Attach_H.pdf

PDF 64 KB Posted

Attached to
Intermountain Region Road and Bridge MATOC Federal contract opportunity
Solicitation number
AG-84M8-S-14-0001
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attachment H

View the file

Other files for this federal contract opportunity

Other files attached to Intermountain Region Road and Bridge MATOC, newest first.
File Type Posted
AG-84M8-S-14-0001_00002.pdf PDF
AG-84M8-S-14-0001_0001.pdf PDF
Performance_Questionaire.pdf PDF
AG-84M8-S-14-0001_043014.pdf PDF
Attach_I_Submittal.pdf PDF
Attach_A_Specifications.pdf PDF
Attach_D.xlsx XLSX spreadsheet
Performance_Questionaire.pdf PDF
Attach_Definitions.pdf PDF
Attach_e.xlsx XLSX spreadsheet
Attach_C.pdf PDF
Attach_F.xlsx XLSX spreadsheet
Attach_G.xlsx XLSX spreadsheet
Attach_B_Sample_Task.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT H : SAMPLE TASK ORDER EXAMPLE COST SCHEDULE

Item No.

Description

Method & Unit of Measure

Unit Price

150 PROJECT REQUIREMENTS

157.31 TEMPORARY EROSION CONTROL PLAN CQ – EACH $ 200.00

157.02 SILT FENCE 3FT WOOD STAKES CQ – LF $ 5.00

158.01 WATERING FOR DUST CONTROL CQ – MGallon $ 250.00

200 EARTHWORK

201.31 CLEARING AND GRUBBING- LIGHT

DISPOSE BY SCATTERING

CQ – ACRE

$ 350.00

201.32 CLEARING AND GRUBBING- HEAVY

DISPOSE BY SCATTERING

CQ – ACRE

$ 1250.00

203.30 REMOVAL OF STRUCTURES AND

OBSTRUCTIONS

CQ – CY

$ 125.00

204.80 EXCAVATION AND EMBANKMENT –

COMMON AND LOOSE ROCK

COMPACTION METHOD B

CQ – CY

$ 3.50

207.01 EARTHWORK GEOTEXTILES:TYPE IV CQ – SY $ 2.50

208.03 STRUCTURAL EXCAVATION AND

BACKFILL

CQ – CY

$ 35.00

209.03 STRUCTURAL BACKFILL-PIPE

BEDDING

CQ – CY

$ 15.00

210.01 ROLLING DIP CQ – EACH $ 1200.00

210.02 WATER BAR CQ – EACH $ 750.00

211.01 ROADWAY OBLITERATION:

RIPPING 8” TO 12” DEPTH

CQ – LANE

MILE

$ 1250.00

211.02 ROADWAY OBLITERATION:

SCARIFYING DECOMPACATION

TO 18” DEPTH

$ 1500.00

211.03 ROADWAY OBLITERATION:

FULL RE-CONTOUR

$ 5000.00

212.01 LINEAR GRADING CQ – LANE

$ 1000.00

230.01 ROADSIDE BRUSHING- MEDIUM CQ - ACRE $ 500.00

251.01 RIPRAP: MACHINE PLACED CLASS 4

COMMERCIAL SOURCE

CQ – CY

$ 65.00

251.02 RIPRAP: MACHINE PLACED CLASS 5

COMMERCIAL SOURCE

CQ – CY

$ 65.00

251.03 RIPRAP: MACHINE PLACED

GOVERNMENT SOURCE

CQ – CY

$ 35.00

252.05 ROCK EMBANKMENT AND ROCK

BUTTRESS: CLASS 6

CQ – CY

$ 60.00

252.51 ROCK: BOULDER PLACEMENT CQ - EACH $ 100.00

253.01 GABIONS:WELDED WIRE: GALVANIZED CQ – CY $ 250.00

255.01 MECHANICALLY STABILIZED EARTH

WALLS – MEASURE PER AREA OF

WALL FACE, EXCAVATION AND

BACKFILL EXCLUDED

CQ – SF

$ 45.00

259.01 SOIL NAIL RETAINING WALLS: PER

SOIL NAIL PLACED 20 FT DEPTH

CQ – EACH $ 500.00

259.11 SOIL NAIL RETAINING WALLS: 8 IN

SHOT CRETE FACE MEASURE PER

AREA OF WALL FACE

$ 25.00

262.01 REINFORCED SOIL EMBANKMENT:

GEOGRID: CATEGORY 2. EXCAVATION

AND EMBANKENT EXCLUDED

CQ – SY

$ 5.00

262.02 REINFORCED SOIL EMBANKMENT:

GEOGRID: CATEGORY 3. EXCAVATION

AND EMBANKENT EXCLUDED

$ 7.50

300 AGGREGATE

301.01 CRUSHED AGGREGATE: GRADATION C

COMPACTION METHOD B

FURNISH AND PLACE, EXCLUDE HAUL

AQ – CY

$20.00

301.02 CRUSHED AGGREGATE SURFACE

COURSE: WITH 2% BENTONITE

301.02 AGGREGATE PLACEMENT

GOVERNMENT FURNISHED

$ 15.00

306.01 DUST PALLIATIVE: MAGNESIUM

CHLORIDE

CQ – SY

$ 1.00

303.01 ROAD RECONDITIONING: INCLUDES

SCARIFY 6 IN DEPTH, SURFACE

BLADING, AND COMPACTION

CQ – MILE

$ 2500.00

303.05 ROAD RECONDITIONING: SURFACE

BLADING ONLY

CQ – MILE

$ 1000.00

324.01 MINOR CRUSHED AGGREGATE:

QUANTITIES LESS THAN 50 CY

$ 50.00

400 ASPHALT

403.01 HOT ASPHALT CONCRETE PAVEMENT

FURNISH AND PLACE, EXCLUDE HAUL

AQ - TON

$ 110.00

404.01 MINOR HOT ASPHALT CONCRETE

PAVEMENT: (LESS THAN 50 TON)

AQ - TON

$ 150.00

408.01 COLD RECYCLED ASPHALT BASE

COURSE

CQ – SY $ 4.00

409.01 ASPHALT SURFACE TREATMENT –

CRS2P ASPHALT

AQ - TON

$ 750.00

409.02 ASPHALT SURFACE TREATMENT –

AGGREGATE CHIPS – ½ IN, 30#/SY

$ 2.50

410.01 ASPHALT SURFACE TREATMENT –

SLURRY SEAL, TYPE II CSS-1H

CQ – SY

$ 4.00

411.01 ASPHALT PRIME COAT CQ - GALLON $ 2.50

411.05 ASPHALT FOG COAT CQ – SY $ 1.50

413.01 ASPHALT PAVEMENT MILLING: 3 IN

DEPTH

CQ – SY $ 2.50

414.01 ASPHALT PAVEMENT CRACK AND

JOINT SEALING, POLYMER OR RUBBER

MODIFIED

AQ –GALLON

$ 5.00

414.31 ASPHALT PAVEMENT: SAW CUTTING AQ –LF $ 2.00

430.01 ASPHALT PAVEMENT PATCHING: FULL

DEPTH HOT ASPHALT CONCRETE MIX

AQ –SY

500 RIGID PAVEMENTS

501.01 REINFORCED PORTLAND CEMENT

CONCRETE SLABS

$ 250.00_

550 BRIDGE REPAIR

552.01 STRUCTURAL CONCRETE CLASS A(AE) CQ – CY $ 500.00

553.01 PRECAST, PRESTRESSED CONCRETE

STRUCTURAL MEMBER CLASS P(AE)

CQ – CY

$ 750.00

556.01 BRIDGE RAILING TYPE II CLASS B CQ – LF $ 60.00

556.02 REMOVE AND RESET BRIDGE RAILING CQ – LF $ 35.00

556.01 APPROACH GUARDRAIL TYPE II CQ – LF $ 60.00

557.01 TREATED STRUCTURAL TIMBER AND

LUMBER

CQ – MBF

$ 3000.00

557.02 TREATED STRUCTURAL TIMBER AND

LUMBER – GLULAM

CQ – MBF

$ 3500.00

561.01 BRIDGE TIMBER CURB: REMOVE AND

REPLACE

CQ – LF

$ 35.00

600 INCIDENTAL CONSTRUCTION

602.01 CMP CULVERT-18 INCH – 16 GA AQ – LF $ 40.00

602.02 CMP CULVERT-24 INCH – 14 GA AQ – LF $ 45.00

602.03 CMP CULVERT-36 INCH – 12 GA AQ – LF $ 60.00

602.04 CMP CULVERT-48 INCH – 10 GA AQ – LF $ 75.00

603.11 STRUCTURAL PLATE CULVERTS –

MEASURED BY SPAN TIMES LENGTH OF

STRUCTURE

$ 45.00

605.01 UNDERDRAIN SYSTEM: INCLUDES 6 IN

PERFORATED PVC PIPE, TYPE I-A

GEOTEXTILE, ½ IN DRAIN ROCK AND

BACKFILL MATERIALS

$ 15.00

607.01 REMOVE, CLEAN, AND RESET EXISTING

CULVERT

AQ – LF

$ 25.00

614.01 LEAN CONCRETE BACKFILL AQ – CY $ 150.00

615.01 CONCRETE PAVEMENTS: SIDEWALKS

AND PADS

AQ – CY

$ 250.00

617.01 GUARDRAIL TYPE II, CLASS A AQ – LF $ 50.00

617.01 GUARDRAIL TERMINAL SECTION CQ – EACH $ 400.00

617.01 GUARDRAIL REPLACE POST CQ – EACH $ 50.00

624.01 TOPSOIL: FURNISH AND PLACE CQ – CY $ 30.00

624.02 TOPSOIL: PLACE CONSERVED CQ – CY $ 15.00

625.07 SEEDING: DRY METHOD GOVT

FURNISHED SEED

CQ- ACRE

$ 50.00

625.08 SEED & MULCH HYDRAULIC METHODS CQ-ACRE $ 100.00

629.01 EROSION CONTROL: TYPE 2.D CQ – SY $ 10.00

629.02 EROSION CONTROL: TYPE 3.B CQ – SY $ 15.00

629.03 WATTLES: 9 IN DIA STRAW CQ – LF $ 5.00

PERMANENT TRAFFIC CONTROL

633.01 SIGN SYSTEM – HDO PLYWOOD, TYPE

III PRISMATIC SHEETING

$ 50.00

633.05 POSTS: 4X4 TREATED WOOD CQ – EACH $ 25.00

633.06 OBJECT MARKER CQ – EACH $ 150.00

633.07 DELINEATOR CQ – EACH $ 25.00

633.11 REMOVE AND RESET SIGN OR OBJECT CQ – EACH $ 50.00

634.01 PERMANENT PAVEMENT MARKING:

4” WIDE STRIPE, THERMOPLASTIC

TYPE H

$ 1.00

635.01 TRAFFIC CONTROL PLAN CQ- EACH $ 150.00

635.05 TYPE III BARRICADES CQ- EACH $ 250.00

635.07 CONSTRUCTION SIGNS CQ- EACH $ 100.00

635.09 FLAGGER AQ- HR $ 25.00

648.01 STREAM SIMULATION MATERIAL

PLACEMENT

CQ – CY

$ 30.00

648.02 STREAM SIMULATION MATERIAL

PLACEMENT- FURNISH AND PLACE

CLASS 14

CQ – CY

$ 60.00

648.51 BOULDER PLACEMENT: SIZE 4 CQ – EACH $ 75.00

648.52 BOULDER PLACEMENT– FURNISH AND

PLACE SIZE 4

CQ – EACH

$ 150.00

800 MATERIAL HAUL

801.1 MATERIAL SHORT HAUL < 5 MILE AQ – CY MILE $ 2.00

801.2 MATERIAL LONG HAUL > 5 MILE AQ – CY MILE $ 0.50

801.3 WEIGHED MATERIAL HAUL AQ–TON MILE $ 0.25

File details come from the government source that posted it. Updated .