Attach_D.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Intermountain Region Road and Bridge MATOC Federal contract opportunity
Solicitation number
AG-84M8-S-14-0001
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attachment D

View the file

Other files for this federal contract opportunity

Other files attached to Intermountain Region Road and Bridge MATOC, newest first.
File Type Posted
AG-84M8-S-14-0001_00002.pdf PDF
AG-84M8-S-14-0001_0001.pdf PDF
Performance_Questionaire.pdf PDF
Attach_H.pdf PDF
Performance_Questionaire.pdf PDF
Attach_Definitions.pdf PDF
Attach_e.xlsx XLSX spreadsheet
Attach_F.xlsx XLSX spreadsheet
Attach_G.xlsx XLSX spreadsheet
Attach_B_Sample_Task.pdf PDF
Attach_C.pdf PDF
AG-84M8-S-14-0001_043014.pdf PDF
Attach_I_Submittal.pdf PDF
Attach_A_Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

example Task Order Request Form fsdefaultUser: This form and a Request for Contract Action (RCA) are the only forms that the District will need to fill out in order to request work under the Job Order Contract. After filling out the left portion of this form send it to the appropriate C.O.R via Lotus Notes:

Contract #00-0000-0-00000
Tack Order Number:

Government Request fsdefaultUser: The Forest Service fills out the left side of this form.

fsdefaultUser: Provide your District # - FY - followed by a sequential number (1, 2, 3, etc.)

Contractor's Clarification and Adjustment fsdefaultUser: The Contractor will fill out the right side of this form.

a. Date of Task Order Request:

fsdefaultUser: Insert todays Date.

a. Date of Task Order Proposal:

b.Project Location:
fsdefaultUser: Identify the Project Location in sufficient detail that the Contractor can locate the site without assistance.b.Subcontractor(s):
c.General Description of Work:
fsdefaultUser: Provide a General Description of the Work. It is not necessary to be technical. Provide sufficient narrative for the Contractor to understand what it is that you desire them to do.c.General Description of Work:

d. Define Volume of Work fsdefaultUser: Define the Volume of Work in general terms such as:

- Sq. Ft.

- Actual quantity of items

- Lineal feet d. Define Volume of Work:

e.General Conditions:
fsdefaultUser: Identify conditions or requirements regarding the identified work.e.General Conditions:

f. Special Conditions:

fsdefaultUser: Identify all special conditions such as:

- If the building will be occupied.

- Restrictive work hours

- Water, power, and telephone access

- Toilet facilities

- Traffic requirements

- Storage requirements f. Special Conditions:

g. Time:

fsdefaultUser: Identify how long you feel that it should take the Contractor to perform the Work - lets say 90 days (Performance Time).

Also Identify how long until you want the Work to be fully accomplished - lets say 120 days (Job Order Time)

g.Time:
Task Order Time:
Performance Period:
h.Required Submittals:

fsdefaultUser: fsdefaultUser:

List all Submittals that you want the Contractor to provide. h. Required Submittals:

i. Government Contact:

fsdefaultUser: List your Name and contact telephone number.

fsdefaultUser: The Contractor will fill out the right side of this form.

fsdefaultUser: Insert todays Date.

fsdefaultUser: Identify the Project Location in sufficient detail that the Contractor can locate the site without assistance. i. Name of Site Superintendent:

j. Attachments and Drawings:

fsdefaultUser: Provide a listing of all attachments such as:

- As-Built Drawings

- Special Product Specifications

- Special requirements fsdefaultUser: Provide a General Description of the Work. It is not necessary to be technical. Provide sufficient narrative for the Contractor to understand what it is that you desire them to do.

fsdefaultUser: Define the Volume of Work in general terms such as:

- Sq. Ft.

- Actual quantity of items

- Lineal feet fsdefaultUser: Identify conditions or requirements regarding the identified work.

fsdefaultUser: Identify all special conditions such as:

- If the building will be occupied.

- Restrictive work hours

- Water, power, and telephone access

- Toilet facilities

- Traffic requirements

- Storage requirements fsdefaultUser: Identify how long you feel that it should take the Contractor to perform the Work - lets say 90 days (Performance Time).

Also Identify how long until you want the Work to be fully accomplished - lets say 120 days (Job Order Time) fsdefaultUser: fsdefaultUser:

List all Submittals that you want the Contractor to provide. j. Attachments:

Attachment D