ATTACHMENT #2 DRAWINGS

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

C

B

A

2 3 4 5 6

BOILER SCHEDULE

MECHANICAL REQUIREMENTS

UNIT LOCA llON MANUFACTIJRER'S SERVES TYPE IINPUT OUTPUT FUEL HEA "TED VOLTAGE/ REMARKS / ACCESSORIES

No. DESIGNATION MBH MBH MEDIA PHASE

B-1 MIECH PARKER 103-9.5 HUMIDIFICATION WATER 1UBE STEAM 398 318 NAT

GAS

STEAM 120/1 150 PSI RA lED

PROVIDE STORM COLLAR,

THIMBLE ROOF PENETRATION

WITH BOTH ROOF PENETRATIONS

THROUGH ADHERED EPDM ROOF

SYSTEM/WOOD DECK

ROOM

TYPE

A

INDUSTRIAL

MANUFACTURER

COLUMBIA

WILLIAMS

LITHONIA

1" NATURAL GAS

LUMINAIRE SCHEDULE

MODEL VOLTS WATTS

LXEM-4-40ML-RFA-EU

97-4-L50/835-FR-DRV-120 120 47

VAP-4000LM-FST-WD-MVOL T-GZ10-40K-90CRI

SLOWDOWN TO FLOOR IN COOLER 1 O" TYPE B STACK THROUGH

BOILER PRESSURE RELIEF ,...;..-,....._ ROOF. TERMINATE 3' -0" ABOVE

ADJACENT ROOF WITH WEATHER

HOOD AND CAP

BLOW DOWN TANK, WITH 2'' VENT

THROUGH ROOF - 4' -0" HIGH

WATER SOFTENER

3/4" MAKE-§/

WATER LINE

SOFTENER

BRINE TANK

3/ 4" LP GAS LINE, AT MAXIMUM

HEIGHT TO PROTECT ON LOADING

DOCK, TO TANK BY OTHERS

0�����0�

ROOM PLAN

3/4" WATER LINE FROM OFFICE.

2'' INSULATION WITH ALUMINUM

CLADDING AND HEAT TRACE

FROM MECHANICAL ROOM TO

OFFICE ACROSS LOADING DOCK

Fftj----t--L�::::::::::::::---- 4" CONCRETE 60"x30"

1/4" STEAM LINE

14x24, 4" DEEP

LOUVER 8' -0"

OFF FLOOR

HOUSEKEEPING PAD

WATER COLUMN AND

BOTTOM BLOW DOWN

TYPE "A" LIGHT FIXTURE

(TYPICAL OF 2)

-------- STEAM PRESSURE REDUCING VALVE

( 15 PSI) AND TEMPERATURE

CONTROL VALVE. PITCH PIPE

TOWARDS WALK-IN COOLER ROOM

14x10 COMBUSTION AIR DUCT, 2" INSULATION, TERMINATE 1 O" OFF OF FLOOR IN COLD TRAP.

MOTORIZED DAMPER INTERLOCKED WITH BURNER.

4 5

LAMP DESCRIPTION

WET/DAMP LOCATION

LED LUMINAIRE, LED,

MEDIUM OUTPUT

ELECTRIC HEAT WRAP

RAYCHEM SXL-1-CR

5 WATT PER FOOT SELF

NOTES

REGULATING OR APPROVED EQUAL

- CONNECT TO NEW 30MA GFI 15A

1-POLE CIRCUIT BREAKER

PROVIDE A MANUAL MOTOR SWITCH

FOR NEW BOILER "81" - CONNECT

TO NEW 20A, 1-POLE CIRCUIT

BREAKER, INTERLOCK DAMPER

PROVIDE A NEW 20A, 1-POLE

CIRCUIT BREAKER FOR WATER

SOFTENER RECEPTACLE, GENERAL

RECEPTACLE, CONTROLS, AND LIGHTS

Keyplan Not to Scale

FOSTER, JACOBS,

& JOHNSON, INC.

D PROFESSIONAL ENGINEERS

C

B

A

525 LAKE AVENUE SOUTH (218) 722-3060

SUITE 222 FAX {218} 722-1931

DULUTH, MN 55802 Email: mail@IU.com

Project Name:

J.W. Tourney

Nursery Steam

Room Project Location:

E 23985 OLD U.S. HWY 2

WATERSMEET, Ml

MARK DATE DESCRIPTION

I•

LINE ISONE INCH

.. I ATFULLSIZE

(IF NOT 1" - SCALE ACCORDINGLY)

Issue Date: March 17, 2017

Project No.: 15037

Filename: 15037M4.dwg

Drawn By: MRA

© 2016 Fos , , Johnson, Inc.

THESE DOCUMENT$ HAVE BEEN PREPARED SPECIFICALLY

FOR THIS PROJECT ONLY. THEYARENOT SUITABLE FORUSE

ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT

THE EXPRESS WRITTEN APPROVAi.AND PARTICIPATION OF FOSlER, JACOBS, & JOHNSON, INC.

Sheet Title:

Enlarged Boiler Room Plan

Sheet Number:

M4