J2_-_Drawings_Toumey_Steam_Room_Final.pdf
PDF 2 MB Posted
- Attached to
- OTT - J. W. Toumey Nursery Steam Room Conversion
- Solicitation number
- AG-569R-S-17-0028
About this file
ATTACHMENT #2 DRAWINGS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional_Pre_Bid_Q&A's_and_Clarifications.pdf | ||
| Amendment_0003_.pdf | ||
| Pre-bid_Meeting_Attendees_List.pdf | ||
| Amendment_0002_.pdf | ||
| Addendum_Number_2-May_4_2017.docx | DOCX document | |
| Addendum_Number_1-May_2017.docx | DOCX document | |
| Amendment_0001.pdf | ||
| J3_-_Maps_JWToumeyNursery-SteamRmProj-VicinityAndProximityLocationMaps.pdf | ||
| J5_-_Technical_Evaluation_Form_-_Experience_Questionnaire_.docx | DOCX document | |
| J1_-_Specifications_Toumey_Technical_Revised.pdf | ||
| J4_-_DB_Wage_Determination_MI120.txt | TXT text file | |
| AG-569R-S-17-0028_JW_TOUMEY_NURSERY_STEAM_ROOM_SOLICITATION.rtf | RTF text file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
B
A
2 3 4 5 6
BOILER SCHEDULE
MECHANICAL REQUIREMENTS
UNIT LOCA llON MANUFACTIJRER'S SERVES TYPE IINPUT OUTPUT FUEL HEA "TED VOLTAGE/ REMARKS / ACCESSORIES
No. DESIGNATION MBH MBH MEDIA PHASE
B-1 MIECH PARKER 103-9.5 HUMIDIFICATION WATER 1UBE STEAM 398 318 NAT
GAS
STEAM 120/1 150 PSI RA lED
PROVIDE STORM COLLAR,
THIMBLE ROOF PENETRATION
WITH BOTH ROOF PENETRATIONS
THROUGH ADHERED EPDM ROOF
SYSTEM/WOOD DECK
ROOM
TYPE
A
INDUSTRIAL
MANUFACTURER
COLUMBIA
WILLIAMS
LITHONIA
1" NATURAL GAS
LUMINAIRE SCHEDULE
MODEL VOLTS WATTS
LXEM-4-40ML-RFA-EU
97-4-L50/835-FR-DRV-120 120 47
VAP-4000LM-FST-WD-MVOL T-GZ10-40K-90CRI
SLOWDOWN TO FLOOR IN COOLER 1 O" TYPE B STACK THROUGH
BOILER PRESSURE RELIEF ,...;..-,....._ ROOF. TERMINATE 3' -0" ABOVE
ADJACENT ROOF WITH WEATHER
HOOD AND CAP
BLOW DOWN TANK, WITH 2'' VENT
THROUGH ROOF - 4' -0" HIGH
WATER SOFTENER
3/4" MAKE-§/
WATER LINE
SOFTENER
BRINE TANK
3/ 4" LP GAS LINE, AT MAXIMUM
HEIGHT TO PROTECT ON LOADING
DOCK, TO TANK BY OTHERS
0�����0�
ROOM PLAN
3/4" WATER LINE FROM OFFICE.
2'' INSULATION WITH ALUMINUM
CLADDING AND HEAT TRACE
FROM MECHANICAL ROOM TO
OFFICE ACROSS LOADING DOCK
Fftj----t--L�::::::::::::::---- 4" CONCRETE 60"x30"
1/4" STEAM LINE
14x24, 4" DEEP
LOUVER 8' -0"
OFF FLOOR
HOUSEKEEPING PAD
WATER COLUMN AND
BOTTOM BLOW DOWN
TYPE "A" LIGHT FIXTURE
(TYPICAL OF 2)
-------- STEAM PRESSURE REDUCING VALVE
( 15 PSI) AND TEMPERATURE
CONTROL VALVE. PITCH PIPE
TOWARDS WALK-IN COOLER ROOM
14x10 COMBUSTION AIR DUCT, 2" INSULATION, TERMINATE 1 O" OFF OF FLOOR IN COLD TRAP.
MOTORIZED DAMPER INTERLOCKED WITH BURNER.
4 5
LAMP DESCRIPTION
WET/DAMP LOCATION
LED LUMINAIRE, LED,
MEDIUM OUTPUT
ELECTRIC HEAT WRAP
RAYCHEM SXL-1-CR
5 WATT PER FOOT SELF
NOTES
REGULATING OR APPROVED EQUAL
- CONNECT TO NEW 30MA GFI 15A
1-POLE CIRCUIT BREAKER
PROVIDE A MANUAL MOTOR SWITCH
FOR NEW BOILER "81" - CONNECT
TO NEW 20A, 1-POLE CIRCUIT
BREAKER, INTERLOCK DAMPER
PROVIDE A NEW 20A, 1-POLE
CIRCUIT BREAKER FOR WATER
SOFTENER RECEPTACLE, GENERAL
RECEPTACLE, CONTROLS, AND LIGHTS
Keyplan Not to Scale
FOSTER, JACOBS,
& JOHNSON, INC.
D PROFESSIONAL ENGINEERS
C
B
A
525 LAKE AVENUE SOUTH (218) 722-3060
SUITE 222 FAX {218} 722-1931
DULUTH, MN 55802 Email: mail@IU.com
Project Name:
J.W. Tourney
Nursery Steam
Room Project Location:
E 23985 OLD U.S. HWY 2
WATERSMEET, Ml
MARK DATE DESCRIPTION
I•
LINE ISONE INCH
.. I ATFULLSIZE
(IF NOT 1" - SCALE ACCORDINGLY)
Issue Date: March 17, 2017
Project No.: 15037
Filename: 15037M4.dwg
Drawn By: MRA
© 2016 Fos , , Johnson, Inc.
THESE DOCUMENT$ HAVE BEEN PREPARED SPECIFICALLY
FOR THIS PROJECT ONLY. THEYARENOT SUITABLE FORUSE
ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT
THE EXPRESS WRITTEN APPROVAi.AND PARTICIPATION OF FOSlER, JACOBS, & JOHNSON, INC.
Sheet Title:
Enlarged Boiler Room Plan
Sheet Number:
M4
| M1 |
| M2 |
| M3 |
| M4 |