RFI for Solicitation # AG-1484-S-16-003 WMNF Backup Generator

Questions and Answers – 11/24/2015

1. What is the total kW output necessary to backup the entire complex? In the scope of work it mentions an existing 35 kW gen set that powered emergency circuits, however I could not find any mention of how much power was needed to back up the entire complex.

See attached page from specification. Existing 35 KW generator is not used or functional and should not effect this contract.

2. Tomahawk Power would like to know if you have considered the future maintenance of the generator, and recommends a servicing every 3 months.

Maintenance contract will be handled separately from installation contract.

3. Specification section16231, Par. 1.1 calls for a 250KW generator. Drawing E-721, top right hand corner, calls for a 150KW generator.

Which is correct?

250KW is the correct size, with capacity to power entire site. As-build drawing E-721 is provided for reference was the original generator for emergency circuits which got replaced with the 35KW generator mentioned in the specifications.

RFI -112415 AG-1484-S-16-003 WMNF Backup Generator