Site_Visit_-120115_AG-1484-S-16-003_WMNF_Backup_Generator.docx
DOCX document 19 KB Posted
- Attached to
- Backup Generator Installation WMNF
- Solicitation number
- AG-1484-S-16-0003
About this file
Site Visit -120115 AG-1484-S-16-003 WMNF Backup Generator
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_-122815_AG-1484-S-16-0003_WMNF_Backup_Generator.docx | DOCX document | |
| RFI_-121615_AG-1484-S-16-0003_WMNF_Backup_Generator.docx | DOCX document | |
| RFI_-121515_AG-1484-S-16-0003_WMNF_Backup_Generator.docx | DOCX document | |
| Attendees.pdf | ||
| WMAC-E-713.pdf | ||
| RFI_-112415_AG-1484-S-16-003_WMNF_Backup_Generator.pdf | ||
| Attach_1_HQ_Generator_Spec.docx | DOCX document | |
| Attach_4_GovtProvidedTechnicalProposalForms.docx | DOCX document | |
| AG-1484-S-16-0003.pdf | ||
| Attach_3_DBWD_NH140009_Building_Grafton_Co.docx | DOCX document | |
| Attach_2_NECC_Gen_and_ATS_Plans.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Notes and Comments Solicitation # AG-1484-S-16-003 WMNF Backup Generator
Questions and Answers – 12/01/2015
1. As-build drawing E-713 (attachment 2) and the group viewed during meeting. Drawing was not previously provided.
See attached drawing E-713
1. During viewing of Main Switch Gear in Boiler House a discussion about installing the generator and transfer switch on the opposite side of the boiler house beside the NHEC pad-mount transformer would be a better alternate location for the generator.
Group was told that as long as all electrical code requirements/specifications were met that would be okay (this location provides less visibility of the generator and boiler house would muffle sound, so if this is the better location it is a win win).
1. Another question that came up is need to shut power off to entire complex for approximately a full day. I stated this would need to take place during a weekend but have asked FLT for confirmation and to determine if any events have been scheduled weekends during the May June time frame.
It was stated this would need to take place during a weekend but have asked FLT for confirmation and to determine if any events have been scheduled weekends during the May June time frame.