Attachment D Unit Description.xls

XLS spreadsheet 26 KB Posted

Attached to
SMMU NRA Mechanical Fuel Reduction and Site Prep
Solicitation number
AG-9A28-S-09-0053
Issued by

About this file

Attachment D Unit Description

View the file

Other files

File Type Posted
Attachment C Map 1.pdf PDF
Attachment C Map 2.pdf PDF
sf-30.rtf RTF text file
Attachments C and D Map 2.pdf PDF
Attachment A Vicinity Map.pdf PDF
Attachment D Vicinity Map.pdf PDF
Attachments C and D Map 1.pdf PDF
Attachment A Map 6.pdf PDF
Attachment B Map 1.pdf PDF
Attachment A Map 1.pdf PDF
Attachment A Map 5.pdf PDF
Attachment C Vicinity Map.pdf PDF
Attachment A Map 4.pdf PDF
Attachment B Vicinity Map.pdf PDF
Attachment A Map 3.pdf PDF
Attachment A Map 7.pdf PDF
Attachment A Map 2.pdf PDF
Attachment E Map 1.pdf PDF
Attachment C Task Order.doc DOC document
Attachment B Unit Description.xls XLS spreadsheet
Attachment D Task Order.doc DOC document
Attachment E Unit Description.xls XLS spreadsheet
AG-9A28-S-09-0053.pdf PDF
Attachment B task order.doc DOC document
Attachment C Unit Description.xls XLS spreadsheet
Attachment E Task Order.doc DOC document
Attachment A task order.doc DOC document
Attachment A Unit Description.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIP FURROWS TASK ORDER

SITE PREP RIP FURROWS
CONTRACT # AG-9A28-S-09-0053IAS Requisition # 284627COR: Nisha van Hees
CONTRACTOR:AAP# 05NP140937973TASK ORDER: #___6_________
SHASTA-TRINITY NATIONAL FOREST, SHASTA-McCLOUD MANAGEMENT UNIT
PROJECT UNITEXISTING STAND CONDITIONTREATMENT SPECIFICATIONSADDED INFORMATION
ITEM #UNIT NAMECOMP. #UNIT #SLOPE %PAST TREATMENTS (Activity/Year)AVG. TPAAVG. TREE HEIGHTAVG. DBHAVG. BRUSH HEIGHTAVG. BRUSH %LEAVE TREE PRIORITYAVG. LEAVE TREE SPACINGAVG. LEAVE TPAMAX. DBH CUTMAX. STUMP HEIGHTBUCKING LENGTHWORK METHODADDITIONAL REQUIREMENTS (see below)
TREATMENT ACRES1=6'-10' 2=10'-15' 3=15'-20' 4=15'-25' 5=25'+1=2"-4" 2=4"-6" 3=4"-8" 4=8"+1=Mech.Rel. 2=Mech.Rel/ PCT 3=Man.Rel. 4=PCT5=Pruning 6=Chipping 7=Slash Removal 8=Mastication 9 = Mechanical Site Prep
0.1Lost Harris Salvage34170A760-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.2Lost Harris Salvage34170B100-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.3Lost Harris Salvage34171250-5%HCC 2006n/an/an/a450%n/an/an/a8429(1)
0.4Baby Powder4016140-5%HCC 2006n/an/an/a450%n/an/an/a8429(2)
0.5Baby Powder40163110-5%HCC 2006n/an/an/a450%n/an/an/a8429(2)
Item Total Acres126
TOTAL ACRES Task Order #126

Work Description: Rip furrows to prepare land for tree planting in previously site prepped recently logged units. Objective is to reduce soil compaction so tree roots are free to grow.

Legend:

(A) Leave Tree Priority=SP,IC,DF,WF,JP, all others, PP PP=Ponderosa Pine, JP=Jeffrey Pine, DF=Douglas Fir, WF=White Fir, IC=Incense Cedar, RF=Red Fir, SP=Sugar Pine, KP=Knobcone Pine, LP=Lodgepole Pine, WWP=Western White Pine, J=Juniper, POC=Port Orford Cedar HCC= Harvest Clearcut, HPC = Harvest Partial Cut, PL=Planting, RL=Release, PCT=Precommercial Thinning, CTH=Commercial Thinning, PR=Pruning, MAST=Mastication, MTRT=Mastication,Release & Thin, WL=Windrow Leveling, DSK=Disking, RT=Rototilling, PF=Prescribed Fire, TPA=Trees per Acre

*Additional Requirements (Task Order specific):

1) LOP (Limited Operating Period) No work Feb. 1 to Aug. 15 for protection of Northern Spotted Owl and Goshawks

2) NO TREATMENT BUFFER ZONE WITHIN 25 FEET OF THE POWDER HILL ROAD #43N49

FSDefaultUser:

File details come from the government source that posted it. Updated .