2._Photos _Maps_ _Drawings_updated.pdf
PDF 21 MB Posted
- Attached to
- Preston Peak Barracks Emergency Repair Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0093
About this file
photos maps drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A3_Project_Specs_Preston_Peak.pdf | ||
| A3_Drawings_05-25-2016.pdf | ||
| A3_Asbestos_Survey_and_Report_Preston_Peak.pdf | ||
| A3_SF30.pdf | ||
| Amendment_000002_Preston_Peak.pdf | ||
| SF30.pdf | ||
| A1_Preston_Peak_Asbestos_Report.pdf | ||
| A1_Preston_Peak_Updated_Specs_Emerg_51216_.pdf | ||
| 1._Updated_Project_Specs_Preston_Peak.pdf | ||
| 3._CA41 _Mod_0 _01082016.pdf | ||
| AG-9AC7-S-16-0093_Solicitation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos
Remove Exist
Roof System to Top Plate
Remove Existing Roof System Structure Complete Within the Limits Indicated and Down to Top Plate.
Remove and Replace Approx. One Square (100 SF) of Roofing Materials at Penetration Damage Area. Remove and Replace All Damaged 1x Board Sheathing to Nearest Rafter, All to Match In-Kind.
Construction Notes
Install New Wood Frame Roof System, Including but Not Necessarily limited to 2x8 Ridge and Hip
Rafters, 2x6 Roof Rafters, 1x Collar/Rafter Ties, 2x4 Ceiling Joists, 1x Alternating Roof Board Sheathing, Min 30# Felt Roofing Paper Underlayment, Metal Shake Shingles and Related Flashing, Ridge, Rake and Eve Metal Triming, all to Replace in Kind and in Accordance with the Contract Specifications.
Remove and Replace Gutter and Downspout System.
Gutters and Down Spout to be Continuous Extruded Galvanized Steel, and Color to Match Existing. Install
2x Gutter Support Blocks to Battered Facia/Soffit at a Maximum of 32" O.C. With Vertical Edge Mount Surface for Gutter Fastening.
Approx Location of Roof Penetration Damage Through to Ceiling Drywall
Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos
Remove Exist
Roof System to Top Plate
Remove Exist
Roof System to Top Plate
Remove and Replace Damaged 1x Soffit/Facia Boards and Related Wood Support Members to Match in Kind. Include Prime and Paint Finish to Match.
Remove and Replace Damaged Solid Wood Siding Boards to Match in Kind. Include Prime and Paint Finish to
Match.
Remove and Replace Existing Drywall, Tape and Finish to Match Existing on All Walls in Bedrooms Indicated, and Entire Ceiling Drywall and Finish in Same Room, Complete to Match.
Prime and Paint Entire Room Walls and Ceiling, Color to Match Existing. Paint Trim at Doors and Windows Where Replaced. Painting to Match Existing Material and Finish.
Remove and Replace Damaged Electrical Circuits in Walls & Ceilings to Nearest Accessible Junction Box and Reconnect per Current Elec Code. Replace Fixtures, Switches and Receptacles with Similar Parts/Materials in These Rooms Complete.
4 5
10 Remove and Replace Existing Insulation with R13 Batt Insulation in Exterior Walls Where Drywall Removed.
11 Remove and Replace Existing Insulation with R30 Batt Insulation in Ceilings Where Drywall Removed.
64 5 6
Approx Location of Roof Penetration Damage
Through Porch Overhang
Approx Location of Roof Penetration Damage Through Porch Overhang
10 10
12 Remove and Replace Existing Door Trim to Match Existing. Sand, Fill Holes, Caulk and Prepare for Primer and Paint Application.
13 Remove and Replace Existing Window Trim to Match Existing. Sand, Fill Holes, Caulk and Prepare for Primer and Paint Application.
NOTICE REGARDING DRYWALL DEMOLITION:
EXISTING DRYWALL, TAPE, AND TEXTURE HAS BEEN TESTED AND
SHOWN TO CONTAIN UP TO 5% ASBESTOS MATERIAL. CONTRACTOR
TO CARRY OUT ABATEMENT WORK IN ACCORDANCE WITH STATE AND
LOCAL LAWS, INCLUDING ALL SPECIAL LICENSING/CERTIFICATION OF
ABATEMENT AND DISPOSAL CONTRACTORS. SEE CONTRACT
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
CIR
A
M R
P E
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
E R
U
TL
U
U.S. DEPARTMENT OF AGRICULTURE
DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE:
REVISIONDATE BY DRAWING NAME
Sheet of
Happy Camp Lower Station
Preston Peak Barracks Emergency Repairs 1 2
K. Nolan 4/20/16 K. Nolan 4/20/16 K. Kellogg 4/20/16
Construction Notes
Brick Chimney Previously Removed to Below Existing Roof Deck Framing. See Contract Photos
CIR
A
M R
P E
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
E R
U
TL
U
U.S. DEPARTMENT OF AGRICULTURE
DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE:
REVISIONDATE BY DRAWING NAME
Sheet of
Happy Camp Lower Station
Preston Peak Barracks Emergency Repairs 2 2
K. Nolan 4/20/16 K. Nolan 4/20/16 K. Kellogg 4/20/16
This Sheet Provided as a Reference for Existing Roof Framing System
View from Southwest Tree Has Been Removed
View from Northeast Tree Has Been Removed
Eve/Facia/Soffit Damage at East Side, South Similar
B R d
Current Weatherized Condition
Roof Framing/Looking West to Join Point at Earlier Addition
Roof Framing/Attic East End
| Preston Peak Work Plan Drawings.pdf |
| Model |
| Plan & Elevation |
| Sections & Details |
File details come from the government source that posted it. Updated .