Attachment 9 Pricing Evaluation Spreadsheet.xls
XLS spreadsheet 82 KB Posted
- Attached to
- Secondary Road Construction
- Solicitation number
- AG4660S080018
- Issued by
-
Department of Agriculture Forest Service
About this file
Pricing Evaluation Spreadsheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 to Site Viist Notes -- Task Order Listing.xls | XLS spreadsheet | |
| Attachment 1 to Site Visit Notes Attendance Sheet Jul 2008.jpg | JPG image | |
| amendment 01 Road Construction IDIQ.rtf | RTF text file | |
| revised pages amendment 0001 AG-4660-S-08-0018.doc | DOC document | |
| Attachment 6 Sample Work Order.rtf | RTF text file | |
| RFP AG-4660-S-08-0018 Road Construction SR.doc | DOC document | |
| Atch 10 11 Vicinity and Fire Ant Map.doc | DOC document | |
| Atch 7 8 Accomplishment Report Water Borrow Map.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 | Fuel $3-$4 | Fuel $4-$5 | Fuel $4-$5 | Fuel $5-$6 | Fuel $5-$6 | Fuel $6-$7 | Fuel $6-$7 |
| Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | ||||
| 215(01) | Supply and Placement of Aggregate No.1 | 600 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(02) | Supply and Placement of Aggregate No.4 | 1500 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 6000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 4000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 220(01) | Borrow Delivered and Placed for Road | 5000 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from On-Site Govt Source | |||||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from Non-Govt Off-Site Borrow Source | |||||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 100 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)N | Supply and Install CPP-24" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)N | Supply and Install CPP-36" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 200 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)S | Supply New CCP-36" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)S | Supply New CCP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)S | Supply New CPP-48" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(01) | Seed and Fertilizer | 50 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(02) | Application of Mulch | 25 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 240(01) | Machine Placed Rip-Rap Class II | 175 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 245(01) | Install Geotextile Fabric | 50 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 10 | MI | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(13) | Trackhoe with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(14) | Compactor with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(15) | Backhoe with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(16) | Motorgrader with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(17) | Dump Truck with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(18) | Crawler Tractor with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(19) | Front End Loader with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 20 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(21) | Chainsaw with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(22) | Unskilled Laborer | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(23) | Unskilled Laborer with Compactor | 200 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 5 | DAY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(01) | Type A Silt Fence | 10 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(02) | Type C Silt Fence | 30 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(03) | Staked Hay Bales | 50 | EA | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(04) | Coconut Matting | 1000 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL OF ALL ITEMS | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| TOTAL Base | $0.00 |
&LPricing Evaluation Spreadsheet&CBase Period&RAttachment 9
Option I
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 | Fuel $3-$4 | Fuel $4-$5 | Fuel $4-$5 | Fuel $5-$6 | Fuel $5-$6 | Fuel $6-$7 | Fuel $6-$7 |
| Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | ||||
| 215(01) | Supply and Placement of Aggregate No.1 | 600 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(02) | Supply and Placement of Aggregate No.4 | 1500 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 6000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 4000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 220(01) | Borrow Delivered and Placed for Road | 5000 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from On-Site Govt Source | |||||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from Non-Govt Off-Site Borrow Source | |||||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 100 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)N | Supply and Install CPP-24" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)N | Supply and Install CPP-36" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 200 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)S | Supply New CCP-36" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)S | Supply New CCP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)S | Supply New CPP-48" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(01) | Seed and Fertilizer | 50 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(02) | Application of Mulch | 25 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 240(01) | Machine Placed Rip-Rap Class II | 175 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 245(01) | Install Geotextile Fabric | 50 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 10 | MI | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(13) | Trackhoe with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(14) | Compactor with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(15) | Backhoe with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(16) | Motorgrader with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(17) | Dump Truck with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(18) | Crawler Tractor with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(19) | Front End Loader with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 20 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(21) | Chainsaw with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(22) | Unskilled Laborer | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(23) | Unskilled Laborer with Compactor | 200 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 5 | DAY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(01) | Type A Silt Fence | 10 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(02) | Type C Silt Fence | 30 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(03) | Staked Hay Bales | 50 | EA | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(04) | Coconut Matting | 1000 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL OF ALL ITEMS | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| TOTAL Option I | $0.00 |
&LPricing Evaluation Spreadsheet&COption Period 1&RAttachment 9
Option II
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 | Fuel $3-$4 | Fuel $4-$5 | Fuel $4-$5 | Fuel $5-$6 | Fuel $5-$6 | Fuel $6-$7 | Fuel $6-$7 |
| Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | ||||
| 215(01) | Supply and Placement of Aggregate No.1 | 600 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(02) | Supply and Placement of Aggregate No.4 | 1500 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 6000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 4000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 220(01) | Borrow Delivered and Placed for Road | 5000 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from On-Site Govt Source | |||||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from Non-Govt Off-Site Borrow Source | |||||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 100 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)N | Supply and Install CPP-24" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)N | Supply and Install CPP-36" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 200 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)S | Supply New CCP-36" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)S | Supply New CCP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)S | Supply New CPP-48" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(01) | Seed and Fertilizer | 50 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(02) | Application of Mulch | 25 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 240(01) | Machine Placed Rip-Rap Class II | 175 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 245(01) | Install Geotextile Fabric | 50 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 10 | MI | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(13) | Trackhoe with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(14) | Compactor with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(15) | Backhoe with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(16) | Motorgrader with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(17) | Dump Truck with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(18) | Crawler Tractor with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(19) | Front End Loader with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 20 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(21) | Chainsaw with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(22) | Unskilled Laborer | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(23) | Unskilled Laborer with Compactor | 200 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 5 | DAY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(01) | Type A Silt Fence | 10 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(02) | Type C Silt Fence | 30 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(03) | Staked Hay Bales | 50 | EA | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(04) | Coconut Matting | 1000 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL OF ALL ITEMS | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Total Option II | $0.00 |
&LPricing Evaluation Spreadsheet&COption II&RAttachment 9
Option III
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 | Fuel $3-$4 | Fuel $4-$5 | Fuel $4-$5 | Fuel $5-$6 | Fuel $5-$6 | Fuel $6-$7 | Fuel $6-$7 |
| Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | Unit Price | Extended Total | ||||
| 215(01) | Supply and Placement of Aggregate No.1 | 600 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(02) | Supply and Placement of Aggregate No.4 | 1500 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 6000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 4000 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 220(01) | Borrow Delivered and Placed for Road | 5000 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from On-Site Govt Source | |||||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Construction from Non-Govt Off-Site Borrow Source | |||||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 100 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)N | Supply and Install CPP-24" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)N | Supply and Install CPP-36" Diameter | 50 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 200 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 150 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(36)S | Supply New CCP-36" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(42)S | Supply New CCP-42" Diameter | 25 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 225(48)S | Supply New CPP-48" Diameter | 40 | LF | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(01) | Seed and Fertilizer | 50 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 235(02) | Application of Mulch | 25 | AC | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 240(01) | Machine Placed Rip-Rap Class II | 175 | TN | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 245(01) | Install Geotextile Fabric | 50 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 10 | MI | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(13) | Trackhoe with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(14) | Compactor with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(15) | Backhoe with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(16) | Motorgrader with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(17) | Dump Truck with Operator | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(18) | Crawler Tractor with Operator | 500 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(19) | Front End Loader with Operator | 100 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 20 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(21) | Chainsaw with Operator | 10 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(22) | Unskilled Laborer | 40 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(23) | Unskilled Laborer with Compactor | 200 | HR | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 5 | DAY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(01) | Type A Silt Fence | 10 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(02) | Type C Silt Fence | 30 | FT | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(03) | Staked Hay Bales | 50 | EA | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 260(04) | Coconut Matting | 1000 | SY | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL OF ALL ITEMS | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Total Option III | $0.00 | ||||||||||
| GRAND TOTAL (total base + total option I, + total option II, +total option III) | $ |
&LPricing Evaluation Spreadsheet&COption III&RAttachment 9
File details come from the government source that posted it. Updated .