Amendment 005 changes the schedule of items(provides a replacement page) clarifies side casting and adds time and materials blasting
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 005 AG-05G1-S-10-0035 AZURITE MINE ACCESS – ROAD CONSTRUCTION
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 of 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) Amendment 005 08-11-2010
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Colville National Forest 765 South Main Colville, WA 99114
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
AG-05G1-S-10-0035
9B. DATED (SEE ITEM 11) 07-19-2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, x is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, XX is required to sign this document and return 1 copies to the issuing office.
AZURITE MINE ACCESS – ROAD CONSTRUCTION – Amendment 005 S. Fk. Slate Creek Bridge Installation and Road Reconditioning
The purpose of this amendment is to clarify or add the following:
1. Side-casting of material for road construction and road reconditioning is allowed. The Government may elect to restrict side casting. Such changes will be made by work order or modification in writing on a case by case basis. Haul routes and deposit points will be identified at that time, and an equitable adjustment will be made to the contract.
2. Time and material line items for the blasting are added to the Schedule of Items. The Contractor shall be paid for actual costs required to conduct blasting operations in accordance with contract specifications plus a markup (%) for the purchase and handling of such materials. Blaster with Equipment line item includes all transportation, permits, signs and equipment to carryout blasting operations. Per Cent markup only applies to blasting materials, fuel for transportation, permits and other consumables related to blasting operations. Blaster shall be certified and possess a
WA State L&I Blaster License. Use the replacement schedule of items as attached.
Continued…
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kris D. Bellini, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED /s/ Kris Bellini 08-11-2010
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 005 AG-05G1-S-10-0035 AZURITE MINE ACCESS – ROAD CONSTRUCTION
3. Items that have been changed from the previous schedule;
Item 20411 has been modified. Previous version was by cubic yard. Modified version is lump sum. Clarification has been added to description; this schedule item is for roadway excavation and embankment at the South Fork Slate Creek Bridge installation site.
Item 30307 has been modified. Estimated quantity has been revised from 11 miles to 10.5 miles.
4. New Items added:
Item 62301A, Blaster with Equipment.
Item 62301B, Laborer.
Item 72501, Markup (%) for consumable materials costs incurred under item 62301A.
All other terms and conditions remain unchanged. Proposal due date remains unchanged being August 12, 2010 at 4 PM. Mail, fax or e-mail offers are acceptable. Fax # 509-684-7283, e-mail: kbellini@fs.fed.us. Call to verify receipt of offer. Bid bonds must be hard copy form.
mailto:kbellini@fs.fed.us
Amendment 005 AG-05G1-S-10-0035 AZURITE MINE ACCESS – ROAD CONSTRUCTION
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B.1 General: The offeror must provide a price on all items. The contractor shall submit the Standard Form
1442, Schedule of Items with prices, Past Performance and Technical Proposal information (see page 35). The
Technical Proposal should include Project Management, Performance Schedule, Quality Control Plan, and a schedule of resources, (subcontractors, personnel and equipment). The offeror may use the experience questionnaire as a supporting document in providing Past Performance and technical proposal information.
Special Note: Government Furnished Material is provided in this contract, see page 7. 20% Bid Bonds are required with offer. Point of contact for technical and site information is Dave Colbert, 509-826-3282
B.1 Schedule of Items:
Item No. Description
Method of Measure Pay Unit
Estimated Quantity Unit Price Total Cost
15101 Mobilization LSQ Lump Sum
15205 Bridge survey and staking LSQ Lump Sum
15713 Soil erosion and pollution control LSQ Lump Sum
20102 Clearing and grubbing LSQ Lump Sum
20305 Removal of structures and obstructions
LSQ
Lump Sum
71401 Geotextile fabric CQ Square Yard
20411 Roadway Excavation and Embankment
LSQ
Lump Sum
30307
Roadway Reconditioning. All Roadway Switchbacks shall be Reconditioned to a 50 Foot Minimum Horizontal Curve Radius.
CQ Mile 10.5
57190
Government-furnished modular bridge superstructure - transport, assemble, and install
LSQ
Lump Sum
60250
18 Inch Corrugated Metal Pipe,
0.064 inch thickness for steel or
0.052 inch for aluminum
CQ Foot 300
61902 Gate, Stockyard CQ Each 1
63501 Temporary traffic control LSQ Lump Sum
62301A Blaster with equipment AQ Hour 100
62301B Laborer AQ Hour 100
72501 Markup (%) for materials costs incurred under 62301A.
AQ Per cent varies % n/a
TOTAL PRICE all items $ _____________