Attachment E Unit Description.xls
XLS spreadsheet 23 KB Posted
- Attached to
- SMMU NRA Mechanical Fuel Reduction and Site Prep
- Solicitation number
- AG-9A28-S-09-0053
About this file
Attachment E Unit Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C Map 1.pdf | ||
| Attachment C Map 2.pdf | ||
| sf-30.rtf | RTF text file | |
| Attachments C and D Map 2.pdf | ||
| Attachment A Vicinity Map.pdf | ||
| Attachment D Vicinity Map.pdf | ||
| Attachments C and D Map 1.pdf | ||
| Attachment A Map 6.pdf | ||
| Attachment B Map 1.pdf | ||
| Attachment A Map 1.pdf | ||
| Attachment A Map 5.pdf | ||
| Attachment C Vicinity Map.pdf | ||
| Attachment A Map 4.pdf | ||
| Attachment B Vicinity Map.pdf | ||
| Attachment A Map 3.pdf | ||
| Attachment A Map 7.pdf | ||
| Attachment A Map 2.pdf | ||
| Attachment E Map 1.pdf | ||
| Attachment C Task Order.doc | DOC document | |
| Attachment B Unit Description.xls | XLS spreadsheet | |
| Attachment D Task Order.doc | DOC document | |
| AG-9A28-S-09-0053.pdf | ||
| Attachment B task order.doc | DOC document | |
| Attachment C Unit Description.xls | XLS spreadsheet | |
| Attachment D Unit Description.xls | XLS spreadsheet | |
| Attachment E Task Order.doc | DOC document | |
| Attachment A task order.doc | DOC document | |
| Attachment A Unit Description.xls | XLS spreadsheet |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mech IDIQ Task Order #2
| SHASTA-TRINITY NATIONAL FOREST, SHASTA-McCLOUD MANAGEMENT UNIT | ||||||||||||||||||||
| PROJECT UNIT | EXISTING STAND CONDITION | TREATMENT SPECIFICATIONS | ADDED INFORMATION | |||||||||||||||||
| ITEM # | UNIT NAME | COMP. # | UNIT # | SLOPE % | PAST TREATMENTS (Activity/Year) | AVG. TPA | AVG. TREE HEIGHT | AVG. DBH | AVG. BRUSH HEIGHT | AVG. BRUSH % | LEAVE TREE PRIORITY | AVG. LEAVE TREE SPACING | AVG. LEAVE TPA | MAX. DBH CUT | MAX. STUMP HEIGHT | BUCKING LENGTH | WORK METHOD | ADDITIONAL REQUIREMENTS (see below) | ||
| TREATMENT ACRES | 1=6'-10' 2=10'-15' 3=15'-20' 4=15'-25' 5=25'+ | 1=2"-4" 2=4"-6" 3=4"-8" 4=8"+ | 1=Mech.Rel. 2=Mech.Rel/ PCT 3=Man.Rel. 4=PCT | 5=Pruning 6=Chipping 7=Slash Removal 8=Mastication | ||||||||||||||||
| 3.1 | Lakehead | 22 | 0-5% | None | 100 | 5 | 4 | 10 | 33% | * | 20' | n/a | 8" | 4 | n/a | 1 & 8 | (1,2) | |||
| Item #3 Total Acres | 22 | |||||||||||||||||||
| TOTAL ACRES Task Order #3 | 22 |
Work Description: ITEM 3 - 22 ACRES OF Mechanical thinning to represent natural conditions.
Legend:
(*) Leave Tree Priority=California Black Oak, Ponderosa Pine, Douglas Fir, Knobcone Pine
*Additional Requirements (Task Order specific):
1) LOP (Limited Operating Period) No work may be performed between Jan. 1 and July 31 if an active bald eagle nest is found within a 1/4 mile of the work site.
2) Equipment shall not operate between the Wednesday prior to Memorial Day Weekend and the Wednesday following Labor Day Weekend.
3) A 10' untreated buffer will be left along the perimeter of the treatment area.
FSDefaultUser:
Sheet2
Sheet3
File details come from the government source that posted it. Updated .