Attachment 9 Pricing Evaluation Spreadsheet.xls

XLS spreadsheet 82 KB Posted

Attached to
Secondary Road Construction
Solicitation number
AG4660S080018
Issued by

About this file

Pricing Evaluation Spreadsheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4Fuel $3-$4Fuel $4-$5Fuel $4-$5Fuel $5-$6Fuel $5-$6Fuel $6-$7Fuel $6-$7
Unit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended Total
215(01)Supply and Placement of Aggregate No.1600TN$0.00$0.00$0.00$0.00
215(02)Supply and Placement of Aggregate No.41500TN$0.00$0.00$0.00$0.00
215(03)Supply and Placement of Crushed Aggregate - GABC6000TN$0.00$0.00$0.00$0.00
215(04)Resurface Existing Roads with Crushed Aggregate-GABC4000TN$0.00$0.00$0.00$0.00
220(01)Borrow Delivered and Placed for Road5000CY$0.00$0.00$0.00$0.00
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$0.00$0.00$0.00$0.00
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter100LF$0.00$0.00$0.00$0.00
225(24)NSupply and Install CPP-24" Diameter50LF$0.00$0.00$0.00$0.00
225(36)NSupply and Install CPP-36" Diameter50LF$0.00$0.00$0.00$0.00
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter200LF$0.00$0.00$0.00$0.00
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter150LF$0.00$0.00$0.00$0.00
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter40LF$0.00$0.00$0.00$0.00
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter150LF$0.00$0.00$0.00$0.00
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$0.00$0.00$0.00$0.00
225(36)SSupply New CCP-36" Diameter25LF$0.00$0.00$0.00$0.00
225(42)SSupply New CCP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)SSupply New CPP-48" Diameter40LF$0.00$0.00$0.00$0.00
235(01)Seed and Fertilizer50AC$0.00$0.00$0.00$0.00
235(02)Application of Mulch25AC$0.00$0.00$0.00$0.00
240(01)Machine Placed Rip-Rap Class II175TN$0.00$0.00$0.00$0.00
245(01)Install Geotextile Fabric50SY$0.00$0.00$0.00$0.00
250(01)Emergency Movement of Contractor's Equipment, Slow Moving10MI$0.00$0.00$0.00$0.00
255(13)Trackhoe with Operator40HR$0.00$0.00$0.00$0.00
255(14)Compactor with Operator10HR$0.00$0.00$0.00$0.00
255(15)Backhoe with Operator100HR$0.00$0.00$0.00$0.00
255(16)Motorgrader with Operator500HR$0.00$0.00$0.00$0.00
255(17)Dump Truck with Operator40HR$0.00$0.00$0.00$0.00
255(18)Crawler Tractor with Operator500HR$0.00$0.00$0.00$0.00
255(19)Front End Loader with Operator100HR$0.00$0.00$0.00$0.00
255(20)Horizontal Shaft Rotary Mixer with Operator20HR$0.00$0.00$0.00$0.00
255(21)Chainsaw with Operator10HR$0.00$0.00$0.00$0.00
255(22)Unskilled Laborer40HR$0.00$0.00$0.00$0.00
255(23)Unskilled Laborer with Compactor200HR$0.00$0.00$0.00$0.00
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose5DAY$0.00$0.00$0.00$0.00
260(01)Type A Silt Fence10FT$0.00$0.00$0.00$0.00
260(02)Type C Silt Fence30FT$0.00$0.00$0.00$0.00
260(03)Staked Hay Bales50EA$0.00$0.00$0.00$0.00
260(04)Coconut Matting1000SY$0.00$0.00$0.00$0.00
TOTAL OF ALL ITEMS$0.00$0.00$0.00$0.00
TOTAL Base$0.00

&LPricing Evaluation Spreadsheet&CBase Period&RAttachment 9

Option I

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4Fuel $3-$4Fuel $4-$5Fuel $4-$5Fuel $5-$6Fuel $5-$6Fuel $6-$7Fuel $6-$7
Unit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended Total
215(01)Supply and Placement of Aggregate No.1600TN$0.00$0.00$0.00$0.00
215(02)Supply and Placement of Aggregate No.41500TN$0.00$0.00$0.00$0.00
215(03)Supply and Placement of Crushed Aggregate - GABC6000TN$0.00$0.00$0.00$0.00
215(04)Resurface Existing Roads with Crushed Aggregate-GABC4000TN$0.00$0.00$0.00$0.00
220(01)Borrow Delivered and Placed for Road5000CY$0.00$0.00$0.00$0.00
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$0.00$0.00$0.00$0.00
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter100LF$0.00$0.00$0.00$0.00
225(24)NSupply and Install CPP-24" Diameter50LF$0.00$0.00$0.00$0.00
225(36)NSupply and Install CPP-36" Diameter50LF$0.00$0.00$0.00$0.00
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter200LF$0.00$0.00$0.00$0.00
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter150LF$0.00$0.00$0.00$0.00
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter40LF$0.00$0.00$0.00$0.00
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter150LF$0.00$0.00$0.00$0.00
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$0.00$0.00$0.00$0.00
225(36)SSupply New CCP-36" Diameter25LF$0.00$0.00$0.00$0.00
225(42)SSupply New CCP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)SSupply New CPP-48" Diameter40LF$0.00$0.00$0.00$0.00
235(01)Seed and Fertilizer50AC$0.00$0.00$0.00$0.00
235(02)Application of Mulch25AC$0.00$0.00$0.00$0.00
240(01)Machine Placed Rip-Rap Class II175TN$0.00$0.00$0.00$0.00
245(01)Install Geotextile Fabric50SY$0.00$0.00$0.00$0.00
250(01)Emergency Movement of Contractor's Equipment, Slow Moving10MI$0.00$0.00$0.00$0.00
255(13)Trackhoe with Operator40HR$0.00$0.00$0.00$0.00
255(14)Compactor with Operator10HR$0.00$0.00$0.00$0.00
255(15)Backhoe with Operator100HR$0.00$0.00$0.00$0.00
255(16)Motorgrader with Operator500HR$0.00$0.00$0.00$0.00
255(17)Dump Truck with Operator40HR$0.00$0.00$0.00$0.00
255(18)Crawler Tractor with Operator500HR$0.00$0.00$0.00$0.00
255(19)Front End Loader with Operator100HR$0.00$0.00$0.00$0.00
255(20)Horizontal Shaft Rotary Mixer with Operator20HR$0.00$0.00$0.00$0.00
255(21)Chainsaw with Operator10HR$0.00$0.00$0.00$0.00
255(22)Unskilled Laborer40HR$0.00$0.00$0.00$0.00
255(23)Unskilled Laborer with Compactor200HR$0.00$0.00$0.00$0.00
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose5DAY$0.00$0.00$0.00$0.00
260(01)Type A Silt Fence10FT$0.00$0.00$0.00$0.00
260(02)Type C Silt Fence30FT$0.00$0.00$0.00$0.00
260(03)Staked Hay Bales50EA$0.00$0.00$0.00$0.00
260(04)Coconut Matting1000SY$0.00$0.00$0.00$0.00
TOTAL OF ALL ITEMS$0.00$0.00$0.00$0.00
TOTAL Option I$0.00

&LPricing Evaluation Spreadsheet&COption Period 1&RAttachment 9

Option II

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4Fuel $3-$4Fuel $4-$5Fuel $4-$5Fuel $5-$6Fuel $5-$6Fuel $6-$7Fuel $6-$7
Unit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended Total
215(01)Supply and Placement of Aggregate No.1600TN$0.00$0.00$0.00$0.00
215(02)Supply and Placement of Aggregate No.41500TN$0.00$0.00$0.00$0.00
215(03)Supply and Placement of Crushed Aggregate - GABC6000TN$0.00$0.00$0.00$0.00
215(04)Resurface Existing Roads with Crushed Aggregate-GABC4000TN$0.00$0.00$0.00$0.00
220(01)Borrow Delivered and Placed for Road5000CY$0.00$0.00$0.00$0.00
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$0.00$0.00$0.00$0.00
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter100LF$0.00$0.00$0.00$0.00
225(24)NSupply and Install CPP-24" Diameter50LF$0.00$0.00$0.00$0.00
225(36)NSupply and Install CPP-36" Diameter50LF$0.00$0.00$0.00$0.00
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter200LF$0.00$0.00$0.00$0.00
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter150LF$0.00$0.00$0.00$0.00
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter40LF$0.00$0.00$0.00$0.00
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter150LF$0.00$0.00$0.00$0.00
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$0.00$0.00$0.00$0.00
225(36)SSupply New CCP-36" Diameter25LF$0.00$0.00$0.00$0.00
225(42)SSupply New CCP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)SSupply New CPP-48" Diameter40LF$0.00$0.00$0.00$0.00
235(01)Seed and Fertilizer50AC$0.00$0.00$0.00$0.00
235(02)Application of Mulch25AC$0.00$0.00$0.00$0.00
240(01)Machine Placed Rip-Rap Class II175TN$0.00$0.00$0.00$0.00
245(01)Install Geotextile Fabric50SY$0.00$0.00$0.00$0.00
250(01)Emergency Movement of Contractor's Equipment, Slow Moving10MI$0.00$0.00$0.00$0.00
255(13)Trackhoe with Operator40HR$0.00$0.00$0.00$0.00
255(14)Compactor with Operator10HR$0.00$0.00$0.00$0.00
255(15)Backhoe with Operator100HR$0.00$0.00$0.00$0.00
255(16)Motorgrader with Operator500HR$0.00$0.00$0.00$0.00
255(17)Dump Truck with Operator40HR$0.00$0.00$0.00$0.00
255(18)Crawler Tractor with Operator500HR$0.00$0.00$0.00$0.00
255(19)Front End Loader with Operator100HR$0.00$0.00$0.00$0.00
255(20)Horizontal Shaft Rotary Mixer with Operator20HR$0.00$0.00$0.00$0.00
255(21)Chainsaw with Operator10HR$0.00$0.00$0.00$0.00
255(22)Unskilled Laborer40HR$0.00$0.00$0.00$0.00
255(23)Unskilled Laborer with Compactor200HR$0.00$0.00$0.00$0.00
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose5DAY$0.00$0.00$0.00$0.00
260(01)Type A Silt Fence10FT$0.00$0.00$0.00$0.00
260(02)Type C Silt Fence30FT$0.00$0.00$0.00$0.00
260(03)Staked Hay Bales50EA$0.00$0.00$0.00$0.00
260(04)Coconut Matting1000SY$0.00$0.00$0.00$0.00
TOTAL OF ALL ITEMS$0.00$0.00$0.00$0.00
Total Option II$0.00

&LPricing Evaluation Spreadsheet&COption II&RAttachment 9

Option III

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4Fuel $3-$4Fuel $4-$5Fuel $4-$5Fuel $5-$6Fuel $5-$6Fuel $6-$7Fuel $6-$7
Unit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended TotalUnit PriceExtended Total
215(01)Supply and Placement of Aggregate No.1600TN$0.00$0.00$0.00$0.00
215(02)Supply and Placement of Aggregate No.41500TN$0.00$0.00$0.00$0.00
215(03)Supply and Placement of Crushed Aggregate - GABC6000TN$0.00$0.00$0.00$0.00
215(04)Resurface Existing Roads with Crushed Aggregate-GABC4000TN$0.00$0.00$0.00$0.00
220(01)Borrow Delivered and Placed for Road5000CY$0.00$0.00$0.00$0.00
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$0.00$0.00$0.00$0.00
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter100LF$0.00$0.00$0.00$0.00
225(24)NSupply and Install CPP-24" Diameter50LF$0.00$0.00$0.00$0.00
225(36)NSupply and Install CPP-36" Diameter50LF$0.00$0.00$0.00$0.00
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter200LF$0.00$0.00$0.00$0.00
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter150LF$0.00$0.00$0.00$0.00
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter40LF$0.00$0.00$0.00$0.00
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter150LF$0.00$0.00$0.00$0.00
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$0.00$0.00$0.00$0.00
225(36)SSupply New CCP-36" Diameter25LF$0.00$0.00$0.00$0.00
225(42)SSupply New CCP-42" Diameter25LF$0.00$0.00$0.00$0.00
225(48)SSupply New CPP-48" Diameter40LF$0.00$0.00$0.00$0.00
235(01)Seed and Fertilizer50AC$0.00$0.00$0.00$0.00
235(02)Application of Mulch25AC$0.00$0.00$0.00$0.00
240(01)Machine Placed Rip-Rap Class II175TN$0.00$0.00$0.00$0.00
245(01)Install Geotextile Fabric50SY$0.00$0.00$0.00$0.00
250(01)Emergency Movement of Contractor's Equipment, Slow Moving10MI$0.00$0.00$0.00$0.00
255(13)Trackhoe with Operator40HR$0.00$0.00$0.00$0.00
255(14)Compactor with Operator10HR$0.00$0.00$0.00$0.00
255(15)Backhoe with Operator100HR$0.00$0.00$0.00$0.00
255(16)Motorgrader with Operator500HR$0.00$0.00$0.00$0.00
255(17)Dump Truck with Operator40HR$0.00$0.00$0.00$0.00
255(18)Crawler Tractor with Operator500HR$0.00$0.00$0.00$0.00
255(19)Front End Loader with Operator100HR$0.00$0.00$0.00$0.00
255(20)Horizontal Shaft Rotary Mixer with Operator20HR$0.00$0.00$0.00$0.00
255(21)Chainsaw with Operator10HR$0.00$0.00$0.00$0.00
255(22)Unskilled Laborer40HR$0.00$0.00$0.00$0.00
255(23)Unskilled Laborer with Compactor200HR$0.00$0.00$0.00$0.00
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose5DAY$0.00$0.00$0.00$0.00
260(01)Type A Silt Fence10FT$0.00$0.00$0.00$0.00
260(02)Type C Silt Fence30FT$0.00$0.00$0.00$0.00
260(03)Staked Hay Bales50EA$0.00$0.00$0.00$0.00
260(04)Coconut Matting1000SY$0.00$0.00$0.00$0.00
TOTAL OF ALL ITEMS$0.00$0.00$0.00$0.00
Total Option III$0.00
GRAND TOTAL (total base + total option I, + total option II, +total option III)$