Attachment C Unit Description.xls

XLS spreadsheet 26 KB Posted

Attached to
SMMU NRA Mechanical Fuel Reduction and Site Prep
Solicitation number
AG-9A28-S-09-0053
Issued by

About this file

Attachment C Unit Description

View the file

Other files

File Type Posted
Attachment C Map 1.pdf PDF
Attachment C Map 2.pdf PDF
sf-30.rtf RTF text file
Attachments C and D Map 2.pdf PDF
Attachment A Vicinity Map.pdf PDF
Attachment D Vicinity Map.pdf PDF
Attachments C and D Map 1.pdf PDF
Attachment A Map 6.pdf PDF
Attachment B Map 1.pdf PDF
Attachment A Map 1.pdf PDF
Attachment A Map 5.pdf PDF
Attachment C Vicinity Map.pdf PDF
Attachment A Map 4.pdf PDF
Attachment B Vicinity Map.pdf PDF
Attachment A Map 3.pdf PDF
Attachment A Map 7.pdf PDF
Attachment A Map 2.pdf PDF
Attachment E Map 1.pdf PDF
Attachment C Task Order.doc DOC document
Attachment B Unit Description.xls XLS spreadsheet
Attachment D Task Order.doc DOC document
Attachment E Unit Description.xls XLS spreadsheet
AG-9A28-S-09-0053.pdf PDF
Attachment B task order.doc DOC document
Attachment D Unit Description.xls XLS spreadsheet
Attachment E Task Order.doc DOC document
Attachment A task order.doc DOC document
Attachment A Unit Description.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE PREP TASK ORDER

SITE PREP MASTICATION
CONTRACT
CONTRACTOR:
SHASTA-TRINITY NATIONAL FOREST, SHASTA-McCLOUD MANAGEMENT UNIT
PROJECT UNITEXISTING STAND CONDITIONTREATMENT SPECIFICATIONSADDED INFORMATION
ITEM #UNIT NAMECOMP. #UNIT #SLOPE %PAST TREATMENTS (Activity/Year)AVG. TPAAVG. TREE HEIGHTAVG. DBHAVG. BRUSH HEIGHTAVG. BRUSH %LEAVE TREE PRIORITYAVG. LEAVE TREE SPACINGAVG. LEAVE TPAMAX. DBH CUTMAX. STUMP HEIGHTBUCKING LENGTHWORK METHODADDITIONAL REQUIREMENTS (see below)
TREATMENT ACRES1=6'-10' 2=10'-15' 3=15'-20' 4=15'-25' 5=25'+1=2"-4" 2=4"-6" 3=4"-8" 4=8"+1=Mech.Rel. 2=Mech.Rel/ PCT 3=Man.Rel. 4=PCT5=Pruning 6=Chipping 7=Slash Removal 8=Mastication 9 = Mechanical Site Prep
0.1Lost Harris Salvage34170A760-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.2Lost Harris Salvage34170B100-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.3Lost Harris Salvage34171250-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.4Baby Powder4016140-5%HCC 2006n/an/an/a450%n/an/an/a8429(2)
0.5Baby Powder40163110-5%HCC 2006n/an/an/a450%n/an/an/a8429(2)
Item Total Acres126
TOTAL ACRES Task Order #126

Work Description: Mastication/mulching of residual logging slash/debris, damaged and excess seedlings and saplings, and grinding of excess woody debris up to 10 inches in diameter to prepare sites for reforestation. This shall be accomplished using drum type or horizontally mounted mastication head. This work requires the powerhead to partially dig into the soil to grind woody debis as well as masticate vegetation. Completion of mastication/grinding will leave a unit with no piles to be burned, free from undesireable brush and conifer species competition and ready for planting. Rotary mounted heads will not be acceptable. This work shall be accomplished prior to ripping of furrows.

Legend:

(A) Leave Tree Priority=SP,IC,DF,WF,JP, all others, PP PP=Ponderosa Pine, JP=Jeffrey Pine, DF=Douglas Fir, WF=White Fir, IC=Incense Cedar, RF=Red Fir, SP=Sugar Pine, KP=Knobcone Pine, LP=Lodgepole Pine, WWP=Western White Pine, J=Juniper, POC=Port Orford Cedar HCC= Harvest Clearcut, HPC = Harvest Partial Cut, PL=Planting, RL=Release, PCT=Precommercial Thinning, CTH=Commercial Thinning, PR=Pruning, MAST=Mastication, MTRT=Mastication,Release & Thin, WL=Windrow Leveling, DSK=Disking, RT=Rototilling, PF=Prescribed Fire, TPA=Trees per Acre *Additional Requirements (Task Order specific):

1) LOP (Limited Operating Period) No work Feb. 1 to Aug. 15 FSDefaultUser:

File details come from the government source that posted it. Updated .