About this file

photos maps drawings

View the file

Other files for this federal contract opportunity

Other files attached to Preston Peak Barracks Emergency Repair, newest first.
File Type Posted
A3_Project_Specs_Preston_Peak.pdf PDF
A3_Drawings_05-25-2016.pdf PDF
A3_Asbestos_Survey_and_Report_Preston_Peak.pdf PDF
A3_SF30.pdf PDF
Amendment_000002_Preston_Peak.pdf PDF
SF30.pdf PDF
A1_Preston_Peak_Asbestos_Report.pdf PDF
A1_Preston_Peak_Updated_Specs_Emerg_51216_.pdf PDF
1._Updated_Project_Specs_Preston_Peak.pdf PDF
3._CA41 _Mod_0 _01082016.pdf PDF
AG-9AC7-S-16-0093_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos

Remove Exist

Roof System to Top Plate

Remove Existing Roof System Structure Complete Within the Limits Indicated and Down to Top Plate.

Remove and Replace Approx. One Square (100 SF) of Roofing Materials at Penetration Damage Area. Remove and Replace All Damaged 1x Board Sheathing to Nearest Rafter, All to Match In-Kind.

Construction Notes

Install New Wood Frame Roof System, Including but Not Necessarily limited to 2x8 Ridge and Hip

Rafters, 2x6 Roof Rafters, 1x Collar/Rafter Ties, 2x4 Ceiling Joists, 1x Alternating Roof Board Sheathing, Min 30# Felt Roofing Paper Underlayment, Metal Shake Shingles and Related Flashing, Ridge, Rake and Eve Metal Triming, all to Replace in Kind and in Accordance with the Contract Specifications.

Remove and Replace Gutter and Downspout System.

Gutters and Down Spout to be Continuous Extruded Galvanized Steel, and Color to Match Existing. Install

2x Gutter Support Blocks to Battered Facia/Soffit at a Maximum of 32" O.C. With Vertical Edge Mount Surface for Gutter Fastening.

Approx Location of Roof Penetration Damage Through to Ceiling Drywall

Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos

Remove Exist

Roof System to Top Plate

Remove Exist

Roof System to Top Plate

Remove and Replace Damaged 1x Soffit/Facia Boards and Related Wood Support Members to Match in Kind. Include Prime and Paint Finish to Match.

Remove and Replace Damaged Solid Wood Siding Boards to Match in Kind. Include Prime and Paint Finish to

Match.

Remove and Replace Existing Drywall, Tape and Finish to Match Existing on All Walls in Bedrooms Indicated, and Entire Ceiling Drywall and Finish in Same Room, Complete to Match.

Prime and Paint Entire Room Walls and Ceiling, Color to Match Existing. Paint Trim at Doors and Windows Where Replaced. Painting to Match Existing Material and Finish.

Remove and Replace Damaged Electrical Circuits in Walls & Ceilings to Nearest Accessible Junction Box and Reconnect per Current Elec Code. Replace Fixtures, Switches and Receptacles with Similar Parts/Materials in These Rooms Complete.

4 5

10 Remove and Replace Existing Insulation with R13 Batt Insulation in Exterior Walls Where Drywall Removed.

11 Remove and Replace Existing Insulation with R30 Batt Insulation in Ceilings Where Drywall Removed.

64 5 6

Approx Location of Roof Penetration Damage

Through Porch Overhang

Approx Location of Roof Penetration Damage Through Porch Overhang

10 10

12 Remove and Replace Existing Door Trim to Match Existing. Sand, Fill Holes, Caulk and Prepare for Primer and Paint Application.

13 Remove and Replace Existing Window Trim to Match Existing. Sand, Fill Holes, Caulk and Prepare for Primer and Paint Application.

NOTICE REGARDING DRYWALL DEMOLITION:

EXISTING DRYWALL, TAPE, AND TEXTURE HAS BEEN TESTED AND

SHOWN TO CONTAIN UP TO 5% ASBESTOS MATERIAL. CONTRACTOR

TO CARRY OUT ABATEMENT WORK IN ACCORDANCE WITH STATE AND

LOCAL LAWS, INCLUDING ALL SPECIAL LICENSING/CERTIFICATION OF

ABATEMENT AND DISPOSAL CONTRACTORS. SEE CONTRACT

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

CIR

A

M R

P E

D

T AFOTNE G

YREKA, CALIFORNIA

KLAMATH NATIONAL FOREST

FOREST SERVICE

E R

U

TL

U

U.S. DEPARTMENT OF AGRICULTURE

DATE:DESIGNED:

DRAWN:

CHECKED:

DATE:

DATE:

REVISIONDATE BY DRAWING NAME

Sheet of

Happy Camp Lower Station

Preston Peak Barracks Emergency Repairs 1 2

K. Nolan 4/20/16 K. Nolan 4/20/16 K. Kellogg 4/20/16

Construction Notes

Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos

CIR

A

M R

P E

D

T AFOTNE G

YREKA, CALIFORNIA

KLAMATH NATIONAL FOREST

FOREST SERVICE

E R

U

TL

U

U.S. DEPARTMENT OF AGRICULTURE

DATE:DESIGNED:

DRAWN:

CHECKED:

DATE:

DATE:

REVISIONDATE BY DRAWING NAME

Sheet of

Happy Camp Lower Station

Preston Peak Barracks Emergency Repairs 2 2

K. Nolan 4/20/16 K. Nolan 4/20/16 K. Kellogg 4/20/16

This Sheet Provided as a Reference for Existing Roof Framing System

View from Southwest Tree Has Been Removed

View from Northeast Tree Has Been Removed

Eve/Facia/Soffit Damage at East Side, South Similar

B R d

Current Weatherized Condition

Roof Framing/Looking West to Join Point at Earlier Addition

Roof Framing/Attic East End

Preston Peak Work Plan Drawings.pdf
Model
Plan & Elevation
Sections & Details