Attach-001-Specs.pdf

PDF 266 KB Posted

Attached to
AZURITE MINE ACCESS - ROAD CONSTRUCTION
Solicitation number
AG-05G1-S-10-0035
Issued by

About this file

Attachment 001 Specifications

View the file

Other files

File Type Posted
amendment-005.pdf PDF
R6 Br Overload Permit Form —
amendment-004.pdf PDF
05_culvert construction details.pdf PDF
06_Rd Structure Detail.pdf PDF
acrow-bridge-specifications-revised.pdf PDF
R34786-10.pdf PDF
01_Title Sheet.pdf PDF
R34786-9.pdf PDF
Blasting specifications.pdf PDF
amendment-003.pdf PDF
04_Culvert Listing-Construction Detail.pdf PDF
07_Typical Gate Detail.pdf PDF
03_Typical Road Template.pdf PDF
02_azurite_mine_access-vicmap.pdf PDF
R34786-8.pdf PDF
amendment-002.pdf PDF
amendment-001.pdf PDF
03_typical road template details.pdf PDF
07_R34786-1 S. Fk. Slate.pdf PDF
02_azurite_mine_access-vicmap.pdf PDF
Attachments-2-thru-5.pdf PDF
01_Azurite_Mine_Access_Title_Page.pdf PDF
09_R34786-3 S. Fk. Slate.pdf PDF
05_Typical Road Structure Details.pdf PDF
04_Culvert Listing-Construction Detail.pdf PDF
08_R34786-2 S. Fk. Slate.pdf PDF
RFP-azurite-mine.pdf PDF
06_Typical Gate Detail.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

ATTACHMENT 001

STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS, 2003 (FP-03)

Supplemental Specifications

101 - Terms, Format, and Definitions

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

157 - Soil Erosion Control

157.03 General

204 - Excavation and Embankment (Replaced)

209 - Structure Excavation and Backfill

209.11 Compacting

255 - Mechanically Stabilized Earth Walls (Replaced)

303 - Road Reconditioning (Replaced)

571 - Prefabricated Bridges (Added)

704 - Soil

704.06 Unclassified Borrow

717 - Structural Metal

717.07 Galvanized Coatings

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

PREFACE

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - TERMS, FORMAT, AND DEFINITIONS

101.00_nat_us_07_25_2005

101.01_nat_us_04_04_2007

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

http://www.nist.gov/

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Add Figure 101-1—Illustration of road structure terms:

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Figure 101-1—Illustration of road structure terms.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

102 - BID, AWARD, AND EXECUTION OF CONTRACT

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

103 - SCOPE OF WORK

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - CONTROL OF WORK

104.00_nat_us_06_16_2006

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - CONTROL OF MATERIAL

105.02_nat_us_01_18_2007

105.02 Material Sources.

(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - ACCEPTANCE OF WORK

106.07_nat_us_05_11_2004

Delete subsection 106.07.

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

o Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

o Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

o Exact time and location of spill including a description of the area involved.

o Containment procedures.

o Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

o Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - PROSECUTION AND PROGRESS

108.00_nat_us_02_16_2005

Deletions.

Delete Section 108 in its entirety.

109 - MEASUREMENT AND PAYMENT

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

Section 157. –SOIL EROSION CONTROL

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.

The contract erosion control plan reflects special concerns and measures to protect resources, including protection of the active channel, unvegetated slopes, and roadway drainage. Ensure that erosion control materials that are organic in nature are from a certified weed free source.

Do not begin work until the necessary controls for a particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted for approval 5 days before intended use of the alternate controls.

When erosion control measures are not functioning as intended, immediately take corrective action.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Section 204. –EXCAVATION AND EMBANKMENT Replace Section 204 in its entirety with the following:

Description

204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments, including bridge approach ramps;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Constructing foundation bearing supports;

(6) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Material

204.03 Conform to the following Subsections:

Geotextile 714.01

Unclassified borrow 704.06

Water 725.01

Construction Requirements

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

204.05 Reserved.

204.06 Roadway Excavation. Excavate as follows:

(a) General. Do not disturb material and vegetation outside the construction limits.

Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to Subsection 204.14.

At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.

Retrieve material deposited outside of the clearing limits as directed by the CO. Place unsuitable material in designated areas.

(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11

(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits.

Compact the scarified material according to Subsection 204.11.

(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.

Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.

204.07 Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections according to Section 152. Prevent unsuitable material from becoming mixed with the backfill.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping or other suitable material. Compact the material according to Subsection 204.11.

204.08 Borrow Excavation.

Replace this subsection with the following:

Borrow source for construction of the foundation bearing supports and the aggregate approach ramps at both ends of the bridge is the existing abandoned roadbed adjacent to and just upstream from the bridge crossing, as approved by the CO. If material is insufficient in quantity or deemed unusable, furnish borrow material from a WSDOT ASA approved source that is or can be certified weed-free.

Borrow source for construction of the geotextile reinforced mechanically stabilized earth (MSE) wall is the upstream side of the culvert located at M.P. 1.967 (~350 feet from the end of the bridge). If material is insufficient in quantity or deemed unusable, furnish borrow material from a WSDOT ASA approved source that is or can be certified weed-free.

204.09 Preparing Foundation for Embankment Construction.

Replace this subsection with the following:

For the geotextile reinforced MSE wall, complete all clearing and grubbing before construction in accordance with Section 201. Remove loose material at the base of the wall until undisturbed soil is encountered before beginning wall construction.

Do not remove any material from existing roadway or surfacing to prepare the embankment for the approach ramp. Construct embankment immediately on top of the existing roadway, including asphalt pavement or aggregate surfacing.

204.10 Embankment Construction.

Replace the first paragraph with the following:

Construct the embankment using unclassified borrow material from the sources listed in 204.08.

Construct the embankment as follows:

(b) Embankment within the roadway prism.

Add the following at the end of the first paragraph:

For construction of the aggregate approach ramps, install a layer of Type III (A-B) geotextile fabric between each 12-inch layer as shown on the plans.

For construction of the foundation bearing supports, install layers of Type III (A-B) geotextile fabric between each 12-inch layer as shown on the plans.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Delete the second paragraph.

Delete subsections (c) and (d)

204.11 Compaction. Compact the embankment in accordance with 209.11 and as follows:

Place material to the minimum depth needed for operation of compacting equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the spreading and compacting equipment. Level and smooth each embankment layer before placing the next layers. Operate spreading and compacting equipment uniformly over the full width of each layer. Place geotextile between layers as shown on the plans. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating spreading and compacting equipment uniformly over the full width of each layer as the embankment is constructed.

204.12 Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter. Maintain all ditches in an open condition and free from leaves, sticks, and other debris.

Form furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow.

204.13 Acceptance.

Excavation and embankment construction will be evaluated under Subsections 106.02 and 106.04.

Clearing and removal of obstructions will be evaluated under Sections 201 and 203.

Measurement

204.14 Measure the Section 204 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

(a) Roadway excavation. Measure roadway excavation in its original position as follows:

(1) Include the following volumes in roadway excavation:

(a) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;

(b) Ditches, except furrow ditches measured under a separate bid item;

(2) Do not include the following in roadway excavation:

(a) Material used for purposes other than required;

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

(b) Material excavated outside the established slope limits.

(b) Unclassified borrow, select borrow, and select topping. When measuring by the cubic yard measure in its original position. If borrow excavation is measured by the cubic yard in place, take initial cross-sections of the ground surface after stripping overburden. Upon completion of excavation and after the borrow source waste material is returned to the source, retake cross-sections before replacing the overburden.

Do not measure borrow excavation used in place of excess roadway excavation.

(c) Embankment construction. Measure embankment construction in its final position. Do not make deductions from the embankment construction quantity for the volume of minor structures.

(1) Include the following volumes in embankment construction:

(a) Roadway embankments;

(b) Material used to backfill subexcavated areas, holes, pits, and other depressions;

(c) Material used to restore deteriorated roadbeds to original contours;

(d) Material used for dikes, ramps, mounds, and berms; and

(e) Material used for construction of foundation bearing supports.

(2) Do not include the following in embankment construction:

(a) Preparing foundations for embankment construction; and

(b) Construction of the MSE Geotextile wall.

(d) Waste. Measure waste by the cubic yard in its final position. Take initial cross-sections of the ground surface after stripping over burden. Upon completion of the waste placement, retake cross-sections before replacing overburden.

Payment

204.15 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 204 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

209 – STRUCTURE EXCAVATION AND BACKFILL

Section 209.11 Compacting.

Delete the subsection and add the following:

Compact backfill using designated compaction method A, B, or C:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer using appropriate compaction equipment until visual displacement ceases. For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.

Method C. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density.

Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Table 209-1 Sampling and Testing Requirements

(2) Compaction methods (A) and (B) do not require AASHTO T-99 or T-310 test methods for foundation fill.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

SECTION 303. - ROAD RECONDITIONING

303.01 This work consists of reconditioning ditches, shoulders, roadbeds, and aggregate surfaces.

In addition widen the roadway to drawing template widths (shown in drawings), and unplug and install culverts as noted in the contract and/or plans. Use only suitable and weed-free commercial and/or designated unclassified borrow to repair the damaged roadway, add curve widening

(template), and to install new aggregate surfacing.

Material

303.02 Conform to the following Subsection:

Crushed aggregate 703.06

Subbase, base and surface course aggregate 703.05

Unclassified Borrow 704.06

Water 725.01

Construction Requirements

303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade. Dispose of waste according to Subsection 204.14.

303.04 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection 204.07.

Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Reshape shoulders and dispose of waste according to Subsection 204.14.

303.05 Roadbed Reconditioning. Repair soft and unstable areas according to Subsection 204.07.

Remove all organic, deleterious, or oversize material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste according to Subsection 204.14. Scarify to a 6-inch depth, remove surface irregularities, and shape to provide a uniform surface. Finish earth surfaces to within 0.05 feet and rock surfaces to within 0.10 feet of the required line, cross-section, and grade. Compact according to Subsection 204.11.

303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full depth of the aggregate surface and according to Subsection 204.07. Scarify to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface according to Section 308.

303.07 Roadway Reconditioning. Perform all the applicable work described in Subsections

303.03 through 303.06.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

303.09 Acceptance. Road reconditioning work will be evaluated under Subsections 106.02 and

106.04.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

571 – PREFABRICATED BRIDGES

571.01 This work consists of installing a Government-furnished Acrow Series 300 modular bridge superstructure by launching or by crane. The work also includes preparation of a project work schedule, development and submittal of an installation plan, retrieval of bridge parts from the storage site, transport of all bridge parts to the site, erection of the modular bridge at the site, construction of foundations and bearing seats, and furnishing all equipment and tools to erect the superstructure..

Materials

571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:

Delineator and Object Marker Retroreflectors 718.12 (b) Type 2 Object Marker and Delineator Posts 718.09 (a)

571.03 Work Schedule and Installation Plan. Within 7 days after Notice to Proceed, submit a

Work Schedule for the project and an Installation Plan for the Acrow superstructure.

In the Work Schedule, include planned dates for retrieval of parts from the storage site listed in

571.04 b. (Auburn, WA)

In the Installation Plan, include the proposed method of installing the Acrow superstructure; the proposed layout at the site during erection and installation; fabrication of concrete footings, geotextile reinforced approach ramp embankments, and concrete “ecology block” backwalls.

571.04 Government-furnished modular steel bridge superstructure components and launching nose. Coordinate retrieval, transportation, and delivery of the Government-furnished

Acrow modular bridge superstructure with the CO and the assigned Government contact.

If the modular superstructure is not assembled and/or installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.

Furnish a forklift and operator at all storage yards capable of operating on loose packed gravel, or similar equipment.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Retrieve Acrow modular bridging parts as outlined below:

a. Retrieve Acrow modular bridging components from the GSA Storage facility in Auburn, Washington. Verify the parts list with the manufacturer before retrieving the materials. A separate list includes parts required to assemble a launching nose; verify the parts list with manufacturer. If a launching nose is used, the parts must be returned to the GSA facility immediately after launching. . The following parts are required to assemble the 90' Acrow

Triple Single Superstructure. Transport weights are approximate for planning purposes only, not truck scale weights.

GSA to S. Fk. Slate - Superstructure

PART # DESCRIPTION QTY

WEIGHT

EACH

TOTAL

WEIGHT

to Bridge

AB 1 PANELS 42 588 24696

AB 2 RAKERS 28 11 308

AB 3 BACING FRAMES 16 52 832

AB 5 END POSTS - MALE 6 205 1230

AB 6 END POSTS - FEMALE 6 211 1266

AB 7 BEARINGS - SINGLE 4 22 88

AB 8 BEARINGS - DOUBLE 4 44 176

AB 9 BASE PLATES 4 321 1284

AB 14 SWAY BRACE - EXTRA WIDE 30 23 690

AB 51 PANEL PINS 96 6 576

AB 52 SAFETY CLIPS 192 0 0

AB 53 BRACING BOLT 96 0.8 76.8

AB 54 RAKER BOLT 56 0.2 11.2

AB 55 TRANSOM SET BOLT 96 0.1 9.6

AB 63 SWAYBRACE BOLT 60 0.7 42

AB 309 STRINGER CLAMP ASSEMBLY 196 5 980

AB 313 DECK UNIT HEAVY 5FT 68 284 19312

AB 314 CURB UNIT HEAVY 5FT 34 342 11628

AB304* TRANSOM EXTRA WIDE HEAVY 14 1005 14070

* Replacement number for SK5176

Total Transport and Installation Weight 77276

GSA Facility

15th and "C" Streets

Auburn, WA 98001

Directions:

North on I-5 to State Route 18 (Exit 142);

East on 18 to State Route 167;

South on 167 approx. 1 mile to 15 th

Street exit;

East on 15 th

Street to TEE at “C” Street;

South on “C” Street approx 300-400 yards to entrance on right;

Turn west into GSA lot;

Turn left (south) at the water tower;

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Approximately 400 yards to Storage yard on left, secured within a chain link fenced area. “US Forest

Service Modular Bridge Inventory Lot”

Notify the CO at least 5 days in advance of the intent to retrieve materials from this location.

Materials may be retrieved prior to approval of submittals but not without acknowledgement and approval of the 5 day prior notification.

Contractor is responsible for the loading, transport, and off-loading of all necessary bridge components at the South Fork Slate Creek Bridge site. The following information is being offered to the contractor with no guarantee as to It’s currency or relevance to the transport process;

An equipment rental business is located very near the Auburn, WA GSA storage facility, and has been used by the government in the past as a source of rental equipment to assist in the loading and offloading of Forest Service materials at the site. This business’s name is Starr Rentals, and is located at 4517 Auburn Way North, Auburn WA, 98001. Their phone number is 253-854-

3922. Their internet site is http://www.starrentals.com/.

Transport weights are approximate for planning purposes only, not truck scale weights.

Upon taking possession of the Government-furnished components at the storage site, assume liability for damage resulting from handling, transporting, or erecting the superstructure and liability for lost components, until final acceptance of the project.

Notify the CO at least 5 days in advance of the intent to retrieve materials from this location. Do not retrieve materials until approval of the Work Plan, Installation Schedule, and verification of coordination with the Acrow representative. Retrieve material within 7 days after approval of the above.

b. Complete all clearing and grubbing in accordance with section 201, removal of structures and obstructions in accordance with section 206, construction of the geotextile reinforced mechanically stablized earth wall in accordance with section 255, and construction of foundation bearing supports in accordance with section 303, and

c. Before assembling the bridge, inventory all parts to determine if any parts are damaged.

Clearly identify and note any damaged parts. Resolve any differences between the inventory and the above parts list. Following verification of damaged or missing parts, replace any parts damaged or lost during construction at no cost to the Government.

d. At least 7 days before installation of modular superstructure, submit an installation plan.

Install the new superstructure by launching it using a Government-furnished, contractor assembled launching nose or by crane. A site visit is required to verify access for a sufficiently sized crane.

Provide the name of the participating Acrow Representative with the installation plan. For a crane installation, furnish documentation of experience in constructing similar types of bridges.

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

Provide a plan that ensures all components are adequately braced at all construction stages.

e. Technical assistance may be available at a cost from from Acrow Corporation. Technical information and assistance regarding the construction of the Acrow Bridge can be obtained from the following:

Mr. Tom Pinder

Acrow Bridge

Suite 225

1746 Cole Blvd.

Golden, CO 80401

Phone: 303-279-9088

Fax: 303-279-9006

Mr. Chuck Hunter

Acrow Limited

Suite #130, 10691 Shellbridge Way

Richmond. B.C., V6X2W8

Phone: 604-276-0550

FAX: 604-270-3644

f. Assemble the bridge according to manufacturer’s recommendation. Place the bearing plates for the Acrow Bridge on foundation bearing supports (geotextile reinforced embankment and geotextile reinforced MSE walls) as shown on the plans.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

Construct all Acrow parts and sub-components, including side beams, so that all parts and sub-components are adequately braced at all construction stages. If sub-components, such as side beams, are not adequately braced and tip over or are torqued in other than the primary axis

(vertical), the contractor will assume financial responsibility for replacement of all parts in the sub-component at current replacement prices.

g. Install geotextile reinforced aggregate ramps as shown on the plans and in accordance with section 204. Install concrete “ecology blocks” as backwalls and deck end supports in conjunction with the construction of the approach ramps.

h. Install object markers and posts at the bridge ends as shown on the plans.

i. Perform road reconditioning work, drainage ditch repair, culvert inlet repair work, and construction of a culvert overflow in accordance with section 303.

571.05 Bearings and Approaches. Construct required foundation supports and bearing seats according to Division 500, section 204 and the plans. Construct aggregate approach ramps in accordance with sections 204, 209, and the plans.

571.06 Acceptance. Furnish a production certification for object markers.

Measurement

571.07 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.

Payment

Azurite Mine Access, Road Construction, Okanogan and Wenatchee National Forest AG-05G1-S-10-0035

571.08 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.

717 – STRUCTURAL METAL

717.07 Galvanized Coatings

Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P-

21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.

File details come from the government source that posted it. Updated .