCEMENT
FIRST
WELD
FIRST
WELD
THIRD
WELD
MITER CORNERS OR VERTICAL
JOINTS & WELD SIMILAR AS SHOWN
BELOW FOR IN-PLANE JOINTS
VERTICAL CROSSVERTICAL TEEVERTICAL ELL
SECOND
WELD
SECOND
WELD
FLAT CROSSFLAT TEEFLAT ELL
"A"
"C" MIN STEM
THICKNESS
@ OUTSIDE
"B" MIN STEM
THICKNESS
@ CTR BULB
"D" CENTER BULB
OUTSIDE DIAMETER
"E" MIN BULB
THICKNESS
"F" APPROXIMATE NO. OF
RIBS EACH SIDE, EACH FACE
OF WATERSTOP
5/32"
1/8" PROJECTION
ALL RIBS, (TYP)
SIZE "A" "B" "C" "D" "E" "F"
4"x3/8" 4" 3/8" 3/8" 7/8" 1/4" 4
WATERSTOP
SCALE: NTS
X
XX
X
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \T
YP
IC
AL
S
EC
TI
O N
S
AN
D D
ET
AI
LS
.d w g
/1 3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
TYPICAL SECTIONS AND
DETAILS
C-9.0
FILTER SAND
FILTER GRAVEL
NOT TO SCALE
C-8.0 TYPICAL FILTER BLANKET
DETAIL
COARSE FILTER GRAVEL
VARIES
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
EMBANKMENT FILL
12" THICK MIN
GEOTEXTILE
FILTER NOTES:
1. VARY THICKNESS OF EMBANKMENT FILL BELOW FILTER BLANKET AS NECESSARY TO MEET EXISTING GROUND.
2. EXCAVATION OF THE EXISTING GROUND WILL BE NECESSARY AT SOME LOCATIONS TO CONSTRUCT THE FILTER
BLANKET.
3. BACKFILL AROUND THE ABANDONED BARREL WITH FILTER SAND TO THREE (3) FEET AROUND THE PIPE.
NOT TO SCALE
A
C-5.0 TYPICAL EXCAVATION TRENCH
SECTION
EXCAVATION NOTES:
1. EXCAVATION SHALL BE SUFFICIENTLY WIDE TO ALLOW COMPACTION EQUIPMENT ADJACENT TO BARREL.
2. SUBGRADE SHALL BE OVERBUILT WITH COMPACTED FILL PRIOR TO LOCALIZED EXCAVATION WHILE SHAPING TO
FIT CONDUIT BARREL.
3. IF EXISTING SOILS DESICCATE DURING EXCAVATION EXPOSURE, SOILS SHALL BE DISKED, MOISTENED, AND
RECOMPACTED PRIOR TO PLACEMENT OF FILL.
EXISTING GRADE
SEE EXC. NOTE 3
SEE EXC. NOTE 2
24" HDPE
BENCH EXCAVATION 2H:1V
SIDE SLOPES, TYP
SEE EXC. NOTE 1
NOT TO SCALE
B
C-5.0 FILTER DIAPHRAGM
SECTION
EMBANKMENT FILL
FILTER SAND
24" HDPE
EXTENTS OF
EXCAVATION
2' MIN.
3'
6'
2' MIN.
FILTER DIAPHRAGM OUTLET TRENCH
1H:1V SIDE SLOPES, TYP
FILTER DIAPHRAGM
3'
EXISTING GRADE
NOT TO SCALE
C-5.0 FILTER DIAPHRAGM
DETAIL
EMBANKMENT FILL
FILTER SAND
FILTER SAND DRAIN
SEE DIAPHRAGM NOTE 1
FILTER DIAPHRAGM
24" HDPE
3'
DIAPHRAGM NOTES:
1. EXTEND DIAPHRAGM FILTER SAND DRAIN TO THE FILTER SAND OF THE
DOWNSTREAM FILTER BLANKET.
FG
PROPOSED GRADE
1H:1V
1H:1V
1.5" HMA TOP COURSE
2" HMA BASE COURSE
8"
1/ 2"
1'
MDOT 22A AGGREGATE COURSE
EMBANKMENT FILL
SEE ROADWAY NOTE 1
ROADWAY NOTES:
1. NATIVE "EMBANKMENT FILL" MAY BE USED BENEATH THE
AGGREGATE COURSE PER APPROVAL FROM THE ENGINEER.
NOT TO SCALE
C-9.0 TYPICAL ROADWAY
DETAIL
ROADWAY
SEE DETAIL 1
2" TOPSOIL, SEED & MULCH
RIPRAP CHANNEL
SECTION
SCALE: 1" = 4'
C
C-6.0
GEOTEXTILE
20'
2' 1' 4' 6'
2'
RIPRAP
1'-6"
C
LA
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \T
EC
H
N
IC
AL
S
PE
C
IF
IC
AT
IO
N S
O
F 4.
dw g
/1 3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE, MI
BARRY COUNTY
SHEET NO.
TECHNICAL
SPECIFICATIONS 1 OF 4
T-1.0
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
PRD
JEP
PRD
Approved: GLK
48098
2004145
1. General Specifications
1.1 Responsible Parties
A. Owner: Michigan Department of Natural Resources (MDNR)/ Michigan Department of Technology, Management, and Budget (MDTMB).
B. Engineer: GEI Consultants of Michigan, P.C. (GEI)
C. Contractor: To Be Determined
D. Environmental Inspector: To Be Determined
1.2 Project Description
A. These notes refer to the work as depicted and noted on the "Hall Lake Dam Rehabilitation" drawings.
B. This project is located at the Hall Lake Dam, which is located near Middleville, MI. The project is owned and operated by the MDNR.
C. The work consists of installing a temporary excavation support system, constructing a new spillway drop inlet consisting of precast stormwater manhole components and an HDPE spillway barrel, and construction a reinforced concrete baffled spillway chute. Work also includes abandoning the existing 24” CMP culvert complete with flowable fill, constructing a graded seepage filter blanket along the downstream toe of the embankment, and a downstream channel tie in.
1.3 Work Sequence and Coordination
A. All work shall be coordinated with Mr. Bruce Watkins, State Facilities Administration and Design and Construction division, MDTMB, 3111 W. Joseph St., Lansing, MI 48917.and/or his designated on-site representative.
B. Contractor shall observe legal relations and responsibility to the public, scope of work, control of water, control of work, control of materials, prosecution and progress, and measurement and payment in conformance with the contract documents.
C. All work shall be performed in accordance with the technical specifications.
1.4 Safety
A. In accordance with generally accepted construction practices, the Contractor is responsible for job-site safety conditions, procedures, and programs. This requirement will apply continuously and not be limited to normal working hours. The Contractor is responsible for the protection of property and the safety and health of its employees, subcontractors, suppliers, agents, and others on or near the property.
B. Contractor is responsible for meeting all federal, state, and local rules and regulations pertaining to safety, and MDTMB/MDNR site specific safety guidelines.
C. Contractor shall be responsible for securing the site for public safety for the duration of the work. Contractor shall be responsible for all site safety precautions.
D. Submittal Requirement: Contractors site safety program. The program shall designate a safety officer and site-specific hazards and mitigation approaches. The plan shall outline the procedures used to prevent accidents and manage them if they occur.
1.5 Quality Control
A. Contractor is solely responsible for quality control of the work. Inspection and testing by the Owner's consultant are solely at the discretion of the Owner, and in no way relieve the Contractor of sole responsibility for maintaining a quality control program.
B. Contractor shall use adequate numbers of skilled workmen who are thoroughly trained, qualified, and experienced in the necessary craft, equipment and who are completely familiar with the specified requirements and methods needed for proper performance of the work.
C. Contractor shall provide all necessary supervision, planning, scheduling, coordination, inspection, testing and control to perform work.
D. Work not conforming to the project drawings and specifications will be identified through the use of non-conformance reports. Non-conformance reports will be issued to the Contractor, Owner, and Engineer for review and will be used to track the resolution of the deficiency.
E. Submittal Requirement: Contractors on-site Quality Control (QC) program. The program shall designate a QC supervisor, delineate recording measures for documentation, testing and inspections and identify reporting to the ENGINEER.
1.6 Quality Assurance
A. The Owner has employed an independent Quality Assurance (QA) Manager to observe the construction.
Contractor shall not conduct work without either Owner or their QA Manager present on site.
1.7 Regulatory Requirements
A. Contractor shall comply with applicable requirements of the laws, codes, ordinances, and regulations of federal, state, and municipal authorities having jurisdiction. Obtain necessary approvals from all such authorities.
B. Contractor shall complete work in compliance with county, state, and federal permits.
C. Contractor shall abide by the requirements of any project-specific permits.
D. The Owner shall obtain all necessary permits for project work.
1.8 Verification of Conditions
A. Examine the areas to receive the work and the conditions under which the work would be performed.
Contractor shall remedy conditions detrimental to the proper and timely completion of the work. Do not proceed until unsatisfactory conditions have been corrected.
B. Verify existing conditions, dimensions, elevations, and quantities in the field prior to preparation of any materials or commencement of any work. Any discrepancies between information shown on these drawings and actual field conditions shall be reported immediately to the Owner and Engineer.
1.9 Meetings
A. A pre-construction meeting is to be held on-site prior to the commencement of work.
B. Progress meeting frequency to be determined.
1.10 Submittals
A. The Contractor shall develop and submit a submittal register based on their review of the design documents for submittal to the Owner and Engineer. Provide the submittal register one week prior to the pre-construction meeting.
B. An electronic (pdf format) copy of the required submittals shall be emailed to the Owner and Engineer. The Owner and Engineer shall have seven (7) business days to review each submittal. Submittals shall be returned to the Contractor as either "No Exceptions Taken", "Approved as Noted", "Revise and Resubmit", or "Rejected" as defined as follows:
1. "No Exceptions Taken" - The material submittal is in general compliance with the project drawings and specifications and is acceptable for use.
2. "Approved as Noted" - The material submittal has been approved for use however the submittal does not meet the project specifications. The submittal may be "approved as noted" with or without the Owner requiring changes.
3. "Revise and Resubmit" - Do not proceed with work covered by submittal. Revise submittal in accordance with Engineer's notations. Resubmit without delay.
4. "Rejected" - The material submittal does not comply with the project drawings and specifications and is not approved for use.
C. The Contractor shall submit request for information (RFI) to the Owner and Engineer as needed. The Engineer will respond in writing to an RFI within 7 calendar days.
D. Contractor shall submit a written work plan that describes in detail the approach to be used in the completion of the work. The work plan shall be submitted one week prior to the pre-construction meeting.
The work plan shall include a narrative of the means and methods planned to execute the described work.
Include descriptions and supporting information for the following:
1. Proposed staffing plan to manage and execute the construction including supervisors and foreman
2. Detailed project schedule
3. Spill prevention control and countermeasures plan
4. Site safety plan
5. Quality control plan
6. Traffic control plan
7. Site staging, erosion control, and haul-route plan
8. Water control plan
9. Demolition plan
10. Cofferdam installation plan (Stamped by a Profession Engineer in the state of Michigan)
11. Excavation plan
12. Spillway Construction plan
13. Downstream Channel tie in plan.
14. Existing Spillway Barrel Abandonment plan
15. Graded filter construction plan
E. Contractor shall submit red-line edits to the project drawings reflecting the as-built conditions. The red-line edits shall be provided to the Engineer and Owner within two weeks of construction completion.
1.11 Protection
A. Contractor shall install sedimentation control comprised of silt fence, turbidity curtain and sediment retention fiber rolls as directed by the Owner's representative.
B. Contractor shall take necessary precautions to avoid damaging existing above ground and below ground utilities.
C. Contractor shall suitably protect all material, in-progress work, and finished work from damage or contamination. Repair any damages or clean up contaminated or flooded areas to the satisfaction of the Owner or QA Manager.
D. Contractor shall assume full responsibility for any and all damage resulting from Contractor's work.
Contractor shall repair or remove, and/or replace items that are damaged due to Contractor's activities.
Repair or replacement will be at the expense of the Contractor and must be performed, at a minimum, to the condition prior to construction. This includes any potential damage to the roadway structure or subbase.
1.12 Water Control
A. Contractor is responsible for establishing and maintaining control of surface, runoff, and seepage water at the site.
B. Permitted baseflows and flood flows up to 12 cfs shall be maintained by the Contractor during construction.
C. Divert inflows from streams, leaks, and seeps away from the Work.
D. Divert surface water away from excavated areas.
E. Maintain the required and selected flood-handling capacity throughout construction.
F. The Contractor shall be responsible for compliance with all permit conditions and shall be responsible for any water quality violations, penalties and fines resulting from construction activities including those resulting from a breach during construction. Repair any damage resulting from water control operations at not cost to the Owner.
G. Discharges from the project site shall not inhibit stream channel restoration work that will be conducted downstream during the same construction period.
H. After having served their purpose, remove all facilities and protective works or level as required by the Owner, so as not to interfere with the operation or usefulness of the reservoir, pipelines, channels and other facilities.
1.13 Cleaning
A. Contractor shall remove tracked debris with manual cleaning or street sweeping methods and accumulated sediment at a frequency to minimize off-site impacts.
B. Contractor shall maintain areas free from accumulations of waste, brush, debris, and rubbish caused by Contractor operations.
C. Contractor shall remove all construction related debris from areas outside the limits of the Contractors work area on a daily basis. No fires will be allowed without Owner approval.
D. Contractor shall legally dispose of all waste debris and rubbish at dump areas off Owner's property.
E. Contractor shall dispose of natural excavated materials at a location approved by the Owner off site.
F. On-site grout and concrete washout basins are not allowed.
2. Materials
2.1 General
A. All materials and fabrication shop drawings shall be submitted to the Engineer for acceptance prior to use.
2.2 Silt Fence
A. Select geotextile used to fabricate silt fence from the MDOT qualified products list. Silt fence must meet the requirements in the MDOT 2020 Standard Specifications for Construction Table 910-1 and have a nominal height of three feet.
B. Submittal Requirement: Provide manufacturer's cut sheet on proposed materials.
2.3 Turbidity Curtain
A. Abasco Type II Turbidity Curtain (or approved equivalent), minimum 18 oz. per square yard, with adjustable length for varying water heights (furling lines) and appropriately designed anchoring system.
B. The turbidity curtain shall be a commercially available, preassembled system, including a geotextile, flotation system, bottom weight, and anchoring and securing mechanism that incorporates buoys. If assembled in panels, it will include a secure mechanism for joining panels together.
C. For hanging curtains (Standard and Impermeable), geotextile must conform to the requirements specified in the Drawings.
D. Hemmed pockets must be sewn or heat bonded to contain flotation material, bottom weights, and for anchor lines
E. The flotation material must maintain buoyancy if punctured or cut.
F. The bottom weight must be sufficient to hold the curtain in a vertical position.
G. The anchorage lines must be of sufficient strength and number to support the curtain and its components and maintain it in a position under normally expected conditions and flood conditions. At a minimum the anchors shall be at least 40 lb at intervals no greater than 100 ft along the length of the curtain.
H. Normal conditions include the forces of waves, wind, currents and discharge flows.
I. Turbidity curtain shall be the floatation type fabricated from impermeable fabric of adequate width to reach within 12-24 inches of the lake bottom.
J. Submittal Requirement: Contractor shall submit the manufacturer's product data and installation methods.
2.4 Water for Dust Control
A. The mineral content of dust control water shall not exceed potable water standards.
2.5 Sediment Retention Fiber Roll
A. Sediment Retention Fiber Roll shall be a tubular shaped product specifically manufactured for erosion and sediment control. Biodegradable logs shall be manufactured using interwoven biodegradable plant material such as straw, coir, or wood shavings in biodegradable or photodegradable netting that is of sufficient strength to resist damage during handling installation and use. Logs shall be in accordance with the 2012 Standard Specifications for Construction Subsection.
B. Submittal Requirement: Manufacturer's product data sheet.
2.6 Geotextile Fabric
A. Non-woven geotextile fabric shall meet the requirements shown in Table 910-1 of MDOT Specifications for Geotextile Liner.
B. Pins: minimum 12 inches long, 3/16-inch nominal diameter, pointed at one end and fitted with a 1.5-inch diameter washer at the other end.
C. Submittal Requirement: Proposed supplier including address and phone number along with a product data sheet.
2.7 Steel Sheet Piling
A. Sheet piling shall be undamaged hot-rolled steel sections of continuous interlocking sheets conforming to ASTM A328 grade 50.
B. The interlocks of sheet piling shall be free sliding, provide a swing angle suitable for the intended installation, but not less than 10-degrees when interlocked, and maintain continuous interlocking when installed.
C. Individual sheets to be a PZC-18 or approved equivalent with the following parameters:
1. Min. Elastic section modulus: PZC-18: 33.5 in3 / ft
2. Min. Moment of inertia: PZC-18: 255.5 in4 / ft
D. Bracing: Provide bracing as required by the Contractors Michigan PE approved Cofferdam Installation Plan.
E. Submittal Requirement: Shop Drawings of sheet pile and bracing system. Product data sheet of sheets and structural members indicated conformance with specifications above.
2.8 Structural Steel
A. Structural steel angles, channels, plates, rod, and bars shall conform to ASTM A36.
B. Intake structure trash rack shall be hot dipped galvanized conforming to ASTM A123.
C. Threaded fasteners and anchors
1. Structural threaded anchors and bolts shall conform to ASTM A325. Connections shall be bearing-type connections, unless specified otherwise. Riveted fasteners will not be allowed. Structural nuts shall be hexagonal ASTM A563, unless otherwise specified, and compatible in grade and finish with the bolts. Provide washer for each nut and bolt head. Washers shall be of the same material as the nuts.
D. Epoxy Anchors
1. Threaded rod for epoxy anchors shall be Hilti HAS or A36 threaded rod installed with Hilti HIT-HY-200R or 200A Adhesive Anchoring System or engineer approved equal.
2. Nuts shall be ASTM F594 - Specification for Stainless Steel Nuts, Alloy Group 1 or 2. Provide washer for each nut. Washers shall be of the same material as the nuts.
E. Welding
1. All welds shall be performed with a low hydrogen E70XX electrode in accordance with the AWS "Welding Handbook" and supplemented by other pertinent standards of the AWS.
F. Finishing
1. All permanent structural steel, fasteners, and anchors shall be hot dipped galvanized in accordance with ANSI/ASTM A123.
2. No specific finish is required for temporary structural steel elements.
G. Submittal Requirements:
1. Shop drawings for each fabricated item. Fabrication drawings showing details of fabrication and demonstrating compliance with specification requirements. Include dimensions, sizes, finishes, fasteners, welds, and materials of construction. For standard manufactured items, submit catalog work sheets showing illustrated cuts of items to be furnished, including scale details, dimensions, and materials. Reference all construction materials by ASTM designations and grades.
2. Detailed placement or erection drawings indicating locations of fabricated items. Reproduction of contract documents will not be accepted for this purpose. Verify all dimensions to ensure proper fit of all fabricated items.
3. Welders' certificates - certify welders employed on the work, verifying AWS qualifications within the previous 12 months.
2.9 High Density Polyethylene (HDPE) Pipe
A. HDPE pipe used for spillway barrel construction shall be Standard Dimension Ratio (SDR) 17 pipe with an outside diameter equal to 24 inches.
B. All HDPE pipes shall conform to ASTM D3350-21: Standard Specification for Polyethylene (PE) Pipe (SDR-PR) Based on Outside Diameter.
C. The pipe shall be homogenous throughout and free of visible cracks, holes, foreign inclusions, voids, signs of excessive deflection during transport or other injurious defects.
D. Joints for HDPE pipe shall be butt fusion welded and shall meet AWWA Standard C 906-90 (or most recent version).
E. Submittal Requirement: Manufacturer's product data sheet.
2.10 Flowable Fill (CLSM)
A. Flowable fill shall be a pumpable controlled low strength material (CLSM) consisting of cement and sand with a maximum compressive strength of 250 psi at 28 days when tested in accordance with ASTM D4832.
B. The material shall have a high mobility with a flow cone efflux time of 35 seconds or less through a 3/4” orifice. The CONTRACTOR will be responsible for performing the mobility testing, and the QA MANAGER shall be responsible for strength testing. The QA MANAGER may also perform supplemental testing, but this does not relieve the CONTRACTOR's duties to perform QC testing of materials.
C. Flowable fill shall have a density greater than 70 pcf.
D. Bulkheads For Pipe Sections
1. Grout Bulkhead: Cement-based dry-pack grout conforming to ASTM C 1107, Grade B or C.
2. Manufactured Bulkhead: Commercially available plug or cap specifically designed and manufactured to be used with pipe being abandoned.
E. Submittal Requirements: Proposed mix design, historical test results, manufacturer's product data sheets, bulkhead construction plan.
2.11 Precast Structures
A. The Spillway Drop Inlet shall be precast and shall conform to ASTM Designation C478. The manhole, lid, walls and foundation, shall be adequately designed to handle all applicable loads. The Spillway Drop Inlet will not be subject to vehicular loading.
B. Minimum wall thickness shall be 6-inches of reinforced concrete.
C. Joints shall be sealed with o-ring gaskets conforming to ASTM C 443.
D. Joints shall be interlocking to secure proper alignment between members and prevent migration of soil through the joint.
E. Opening for penetrations shall be smooth and free of surface irregularities and without exposed steel reinforcing.
F. Spillway Drop Inlet access port shall be 24” in diameter with a 26” diameter lip capable of accommodating the manhole cover such that it sits flush with the top of the manhole lid.
G. Submittal Requirements: Submit materials, drawings and manufacturer's information 14 days prior to installation on-site.
H. The spillway drop inlet structure is to be subjected to an exfiltration test. All incoming and outgoing pipelines shall be plugged and the manhole filled with water up to +/- 6 inches of the manhole cover. If the water loss exceeds the maximum allowable as shown below, the manhole shall have failed the test.
Depth of Drop inlet(ft) Max allowable water loss 0-8 1inch/5min >8 1/8 gal/vertical ft/5min
NOTE: Any failure of the above test shall be inspected as to the source of the problem, corrected, and retested.
2.12 Covers and Castings
A. Frames and covers for openings shall be cast-iron, ASTM A48, of Neenah Foundry Company, Neenah, Wisconsin, or approved equal.
B. The manhole cover shall be a slotted 26” diameter Neenah Type G grate.
C. Submittal Requirements: Manufacturers product data sheet.
R
EY
, A J
B :\W or ki ng \D
TM
B\
Ya nk ee S pr in gs R
A G un L ak e
Im pr ov em en ts
\H al l L ak e D am \0
0_ C
AD
\D es ig n\ W or ki ng \T
EC
H
N
IC
AL
S
PE
C
IF
IC
AT
IO
N S
O
F 4.
dw g
/1 3/
MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET
3111 W. JOSEPH ST.
LANSING, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
NO DATE ISSUE/REVISION APP
A 5/19/2023 100% ISSUE FOR PERMIT GLK
ISSUED FOR PERMIT
SHEET NAME DWG. NO.HALL LAKE DAM
REHABILITATION
GUN LAKE ROAD
MIDDLEVILLE,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .