CFSL-HVACRepairsAndEnergyUpgrades-100-Binder1-HS.pdf
PDF 2 MB Posted
- Solicitation number
- AG-04T0-S-16-0029
About this file
Drawings Binder 1
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
PROJECT LOCATION
MECHANICAL / ELECTRICAL:
DESIGN TEAM
ARCHITECT:
CHAMBERLIN ARCHITECTS
437 Main St.
Grand Junction, CO 81501
(970) 242-68041
STRUCTURAL:
MARTIN / MARTIN
12499 West Colfax Avenue Lakewood, CO 80215
(303) 431-6100
RMH GROUP
12600 West Colfax Avenue Suite A-400 Lakewood, CO 80215
(303) 239-0909
OWNER
USDA FOREST SERVICE
740 Simms Street Golden, CO 80401
(303) 275-5455
LOCALITY MAP
LOCALITY MAP
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
COVER SHEET G.001
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 1
DRAWING LIST
M.410 MECHANICAL DETAILS
M.411 MECHANICAL DETAILS
M.412 MECHANICAL DETAILS
M.413 MECHANICAL DETAILS
M.414 MECHANICAL DETAILS
M.420 MECHANICAL FLOW DIAGRAM, NEW STEAM FLOW DIAGRAM
M.430 MECHANICAL FLOW DIAGRAM, NEW HEATING WATER SYSTEM
M.440 MECHANICAL FLOW DIAGRAM, CHILLED WATER SYSTEM INSTALLATION
M.450 MECHANICAL FLOW DIAGRAM, PROCESS CHILLED WATER
M.460 MECHANICAL FLOW DIAGRAM, HEAT RECOVERY SYSTEM
C.010 MECHANICAL CONTROL DIAGRAMS
C.401 MECHANICAL CONTROL DIAGRAMS
C.402 MECHANICAL CONTROL DIAGRAMS
LC.411 MECHANICAL CONTROL DIAGRAMS
LC.412 MECHANICAL CONTROL DIAGRAMS
LC.413 MECHANICAL CONTROL DIAGRAMS
CC.421 MECHANICAL CONTROL DIAGRAMS
NC.422 MECHANICAL CONTROL DIAGRAMS
NC.423 MECHANICAL CONTROL DIAGRAMS
CC.431 MECHANICAL CONTROL DIAGRAMS
CC.441 MECHANICAL CONTROL DIAGRAMS
CC.442 MECHANICAL FLOW DIAGRAM HEAT RECOVERY SYSTEM
WC.451 MECHANICAL CONTROL DIAGRAMS
WC.461 MECHANICAL CONTROL DIAGRAMS
WC.462 MECHANICAL FLOW DIAGRAM HEAT RECOVERY SYSTEM
ELECTRICAL
E.010 ELECTRICAL LEGEND
ED.111 ELECTRICAL DEMOLITION OVERALL PLAN
ED.112 ELECTRICAL DEMOLITION OVERALL PLAN
ED.113 ELECTRICAL DEMOLITION OVERALL PLAN
ED.311 ENLARGED ELECTRICAL DEMO FIRST FLOOR
ED.410 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
ED.411 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
ED.412 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
E.111 ELECTRICAL INSTALLATION OVERALL PLAN
E.112 ELECTRICAL INSTALLATION OVERALL PLAN
E.113 ELECTRICAL INSTALLATION OVERALL PLAN
E.311 ENLARGED ELECTRICAL INSTALLATION FIRST FLOOR
E.410 ELECTRICAL ONE-LINE
E.411 ELECTRICAL ONE-LINE
E.412 ELECTRICAL ONE-LINE
E.510 ELECTRICAL SCHEDULES
E.511 ELECTRICAL SCHEDULES
E.512 ELECTRICAL SCHEDULES
E.513 ELECTRICAL SCHEDULES
E.514 ELECTRICAL SCHEDULES
E.515 ELECTRICAL SCHEDULES
E.516 ELECTRICAL SCHEDULES
E.517 ELECTRICAL SCHEDULES
DRAWING LIST
CMD.111 MECHANICAL DEMOLITION CENTRAL WING NORTH, FIRST FLOOR
CMD.112 MECHANICAL DEMOLITION CENTRAL WING SOUTH, FIRST FLOOR
CMD.113 MECHANICAL DEMOLITION CENTRAL WING WEST, FIRST FLOOR
CMD.121 MECHANICAL DEMOLITION CENTRAL WING NORTH, SECOND FLOOR
CMD.122 MECHANICAL DEMOLITION CENTRAL WING SOUTH, SECOND FLOOR
CMD.123 MECHANICAL DEMOLITION CENTRAL WING WEST, SECOND FLOOR
CMD.131 MECHANICAL DEMOLITION CENTRAL WING NORTH, THIRD FLOOR
CMD.132 MECHANICAL DEMOLITION CENTRAL WING SOUTH, THIRD FLOOR
CMD.133 MECHANICAL DEMOLITION CENTRAL WING WEST, THIRD FLOOR
CMD.210 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING
CMD.211 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING
CMD.212 MECHANICAL DEMOLITION SECTIONS CENTRAL WING
CMD.213 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING
CMD.311 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, FIRST FLOOR
CMD.312 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, FIRST FLOOR
CMD.321 ENLARGED MECHANICAL DEMOLITION CENTRAL WING, SECOND FLOOR
CMD.331 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, THIRD FLOOR
CMD.332 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, THIRD FLOOR
CM.111 MECHANICAL INSTALLATION, CENTRAL WING NORTH, FIRST FLOOR
CM.112 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, FIRST FLOOR
CM.113 MECHANICAL INSTALLATION, CENTRAL WING WEST, FIRST FLOOR
CM.121 MECHANICAL INSTALLATION, CENTRAL WING NORTH, SECOND FLOOR
CM.122 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, SECOND FLOOR
CM.123 MECHANICAL INSTALLATION, CENTRAL WING WEST, SECOND FLOOR
CM.131 MECHANICAL INSTALLATION, CENTRAL WING NORTH, THIRD FLOOR
CM.132 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, THIRD FLOOR
CM.133 MECHANICAL INSTALLATION, CENTRAL WING WEST, THIRD FLOOR
CM.210 MECHANICAL SECTIONS, CENTRAL WING
CM.211 MECHANICAL SECTIONS, CENTRAL WING
CM.212 MECHANICAL SECTIONS, CENTRAL WING
CM.311 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, FIRST FLOOR
CM.312 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, FIRST FLOOR
CM.321 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, SECOND FLOOR
CM.331 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, THIRD FLOOR
CM.332 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, THIRD FLOOR
CM.510 MECHANICAL SCHEDULES - PHASE 2
CM.511 MECHANICAL SCHEDULES - PHASE 2A
WMD.111 MECHANICAL DEMOLITION WEST WING NORTH, FIRST FLOOR
WMD.112 MECHANICAL DEMOLITION WEST WING SOUTH, FIRST FLOOR
WMD.121 MECHANICAL DEMOLITION WEST WING NORTH, SECOND FLOOR
WMD.122 MECHANICAL DEMOLITION WEST WING SOUTH, SECOND FLOOR
WMD.131 MECHANICAL DEMOLITION WEST WING NORTH, THIRD FLOOR
WMD.132 MECHANICAL DEMOLITION WEST WING SOUTH, THIRD FLOOR
WMD.211 MECHANICAL DEMOLITION SECTIONS, WEST WING
WMD.212 MECHANICAL DEMOLITION SECTIONS, WEST WING
WMD.311 ENLARGED MECHANICAL DEMOLITION, WEST WING, FIRST FLOOR
WMD.312 ENLARGED MECHANICAL DEMOLITION, WEST WING, FIRST FLOOR
WMD.321 ENLARGED MECHANICAL DEMOLITION, WEST WING, SECOND FLOOR
WMD.331 ENLARGED MECHANICAL DEMOLITION, WEST WING, THIRD FLOOR
WMD.332 ENLARGED MECHANICAL DEMOLITION, WEST WING, THIRD FLOOR
WM.111 MECHANICAL INSTALLATION, WEST WING NORTH, FIRST FLOOR
WM.112 MECHANICAL INSTALLATION, WEST WING SOUTH, FIRST FLOOR
WM.121 MECHANICAL INSTALLATION, WEST WING NORTH, SECOND FLOOR
WM.122 MECHANICAL INSTALLATION, WEST WING SOUTH, SECOND FLOOR
WM.131 MECHANICAL INSTALLATION, WEST WING NORTH, THIRD FLOOR
WM.132 MECHANICAL INSTALLATION, WEST WING SOUTH, THIRD FLOOR
WM.210 MECHANICAL INSTALL SECTIONS, WEST WING
WM.211 MECHANICAL SECTIONS, WEST WING
WM.212 MECHANICAL SECTIONS, WEST WING
WM.311 ENLARGED MECHANICAL INSTALLATION, WEST WING, FIRST FLOOR
WM.312 ENLARGED MECHANICAL INSTALLATION, WEST WING, FIRST FLOOR
WM.321 ENLARGED MECHANICAL INSTALLATION, WEST WING, SECOND FLOOR
WM.322 ENLARGED MECHANICAL INSTALLATION, WEST WING, SECOND FLOOR
WM.331 ENLARGED MECHANICAL INSTALLATION, WEST WING, THIRD FLOOR
WM.332 ENLARGED MECHANICAL INSTALLATION, WEST WING, THIRD FLOOR
WM.510 MECHANICAL SCHEDULES - PHASES 3 & 3A
WM.511 MECHANICAL SCHEDULES - PHASE 4
WM.512 MECHANICAL SCHEDULES - PHASE 5
MD.420 MECHANICAL FLOW DIAGRAM, EXISTING STEAM FLOW DIAGRAM
MD.430 MECHANICAL FLOW DIAGRAM, EXISTING HEATING WATER SYSTEM
MD.440 MECHANICAL FLOW DIAGRAM, EXISTING CHILLED WATER SYSTEM
DRAWING LIST
GENERAL
G.001 COVER SHEET
G.002 PHASING PLANS
ARCHITECTURAL
A.001 NOTES, SYMBOLS, ABBREVIATIONS AND WALL TYPES
A.002 CODE CHECKLIST & PLAN
A.003 CODE PLANS
A.020 1ST FLOOR DEMO PLANS
A.021 1ST FLOOR REFLECTED CEILING DEMO PLAN
A.022 2ND FLOOR REFLECTED CEILING DEMO PLAN
A.023 3RD FLOOR REFLECTED CEILING DEMO PLAN
A.110 FIRST FLOOR PLAN
CWA.140 ROOF PLAN
LWA.140 ROOF PLAN
WNA.140 ROOF PLAN
A.210 EXTERIOR ELEVATIONS
A.211 EXTERIOR ELEVATIONS
A.212 EXTERIOR ELEVATIONS
A.213 EXTERIOR ELEVATIONS
A.301 ENLARGED FLOOR PLANS & DETAILS
A.410 WINDOW & DOOR TYPES, DETAILS & SCHEDULE
A.411 ROOF DETAILS
A.412 ROOF DETAILS
A.501 WALL SECTIONS
STRUCTURAL
S.001 SYMBOLS, ABBREVIATIONS & DESIGN CRITERIA
S.002 GENERAL NOTES & QUALITY ASSURANCE
S.003 GENERAL NOTES & QUALITY ASSURANCE
S.004 GENERAL NOTES & QUALITY ASSURANCE
S.110 FIRST FLOOR PLAN
S.120 SECOND FLOOR PLAN
S.130 THIRD FLOOR PLAN
S.140 ROOF PLAN
NS.301 PARTIAL NORTH ENLARGED PLAN
CS.301 PARTIAL CENTRAL ENLARGED PLAN
CS.302 PARTIAL CENTRAL ENLARGED PLAN
WS.301 PARTIAL WEST ENLARGED PLAN
WS.302 PARTIAL WEST ENLARGED PLAN
WS.303 PARTIAL WEST ENLARGED PLAN
S.410 STRUCTURAL DETAILS
S.411 STRUCTURAL DETAILS
S.412 WEST WING ADDITION DETAILS
S.413 WEST WING ADDITION DETAILS
MECHANICAL
M.010 MECHANICAL LEGEND
LMD.111 MECHANICAL DEMOLITION LAB SERVICES WING, FIRST FLOOR
LMD.121 MECHANICAL DEMOLITION LAB SERVICES WING, SECOND FLOOR
LMD.131 MECHANICAL DEMOLITION LAB SERVICES WING, THIRD FLOOR
LMD.211 MECHANICAL DEMOLITION SECTIONS LAB SERVICES WING
LMD.311 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, FIRST FLOOR
LMD.312 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, FIRST FLOOR
LMD.331 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, THIRD FLOOR
LM.111 MECHANICAL INSTALLATION, LAB SERVICE WING, FIRST FLOOR
LM.121 MECHANICAL INSTALLATION, LAB SERVICE WING, SECOND FLOOR
LM.131 MECHANICAL INSTALLATION, LAB SERVICE WING, THIRD FLOOR
LM.211 MECHANICAL SECTION LAB SERVICES WING
LM.221 MECHANICAL SECTION, LAB SERVICES WING
LM.311 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, FIRST FLOOR
LM.312 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, FIRST FLOOR
LM.331 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, THIRD FLOOR
LM.510 MECHANICAL SCHEDULES - PHASE 1
NMD.111 MECHANICAL DEMOLITION NORTH WING, FIRST FLOOR
NMD.112 MECHANICAL DEMOLITION NORTH WING, SECOND FLOOR
NM.111 MECHANICAL INSTALLATION, NORTH WING, FIRST FLOOR
NM.112 MECHANICAL INSTALLATION, NORTH WING, SECOND FLOOR
NM.510 MECHANICAL SCHEDULES - PHASE 1A
CFSL HVAC REPAIRS &
ENERGY UPGRADES
CORVALLIS, OREGON
TITLE II: 100% CONSTRUCTION
DOCUMENTS
FDFD
FA
CP
TANK
CONT ROL LER
FDFD
FA
CP
TANK
CONT ROL LER
34 4
1A 1
A.213
34 4
1A
2A
3A4 4
4A
1A
2A
4A
1A
PHASE 1
PHASE 1A
PHASE 2
PHASE 2A
PHASE 3
PHASE 3A
PHASE 4
PHASE 4A
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
PHASING PLANS G.002
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 2
NOT TO SCALEG.002
FIRST FLOOR - PHASING PLAN1
NOT TO SCALEG.002
SECOND FLOOR - PHASING PLAN2
NOT TO SCALEG.002
THIRD FLOOR - PHASING PLAN3
NOT TO SCALEG.002
ROOF - PHASING PLAN4
LEGEND - PHASINGKEY PLAN
NOTES:
1. THESE DIAGRAMS SHOW THE GENERAL AREAS OF WORK IN EACH PHASE.
IN SOME AREAS WORK WILL OCCUR IN MULTIPLE PHASES. IN SOME AREAS SOME
WORK WILL OCCUR IN PHASES OTHER THAN THAT SHOWN ON THESE DIAGRAMS.
REFER TO INDIVIDUAL PLAN, SECTION, & ENLARGED PLAN SHEETS FOR ADDITIONAL
INFORMATION.
REVISION
ELEVATION
COLUMN GRID LOCATION
DOOR NUMBER
WINDOW TYPE
CENTER LINE
LINE OF WALL ABOVE OR HIDDEN
LINE
BREAK LINE
MATCH LINE
ROOM NAME
ROOM NUMBER
INTERIOR WALL ELEVATION
REFERENCE DRAWING
REFERENCED SECTION NUMBER
SHEET NUMBER
BASIC WALL TYPE
WALL TYPE AND PROPERTIES, SEE
"WALL DESIGNATION KEY" BELOW
REFERENCED DETAIL NUMBER
SHEET NUMBER
A101
A
101A
Room
A101
TYP
A101
TYP
ANGLE
DIAMETER
PERPENDICULAR
PLATE
PLUS OR MINUS
FLOOR DRAIN
FIRE EXTINGUISHERFE
FD
100' 0"
TOP OF WALL
SB2 XD
AL HM
1. COMPLY WITH ALL MANUFACTURERS
RECOMMENDATIONS AND INDUSTRY
STANDARDS RELEVANT TO THE
WORK HEREIN.
2. ALL DIMENSIONS ARE FROM FACE
OF FINISH UNO.
3. ALL ALIGNMENTS ARE FACE OF
FINISH UNO.
4. FIELD VERIFY ALL DIMENSIONS AND
ROUGH OPENINGS PRIOR TO
FABRICATION AND/OR INSTALLATION.
ABV above ACC accessories AFF above finished floor ALT alternate AL aluminum APC acoustical panel ceiling ARCH architect (ural) ASPH asphalt A/C air conditioning
BCS baby changing station BD board BLDG building BLKG blocking BO bottom of BRG bearing
CBU cemetitious backer unit CG corner guard CJ control joint CLG ceiling CLR clear (ance) CMU concrete masonry unit CNRG corner guard COL column CONC concrete CONT continuous or continue CORR corridor CPT carpet (ed) CSMT casement CT ceramic tile CTR center CWOG center wall on grid
DBL double DEMO demolish / demolition DF drinking fountain DIM dimension (s) DIR direction DISP dispenser DN down DR door DS downspout DTL detail DWG drawing DWR drawer
E east EA each EC evaporative cooler
EG etched glass/glazing EIFS exterior insul finish sys EJ expansion joint EL elevation ELEC electric (al) EM emergency EWC electric water cooler EWG end wall corner guard EQ equal EXG existing EXH exhaust EXP exposed EXT exterior
FBO furnished by owner FD floor drain FDN foundation FE fire extinguisher FEC fire extinguisher cabinet FEP finished end panel FFE finished floor elevation FIN finish FLG flashing FLR floor (ing) FLUR fluorescent FO face of FRMG framing FRP fiber reinforced plastic FT foot (feet) FTG footing FV field verify
GA gage, gauge GAL gallon GALV galvanized GB grab bar GC general contractor GL glass, glazing GWB gypsum wallboard GYP gypsum
HAS headed anchor stud HB hose bibb HCP handicap (ed) HDR header HDW hardware HM hollow metal HOR horizontal HSS hollow structural sections
HT height HVAC heating /vent /air cond HWD hardwood
INCL include (d) (ing) INSUL insulate (d) (ing) INT interior INV invert
JST joist JT joint
L length, angle LAM laminate (d) LAV lavatory LB pound LF lineal foot LG laminated glass, glazing LIN linoleum LT light
MA match MAS masonry MATL material MAX maximum MB marker board MECH mechanic (al) MFR manufacture (r) (d) MH manhole MIN minimum MISC miscellaneous MLD molding, moulding MMB membrane MO masonry opening MT mount (ed) (ing) MTL metal
N north N/A not applicable NIC not in contract NOM nominal NTS not to scale NECY necessary
OC on center (s) OD outside diameter OFD overflow drain OH overhead OPG opening
OPH opposite hand OPP opposite OSB oriented strand board OTS open to structure
PAF powder actuated fasteners PB particle board PERF perforate PERIM perimeter PLAM plastic laminate PLT plate PNL panel PNT paint (ed) PR pair PROJ projector, projection PSF pounds per square foot PSI pounds per square inch PT pressure treated PTD paper towel dispenser PTN partition PVC polyvinyl cholride PVMT pavement PWD plywood
QT quarry tile
R riser, radius RB rubber base REC recycling RCMD recommend (ed) (ations) RE reference REF refrigerator REIN reinforce (d) (ing) REQ required REV revision (s), revised RD roof drain RFG roofing RH robe hook RM room RO rough opening ROW right of way RR restroom RTU roof top unit RUB rubber
S south SAG susp acoustic grid SC shower curtain rod & hooks SCH schedule SD soap dispenser
SHT sheet SHTG sheathing SIM similar SND sanitary napkin dispenser SNV sanitary napkin vendor SPEC specification SPKR speaker SQ square SST stainless steel STD standard STL steel STOR storage STR structural SUSP suspended
T tread TB towel bar TEL telephone T.O. top of TOC top of concrete TOS top of steel TOW top of wall TPD toilet paper dispenser TS tube steel TYP typical T&G tongue and groove
UNO unless noted otherwise
VB vapor barrier VCT vinyl composition tile VERT vertical VIF verify in field VM vending machine VNL vinyl sheet VTR vent through roof
W west, wide, width W/ with WB wood base WC watercloset WD wood WDW window WF wide flange WG wire glass W/O without WP waterproof (ing) WR waste receptacle WRB weather resistive barrier WWM welded wire mesh
NOTES:
1. ALL EXTERIOR WALL TYPES ARE SHOWN WITH THE
EXTERIOR WALL FACING RIGHT UNLESS
OTHERWISE NOTED.
2. WALL TYPE CHANGES OCCUR AT CORNERS OR
INTERSECTIONS OF WALLS UNLESS NOTED
OTHERWISE.
1x6 CEDAR SIDING
1x3 WD FURRING
BUILDING PAPER
1/2" EXT SHEATHING
BATT INSULATION
5/8" GWB (PNT)
2x6 WD FRM'G @ 12" O.C.
WEATHER BARRIER
1/2" EXT SHEATHING
BATT INSULATION
5/8" GWB (PNT)
2x6 WD FRM'G @ 12" O.C.
WOOD SIDING TO MATCH
EXG ADJACENT (PNT)
5/8" GWB (PNT)
BATT INSULATION
5/8" GWB (PNT)
2x6 WD FRM'G @ 12" O.C.
(2) LAYERS TYPE X
5/8" GWB (PNT)
MTL C-H STUDS, 4" x 1 1/2" @ 24" O.C.
1" x 24" GWB LINE PANELS
UL U437 - 2 HOUR FIRE RATING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
NOTES, SYMBOLS, ABBREVIATIONS AND
WALL TYPES
A.001
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 3
SYMBOLS GENERAL NOTESARCHITECTURAL ABBREVIATIONS
0' 6"
1'0' 6"
1' A.001
WALL TYPES1
F
ALLOWABLE AREA INCREASES
BUILDING AREA MODIFICATION:
(SECTION 506.1)
ALLOWABLE INCREASE FOR FRONTAGE:
(SECTION 506.2)
AUTOMATIC SPRINKLER SYSTEM:
(SECTION 506.3)
TOTAL ALLOWABLE AREA:
ALLOWABLE NUMBER OF STORIES:
(504.2)
INCIDENTAL USE AREAS (508.2)
FURNACE ROOM/BOILER ROOM
STORAGE (OVER 100 SF)
FIRE EXTINGUISHER
TOTAL OCCUPANT LOAD:
NUMBER OF EXITS REQUIRED FOR BUILDING
(TABLE 1018.1):
TOTAL OCCUPANT LOAD (TOL):
WIDTH OF REQUIRED EXITS (TOL/NUMBER OF
REQUIRED EXITS)*0.2 IN INCHES:
(SECTION 1005.1)
PROVIDED NUMBER OF EXITS:
REQUIRED WIDTH OF PROVIDED EXITS IN
INCHES:
A =At + (At * If ) + (At * Is)
A = 9,000 + (9,000 * 0.56) + (9,000 * 2)
A = 96,120 SQ FT
If = (F/P - 0.25) W/30
If = (1,395.08/1727.16 - 0.25] * 30/30 = 0.56
Is = 2
96,120 SQ FT
SEPARATION
N.A.
N.A.
1 WITHIN 75 FT OF TRAVEL
MIXED OCCUPANCIES:
N.A.
(818/3) * 0.2 = 54.5 IN
(818/6) * 0.2 = 27.3 IN
CODE IN USE:
TYPE OF OCCUPANCY:
TYPE OF CONSTRUCTION:
BUILDING AREA
FIRST FLOOR GSF:
SECOND FLOOR GSF:
THIRD FLOOR GSF:
2010 ADDITION (NIC):
TOTAL BUILDING AREA GSF:
TOTAL NUMBER OF STORIES:
SITE SET BACKS
FRONT YARD:
SIDE YARD:
REAR YARD:
BASIC ALLOWABLE FLOOR AREA (A )
(TABLE 503)
2014 OREGON BUILDING CODE (OBC)
2012 INTERNATIONAL BUILDING CODE (IBC)
2012 INTERNATIONAL MECHANICAL CODE (IMC)
2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2012 INTERNATIONAL PLUMBING CODE (IPC)
2012 INTERNATIONAL FUEL GAS CODE (IFGC)
2012 NATIONAL ELECTRICAL CODE (NEC)
GROUP B
TYPE V-B
29,353 SQ FT
30,378 SQ FT
22,000 SQ FT
11,848 SQFT
93,579 SQ FT
30' TO ASSUMED PROPERTY LINE
30' TO ASSUMED PROPERTY LINE
30' TO ASSUMED PROPERTY LINE
18,000 SQ FT FOR TYPE V-B
2HR FIRE BARRIER (TYP)
2HR FIRE BARRIER (TYP)
2HR FIRE WALL
2HR FIRE WALL
1 1/2 HR RATED DOOR
5'-
4"
TR
AV
EL
D
IS
TA
NC
E
70'-3"
TRAVEL DISTANCE
8'-
4"
TR
AV
EL
D
IS
TA
NC
E
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
CODE CHECKLIST & PLAN A.002
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 4
NOTES:
1. THE EXISTING BUILDING IS NOT FULLY COMPLIANT WITH THE 2012 IBC
IN THE FOLLOWING AREAS:
A. MECHANICAL CORES ARE 2 HOUR RATED CONCRETE ENCLOSURE
BUT DO NOT HAVE THE REQUIRED FIRE DAMPERS AT PENETRATIONS.
B. EXIT STAIRWAYS DO NOT MEET ALL REQUIREMENTS OF THE CURRENT
CODE INCLUDING BUT NOT LIMITED TO GUARDRAILS AND EXIT PASSAGE
WAYS.
THE AUTHORITY HAVING JURISDICTION HAS DETERMINED THAT IT IS NOT
FEASIBLE TO BRING ALL PARTS OF THE BUILDING UP TO CURRENT CODES.
0' 8'
16'0' 8'
16' A.002
FIRST FLOOR CODE PLAN1
2HR FIRE BARRIER (TYP)
2HR FIRE BARRIER (TYP)
2HR FIRE WALL
1 1/2 HR RATED DOOR
3'-
9"
TR
AV
EL
D
IS
TA
NC
E
2'-
TR
AV
EL
D
IS
TA
NC
E
170'-8"
TRAVEL DISTANCE
3'-
7"
TR
AV
EL
D
IS
TA
NC
E
2HR FIRE BARRIER (TYP)
2HR FIRE BARRIER (TYP)
2HR FIRE WALL
1 1/2 HR RATED DOOR
5'-
1"
TR
AV
EL
D
IS
TA
NC
E
2'-
TR
AV
EL
D
IS
TA
NC
E
8'-
0"
TR
AV
EL
D
IS
TA
NC
E
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
CODE PLANS A.003
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 5
0' 8'
16'0' 8'
16' A.003
SECOND FLOOR CODE PLAN1
0' 8'
16'0' 8'
16' A.003
THIRD FLOOR CODE PLAN2
EAST WING, NIC
A.020
REMOVE WD LOUVERS (PHASE 3), RE: MECH
PHASE 1
MECH ROOM
199.1
RE: MECH FOR EQUIPMENT DEMO
DEMO LOUVER, RE: MECH
DEMO WALL BELOW LOUVER
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
EXISTING WALL TO
REMAIN
EXISTING ITEM TO
REMAIN
LEGEND
EXISTING ITEM TO BE
DEMOLISHED
EXISTING WALL TO BE
DEMOLISHED
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
1ST FLOOR DEMO PLANS A.020
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 6
0' 8'
16'0' 8'
16' A.020
FIRST FLOOR DEMO PLAN1
0' 2'
4'0' 2'
4' A.020
FIRST FLOOR DEMO PLAN - LAB SERVICES (PHASE 1)2
KEY PLAN
PHASE 1
PHASE 1A
PHASE 2
PHASE 4
PHASE 3
OFFICE
STORAGE
199.2
MECH ROOM
199.1
METAL SHOP
199.5
USGS IT
MECH
165.1HALL
154.6
OFFICE
HALL
154.4
HALL
154.3
HALL
150.3
HALL
100.6
LAW
ENFORCEMENT
NRIS
BUDGET
BUDGET
121.1
NRIS ROOM
NRIS OFFICE
HALL
100.9
HALL
100.3
COPY
103NRIS OFFICE
FLUX OFFICE
HALL
100.8
AQM OFFICE
AQM OFFICE
AQM OFFICE
COMM CLST.
102.2
FIRE OFFICE
100.2
FIRE OFFICE
OFFICE
OFFICE
HALL
100.5
HALL
100.4
EXISTING WALL TO
REMAIN
EXISTING ITEM TO
REMAIN
LEGEND
EXISTING ITEM TO BE
DEMOLISHED
EXISTING WALL TO BE
DEMOLISHED
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
1ST FLOOR REFLECTED CEILING DEMO PLAN A.021
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 7
0' 8'
16'0' 8'
16' A.021
1ST FLOOR REFLECTED CEILING DEMO PLAN1 NOTE: COORDINATE CEILING DEMOLITION W/ MECH. DRAWINGS
PHASE 1A
PHASE 2
PHASE 2A
PHASE 1
PHASE 3A
NATURAL RESOURCES
RECREATION & ECOLOGY
MECH ROOM
ENGINEERING
297.2
REC. OFFICE
297.5
LAB
TIMBER
296.1
TIMBER
HALL
ELEC ROOM
297.1
FREEZER
COOLER
HALL
OFFICE
287 MECH
287.1
MDS OFFICE
HALL
252.7
OFFICE
HALL
252.6
AREMP
OFFICE
OFFICE
OFFICE
HALL
252.5
HALL
252.3
OFFICE
257.1
LAB
253.1
LAB
HALL
252.2 HALL
249.4
BREAK ROOM
MECH
231.1
VTC
HALL
200.7
OFFICE
OFFICE
MECH
215.1
OFFICE
COOLER
STORAGE
HELP DESK
HALL
200.4
OFFICE
OFFICE
OFFICE
NFS IT
OFFICE
217.1
OFFICE
HALL
200.8
NRIS OFFICE
NRIS OFFICE
PROJECTION
200.1
HALL
200.3
CONFERENCE ROOM
STORAGE
228.1
PHASE 4
PHASE 3
EXISTING WALL TO
REMAIN
EXISTING ITEM TO
REMAIN
LEGEND
EXISTING ITEM TO BE
DEMOLISHED
EXISTING WALL TO BE
DEMOLISHED
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
2ND FLOOR REFLECTED CEILING DEMO PLAN A.022
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 8
0' 8'
16'0' 8'
16' A.022
2ND FLOOR REFLECTED CEILING DEMO PLAN1
PHASE 2A
PHASE 1
OFFICE
OFFICE
HALL
350.3
ROOM
STORAGE
OFFICE
OFFICE
EPF PRINT LAB
OFFICE
363 OFFICE
OFFICE
HALL
330.2
LAB
LAB
LAB
379.1
NRIS OFFICE
311MECH RM
303.2
NRIS OFFICE
HALL
301.7
STORAGE
310.1
HALL
301.6
ROOM
HALL
301.9
HALL
334.3
OFFICE
HALL
350.4
OFFICE
PHASE 4
PHASE 3
EXISTING WALL TO
REMAIN
EXISTING ITEM TO
REMAIN
LEGEND
EXISTING ITEM TO BE
DEMOLISHED
EXISTING WALL TO BE
DEMOLISHED
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
3RD FLOOR REFLECTED CEILING DEMO PLAN A.023
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 9
0' 8'
16'0' 8'
16' A.023
3RD FLOOR REFLECTED CEILING DEMO PLAN1
A.211
A.213 21
A.210 1
A.212
A.2102
A.211
A.213 3
A.301
PHASE 3
CENTRAL
WING
NORTH
WING
LAB
SERVICES
WEST
WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
FIRST FLOOR PLAN A.110
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 10
0' 8'
16'0' 8'
16' A.110
FIRST FLOOR - FOR REFERENCE1
KEY PLAN
NOTES:
1. REFERENCE CEILING DEMO PLANS FOR LOCATIONS WHERE CEILINGS
NEED TO BE REPLACED. REPLACE ALL CEILINGS WITH IN KID MATERIAL, PATCH
PRIME & PAINT TO ACHIEVE UNIFORM CEILING FINISH WITHOUT VISIBLE
TRANSITIONS FROM PREVIOUS TO NEW WORK.
2. REFERENCE MECHANICAL DEMO PLANS FOR LOCATIONS OF T-STAT
REMOVALS. PATCH, REPAIR & PAINT ALL LOCATION WHERE REMOVAL OCCURS
TO PRODUCE UNIFORM FINISH TO ADJACENT FINISHES.
NC
WL
SLOPE
SLOPE
SL
OP
E
SLOPESLOPE SLOPESLOPE
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E SKYLIGHTS
SK
YL
IG
HT
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SLOPE
EXG HVAC SPLIT
UNITS (TYP)
EAST WING BLDG OUTLINE, NO WORK THIS AREA
EXHAUST FAN (TYP)
SLOPE
SL
OP
E
SLOPESLOPE
SL
OP
E
2 2
TYP
TYP
TYP
NEW BUILDING EXPANSION JOINT
7 7
TYP
TYP
A.411
A.411
A.411
A.411
A.213 45
AHU-N1, RE: MECH
SLOPE
A.411LOW
(TYP)
A.411LOW
(TYP)
A.411 LOW
(TYP)
A.411 LOW
(TYP)
A.411
A.412
A.411
LOW
A.411
TYP
TYP
A.411
TYP
A.411
TYP
A.411 TYP
A.411 TYP
A.411 LOW
A.412
LOW
SIM
A.411
TYP
TYP
A.411
LOW @
ASPHALT
A.411
TYP
A.411
A.412
SIM
LOW
1 SL
OP
E
SLOPE
A.411
SIM
A.411
TYP
A.411
A.412 SIM
LOW
SIM
A.411
SIM
A.412
A.412
A.301
LOW
A.412
SIM
1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/
NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.
2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON
2" RIGID INSULATION.
3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.
4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.
5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER
RE-ROOF IS COMPLETE.
6 DEMO EXG PENTHOUSE.
7 EXG SST COPING TO REMAIN.
8 NEW SST COPING TO MATCH EXG.
9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.
10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.
11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.
1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE
2 INCHES.
2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF
WATER IS NOT ACCEPTABLE.
3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER
NEW ROOF DETAILS.
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
ROOF PLAN CWA.140
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 11
KEY PLAN - CENTRAL WING
0' 4'
8'0' 4'
8'
CWA.140
CENTRAL WING ROOF PLAN (PHASE 4A)1
GENERAL ROOF KEY NOTES
GENERAL ROOF NOTES
SL
OP
E
SLOPE
SKYLIGHT
EXG ROOF HATCH
SL
OP
E
SL
OP
E
SLOPE
SL
OP
E
SLOPE
SL
OP
E
SL
OP
E
SLOPE
SLOPE
EXG SKYLIGHT
ON NEW CURB
EXG SKYLIGHT
EXG SKYLIGHT
DN
SKYLIGHT
TYP
A.411
A.411
A.411
AIR COOLED FLUID
COOLER, RE: MECH
PHASE 1
A.412
A.412
SL
OP
E
SLOPE
STL GUARD RAIL (PNT)
A.412
NEW EL-L2, RE-USE
EXG CURB. RE: MECH
EXG CC-4,
RE: MECH
A.411
A.411
A.411
A.411
A.412
A.412
A.412
A.412
A.411
EXG SKYLIGHT
ON NEW CURB
A.412
LOW @
SCUPPER 4
A.412
LOW
A.411
A.411
A.412
LOW
A.411
1' -0
1' -0
PHASE 4
NC
WL
1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/
NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.
2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON
2" RIGID INSULATION.
3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.
4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.
5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER
RE-ROOF IS COMPLETE.
6 DEMO EXG PENTHOUSE.
7 EXG SST COPING TO REMAIN.
8 NEW SST COPING TO MATCH EXG.
9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.
10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.
11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.
1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE
2 INCHES.
2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF
WATER IS NOT ACCEPTABLE.
3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER
NEW ROOF DETAILS.
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
ROOF PLAN LWA.140
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 12
0' 4'
8'0' 4'
8'
LWA.140
LAB SERVICES WING ROOF PLAN (PHASE 1)1
KEY PLAN - LAB SERVICES WING
GENERAL ROOF KEY NOTES
GENERAL ROOF NOTES
NOT USED
NOT USED
NOT USED
NOT USED
SIM
SLOPESLOPE SLOPESLOPE
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
SL
OP
E
DN
EXHAUST FAN (TYP)
NEW BUILDING EXPANSION JOINT
TYP
TYP
TYP
TYP
TYP
7 2
TYP
A.411
A.411
SLOPE
DN
A.411
LOW
(TYP)
A.411
LOW
(TYP)
A.411
A.411
A.411
A.411
A.412
LOW
SIM
A.411
TYP
A.411
LOW @
SHINGLES
TYP
A.411
A.412
A.412
A.412
LOW
A.411TYP
PHASE 1 PHASE 4
NC
WL
1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/
NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.
2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON
2" RIGID INSULATION.
3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.
4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.
5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER
RE-ROOF IS COMPLETE.
6 DEMO EXG PENTHOUSE.
7 EXG SST COPING TO REMAIN.
8 NEW SST COPING TO MATCH EXG.
9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.
10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.
11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.
1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE
2 INCHES.
2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF
WATER IS NOT ACCEPTABLE.
3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER
NEW ROOF DETAILS.
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
ROOF PLAN WNA.140
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 13
0' 4'
8'0' 4'
8'
WNA.140
WEST WING ROOF PLAN (PHASE 4A)1
KEY PLAN - WEST WING
GENERAL ROOF KEY NOTES
GENERAL ROOF NOTES
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
X
X
D
D
D
X X X X X
EXG CONC STAIR TOWER
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A EXG CEMENT BOARD T1-11 SIDING
EXG HORIZONTAL WD SIDING
BR
ID
GE
B
EY
ON
D
X X X
EXG SST COPING TO REMAIN
PHASE 1
LAB SERVICES WING
X
PHASE 4
WEST WING
A.
RE
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D D D D D
D D D
D
D
D
D
DDDDD
DDDDDD D
E E E E E ED
D
D
X X X
EXG VERTICAL WD SIDING
EXG HORIZONTAL WD SIDING
EXG CEMENT BOARD T1-11 SIDING
EXG CONC STAIR TOWER
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A
EXG SST COPING TO REMAIN
CENTRAL WINGLAB SERVICES BEYOND
NORTH WINGCENTRAL WING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
EXTERIOR ELEVATIONS A.210
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 14
0' 4'
8'0' 4'
8' A.210
WEST ELEVATION 11
0' 4'
8'0' 4'
8' A.210
EAST ELEVATION2
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D
D
DXXXXD
XXXXD
XXXXDA
B
AA
BBBBBB
A
B
AA
BBBBBB
A
B
CA
BBBBBB
XXEEEEEEEEEEEEXX
D D D DXXXX
EXG CONC MECH CORE
EXG SST COPING TO REMAIN
REINSTALL EXG COPPER GRAVEL STOP
(TYP), PHASE 4A
EXG VERTICAL WD SIDING
NEW FILTER ACCESS ENCLOSURE.
1x6 CEDAR SIDING ON WD FRM'G (PHASE 3)
NEW PRE FINISHED STANDING
SEAM MTL ROOFING, PHASE 3
WARPED 1x6 CEDAR LOUVER (PHASE 3)
10' - 0"
OP
EN
LO
UV
ER
6"
A.501
REMOVABLE SHEATHING & FRM'G PANEL
FOR REMOVAL DURING PHASE 3A TO
INSTALL AHU, RE; MECH & STR
WEST WING
NORTH WING
PRE FINISHED MTL COUNTERFLASHING
REMOVE & REINSTALL EXG SST
COPING W/ NEW ROOF
MEMBRANE INSTALLATION
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
X X X X X
D
D
D X X
X X
D
D
D
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1
EXG CEMENT BOARD T1-11 SIDING
EXG SST COPING TO REMAIN
CENTRAL WING
LAB SERVICES
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
EXTERIOR ELEVATIONS A.211
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 15
0' 4'
8'0' 4'
8' A.211
NORTH ELEVATION1
0' 4'
8'0' 4'
8' A.211
SOUTH ELEVATION2
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D
D
D
X X X
X X X
X
EXG CONC ELEVATOR TOWER
EXG HORIZONTAL WD SIDING
EXG VERTICAL WD SIDING
EXG CEMENT BOARD T1-11 SIDING
EXG CONC MECH CORE
BR
ID
GE
REINSTALL EXG COPPER
GRAVEL STOP (TYP), PHASE 4A
EXG SST COPING TO REMAIN EXG SST COPING TO REMAIN
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
AA
A A
B B B B B B B B B
B B B BB B B B
XXX
EXG CONC STAIR TOWER
EXG CEMENT BOARD T1-11 SIDING
EXG VERTICAL WD SIDING
REINSTALL EXG COPPER COPING
(TYP), PHASE 1
EXG HORIZONTAL WD SIDING
BR
ID
GE
REINSTALL EXG COPPER COPING
(TYP), PHASE 4A
NEW MTL PIPE GUARDRAIL, PHASE 1 (PNT)
1'-0" TYP EQ EQ EQ EQ EQ EQ
PHASE 4APHASE 1
FIRST FLOOR
100' - 0"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
X X X X
BR
ID
GE
EXG VERTICAL WD SIDING
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1
NEW VENT HOOD
(PHASE 1), RE: MECH
NEW SIDING TO MATCH
ADJACENT EXG
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
DDDDDD
REPLACE EXG COPPER GRAVEL STOP
(TYP), PHASE 4A
EXG VERTICAL WD SIDING
EXG CEMENT BOARD T1-11 SIDING
DDDDDD
DDDDDD
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
EXTERIOR ELEVATIONS A.212
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 16
0' 4'
8'0' 4'
8' A.212
WEST WING SOUTH ELEVATION2
0' 4'
8'0' 4'
8' A.212
LAB SERVICES EAST ELEVATION3
0' 4'
8'0' 4'
8' A.212
LAB SERVICES NORTH ELEVATION4
0' 4'
8'0' 4'
8' A.212
CENTRAL WING WEST ELEVATION1
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENTS TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D D D D D D E E E
EXG VERTICAL WD SIDING
EXG HORIZONTAL WD SIDING
REINSTALL EXG COPPER
GRAVEL STOP (TYP), PHASE 4A
D D D D D D
FIRST FLOOR
100' - 0"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
X X
X
X
EXG CEMENT BOARD T1-11 SIDING
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DX
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A
EXG VERTICAL WD SIDING
WEST WING
LOUVER ADDITION
FIRST FLOOR
100' - 0"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
F F F F F F F F F F F F F F F
REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A
EXG VERTICAL WD SIDING
FIRST FLOOR
100' - 0"
ROOF PLAN
137' - 2"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
D
D
D
REINSTALL EXG
COPPER GRAVEL STOP
(TYP), PHASE 4A
EXG CEMENT BOARD
T1-11 SIDING
WEST WING
LOUVER ADDITION
PRE FINISHED STANDING SEAM
MTL ROOF (PHASE 3)
PRE FINISHED MTL GUTTER &
DOWNSPOUT (PHASE 3)
FIRST FLOOR
100' - 0"
SECOND FLOOR
112' - 4"
THIRD FLOOR
124' - 10"
REINSTALL EXG COPPER
GRAVEL STOP (TYP), PHASE 4A
EXG VERTICAL WD SIDING
XX X X
XX
EXG SST COPING
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
EXTERIOR ELEVATIONS A.213
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 17
0' 4'
8'0' 4'
8' A.213
NORTH WING EAST ELEVATION2
0' 4'
8'0' 4'
8' A.213
LAB SERVICES LOADING BAY EAST ELEVATION3
0' 4'
8'0' 4'
8' A.213
WEST WING EAST ELEVATION1
0' 4'
8'0' 4'
8' A.213
NORTH WING SOUTH ELEVATION4
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. RE: CWA.140 FOR ELEVATION LOCATION.
4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
0' 4'
8'0' 4'
8' A.213
WEST ELEVATION 26
0' 4'
8'0' 4'
8' A.213
CENTRAL WING NORTH ELEVATION5
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. RE: CWA.140 FOR ELEVATION LOCATION.
4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
NOTES:
1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.
2. RE: A.410 FOR WINDOW TYPES.
3. RE: CWA.140 FOR ELEVATION LOCATION.
4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
3'
- 0
10' - 0"
FILTER ACCESS @ ALL
FLOOR LEVELS, RE: MECH
STL GRATE FLOOR
@ EACH FLOOR LEVEL
(PNT), RE: STR
OPEN LOUVER AREA
8' - 0"
MECHANICAL CORE
A.501
NEW INSULATED ACCESS DOORS @ ALL LEVELS
AHU, RE; MECH
A.301
EXG FUME HOOD
EXHAUST, RE: MECH
A.301
A.301
A.501
ABV
ROOF OVERHANG ABOVE
MECH ROOM
199.1
RE: MECH FOR NEW DUCT WORK
INFILL SIDING TO MATCH EXG. ADJACENT
INTEGRAL HOOD, RE: MECH
A.301 A.301
MECH HOOD, RE: MECH
CONT BACKER ROD & SEALANT
NEW 1x4 PT WD TRIM. CONT AROUND
& TIGHT TO HOOD (PNT)
FOAM INSULATION TIGHT
TO FRAMING & DUCT
PENETRATION
EXG FRM'G
CUT BACK EXG WD SIDING TO
INSTALL NEW WD TRIM
INSTALL NEW WEATHER BARRIER
FLASHING OVER EXG WEATHER
BARRIER & INTO OPENING
HOOD, SLOPE TOP, RE: MECH
CONT PRE FINISHED MTL
FLASHING W/ HEMMED DRIP EDGE
CONT BACKER ROD &
SEALANT, TYP
LAP EXG WEATHER BARRIER OVER
DRIP EDGE
NEW 1x4 WD TRIM, SLOPE TOP (PNT)
LAP WEATHER BARRIER
FLASHING INTO OPENING
FOAM INSULATION TIGHT TO
FRM'G & DUCT PENETRATION
EXG HEADER & WALL ASSEMBLY
CONT PRE FINISHED MTL
FLASHING W/ HEMMED DRIP EDGE
LAP WEATHER BARRIER OVER
FLASHING FLANGE
WEATHER BARRIER FLASHING,
LAP INTO OPENING
ME
CH
HO
OD
S I
ZE
CO
OR
DI
NA
TE
SI
LL
HE
IG
HT
W
FILTER BANK, RE: MECH
AHU, RE; MECH
FILL VOID BETWEEN WD FRM'G
& AHU CASING W/ FOAM INSULATION
1/2" PWD TRIM TIGHT TO AHU CASING,
SEAL W/ CONT BACKER ROD & SEALANT
PROVIDE CONT BACKER ROD &
SEALANT @ JOINT W/ EXG WALL
RE: MECH FOR EXACT SIZE
3' - 6" AHU CASING
4"
VERIFY DIMENSIONS IN FIELD
7' - 4" 4"
1/2" PWD FILLER
STL HSS, RE: STR
WD 2x6 FRM'G, RE: STR
BUILDING PAPER
WD 1x3 VERTICAL FRM'G @ 24" O.C.
WD 1x6 HORIZONTAL SIDING, MITER @ CORNERS
PRE FINISHED MTL CORNER TRIM, RE: SPECS
FILL VOID W/ INSULATION
TY
P
/2"
SILL SEAL, RE: SPECS
CONT SEALANT @ CONC
JOINT
PT WD 2x6 SILL
GLV MTL FLASHING W/
CONT HEMMED EDGE
LAP BUILDING PAPER
OVER EDGE OF FLASHING
1" CHAMFER @ EDGE OF CONC
CONT BACKER ROD & SEALANT
SLOPE 1/2"
CONT PRE FINISHED
MTL FLASHING CAP
W/ HEMMED EDGE
WEATHER BARRIER
FLASHING
BUILDING PAPER
PT WD BLK'G
STEEL TUBE, RE: STR
2"
LAP BUILDING PAPER
OVER MTL FLASHING
1x6 CEDAR SIDING ON 3/4"
VERTICAL WD FURRING
ON BUILDING PAPER ON
1/2" EXT SHEATHING
HSS, RE: STR
HSS BYND, RE: STR
PT 2x WD & 1/2"
PWD BLK'G
2 1/2"
1" 2"
.00
1/8 1/8
(2) #10 TEK SCREWS (TYP)
PL 14 GA x 2 1/2"
PL 14 GA (CTRD ON HSS)
(2) 0.157" DIA PAF'S
PL 14 GA x 2 1/2"
TYPICAL ATTACHMENT FOR
ANGLES 0-45 DEGREES
TYPICAL ATTACHMENT FOR
ANGLES 45-90 DEGREES
HSS, RE: STR
1"
/2"
.00
.50
° TYPICAL ATTACHMENT @
47.5 DEGREES
CONT BACKER ROD
& SEALANT (TYP)
SCRIBE PWD TIGHT TO
EXG WD SIDING
2x6 WD FRM'G, RE: STR
EXG WALL ASSEMBLY
REMOVE EXG WD SIDING
@ NEW CONSTRUCTION
TIE-IN LOCATION
W SECTION, RE: STR
GALV MTL FLASHING W/ HEMMED DRIP EDGE
PT WD 1x3 TRIM (PNT), SCRIBE TIGHT
AROUND W SECTION. MITER CORNERS
CONT BACKER ROD & SEALANT (TYP)
EXG WD SIDING, CUT TO ALLOW W SECTION
PENETRATION & TRIM INSTALLATION
LAP EXG WEATHER BARRIER OVER
NEW FLASHING FLANGE
PRE FINISHED MTL
COUNTERFLASHING,
RE: /4 A.412
PT WD 1x TRIM (PNT), MITER TO 1x3 TRIM
AROUND W SECTION
1' -6
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
ENLARGED FLOOR PLANS & DETAILS A.301
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 18
0' 2'
4'0' 2'
4' A.301
WEST WING LOUVER ENCLOSURE TYPICAL FLOOR PLAN (PHASE 3)1
0' 2'
4'0' 2'
4' A.301
FIRST FLOOR PLAN - LAB SERVICES (PHASE 1)2
0' 6"
1'0' 6"
1' A.301
LAB SERVICES HOOD PENETRATION DETAIL9
0' 6"
1'0' 6"
1' A.301
LAB SERVICES HOOD PENETRATION HEAD DETAIL10
0' 1'
2'0' 1'
2' A.301
TYPICAL FILTER ACCESS11
0' 3"
6"0' 3"
6" A.301
LOUVER ENCLOSURE CORNER DETAIL8
0' 3"
6"0' 3"
6" A.301
LOUVER ENCLOSURE SILL DETAIL4
0' 3"
6"0' 3"
6" A.301
LOUVER SILL DETAIL5
0' 3"
6"0' 3"
6" A.301
LOUVER HEAD DETAIL6
0' 3"
6"0' 3"
6" A.301
CEDAR SIDING ATTACHMENT DETAIL7
0' 3"
6"0' 3"
6" A.301
LOUVER ENCLOSURE @ EXG PLAN DETAIL3
NOTE:
FASTENING & INSTALLATION OF WARPED CEDAR PLANKS TO ADDRESS SHRINKAGE
& STRESSES FROM WETTING, WARPING & DRYING PROCESSES.
0' 6"
1'0' 6"
1' A.301
W SECTION WALL PENETRATION DETAIL12
A
2' - 6"
2' -1
/2"
3' -5
1/2
1' -1
1"
8' -3
C
3' -0
5'
-3
2' - 6"
B
2' -1
/2"
3' -5
1/2
1' -1
1"
8' -3
2' - 4 1/2"
ED
8' -3
2' - 4 1/2"
2' -1
/2"
3' -7
1'
-9 1/2
6' -5
1/2
2' - 6" x12 x38 x1 x126 x21
NOTES:
1. ALL WINDOWS TO BE REPLACE U.N.O. NEW WINDOWS TO BE FIBERGLASS CLAD.
2. DEMO ONLY GLAZING @ TYPE F. NEW WINDOWS TO BE BLOCK INSTALLED THROUGH JAMBS (OMIT NAILING FLANGE).
SAND, PRIME & PAINT EXG JAMB, SILL & HEAD TO REMAIN.
3. ALL WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.
4. PROVIDE AN ALLOWANCE FOR THE REPLACEMENT OF 40 WD WINDOW SILLS, CONTRACTOR TO VERIFY EXACT QUANTITY IN FIELD.
5. WINDOW REPLACEMENT NUMBERS ARE FOR REFERENCE ONLY, CONTRACTOR TO VERIFY EXACT QUANTITIES IN FIELD. BASIS OF
DESIGN IS THE REPLACEMENT OF ALL SINGLE PANE WINDOW ASSEMBLIES.
X
EXISTING WINDOW
TO REMAIN
A.410
A.410
A.410
F x15
1' -1
1" 5'
-8
2' - 4 1/2"
TYP
TYP
TYP
A.410
A.410
A.410
FIBERGLASS AWNING
WINDOW
LAP WEATHER BARRIER FLASHING
OVER WINDOW MOUNTING FLANGE
& INTO ROUGH OPENING (TYP)
1/4
/4"
CONT SEALANT (TYP)
REMOVE EXG WD SIDING AS REQ'D
FOR INSTALL OF NEW WINDOW
CONT BACKER ROD & SEALANT (TYP)
NEW 4 QUARTER WD TRIM (PNT)
EXG
/4"
FIBERGLASS AWNING
WINDOW
LAP WEATHER BARRIER FLASHING
OVER WINDOW MOUNTING FLANGE
& INTO ROUGH OPENING (TYP)
CONT SEALANT (TYP)
REMOVE EXG WD SIDING AS REQ'D
FOR INSTALL OF NEW WINDOW
NEW 4 QUARTER WD TRIM (PNT)
PRE FINISHED MTL DRIP EDGE
/4"
1/4
EXG
CONT BACKER ROD & SEALANT (TYP)
FIBERGLASS AWNING
WINDOW
LAP WEATHER BARRIER FLASHING
OVER WINDOW MOUNTING FLANGE
& INTO ROUGH OPENING (TYP)
CONT SEALANT (TYP)
REMOVE EXG WD SIDING AS REQ'D
FOR INSTALL OF NEW WINDOW
/4"
NEW 4 QUARTER WD TRIM (PNT)
1/4
/4"
EXG
FIBERGLASS FIXED WINDOW,
INSTALL W/ OUT NAILING FIN
CONT SEALANT (TYP)
EXG
/4"
EXG WD SILL, SCRAPE, PRIME &
PAINT TO MATCH EXG
NEW WD TRIM, MITER @ CORNERS,
FINISH & PROFILE TO MATCH EXG
FIBERGLASS FIXED
WINDOW
CONT SEALANT (TYP)
TY
P
/4"
EXG, VERIFY EXACT
CONDITION IN FIELD
CONT SEALANT, EA SIDE
(TYP)
NEW WD TRIM, MITER @ CORNERS,
FINISH & PROFILE TO MATCH EXG FIBERGLASS FIXED
WINDOW
CONT SEALANT (TYP)
/4"
EXG
CONT SEALANT, EA SIDE (TYP)
NEW WD TRIM, MITER @ CORNERS,
FINISH & PROFILE TO MATCH EXG
HE
IG
HT
WIDTH
F
2"
AS SCH
DOOR WIDTH 2"
DO
OR
HE
IG
HT
AS
SC
H
2"
CONT BACKER
ROD & SEALANT,
EA SIDE (TYP)
HM FRAME,
PNT
DOOR, RE:
SCHED
1 1/2" 4 1/4" 2"
EXG CONC WALL
PROVIDE DOUBLE
STUDS @ JAMBS
SEALANT, EA
SIDE (TYP)
HM FRAME (PNT)
DOOR, RE: SCHED
1 1/2" 4 1/4" 2"
2"
1/2"
HM DOOR, RE: SCHED
ALUM THRESHOLD, SET IN
FULL SEALANT BED
EXG CONC THRESHOLD
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
WINDOW & DOOR TYPES, DETAILS &
SCHEDULE
A.410
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 19
0' 2'
4'0' 2'
4' A.410
WINDOW ELEVATIONS1
0' 3"
6"0' 3"
6" A.410
WINDOW SILL DETAIL2
0' 3"
6"0' 3"
6" A.410
WINDOW HEAD DETAIL3
0' 3"
6"0' 3"
6" A.410
WINDOW JAMB DETAIL4
0' 3"
6"0' 3"
6" A.410
WINDOW SILL DETAIL @ F5
0' 3"
6"0' 3"
6" A.410
WINDOW JAMB DETAIL @ F7
0' 3"
6"0' 3"
6" A.410
WINDOW HEAD DETAIL @ F6
DOOR SCHEDULE
DOOR
NO.
DOOR FRAME
HDWR
SET NOTES
SIGNAGE
W H T
MATERIA
L TYPE
FIRE
RATING MATERIAL TYPE
DETAIL SIGN
TYPE TEXTJAMB HEAD SILL
101 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100
102 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100
103 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100
0' 2'
4'0' 2'
4' A.410
DOOR TYPES8
0' 2'
4'0' 2'
4' A.410
FRAME TYPES9
0' 3"
6"0' 3"
6" A.410
INT DOOR HEAD10
0' 3"
6"0' 3"
6" A.410
INT DOOR JAMB11
0' 3"
6"0' 3"
6" A.410
HM DOOR THRESHOLD DETAIL12
CONT SEALANT PER ROOF MEMBRANE
MFR'R (TYP)
EXG COPPER COPING W/
NEW CONT SST CLEAT
LAP ROOFING MEMBRANE
DOWN FASCIA
EXG WD 2x4 TRIM SALVAGED &
REINSTALLED (PNT)
(2) PT WD 2x BLK'G
EXG VERTICAL WD SIDING & MTL
FLASHING
NEW ROOF MEMBRANE ON 1/2" SUBSTRATE
BOARD ON 2" RIGID INSULATION
EXG
ROOF MEMBRANE FLASHING STRIP
CONT CANT STRIP
WD 1x TRIM (PNT)
CONT BACKER ROD & SEALANT
WEATHER BARRIER
FLASHING FROM SHEATHING
OVER FLANGE OF EXG MTL
FLASHING
3"
SST TERM BAR
CONT SEALANT (TYP)
FULLY ADHERE ROOF MEMBRANE
TO PARAPET WALL
CONT CANT STRIP
WD BLK'G AS REQ'D BY ROOFING
MFR'R FOR INSTALLATION
NEW ROOF MEMBRANE ON
1/2" SUBSTRATE BOARD
ON 2" RIGID INSULATION
EXG
1'
- 0
ROOF MEMBRANE EXPANSION
JOINT COVER
COMPRESSIBLE ROD
COMPRESSIBLE INSULATION
CONT EDGE SEALANT PER
ROOF MEMBRANE MFR'R
CONT CANT STRIP
NEW ROOF MEMBRANE (LAP
INTO EXPANSION JOINT) ON 1/2"
SUBSTRATE BOARD ON 2" RIGID
INSULATION
PT WD 2x6 BLK'G. STAND
ON EDGE @ SIM
EXG
CONT SEALANT, PER MEMBRANE ROOF MFR'R (TYP)
NEW ROOF MEMBRANE ON 1/2" SUBSTRATE
BOARD ON 2" RIGID INSULATION
ROOF MEMBRANE CURB FLASHING,
EXTEND 3'-0" BEHIND ASPHALT SHINGLES
PRE FINISHED MTL FLASHING
FLASH ICE & WATER SHIELD OVER NEW
MEMBRANE ROOFING & OVER MTL FLASHING
NEW ASPHALT SHINGLE ROOFING
PT WD BLK'G AS REQ'D BY ROOFING MFR'R
EXG CONT ICE & WATER SHIELD UNDER
ASPHALT SHINGLE ROOFING (TYP)
4"
DRAIN LEADER, EXG
ROOF DECK, EXG
STRAINER, EXG
NEW ROOF INSULATIONWELD/ADHERE MEMBRANE
FLASHING TO ROOF MEMBRANE &
PROVIDE EDGE SEALANT PER
ROOFING MFR
RECOMMENDATIONS (ALL SIDES)
MEMBRANE FLASHING,
WRAP INTO DRAIN
2' - 0"
2' - 0"
2"
OVERFLOW ROOF DRAIN @ SIM
4"
6"
PRE FINISHED MTL WALL TO
ROOF FLASHING
ASPHALT SHINGLES ON
CONT ICE & WATER SHIELD
ON EXG ROOF SHEATHING
CONT GALV MTL CLEAT
LAP ICE & WATER SHIELD UP WALL
LAP ROOF MEMBRANE OVER WALL TO
ROOF FLASHING
PRE FINISHED MTL FLASHING W/
HEMMED EDGE
ROOF MEMBRANE FLASHING W/ CONT EDGE
SEALANT PER ROOF MEMBRANE MFR'R
ROOF MEMBRANE ON 1/2" SUBSTRATE
BOARD ON TAPERED INSULATION
6"
EXG CONC WALL
CONT SEALANT
PRE FINISHED MTL COUNTER
FLASHING
PRE FINISHED WALL TO ROOF
FLASHING
ASPHALT SHINGLES ON
CONT ICE & WATER SHIELD
ON EXG ROOF SHEATHING
CONT GALV MTL CLEAT
TAPERED INSULATION TO SLOPE
PER ROOF PLANS IN MECHANICAL
CORE ROOF AREAS
LAP ICE & WATER SHIELD UP WALL
1 1 /2"
6"
OV
ER
LA
P
(T
YP
4"
6"
EXG COPPER COPING W/
NEW CONT SST CLEAT
LAP ICE & WATER SHIELD
DOWN FASCIA
EXG WD 2x4 TRIM
EXG VERTICAL WD SIDING & MTL
FLASHING
EXG
PRE FINISHED MTL CURB TO ROOF FLASHING
CONT GALV MTL CLEAT
ASPHALT SHINGLES ON
CONT ICE & WATER SHIELD
ON EXG ROOF SHEATHING
NEW ROOF MEMBRANE ON
1/2" SUBSTRATE
BOARD ON 2" RIGID
INSULATION
PRE FINISHED MTL FLASHING
FLASH ICE & WATER SHIELD OVER NEW
MEMBRANE ROOFING & OVER MTL FLASHING
NEW ASPHALT SHINGLE ROOFING
EXG
CONT ICE & WATER SHIELD UNDER ASPHALT
SHINGLE ROOFING (TYP)
STRAINER, EXG
WELD/ADHERE MEMBRANE FLASHING TO
ROOF MEMBRANE & PROVIDE EDGE
SEALANT PER ROOFING MFR
RECOMMENDATIONS (ALL SIDES)
MEMBRANE FLASHING,
WRAP INTO DRAIN (TYP)
LAP ROOF MEMBRANE FLASHING UP CURB,
OVER ICE & WATER SHIELD & UNDER MTL
FLASHING
CONT CANT STRIP
EXG COPPER COPING W/
NEW CONT SST CLEAT
LAP ICE & WATER SHIELD
DOWN FASCIA
EXG WD 2x4 TRIM SALVAGED
& REINSTALLED (PNT)
EXG VERTICAL WD SIDING
& MTL FLASHING
EXG
PRE FINISHED MTL CURB TO ROOF FLASHING
CONT GALV MTL CLEAT
ASPHALT SHINGLES ON
CONT ICE & WATER SHIELD
ON EXG ROOF SHEATHING6"
(2) PT WD 2x4 BLK'G
WD 1x TRIM (PNT)
WEATHER BARRIER
FLASHING FROM SHEATHING
OVER FLANGE OF EXG MTL
FLASHING
CONT BACKER ROD &
SEALANT (TYP)
3"
INTERLOCK EDGE OF ROOF PANEL
WITH DRIP EDGE
GALV MTL DRIP EDGE W/ HEMMED EDGE
CONT ICE & WATER SHIELD, LAP
DOWN FASCIA
1/2" ROOF SHEATHING ON 2" RIGID
INSULATION ON (2) LAYERS 3/4" ROOF
SHEATHING, RE: STR
STANDING SEAM MTL ROOFING
WD 1x6 FASCIA TRIM (STAIN)
PRE FINISHED 4" MTL GUTTER
PRE FINISHED MTL RAFTER END CAP.
FORM FROM SINGLE PIECE OF MTL
RIVET, COLOR TO MATCH FLASHING
SHEET MTL SCREW TO FASTEN TOP,
CONCEALED BEHIND T&G SOFFIT
EXPOSED WD 4x6 RAFTER TAIL BEYOND
(STAIN)
CONT BACKER ROD & SEALANT (TYP)
CEDAR T&G SOFFIT BOARDS (STAIN)
REMOVABLE EXPANDED
MTL LEAF GUARD
STANDING SEAM MTL ROOF ON CONT ICE
& WATER SHIELD ON 1/2" ROOF
SHEATHING ON 2" RIGID INSULATION ON
(2) LAYERS 3/4" ROOF SHEATHING, RE: STR
4"
CONT 'Z' CLEAT BY ROOF MFR'R
PRE FINISHED MTL RAKE FLASHING W/
CONT CLEAT
LAP ICE & WATER SHIELD DOWN
FASCIA (TYP)
WD 1x6 FASCIA TRIM (STAIN)
BUILDING PAPER
PT WD 2x4 BLK'G
CEDAR T&G SOFFIT BOARDS (STAIN)
CONT BACKER ROD & SEALANT (TYP)
R26
TLTNEMTR
AP
E D
UCIRGAFO
ER
U
PACIFIC NORTHWEST RESEARCH STATION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
OF
Group/Firm:
Forest
Design:
Sheet Title:
Sheet
Sub Sheet:
Checked:
Date:
CORVALLIS FORESTRY
SCIENCES LABORATORY
CFSL HVAC REPAIRS & ENERGY UPGRADES
ROOF DETAILS A.411
CHAMBERLIN
P. HUMMEL
W. DUECKER
03/14/16CORVALLIS, OREGON 20
0' 3"
6"0' 3"
6" A.411
COPPER COPING DETAIL1
0' 3"
6"0' 3"
6" A.411
TERM BAR ROOF DETAIL8
0' 3"
6"0' 3"
6" A.411
ROOF EXPANSION JOINT DETAIL10
0' 3"
6"0' 3"
6" A.411
MEMBRANE TO SHINGLES ROOF DETAIL4
0' 3"
6"0' 3"
6" A.411
TYPICAL ROOF DRAIN DETAIL9
0' 3"
6"0' 3"
6" A.411
ASPHALT SHINGLE ROOF DETAIL @ DRIP EDGE7
0' 3"
6"0' 3"
6" A.411
ASPHALT SHINGLE TERMINATION DETAIL @ CONC6
0' 3"
6"0' 3"
6" A.411
LAB SCIENCES COPPER COPING DETAIL3
0' 3"
6"0' 3"
6" A.411
ROOF DRAIN DETAIL @ SHINGLES & MEMBRANE5
0' 3"
6"0' 3"
6" A.411
COPPER COPING RAKE DETAIL @ SHINGLES2
0' 3"
6"0' 3"
6" A.411
GUTTER DETAIL @ MTL ROOF12
0' 3"
6"0' 3"
6" A.411
METAL ROOF RAKE DETAIL11
PRE-MOLDED PIPE
FLASHING
CONT SEALANT (TYP)
SST CLAMPING RING
NEW ROOF MEMBRANE ON 1/2"
SUBSTRATE BOARD ON 2" MIN RIGID
INSULATION ON EXG ROOF
ROOF MEMBRANE FLASHING W/
CONT EDGE SEALANT PER
MEMBRANE MFR'R
PRE-MOLDED PIPE FLASHING
CONT SEALANT (TYP)
SST CLAMPING RING
NEW ROOF MEMBRANE ON 1/2"
SUBSTRATE BOARD ON 2" MIN
RIGID INSULATION ON EXG ROOF
STL PIPE PENETRATION, RE: STR
FUTURE RTU STRUCTURAL ATTACHMENT
MA
TC
H
EX
G
SS
T
CO
PI
NG
5"
SLOPE 1"
"A
BO
VE
FI
NI
SH
RO
OF
IN
G
LE
VE
L
STL PIPE 1 1/2 STD GUARDRAIL
(PNT), RE: STR FOR
ATTACHMENT DETAIL. OMIT @ SIM.
SST MTL COPING W/
CONT CLEATS. REPLACE EXG @ SIM.
LAP ROOFING OVER
PARAPET
PT WD 2x BLK'G
NEW ROOF MEMBRANE ON 1/2"
SUBSTRATE BOARD ON TAPERED
RIGID INSULATION, 2" @ MIN DEPTH
CO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .