Attachment C Unit Description.xls
XLS spreadsheet 26 KB Posted
- Attached to
- SMMU NRA Mechanical Fuel Reduction and Site Prep
- Solicitation number
- AG-9A28-S-09-0053
About this file
Attachment C Unit Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C Map 1.pdf | ||
| Attachment C Map 2.pdf | ||
| sf-30.rtf | RTF text file | |
| Attachments C and D Map 2.pdf | ||
| Attachment A Vicinity Map.pdf | ||
| Attachment D Vicinity Map.pdf | ||
| Attachments C and D Map 1.pdf | ||
| Attachment A Map 6.pdf | ||
| Attachment B Map 1.pdf | ||
| Attachment A Map 1.pdf | ||
| Attachment A Map 5.pdf | ||
| Attachment C Vicinity Map.pdf | ||
| Attachment A Map 4.pdf | ||
| Attachment B Vicinity Map.pdf | ||
| Attachment A Map 3.pdf | ||
| Attachment A Map 7.pdf | ||
| Attachment A Map 2.pdf | ||
| Attachment E Map 1.pdf | ||
| Attachment C Task Order.doc | DOC document | |
| Attachment B Unit Description.xls | XLS spreadsheet | |
| Attachment D Task Order.doc | DOC document | |
| Attachment E Unit Description.xls | XLS spreadsheet | |
| AG-9A28-S-09-0053.pdf | ||
| Attachment B task order.doc | DOC document | |
| Attachment D Unit Description.xls | XLS spreadsheet | |
| Attachment E Task Order.doc | DOC document | |
| Attachment A task order.doc | DOC document | |
| Attachment A Unit Description.xls | XLS spreadsheet |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE PREP TASK ORDER
| SITE PREP MASTICATION | ||||||||||||||||||||
| CONTRACT | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| SHASTA-TRINITY NATIONAL FOREST, SHASTA-McCLOUD MANAGEMENT UNIT | ||||||||||||||||||||
| PROJECT UNIT | EXISTING STAND CONDITION | TREATMENT SPECIFICATIONS | ADDED INFORMATION | |||||||||||||||||
| ITEM # | UNIT NAME | COMP. # | UNIT # | SLOPE % | PAST TREATMENTS (Activity/Year) | AVG. TPA | AVG. TREE HEIGHT | AVG. DBH | AVG. BRUSH HEIGHT | AVG. BRUSH % | LEAVE TREE PRIORITY | AVG. LEAVE TREE SPACING | AVG. LEAVE TPA | MAX. DBH CUT | MAX. STUMP HEIGHT | BUCKING LENGTH | WORK METHOD | ADDITIONAL REQUIREMENTS (see below) | ||
| TREATMENT ACRES | 1=6'-10' 2=10'-15' 3=15'-20' 4=15'-25' 5=25'+ | 1=2"-4" 2=4"-6" 3=4"-8" 4=8"+ | 1=Mech.Rel. 2=Mech.Rel/ PCT 3=Man.Rel. 4=PCT | 5=Pruning 6=Chipping 7=Slash Removal 8=Mastication 9 = Mechanical Site Prep | ||||||||||||||||
| 0.1 | Lost Harris Salvage | 34 | 170A | 76 | 0-5% | HCC 2006 | n/a | n/a | n/a | 4 | 50% | n/a | n/a | n/a | 8 | 4 | 2 | 9 | (1) | |
| 0.2 | Lost Harris Salvage | 34 | 170B | 10 | 0-5% | HCC 2006 | n/a | n/a | n/a | 4 | 50% | n/a | n/a | n/a | 8 | 4 | 2 | 9 | (1) | |
| 0.3 | Lost Harris Salvage | 34 | 171 | 25 | 0-5% | HCC 2006 | n/a | n/a | n/a | 4 | 50% | n/a | n/a | n/a | 8 | 4 | 2 | 9 | (1) | |
| 0.4 | Baby Powder | 40 | 161 | 4 | 0-5% | HCC 2006 | n/a | n/a | n/a | 4 | 50% | n/a | n/a | n/a | 8 | 4 | 2 | 9 | (2) | |
| 0.5 | Baby Powder | 40 | 163 | 11 | 0-5% | HCC 2006 | n/a | n/a | n/a | 4 | 50% | n/a | n/a | n/a | 8 | 4 | 2 | 9 | (2) | |
| Item Total Acres | 126 | |||||||||||||||||||
| TOTAL ACRES Task Order # | 126 |
Work Description: Mastication/mulching of residual logging slash/debris, damaged and excess seedlings and saplings, and grinding of excess woody debris up to 10 inches in diameter to prepare sites for reforestation. This shall be accomplished using drum type or horizontally mounted mastication head. This work requires the powerhead to partially dig into the soil to grind woody debis as well as masticate vegetation. Completion of mastication/grinding will leave a unit with no piles to be burned, free from undesireable brush and conifer species competition and ready for planting. Rotary mounted heads will not be acceptable. This work shall be accomplished prior to ripping of furrows.
Legend:
(A) Leave Tree Priority=SP,IC,DF,WF,JP, all others, PP PP=Ponderosa Pine, JP=Jeffrey Pine, DF=Douglas Fir, WF=White Fir, IC=Incense Cedar, RF=Red Fir, SP=Sugar Pine, KP=Knobcone Pine, LP=Lodgepole Pine, WWP=Western White Pine, J=Juniper, POC=Port Orford Cedar HCC= Harvest Clearcut, HPC = Harvest Partial Cut, PL=Planting, RL=Release, PCT=Precommercial Thinning, CTH=Commercial Thinning, PR=Pruning, MAST=Mastication, MTRT=Mastication,Release & Thin, WL=Windrow Leveling, DSK=Disking, RT=Rototilling, PF=Prescribed Fire, TPA=Trees per Acre *Additional Requirements (Task Order specific):
1) LOP (Limited Operating Period) No work Feb. 1 to Aug. 15 FSDefaultUser:
File details come from the government source that posted it. Updated .