Attachment A Unit Description.xls
XLS spreadsheet 26 KB Posted
- Attached to
- SMMU NRA Mechanical Fuel Reduction and Site Prep
- Solicitation number
- AG-9A28-S-09-0053
About this file
Attachment A Unit Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C Map 1.pdf | ||
| Attachment C Map 2.pdf | ||
| sf-30.rtf | RTF text file | |
| Attachments C and D Map 2.pdf | ||
| Attachment A Vicinity Map.pdf | ||
| Attachment D Vicinity Map.pdf | ||
| Attachments C and D Map 1.pdf | ||
| Attachment A Map 6.pdf | ||
| Attachment B Map 1.pdf | ||
| Attachment A Map 1.pdf | ||
| Attachment A Map 5.pdf | ||
| Attachment C Vicinity Map.pdf | ||
| Attachment A Map 4.pdf | ||
| Attachment B Vicinity Map.pdf | ||
| Attachment A Map 3.pdf | ||
| Attachment A Map 7.pdf | ||
| Attachment A Map 2.pdf | ||
| Attachment E Map 1.pdf | ||
| Attachment C Task Order.doc | DOC document | |
| Attachment B Unit Description.xls | XLS spreadsheet | |
| Attachment D Task Order.doc | DOC document | |
| Attachment E Unit Description.xls | XLS spreadsheet | |
| AG-9A28-S-09-0053.pdf | ||
| Attachment B task order.doc | DOC document | |
| Attachment C Unit Description.xls | XLS spreadsheet | |
| Attachment D Unit Description.xls | XLS spreadsheet | |
| Attachment E Task Order.doc | DOC document | |
| Attachment A task order.doc | DOC document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mech IDIQ, Task Order #1, 2009
| TASK ORDER: #______1______ | ||||||||||||||||||||
| SHASTA-TRINITY NATIONAL FOREST, SHASTA-McCLOUD MANAGEMENT UNIT | ||||||||||||||||||||
| PROJECT UNIT | EXISTING STAND CONDITION | TREATMENT SPECIFICATIONS | ADDED INFORMATION | |||||||||||||||||
| TASK ORDER # | UNIT NAME | COMP. # | UNIT # | SLOPE % | PAST TREATMENTS (Activity/Year) | AVG. TPA | AVG. TREE HEIGHT | AVG. DBH | AVG. BRUSH HEIGHT | AVG. BRUSH % | LEAVE TREE PRIORITY | AVG. LEAVE TREE SPACING | AVG. LEAVE TPA | MAX. DBH CUT | MAX. STUMP HEIGHT | BUCKING LENGTH | WORK METHOD | ADDITIONAL REQUIREMENTS* | ||
| TREATMENT ACRES | 1=6'-10' 2=10'-15' 3=15'-20' 4=15'-25' 5=25'+ | 1=2"-4" 2=4"-6" 3=4"-8" 4=8"+ | 1=Mech.Rel. 2=Mech.Rel/ PCT 3=Man.Rel. 4=PCT | 5=Pruning 6=Chipping 7=Slash Removal 8=Mastication | ||||||||||||||||
| 1 | POWDER HILL | 40 | 4 | 9 | 0-50% | PL82, PCT91 | 500 | 4 | 3 | 4' | 100% | (A) | 18'x18' | 130-150 | 8" | 4" | 6' | 2,8 | ||
| 1 | LAVA CRACK | 40 | 6 | 154 | 0-20% | PL82 | 400 | 2 | 3 | 5' | 90% | (A) | 18'x18' | 130-150 | 8" | 4" | 6' | 2,8 | (2) | |
| 1 | CRACK | 40 | 243 | 12 | 0-15% | PL82 | 400 | 2 | 2 | 4' | 40% | (A) | 18'x18' | 130-150 | 8" | 4" | 6' | 2,8 | ||
| 1 | CRACK | 40 | 242 | 1 | 0-10% | PL92,RL95 | 500 | 3 | 2 | 4 | 50% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 167 | 9 | 0-10% | CC87, PL89,PCT96 | 350 | 3 | 3 | 4 | 80% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 168 | 6 | 0-10% | CC87, PL89,PCT96 | 350 | 3 | 3 | 4 | 80% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 207 | 9 | 0-35% | CC92, PL93 | 350 | 3 | 3 | 4 | 80% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 211 | 15 | 0-10% | CC92, PL93 | 350 | 3 | 3 | 4 | 90% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 214 | 18 | 0-10% | CC92, PL93 | 350 | 3 | 3 | 4 | 70% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 215 | 6 | 0-25% | CC92, PL93 | 350 | 3 | 3 | 4 | 90% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Car Too | 30 | 216 | 8 | 0-10% | CC92, PL93 | 350 | 3 | 3 | 4 | 90% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Mt. Thin | 5 | 25 | 67 | 0-10% | PL77 | **see note below | 3 | 3 | 4 | 100% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Mt. Thin | 5 | 29 | 63 | 0-10% | PL85 | 300 | 3 | 3 | 4 | 100% | (A) | 18x18' | 130-150 | 8" | 4" | 6' | 2 & 8 | ||
| 1 | Edson | 16 | 137 | 14 | 0-5% | PL85 | 400 | 4 | 4 | 5 | 70% | (A) | 18x18' | 130-150 | 8" | 4" | 6" | 2 & 8 | ||
| 1 | Edson | 16 | 138 | 20 | 0-5% | PL85 | 340 | 4 | 4 | 5 | 70% | (A) | 18x18' | 130-150 | 8" | 4" | 6" | 2 & 8 | ||
| 1 | Edson | 16 | 226 | 9 | 0-5% | PL85 | 520 | 4 | 4 | 5 | 70% | (A) | 18x18' | 130-150 | 8" | 4" | 6" | 2 & 8 | ||
| Total Acres Task Order #1 | 420 |
&C&"Arial,Bold"&12 2009 MECHANICAL PRECOMMERCIAL THINNING/RELEASE/HAZARDOUS FUEL REDUCTION &R&T&D FSDefaultUser:
LEGEND:
Definitions: PP=Ponderosa Pine, JP=Jeffrey Pine, DF=Douglas Fir, WF=White Fir, IC=Incense Cedar, RF=Red Fir, SP=Sugar Pine, KP=Knobcone Pine, LP=Lodgepole Pine, WWP=Western White Pine, J=Juniper, POC=Port Orford Cedar CC=Clear Cut, PL=Planting, RL=Release, PCT=Precommercial Thinning, PR=Pruning, MAST=Mastication, MTRT=Mastication, Release & Thin, WL=Windrow Leveling, DSK=Disking, RT=Rototilling, PF=Prescribed Fire, TPA=Trees per Acre
*Additional Requirements (Task Order specific):
(1) LOP (Limited Operating Period) No work May 1 - June 30
(2) No work within 25 feet of Road 43N49
** Mountain Thin #5-25 has approximately 2000 trees per acre (TPA) in approximately 60% of the unit. The Unit was planted in 1984 at a 10x10 foot spacing with Ponderosa Pine, Douglas fir, and Jeffery Pine (414 TPA). The remaining trees per acre, mostly made up of Knobcone pine natural regeneration, account for an estimated 1700 trees per acre. Most of these "naturals" are highly suppressed trees growing entwined in the brush, they have small diameters, are very spindly and will NOT be left as desirable leave trees.
File details come from the government source that posted it. Updated .