Addendum 1_20046.pdf

PDF 123 KB Posted

Attached to
751/20046. BDW; Hall Lake Dam Decommissioning
Solicitation number
RFP 171 240000000633 2
Issued by
Baraga County, Michigan

About this file

This is an Addendum No. 1 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Hall Lake Dam Decommissioning project (File Number 751/20046.BDW). The addendum was issued on December 21, 2023, with a proposal due date of December 28, 2023. The addendum incorporates interpretations, clarifications, and modifications to the original RFP and includes an attachment listing pre-proposal meeting attendance. Project Director Bruce Watkins approved and issued the addendum through the Buy4Michigan.com portal.

The addendum does not specify pricing terms, funding amounts, set-asides, or other financial details in the provided content. No incumbent information, contract term, renewal options, or specific scope of work elements are detailed in this addendum document. The attachment referenced regarding pre-proposal meeting attendance is not included in the provided material.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 7/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. __1__

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.Buy4Michigan.com as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

12/21/2023

PROJECT NAME

Hall Lake Dam Decommissioning

FILE NUMBER

751/20046.BDW

PROJECT DIRECTOR

Bruce Watkins

PROPOSAL DUE DATE:

12/28/2023

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Item 1 – Pre-Proposal Meeting Attendance - attached

APPROVED BY: Bruce Watkins

PROJECT DIRECTOR Bruce Watkins DATE December 21,2023 http://www.buy4michigan.com/

File details come from the government source that posted it. Updated .