VICINITY MAP

PROJECT LOCATION

MECHANICAL / ELECTRICAL:

DESIGN TEAM

ARCHITECT:

CHAMBERLIN ARCHITECTS

437 Main St.

Grand Junction, CO 81501

(970) 242-68041

STRUCTURAL:

MARTIN / MARTIN

12499 West Colfax Avenue Lakewood, CO 80215

(303) 431-6100

RMH GROUP

12600 West Colfax Avenue Suite A-400 Lakewood, CO 80215

(303) 239-0909

OWNER

USDA FOREST SERVICE

740 Simms Street Golden, CO 80401

(303) 275-5455

LOCALITY MAP

LOCALITY MAP

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

COVER SHEET G.001

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 1

DRAWING LIST

M.410 MECHANICAL DETAILS

M.411 MECHANICAL DETAILS

M.412 MECHANICAL DETAILS

M.413 MECHANICAL DETAILS

M.414 MECHANICAL DETAILS

M.420 MECHANICAL FLOW DIAGRAM, NEW STEAM FLOW DIAGRAM

M.430 MECHANICAL FLOW DIAGRAM, NEW HEATING WATER SYSTEM

M.440 MECHANICAL FLOW DIAGRAM, CHILLED WATER SYSTEM INSTALLATION

M.450 MECHANICAL FLOW DIAGRAM, PROCESS CHILLED WATER

M.460 MECHANICAL FLOW DIAGRAM, HEAT RECOVERY SYSTEM

C.010 MECHANICAL CONTROL DIAGRAMS

C.401 MECHANICAL CONTROL DIAGRAMS

C.402 MECHANICAL CONTROL DIAGRAMS

LC.411 MECHANICAL CONTROL DIAGRAMS

LC.412 MECHANICAL CONTROL DIAGRAMS

LC.413 MECHANICAL CONTROL DIAGRAMS

CC.421 MECHANICAL CONTROL DIAGRAMS

NC.422 MECHANICAL CONTROL DIAGRAMS

NC.423 MECHANICAL CONTROL DIAGRAMS

CC.431 MECHANICAL CONTROL DIAGRAMS

CC.441 MECHANICAL CONTROL DIAGRAMS

CC.442 MECHANICAL FLOW DIAGRAM HEAT RECOVERY SYSTEM

WC.451 MECHANICAL CONTROL DIAGRAMS

WC.461 MECHANICAL CONTROL DIAGRAMS

WC.462 MECHANICAL FLOW DIAGRAM HEAT RECOVERY SYSTEM

ELECTRICAL

E.010 ELECTRICAL LEGEND

ED.111 ELECTRICAL DEMOLITION OVERALL PLAN

ED.112 ELECTRICAL DEMOLITION OVERALL PLAN

ED.113 ELECTRICAL DEMOLITION OVERALL PLAN

ED.311 ENLARGED ELECTRICAL DEMO FIRST FLOOR

ED.410 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

ED.411 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

ED.412 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

E.111 ELECTRICAL INSTALLATION OVERALL PLAN

E.112 ELECTRICAL INSTALLATION OVERALL PLAN

E.113 ELECTRICAL INSTALLATION OVERALL PLAN

E.311 ENLARGED ELECTRICAL INSTALLATION FIRST FLOOR

E.410 ELECTRICAL ONE-LINE

E.411 ELECTRICAL ONE-LINE

E.412 ELECTRICAL ONE-LINE

E.510 ELECTRICAL SCHEDULES

E.511 ELECTRICAL SCHEDULES

E.512 ELECTRICAL SCHEDULES

E.513 ELECTRICAL SCHEDULES

E.514 ELECTRICAL SCHEDULES

E.515 ELECTRICAL SCHEDULES

E.516 ELECTRICAL SCHEDULES

E.517 ELECTRICAL SCHEDULES

DRAWING LIST

CMD.111 MECHANICAL DEMOLITION CENTRAL WING NORTH, FIRST FLOOR

CMD.112 MECHANICAL DEMOLITION CENTRAL WING SOUTH, FIRST FLOOR

CMD.113 MECHANICAL DEMOLITION CENTRAL WING WEST, FIRST FLOOR

CMD.121 MECHANICAL DEMOLITION CENTRAL WING NORTH, SECOND FLOOR

CMD.122 MECHANICAL DEMOLITION CENTRAL WING SOUTH, SECOND FLOOR

CMD.123 MECHANICAL DEMOLITION CENTRAL WING WEST, SECOND FLOOR

CMD.131 MECHANICAL DEMOLITION CENTRAL WING NORTH, THIRD FLOOR

CMD.132 MECHANICAL DEMOLITION CENTRAL WING SOUTH, THIRD FLOOR

CMD.133 MECHANICAL DEMOLITION CENTRAL WING WEST, THIRD FLOOR

CMD.210 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING

CMD.211 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING

CMD.212 MECHANICAL DEMOLITION SECTIONS CENTRAL WING

CMD.213 MECHANICAL DEMOLITION SECTIONS, CENTRAL WING

CMD.311 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, FIRST FLOOR

CMD.312 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, FIRST FLOOR

CMD.321 ENLARGED MECHANICAL DEMOLITION CENTRAL WING, SECOND FLOOR

CMD.331 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, THIRD FLOOR

CMD.332 ENLARGED MECHANICAL DEMOLITION, CENTRAL WING, THIRD FLOOR

CM.111 MECHANICAL INSTALLATION, CENTRAL WING NORTH, FIRST FLOOR

CM.112 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, FIRST FLOOR

CM.113 MECHANICAL INSTALLATION, CENTRAL WING WEST, FIRST FLOOR

CM.121 MECHANICAL INSTALLATION, CENTRAL WING NORTH, SECOND FLOOR

CM.122 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, SECOND FLOOR

CM.123 MECHANICAL INSTALLATION, CENTRAL WING WEST, SECOND FLOOR

CM.131 MECHANICAL INSTALLATION, CENTRAL WING NORTH, THIRD FLOOR

CM.132 MECHANICAL INSTALLATION, CENTRAL WING SOUTH, THIRD FLOOR

CM.133 MECHANICAL INSTALLATION, CENTRAL WING WEST, THIRD FLOOR

CM.210 MECHANICAL SECTIONS, CENTRAL WING

CM.211 MECHANICAL SECTIONS, CENTRAL WING

CM.212 MECHANICAL SECTIONS, CENTRAL WING

CM.311 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, FIRST FLOOR

CM.312 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, FIRST FLOOR

CM.321 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, SECOND FLOOR

CM.331 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, THIRD FLOOR

CM.332 ENLARGED MECHANICAL INSTALLATION, CENTRAL WING, THIRD FLOOR

CM.510 MECHANICAL SCHEDULES - PHASE 2

CM.511 MECHANICAL SCHEDULES - PHASE 2A

WMD.111 MECHANICAL DEMOLITION WEST WING NORTH, FIRST FLOOR

WMD.112 MECHANICAL DEMOLITION WEST WING SOUTH, FIRST FLOOR

WMD.121 MECHANICAL DEMOLITION WEST WING NORTH, SECOND FLOOR

WMD.122 MECHANICAL DEMOLITION WEST WING SOUTH, SECOND FLOOR

WMD.131 MECHANICAL DEMOLITION WEST WING NORTH, THIRD FLOOR

WMD.132 MECHANICAL DEMOLITION WEST WING SOUTH, THIRD FLOOR

WMD.211 MECHANICAL DEMOLITION SECTIONS, WEST WING

WMD.212 MECHANICAL DEMOLITION SECTIONS, WEST WING

WMD.311 ENLARGED MECHANICAL DEMOLITION, WEST WING, FIRST FLOOR

WMD.312 ENLARGED MECHANICAL DEMOLITION, WEST WING, FIRST FLOOR

WMD.321 ENLARGED MECHANICAL DEMOLITION, WEST WING, SECOND FLOOR

WMD.331 ENLARGED MECHANICAL DEMOLITION, WEST WING, THIRD FLOOR

WMD.332 ENLARGED MECHANICAL DEMOLITION, WEST WING, THIRD FLOOR

WM.111 MECHANICAL INSTALLATION, WEST WING NORTH, FIRST FLOOR

WM.112 MECHANICAL INSTALLATION, WEST WING SOUTH, FIRST FLOOR

WM.121 MECHANICAL INSTALLATION, WEST WING NORTH, SECOND FLOOR

WM.122 MECHANICAL INSTALLATION, WEST WING SOUTH, SECOND FLOOR

WM.131 MECHANICAL INSTALLATION, WEST WING NORTH, THIRD FLOOR

WM.132 MECHANICAL INSTALLATION, WEST WING SOUTH, THIRD FLOOR

WM.210 MECHANICAL INSTALL SECTIONS, WEST WING

WM.211 MECHANICAL SECTIONS, WEST WING

WM.212 MECHANICAL SECTIONS, WEST WING

WM.311 ENLARGED MECHANICAL INSTALLATION, WEST WING, FIRST FLOOR

WM.312 ENLARGED MECHANICAL INSTALLATION, WEST WING, FIRST FLOOR

WM.321 ENLARGED MECHANICAL INSTALLATION, WEST WING, SECOND FLOOR

WM.322 ENLARGED MECHANICAL INSTALLATION, WEST WING, SECOND FLOOR

WM.331 ENLARGED MECHANICAL INSTALLATION, WEST WING, THIRD FLOOR

WM.332 ENLARGED MECHANICAL INSTALLATION, WEST WING, THIRD FLOOR

WM.510 MECHANICAL SCHEDULES - PHASES 3 & 3A

WM.511 MECHANICAL SCHEDULES - PHASE 4

WM.512 MECHANICAL SCHEDULES - PHASE 5

MD.420 MECHANICAL FLOW DIAGRAM, EXISTING STEAM FLOW DIAGRAM

MD.430 MECHANICAL FLOW DIAGRAM, EXISTING HEATING WATER SYSTEM

MD.440 MECHANICAL FLOW DIAGRAM, EXISTING CHILLED WATER SYSTEM

DRAWING LIST

GENERAL

G.001 COVER SHEET

G.002 PHASING PLANS

ARCHITECTURAL

A.001 NOTES, SYMBOLS, ABBREVIATIONS AND WALL TYPES

A.002 CODE CHECKLIST & PLAN

A.003 CODE PLANS

A.020 1ST FLOOR DEMO PLANS

A.021 1ST FLOOR REFLECTED CEILING DEMO PLAN

A.022 2ND FLOOR REFLECTED CEILING DEMO PLAN

A.023 3RD FLOOR REFLECTED CEILING DEMO PLAN

A.110 FIRST FLOOR PLAN

CWA.140 ROOF PLAN

LWA.140 ROOF PLAN

WNA.140 ROOF PLAN

A.210 EXTERIOR ELEVATIONS

A.211 EXTERIOR ELEVATIONS

A.212 EXTERIOR ELEVATIONS

A.213 EXTERIOR ELEVATIONS

A.301 ENLARGED FLOOR PLANS & DETAILS

A.410 WINDOW & DOOR TYPES, DETAILS & SCHEDULE

A.411 ROOF DETAILS

A.412 ROOF DETAILS

A.501 WALL SECTIONS

STRUCTURAL

S.001 SYMBOLS, ABBREVIATIONS & DESIGN CRITERIA

S.002 GENERAL NOTES & QUALITY ASSURANCE

S.003 GENERAL NOTES & QUALITY ASSURANCE

S.004 GENERAL NOTES & QUALITY ASSURANCE

S.110 FIRST FLOOR PLAN

S.120 SECOND FLOOR PLAN

S.130 THIRD FLOOR PLAN

S.140 ROOF PLAN

NS.301 PARTIAL NORTH ENLARGED PLAN

CS.301 PARTIAL CENTRAL ENLARGED PLAN

CS.302 PARTIAL CENTRAL ENLARGED PLAN

WS.301 PARTIAL WEST ENLARGED PLAN

WS.302 PARTIAL WEST ENLARGED PLAN

WS.303 PARTIAL WEST ENLARGED PLAN

S.410 STRUCTURAL DETAILS

S.411 STRUCTURAL DETAILS

S.412 WEST WING ADDITION DETAILS

S.413 WEST WING ADDITION DETAILS

MECHANICAL

M.010 MECHANICAL LEGEND

LMD.111 MECHANICAL DEMOLITION LAB SERVICES WING, FIRST FLOOR

LMD.121 MECHANICAL DEMOLITION LAB SERVICES WING, SECOND FLOOR

LMD.131 MECHANICAL DEMOLITION LAB SERVICES WING, THIRD FLOOR

LMD.211 MECHANICAL DEMOLITION SECTIONS LAB SERVICES WING

LMD.311 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, FIRST FLOOR

LMD.312 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, FIRST FLOOR

LMD.331 ENLARGED MECHANICAL DEMOLITION, LAB SERVICES WING, THIRD FLOOR

LM.111 MECHANICAL INSTALLATION, LAB SERVICE WING, FIRST FLOOR

LM.121 MECHANICAL INSTALLATION, LAB SERVICE WING, SECOND FLOOR

LM.131 MECHANICAL INSTALLATION, LAB SERVICE WING, THIRD FLOOR

LM.211 MECHANICAL SECTION LAB SERVICES WING

LM.221 MECHANICAL SECTION, LAB SERVICES WING

LM.311 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, FIRST FLOOR

LM.312 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, FIRST FLOOR

LM.331 ENLARGED MECHANICAL INSTALLATION, LAB SERVICES WING, THIRD FLOOR

LM.510 MECHANICAL SCHEDULES - PHASE 1

NMD.111 MECHANICAL DEMOLITION NORTH WING, FIRST FLOOR

NMD.112 MECHANICAL DEMOLITION NORTH WING, SECOND FLOOR

NM.111 MECHANICAL INSTALLATION, NORTH WING, FIRST FLOOR

NM.112 MECHANICAL INSTALLATION, NORTH WING, SECOND FLOOR

NM.510 MECHANICAL SCHEDULES - PHASE 1A

CFSL HVAC REPAIRS &

ENERGY UPGRADES

CORVALLIS, OREGON

TITLE II: 100% CONSTRUCTION

DOCUMENTS

FDFD

FA

CP

TANK

CONT ROL LER

FDFD

FA

CP

TANK

CONT ROL LER

34 4

1A 1

A.213

34 4

1A

2A

3A4 4

4A

1A

2A

4A

1A

PHASE 1

PHASE 1A

PHASE 2

PHASE 2A

PHASE 3

PHASE 3A

PHASE 4

PHASE 4A

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

PHASING PLANS G.002

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 2

NOT TO SCALEG.002

FIRST FLOOR - PHASING PLAN1

NOT TO SCALEG.002

SECOND FLOOR - PHASING PLAN2

NOT TO SCALEG.002

THIRD FLOOR - PHASING PLAN3

NOT TO SCALEG.002

ROOF - PHASING PLAN4

LEGEND - PHASINGKEY PLAN

NOTES:

1. THESE DIAGRAMS SHOW THE GENERAL AREAS OF WORK IN EACH PHASE.

IN SOME AREAS WORK WILL OCCUR IN MULTIPLE PHASES. IN SOME AREAS SOME

WORK WILL OCCUR IN PHASES OTHER THAN THAT SHOWN ON THESE DIAGRAMS.

REFER TO INDIVIDUAL PLAN, SECTION, & ENLARGED PLAN SHEETS FOR ADDITIONAL

INFORMATION.

REVISION

ELEVATION

COLUMN GRID LOCATION

DOOR NUMBER

WINDOW TYPE

CENTER LINE

LINE OF WALL ABOVE OR HIDDEN

LINE

BREAK LINE

MATCH LINE

ROOM NAME

ROOM NUMBER

INTERIOR WALL ELEVATION

REFERENCE DRAWING

REFERENCED SECTION NUMBER

SHEET NUMBER

BASIC WALL TYPE

WALL TYPE AND PROPERTIES, SEE

"WALL DESIGNATION KEY" BELOW

REFERENCED DETAIL NUMBER

SHEET NUMBER

A101

A

101A

Room

A101

TYP

A101

TYP

ANGLE

DIAMETER

PERPENDICULAR

PLATE

PLUS OR MINUS

FLOOR DRAIN

FIRE EXTINGUISHERFE

FD

100' 0"

TOP OF WALL

SB2 XD

AL HM

1. COMPLY WITH ALL MANUFACTURERS

RECOMMENDATIONS AND INDUSTRY

STANDARDS RELEVANT TO THE

WORK HEREIN.

2. ALL DIMENSIONS ARE FROM FACE

OF FINISH UNO.

3. ALL ALIGNMENTS ARE FACE OF

FINISH UNO.

4. FIELD VERIFY ALL DIMENSIONS AND

ROUGH OPENINGS PRIOR TO

FABRICATION AND/OR INSTALLATION.

ABV above ACC accessories AFF above finished floor ALT alternate AL aluminum APC acoustical panel ceiling ARCH architect (ural) ASPH asphalt A/C air conditioning

BCS baby changing station BD board BLDG building BLKG blocking BO bottom of BRG bearing

CBU cemetitious backer unit CG corner guard CJ control joint CLG ceiling CLR clear (ance) CMU concrete masonry unit CNRG corner guard COL column CONC concrete CONT continuous or continue CORR corridor CPT carpet (ed) CSMT casement CT ceramic tile CTR center CWOG center wall on grid

DBL double DEMO demolish / demolition DF drinking fountain DIM dimension (s) DIR direction DISP dispenser DN down DR door DS downspout DTL detail DWG drawing DWR drawer

E east EA each EC evaporative cooler

EG etched glass/glazing EIFS exterior insul finish sys EJ expansion joint EL elevation ELEC electric (al) EM emergency EWC electric water cooler EWG end wall corner guard EQ equal EXG existing EXH exhaust EXP exposed EXT exterior

FBO furnished by owner FD floor drain FDN foundation FE fire extinguisher FEC fire extinguisher cabinet FEP finished end panel FFE finished floor elevation FIN finish FLG flashing FLR floor (ing) FLUR fluorescent FO face of FRMG framing FRP fiber reinforced plastic FT foot (feet) FTG footing FV field verify

GA gage, gauge GAL gallon GALV galvanized GB grab bar GC general contractor GL glass, glazing GWB gypsum wallboard GYP gypsum

HAS headed anchor stud HB hose bibb HCP handicap (ed) HDR header HDW hardware HM hollow metal HOR horizontal HSS hollow structural sections

HT height HVAC heating /vent /air cond HWD hardwood

INCL include (d) (ing) INSUL insulate (d) (ing) INT interior INV invert

JST joist JT joint

L length, angle LAM laminate (d) LAV lavatory LB pound LF lineal foot LG laminated glass, glazing LIN linoleum LT light

MA match MAS masonry MATL material MAX maximum MB marker board MECH mechanic (al) MFR manufacture (r) (d) MH manhole MIN minimum MISC miscellaneous MLD molding, moulding MMB membrane MO masonry opening MT mount (ed) (ing) MTL metal

N north N/A not applicable NIC not in contract NOM nominal NTS not to scale NECY necessary

OC on center (s) OD outside diameter OFD overflow drain OH overhead OPG opening

OPH opposite hand OPP opposite OSB oriented strand board OTS open to structure

PAF powder actuated fasteners PB particle board PERF perforate PERIM perimeter PLAM plastic laminate PLT plate PNL panel PNT paint (ed) PR pair PROJ projector, projection PSF pounds per square foot PSI pounds per square inch PT pressure treated PTD paper towel dispenser PTN partition PVC polyvinyl cholride PVMT pavement PWD plywood

QT quarry tile

R riser, radius RB rubber base REC recycling RCMD recommend (ed) (ations) RE reference REF refrigerator REIN reinforce (d) (ing) REQ required REV revision (s), revised RD roof drain RFG roofing RH robe hook RM room RO rough opening ROW right of way RR restroom RTU roof top unit RUB rubber

S south SAG susp acoustic grid SC shower curtain rod & hooks SCH schedule SD soap dispenser

SHT sheet SHTG sheathing SIM similar SND sanitary napkin dispenser SNV sanitary napkin vendor SPEC specification SPKR speaker SQ square SST stainless steel STD standard STL steel STOR storage STR structural SUSP suspended

T tread TB towel bar TEL telephone T.O. top of TOC top of concrete TOS top of steel TOW top of wall TPD toilet paper dispenser TS tube steel TYP typical T&G tongue and groove

UNO unless noted otherwise

VB vapor barrier VCT vinyl composition tile VERT vertical VIF verify in field VM vending machine VNL vinyl sheet VTR vent through roof

W west, wide, width W/ with WB wood base WC watercloset WD wood WDW window WF wide flange WG wire glass W/O without WP waterproof (ing) WR waste receptacle WRB weather resistive barrier WWM welded wire mesh

NOTES:

1. ALL EXTERIOR WALL TYPES ARE SHOWN WITH THE

EXTERIOR WALL FACING RIGHT UNLESS

OTHERWISE NOTED.

2. WALL TYPE CHANGES OCCUR AT CORNERS OR

INTERSECTIONS OF WALLS UNLESS NOTED

OTHERWISE.

1x6 CEDAR SIDING

1x3 WD FURRING

BUILDING PAPER

1/2" EXT SHEATHING

BATT INSULATION

5/8" GWB (PNT)

2x6 WD FRM'G @ 12" O.C.

WEATHER BARRIER

1/2" EXT SHEATHING

BATT INSULATION

5/8" GWB (PNT)

2x6 WD FRM'G @ 12" O.C.

WOOD SIDING TO MATCH

EXG ADJACENT (PNT)

5/8" GWB (PNT)

BATT INSULATION

5/8" GWB (PNT)

2x6 WD FRM'G @ 12" O.C.

(2) LAYERS TYPE X

5/8" GWB (PNT)

MTL C-H STUDS, 4" x 1 1/2" @ 24" O.C.

1" x 24" GWB LINE PANELS

UL U437 - 2 HOUR FIRE RATING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

NOTES, SYMBOLS, ABBREVIATIONS AND

WALL TYPES

A.001

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 3

SYMBOLS GENERAL NOTESARCHITECTURAL ABBREVIATIONS

0' 6"

1'0' 6"

1' A.001

WALL TYPES1

F

ALLOWABLE AREA INCREASES

BUILDING AREA MODIFICATION:

(SECTION 506.1)

ALLOWABLE INCREASE FOR FRONTAGE:

(SECTION 506.2)

AUTOMATIC SPRINKLER SYSTEM:

(SECTION 506.3)

TOTAL ALLOWABLE AREA:

ALLOWABLE NUMBER OF STORIES:

(504.2)

INCIDENTAL USE AREAS (508.2)

FURNACE ROOM/BOILER ROOM

STORAGE (OVER 100 SF)

FIRE EXTINGUISHER

TOTAL OCCUPANT LOAD:

NUMBER OF EXITS REQUIRED FOR BUILDING

(TABLE 1018.1):

TOTAL OCCUPANT LOAD (TOL):

WIDTH OF REQUIRED EXITS (TOL/NUMBER OF

REQUIRED EXITS)*0.2 IN INCHES:

(SECTION 1005.1)

PROVIDED NUMBER OF EXITS:

REQUIRED WIDTH OF PROVIDED EXITS IN

INCHES:

A =At + (At * If ) + (At * Is)

A = 9,000 + (9,000 * 0.56) + (9,000 * 2)

A = 96,120 SQ FT

If = (F/P - 0.25) W/30

If = (1,395.08/1727.16 - 0.25] * 30/30 = 0.56

Is = 2

96,120 SQ FT

SEPARATION

N.A.

N.A.

1 WITHIN 75 FT OF TRAVEL

MIXED OCCUPANCIES:

N.A.

(818/3) * 0.2 = 54.5 IN

(818/6) * 0.2 = 27.3 IN

CODE IN USE:

TYPE OF OCCUPANCY:

TYPE OF CONSTRUCTION:

BUILDING AREA

FIRST FLOOR GSF:

SECOND FLOOR GSF:

THIRD FLOOR GSF:

2010 ADDITION (NIC):

TOTAL BUILDING AREA GSF:

TOTAL NUMBER OF STORIES:

SITE SET BACKS

FRONT YARD:

SIDE YARD:

REAR YARD:

BASIC ALLOWABLE FLOOR AREA (A )

(TABLE 503)

2014 OREGON BUILDING CODE (OBC)

2012 INTERNATIONAL BUILDING CODE (IBC)

2012 INTERNATIONAL MECHANICAL CODE (IMC)

2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2012 INTERNATIONAL PLUMBING CODE (IPC)

2012 INTERNATIONAL FUEL GAS CODE (IFGC)

2012 NATIONAL ELECTRICAL CODE (NEC)

GROUP B

TYPE V-B

29,353 SQ FT

30,378 SQ FT

22,000 SQ FT

11,848 SQFT

93,579 SQ FT

30' TO ASSUMED PROPERTY LINE

30' TO ASSUMED PROPERTY LINE

30' TO ASSUMED PROPERTY LINE

18,000 SQ FT FOR TYPE V-B

2HR FIRE BARRIER (TYP)

2HR FIRE BARRIER (TYP)

2HR FIRE WALL

2HR FIRE WALL

1 1/2 HR RATED DOOR

5'-

4"

TR

AV

EL

D

IS

TA

NC

E

70'-3"

TRAVEL DISTANCE

8'-

4"

TR

AV

EL

D

IS

TA

NC

E

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

CODE CHECKLIST & PLAN A.002

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 4

NOTES:

1. THE EXISTING BUILDING IS NOT FULLY COMPLIANT WITH THE 2012 IBC

IN THE FOLLOWING AREAS:

A. MECHANICAL CORES ARE 2 HOUR RATED CONCRETE ENCLOSURE

BUT DO NOT HAVE THE REQUIRED FIRE DAMPERS AT PENETRATIONS.

B. EXIT STAIRWAYS DO NOT MEET ALL REQUIREMENTS OF THE CURRENT

CODE INCLUDING BUT NOT LIMITED TO GUARDRAILS AND EXIT PASSAGE

WAYS.

THE AUTHORITY HAVING JURISDICTION HAS DETERMINED THAT IT IS NOT

FEASIBLE TO BRING ALL PARTS OF THE BUILDING UP TO CURRENT CODES.

0' 8'

16'0' 8'

16' A.002

FIRST FLOOR CODE PLAN1

2HR FIRE BARRIER (TYP)

2HR FIRE BARRIER (TYP)

2HR FIRE WALL

1 1/2 HR RATED DOOR

3'-

9"

TR

AV

EL

D

IS

TA

NC

E

2'-

TR

AV

EL

D

IS

TA

NC

E

170'-8"

TRAVEL DISTANCE

3'-

7"

TR

AV

EL

D

IS

TA

NC

E

2HR FIRE BARRIER (TYP)

2HR FIRE BARRIER (TYP)

2HR FIRE WALL

1 1/2 HR RATED DOOR

5'-

1"

TR

AV

EL

D

IS

TA

NC

E

2'-

TR

AV

EL

D

IS

TA

NC

E

8'-

0"

TR

AV

EL

D

IS

TA

NC

E

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

CODE PLANS A.003

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 5

0' 8'

16'0' 8'

16' A.003

SECOND FLOOR CODE PLAN1

0' 8'

16'0' 8'

16' A.003

THIRD FLOOR CODE PLAN2

EAST WING, NIC

A.020

REMOVE WD LOUVERS (PHASE 3), RE: MECH

PHASE 1

MECH ROOM

199.1

RE: MECH FOR EQUIPMENT DEMO

DEMO LOUVER, RE: MECH

DEMO WALL BELOW LOUVER

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

EXISTING WALL TO

REMAIN

EXISTING ITEM TO

REMAIN

LEGEND

EXISTING ITEM TO BE

DEMOLISHED

EXISTING WALL TO BE

DEMOLISHED

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

1ST FLOOR DEMO PLANS A.020

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 6

0' 8'

16'0' 8'

16' A.020

FIRST FLOOR DEMO PLAN1

0' 2'

4'0' 2'

4' A.020

FIRST FLOOR DEMO PLAN - LAB SERVICES (PHASE 1)2

KEY PLAN

PHASE 1

PHASE 1A

PHASE 2

PHASE 4

PHASE 3

OFFICE

STORAGE

199.2

MECH ROOM

199.1

METAL SHOP

199.5

USGS IT

MECH

165.1HALL

154.6

OFFICE

HALL

154.4

HALL

154.3

HALL

150.3

HALL

100.6

LAW

ENFORCEMENT

NRIS

BUDGET

BUDGET

121.1

NRIS ROOM

NRIS OFFICE

HALL

100.9

HALL

100.3

MAIL

COPY

103NRIS OFFICE

FLUX OFFICE

HALL

100.8

AQM OFFICE

AQM OFFICE

AQM OFFICE

COMM CLST.

102.2

FIRE OFFICE

100.2

FIRE OFFICE

OFFICE

OFFICE

HALL

100.5

HALL

100.4

EXISTING WALL TO

REMAIN

EXISTING ITEM TO

REMAIN

LEGEND

EXISTING ITEM TO BE

DEMOLISHED

EXISTING WALL TO BE

DEMOLISHED

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

1ST FLOOR REFLECTED CEILING DEMO PLAN A.021

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 7

0' 8'

16'0' 8'

16' A.021

1ST FLOOR REFLECTED CEILING DEMO PLAN1 NOTE: COORDINATE CEILING DEMOLITION W/ MECH. DRAWINGS

PHASE 1A

PHASE 2

PHASE 2A

PHASE 1

PHASE 3A

NATURAL RESOURCES

RECREATION & ECOLOGY

MECH ROOM

ENGINEERING

297.2

REC. OFFICE

297.5

LAB

TIMBER

296.1

TIMBER

HALL

ELEC ROOM

297.1

FREEZER

COOLER

HALL

OFFICE

287 MECH

287.1

MDS OFFICE

HALL

252.7

OFFICE

HALL

252.6

AREMP

OFFICE

OFFICE

OFFICE

HALL

252.5

HALL

252.3

OFFICE

257.1

LAB

253.1

LAB

HALL

252.2 HALL

249.4

BREAK ROOM

MECH

231.1

VTC

HALL

200.7

OFFICE

OFFICE

MECH

215.1

OFFICE

COOLER

STORAGE

HELP DESK

HALL

200.4

OFFICE

OFFICE

OFFICE

NFS IT

OFFICE

217.1

OFFICE

HALL

200.8

NRIS OFFICE

NRIS OFFICE

PROJECTION

200.1

HALL

200.3

CONFERENCE ROOM

STORAGE

228.1

PHASE 4

PHASE 3

EXISTING WALL TO

REMAIN

EXISTING ITEM TO

REMAIN

LEGEND

EXISTING ITEM TO BE

DEMOLISHED

EXISTING WALL TO BE

DEMOLISHED

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

2ND FLOOR REFLECTED CEILING DEMO PLAN A.022

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 8

0' 8'

16'0' 8'

16' A.022

2ND FLOOR REFLECTED CEILING DEMO PLAN1

PHASE 2A

PHASE 1

OFFICE

OFFICE

HALL

350.3

ROOM

STORAGE

OFFICE

OFFICE

EPF PRINT LAB

OFFICE

363 OFFICE

OFFICE

HALL

330.2

LAB

LAB

LAB

379.1

NRIS OFFICE

311MECH RM

303.2

NRIS OFFICE

HALL

301.7

STORAGE

310.1

HALL

301.6

ROOM

HALL

301.9

HALL

334.3

OFFICE

HALL

350.4

OFFICE

PHASE 4

PHASE 3

EXISTING WALL TO

REMAIN

EXISTING ITEM TO

REMAIN

LEGEND

EXISTING ITEM TO BE

DEMOLISHED

EXISTING WALL TO BE

DEMOLISHED

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

3RD FLOOR REFLECTED CEILING DEMO PLAN A.023

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 9

0' 8'

16'0' 8'

16' A.023

3RD FLOOR REFLECTED CEILING DEMO PLAN1

A.211

A.213 21

A.210 1

A.212

A.2102

A.211

A.213 3

A.301

PHASE 3

CENTRAL

WING

NORTH

WING

LAB

SERVICES

WEST

WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

FIRST FLOOR PLAN A.110

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 10

0' 8'

16'0' 8'

16' A.110

FIRST FLOOR - FOR REFERENCE1

KEY PLAN

NOTES:

1. REFERENCE CEILING DEMO PLANS FOR LOCATIONS WHERE CEILINGS

NEED TO BE REPLACED. REPLACE ALL CEILINGS WITH IN KID MATERIAL, PATCH

PRIME & PAINT TO ACHIEVE UNIFORM CEILING FINISH WITHOUT VISIBLE

TRANSITIONS FROM PREVIOUS TO NEW WORK.

2. REFERENCE MECHANICAL DEMO PLANS FOR LOCATIONS OF T-STAT

REMOVALS. PATCH, REPAIR & PAINT ALL LOCATION WHERE REMOVAL OCCURS

TO PRODUCE UNIFORM FINISH TO ADJACENT FINISHES.

NC

WL

SLOPE

SLOPE

SL

OP

E

SLOPESLOPE SLOPESLOPE

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E SKYLIGHTS

SK

YL

IG

HT

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SLOPE

EXG HVAC SPLIT

UNITS (TYP)

EAST WING BLDG OUTLINE, NO WORK THIS AREA

EXHAUST FAN (TYP)

SLOPE

SL

OP

E

SLOPESLOPE

SL

OP

E

2 2

TYP

TYP

TYP

NEW BUILDING EXPANSION JOINT

7 7

TYP

TYP

A.411

A.411

A.411

A.411

A.213 45

AHU-N1, RE: MECH

SLOPE

A.411LOW

(TYP)

A.411LOW

(TYP)

A.411 LOW

(TYP)

A.411 LOW

(TYP)

A.411

A.412

A.411

LOW

A.411

TYP

TYP

A.411

TYP

A.411

TYP

A.411 TYP

A.411 TYP

A.411 LOW

A.412

LOW

SIM

A.411

TYP

TYP

A.411

LOW @

ASPHALT

A.411

TYP

A.411

A.412

SIM

LOW

1 SL

OP

E

SLOPE

A.411

SIM

A.411

TYP

A.411

A.412 SIM

LOW

SIM

A.411

SIM

A.412

A.412

A.301

LOW

A.412

SIM

1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/

NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.

2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON

2" RIGID INSULATION.

3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.

4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.

5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER

RE-ROOF IS COMPLETE.

6 DEMO EXG PENTHOUSE.

7 EXG SST COPING TO REMAIN.

8 NEW SST COPING TO MATCH EXG.

9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.

10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.

11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.

1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE

2 INCHES.

2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF

WATER IS NOT ACCEPTABLE.

3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER

NEW ROOF DETAILS.

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

ROOF PLAN CWA.140

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 11

KEY PLAN - CENTRAL WING

0' 4'

8'0' 4'

8'

CWA.140

CENTRAL WING ROOF PLAN (PHASE 4A)1

GENERAL ROOF KEY NOTES

GENERAL ROOF NOTES

SL

OP

E

SLOPE

SKYLIGHT

EXG ROOF HATCH

SL

OP

E

SL

OP

E

SLOPE

SL

OP

E

SLOPE

SL

OP

E

SL

OP

E

SLOPE

SLOPE

EXG SKYLIGHT

ON NEW CURB

EXG SKYLIGHT

EXG SKYLIGHT

DN

SKYLIGHT

TYP

A.411

A.411

A.411

AIR COOLED FLUID

COOLER, RE: MECH

PHASE 1

A.412

A.412

SL

OP

E

SLOPE

STL GUARD RAIL (PNT)

A.412

NEW EL-L2, RE-USE

EXG CURB. RE: MECH

EXG CC-4,

RE: MECH

A.411

A.411

A.411

A.411

A.412

A.412

A.412

A.412

A.411

EXG SKYLIGHT

ON NEW CURB

A.412

LOW @

SCUPPER 4

A.412

LOW

A.411

A.411

A.412

LOW

A.411

1' -0

1' -0

PHASE 4

NC

WL

1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/

NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.

2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON

2" RIGID INSULATION.

3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.

4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.

5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER

RE-ROOF IS COMPLETE.

6 DEMO EXG PENTHOUSE.

7 EXG SST COPING TO REMAIN.

8 NEW SST COPING TO MATCH EXG.

9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.

10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.

11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.

1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE

2 INCHES.

2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF

WATER IS NOT ACCEPTABLE.

3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER

NEW ROOF DETAILS.

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

ROOF PLAN LWA.140

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 12

0' 4'

8'0' 4'

8'

LWA.140

LAB SERVICES WING ROOF PLAN (PHASE 1)1

KEY PLAN - LAB SERVICES WING

GENERAL ROOF KEY NOTES

GENERAL ROOF NOTES

NOT USED

NOT USED

NOT USED

NOT USED

SIM

SLOPESLOPE SLOPESLOPE

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

SL

OP

E

DN

EXHAUST FAN (TYP)

NEW BUILDING EXPANSION JOINT

TYP

TYP

TYP

TYP

TYP

7 2

TYP

A.411

A.411

SLOPE

DN

A.411

LOW

(TYP)

A.411

LOW

(TYP)

A.411

A.411

A.411

A.411

A.412

LOW

SIM

A.411

TYP

A.411

LOW @

SHINGLES

TYP

A.411

A.412

A.412

A.412

LOW

A.411TYP

PHASE 1 PHASE 4

NC

WL

1 DEMO EXG ASPHALT SHINGLES INCLUDING ROOF UNDERLAYMENT & REPLACE W/

NEW ASPHALT SHINGLES TO MATCH EXG W/ CONT ICE & WATER SHIELD.

2 DEMO EXG MEMBRANE ROOF & REPLACE W/ NEW SINGLE PLY MEMBRANE ON

2" RIGID INSULATION.

3 DEMO EXG BUILT UP CRICKETS & REPLACE W/ NEW 1/4:12 SLOPED CRICKETS.

4 REMOVE, SALVAGE & REINSTALL EXG COPPER COPINGS.

5 REMOVE & STORE EXG STAIR & WALKWAY SYSTEMS. REPLACE AFTER

RE-ROOF IS COMPLETE.

6 DEMO EXG PENTHOUSE.

7 EXG SST COPING TO REMAIN.

8 NEW SST COPING TO MATCH EXG.

9 NEW STANDING SEAM MTL ROOFING 2" RIGID INSULATION.

10 NEW PRE FINISHED MTL GUTTER & DOWNSPOUT.

11 REMOVE & SALVAGE EXG SST COPING & REINSTALL W/ NEW ROOF MEMBRANE.

1. MINIMUM INSULATION THICKNESS AT INTERNAL ROOF DRAINS SHALL BE

2 INCHES.

2. PROVIDE POSITIVE DRAINAGE AT ALL AREAS OF ROOF. PONDING OF

WATER IS NOT ACCEPTABLE.

3. REMOVE ALL ROTTEN PERIMETER ROOF EDGE BLK'G & REPLACE AS PER

NEW ROOF DETAILS.

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

ROOF PLAN WNA.140

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 13

0' 4'

8'0' 4'

8'

WNA.140

WEST WING ROOF PLAN (PHASE 4A)1

KEY PLAN - WEST WING

GENERAL ROOF KEY NOTES

GENERAL ROOF NOTES

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

X

X

D

D

D

X X X X X

EXG CONC STAIR TOWER

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A EXG CEMENT BOARD T1-11 SIDING

EXG HORIZONTAL WD SIDING

BR

ID

GE

B

EY

ON

D

X X X

EXG SST COPING TO REMAIN

PHASE 1

LAB SERVICES WING

X

PHASE 4

WEST WING

A.

RE

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D D D D D

D D D

D

D

D

D

DDDDD

DDDDDD D

E E E E E ED

D

D

X X X

EXG VERTICAL WD SIDING

EXG HORIZONTAL WD SIDING

EXG CEMENT BOARD T1-11 SIDING

EXG CONC STAIR TOWER

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A

EXG SST COPING TO REMAIN

CENTRAL WINGLAB SERVICES BEYOND

NORTH WINGCENTRAL WING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

EXTERIOR ELEVATIONS A.210

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 14

0' 4'

8'0' 4'

8' A.210

WEST ELEVATION 11

0' 4'

8'0' 4'

8' A.210

EAST ELEVATION2

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D

D

DXXXXD

XXXXD

XXXXDA

B

AA

BBBBBB

A

B

AA

BBBBBB

A

B

CA

BBBBBB

XXEEEEEEEEEEEEXX

D D D DXXXX

EXG CONC MECH CORE

EXG SST COPING TO REMAIN

REINSTALL EXG COPPER GRAVEL STOP

(TYP), PHASE 4A

EXG VERTICAL WD SIDING

NEW FILTER ACCESS ENCLOSURE.

1x6 CEDAR SIDING ON WD FRM'G (PHASE 3)

NEW PRE FINISHED STANDING

SEAM MTL ROOFING, PHASE 3

WARPED 1x6 CEDAR LOUVER (PHASE 3)

10' - 0"

OP

EN

LO

UV

ER

6"

A.501

REMOVABLE SHEATHING & FRM'G PANEL

FOR REMOVAL DURING PHASE 3A TO

INSTALL AHU, RE; MECH & STR

WEST WING

NORTH WING

PRE FINISHED MTL COUNTERFLASHING

REMOVE & REINSTALL EXG SST

COPING W/ NEW ROOF

MEMBRANE INSTALLATION

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

X X X X X

D

D

D X X

X X

D

D

D

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1

EXG CEMENT BOARD T1-11 SIDING

EXG SST COPING TO REMAIN

CENTRAL WING

LAB SERVICES

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

EXTERIOR ELEVATIONS A.211

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 15

0' 4'

8'0' 4'

8' A.211

NORTH ELEVATION1

0' 4'

8'0' 4'

8' A.211

SOUTH ELEVATION2

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D

D

D

X X X

X X X

X

EXG CONC ELEVATOR TOWER

EXG HORIZONTAL WD SIDING

EXG VERTICAL WD SIDING

EXG CEMENT BOARD T1-11 SIDING

EXG CONC MECH CORE

BR

ID

GE

REINSTALL EXG COPPER

GRAVEL STOP (TYP), PHASE 4A

EXG SST COPING TO REMAIN EXG SST COPING TO REMAIN

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

AA

A A

B B B B B B B B B

B B B BB B B B

XXX

EXG CONC STAIR TOWER

EXG CEMENT BOARD T1-11 SIDING

EXG VERTICAL WD SIDING

REINSTALL EXG COPPER COPING

(TYP), PHASE 1

EXG HORIZONTAL WD SIDING

BR

ID

GE

REINSTALL EXG COPPER COPING

(TYP), PHASE 4A

NEW MTL PIPE GUARDRAIL, PHASE 1 (PNT)

1'-0" TYP EQ EQ EQ EQ EQ EQ

PHASE 4APHASE 1

FIRST FLOOR

100' - 0"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

X X X X

BR

ID

GE

EXG VERTICAL WD SIDING

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1

NEW VENT HOOD

(PHASE 1), RE: MECH

NEW SIDING TO MATCH

ADJACENT EXG

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

DDDDDD

REPLACE EXG COPPER GRAVEL STOP

(TYP), PHASE 4A

EXG VERTICAL WD SIDING

EXG CEMENT BOARD T1-11 SIDING

DDDDDD

DDDDDD

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

EXTERIOR ELEVATIONS A.212

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 16

0' 4'

8'0' 4'

8' A.212

WEST WING SOUTH ELEVATION2

0' 4'

8'0' 4'

8' A.212

LAB SERVICES EAST ELEVATION3

0' 4'

8'0' 4'

8' A.212

LAB SERVICES NORTH ELEVATION4

0' 4'

8'0' 4'

8' A.212

CENTRAL WING WEST ELEVATION1

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENTS TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D D D D D D E E E

EXG VERTICAL WD SIDING

EXG HORIZONTAL WD SIDING

REINSTALL EXG COPPER

GRAVEL STOP (TYP), PHASE 4A

D D D D D D

FIRST FLOOR

100' - 0"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

X X

X

X

EXG CEMENT BOARD T1-11 SIDING

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 1

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

DX

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A

EXG VERTICAL WD SIDING

WEST WING

LOUVER ADDITION

FIRST FLOOR

100' - 0"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

F F F F F F F F F F F F F F F

REINSTALL EXG COPPER GRAVEL STOP (TYP), PHASE 4A

EXG VERTICAL WD SIDING

FIRST FLOOR

100' - 0"

ROOF PLAN

137' - 2"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

D

D

D

REINSTALL EXG

COPPER GRAVEL STOP

(TYP), PHASE 4A

EXG CEMENT BOARD

T1-11 SIDING

WEST WING

LOUVER ADDITION

PRE FINISHED STANDING SEAM

MTL ROOF (PHASE 3)

PRE FINISHED MTL GUTTER &

DOWNSPOUT (PHASE 3)

FIRST FLOOR

100' - 0"

SECOND FLOOR

112' - 4"

THIRD FLOOR

124' - 10"

REINSTALL EXG COPPER

GRAVEL STOP (TYP), PHASE 4A

EXG VERTICAL WD SIDING

XX X X

XX

EXG SST COPING

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

EXTERIOR ELEVATIONS A.213

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 17

0' 4'

8'0' 4'

8' A.213

NORTH WING EAST ELEVATION2

0' 4'

8'0' 4'

8' A.213

LAB SERVICES LOADING BAY EAST ELEVATION3

0' 4'

8'0' 4'

8' A.213

WEST WING EAST ELEVATION1

0' 4'

8'0' 4'

8' A.213

NORTH WING SOUTH ELEVATION4

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. RE: CWA.140 FOR ELEVATION LOCATION.

4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

0' 4'

8'0' 4'

8' A.213

WEST ELEVATION 26

0' 4'

8'0' 4'

8' A.213

CENTRAL WING NORTH ELEVATION5

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. RE: CWA.140 FOR ELEVATION LOCATION.

4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

NOTES:

1. ALL BUILDING ELEMENTS ARE EXISTING TO REMAIN UNLESS NOTED AS NEW OR REINSTALLED.

2. RE: A.410 FOR WINDOW TYPES.

3. RE: CWA.140 FOR ELEVATION LOCATION.

4. WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

3'

- 0

10' - 0"

FILTER ACCESS @ ALL

FLOOR LEVELS, RE: MECH

STL GRATE FLOOR

@ EACH FLOOR LEVEL

(PNT), RE: STR

OPEN LOUVER AREA

8' - 0"

MECHANICAL CORE

A.501

NEW INSULATED ACCESS DOORS @ ALL LEVELS

AHU, RE; MECH

A.301

EXG FUME HOOD

EXHAUST, RE: MECH

A.301

A.301

A.501

ABV

ROOF OVERHANG ABOVE

MECH ROOM

199.1

RE: MECH FOR NEW DUCT WORK

INFILL SIDING TO MATCH EXG. ADJACENT

INTEGRAL HOOD, RE: MECH

A.301 A.301

MECH HOOD, RE: MECH

CONT BACKER ROD & SEALANT

NEW 1x4 PT WD TRIM. CONT AROUND

& TIGHT TO HOOD (PNT)

FOAM INSULATION TIGHT

TO FRAMING & DUCT

PENETRATION

EXG FRM'G

CUT BACK EXG WD SIDING TO

INSTALL NEW WD TRIM

INSTALL NEW WEATHER BARRIER

FLASHING OVER EXG WEATHER

BARRIER & INTO OPENING

HOOD, SLOPE TOP, RE: MECH

CONT PRE FINISHED MTL

FLASHING W/ HEMMED DRIP EDGE

CONT BACKER ROD &

SEALANT, TYP

LAP EXG WEATHER BARRIER OVER

DRIP EDGE

NEW 1x4 WD TRIM, SLOPE TOP (PNT)

LAP WEATHER BARRIER

FLASHING INTO OPENING

FOAM INSULATION TIGHT TO

FRM'G & DUCT PENETRATION

EXG HEADER & WALL ASSEMBLY

CONT PRE FINISHED MTL

FLASHING W/ HEMMED DRIP EDGE

LAP WEATHER BARRIER OVER

FLASHING FLANGE

WEATHER BARRIER FLASHING,

LAP INTO OPENING

ME

CH

HO

OD

S I

ZE

CO

OR

DI

NA

TE

SI

LL

HE

IG

HT

W

FILTER BANK, RE: MECH

AHU, RE; MECH

FILL VOID BETWEEN WD FRM'G

& AHU CASING W/ FOAM INSULATION

1/2" PWD TRIM TIGHT TO AHU CASING,

SEAL W/ CONT BACKER ROD & SEALANT

PROVIDE CONT BACKER ROD &

SEALANT @ JOINT W/ EXG WALL

RE: MECH FOR EXACT SIZE

3' - 6" AHU CASING

4"

VERIFY DIMENSIONS IN FIELD

7' - 4" 4"

1/2" PWD FILLER

STL HSS, RE: STR

WD 2x6 FRM'G, RE: STR

BUILDING PAPER

WD 1x3 VERTICAL FRM'G @ 24" O.C.

WD 1x6 HORIZONTAL SIDING, MITER @ CORNERS

PRE FINISHED MTL CORNER TRIM, RE: SPECS

FILL VOID W/ INSULATION

TY

P

/2"

SILL SEAL, RE: SPECS

CONT SEALANT @ CONC

JOINT

PT WD 2x6 SILL

GLV MTL FLASHING W/

CONT HEMMED EDGE

LAP BUILDING PAPER

OVER EDGE OF FLASHING

1" CHAMFER @ EDGE OF CONC

CONT BACKER ROD & SEALANT

SLOPE 1/2"

CONT PRE FINISHED

MTL FLASHING CAP

W/ HEMMED EDGE

WEATHER BARRIER

FLASHING

BUILDING PAPER

PT WD BLK'G

STEEL TUBE, RE: STR

2"

LAP BUILDING PAPER

OVER MTL FLASHING

1x6 CEDAR SIDING ON 3/4"

VERTICAL WD FURRING

ON BUILDING PAPER ON

1/2" EXT SHEATHING

HSS, RE: STR

HSS BYND, RE: STR

PT 2x WD & 1/2"

PWD BLK'G

2 1/2"

1" 2"

.00

1/8 1/8

(2) #10 TEK SCREWS (TYP)

PL 14 GA x 2 1/2"

PL 14 GA (CTRD ON HSS)

(2) 0.157" DIA PAF'S

PL 14 GA x 2 1/2"

TYPICAL ATTACHMENT FOR

ANGLES 0-45 DEGREES

TYPICAL ATTACHMENT FOR

ANGLES 45-90 DEGREES

HSS, RE: STR

1"

/2"

.00

.50

° TYPICAL ATTACHMENT @

47.5 DEGREES

CONT BACKER ROD

& SEALANT (TYP)

SCRIBE PWD TIGHT TO

EXG WD SIDING

2x6 WD FRM'G, RE: STR

EXG WALL ASSEMBLY

REMOVE EXG WD SIDING

@ NEW CONSTRUCTION

TIE-IN LOCATION

W SECTION, RE: STR

GALV MTL FLASHING W/ HEMMED DRIP EDGE

PT WD 1x3 TRIM (PNT), SCRIBE TIGHT

AROUND W SECTION. MITER CORNERS

CONT BACKER ROD & SEALANT (TYP)

EXG WD SIDING, CUT TO ALLOW W SECTION

PENETRATION & TRIM INSTALLATION

LAP EXG WEATHER BARRIER OVER

NEW FLASHING FLANGE

PRE FINISHED MTL

COUNTERFLASHING,

RE: /4 A.412

PT WD 1x TRIM (PNT), MITER TO 1x3 TRIM

AROUND W SECTION

1' -6

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

ENLARGED FLOOR PLANS & DETAILS A.301

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 18

0' 2'

4'0' 2'

4' A.301

WEST WING LOUVER ENCLOSURE TYPICAL FLOOR PLAN (PHASE 3)1

0' 2'

4'0' 2'

4' A.301

FIRST FLOOR PLAN - LAB SERVICES (PHASE 1)2

0' 6"

1'0' 6"

1' A.301

LAB SERVICES HOOD PENETRATION DETAIL9

0' 6"

1'0' 6"

1' A.301

LAB SERVICES HOOD PENETRATION HEAD DETAIL10

0' 1'

2'0' 1'

2' A.301

TYPICAL FILTER ACCESS11

0' 3"

6"0' 3"

6" A.301

LOUVER ENCLOSURE CORNER DETAIL8

0' 3"

6"0' 3"

6" A.301

LOUVER ENCLOSURE SILL DETAIL4

0' 3"

6"0' 3"

6" A.301

LOUVER SILL DETAIL5

0' 3"

6"0' 3"

6" A.301

LOUVER HEAD DETAIL6

0' 3"

6"0' 3"

6" A.301

CEDAR SIDING ATTACHMENT DETAIL7

0' 3"

6"0' 3"

6" A.301

LOUVER ENCLOSURE @ EXG PLAN DETAIL3

NOTE:

FASTENING & INSTALLATION OF WARPED CEDAR PLANKS TO ADDRESS SHRINKAGE

& STRESSES FROM WETTING, WARPING & DRYING PROCESSES.

0' 6"

1'0' 6"

1' A.301

W SECTION WALL PENETRATION DETAIL12

A

2' - 6"

2' -1

/2"

3' -5

1/2

1' -1

1"

8' -3

C

3' -0

5'

-3

2' - 6"

B

2' -1

/2"

3' -5

1/2

1' -1

1"

8' -3

2' - 4 1/2"

ED

8' -3

2' - 4 1/2"

2' -1

/2"

3' -7

1'

-9 1/2

6' -5

1/2

2' - 6" x12 x38 x1 x126 x21

NOTES:

1. ALL WINDOWS TO BE REPLACE U.N.O. NEW WINDOWS TO BE FIBERGLASS CLAD.

2. DEMO ONLY GLAZING @ TYPE F. NEW WINDOWS TO BE BLOCK INSTALLED THROUGH JAMBS (OMIT NAILING FLANGE).

SAND, PRIME & PAINT EXG JAMB, SILL & HEAD TO REMAIN.

3. ALL WINDOW REPLACEMENT TO OCCUR DURING CONSTRUCTION PHASE 4A.

4. PROVIDE AN ALLOWANCE FOR THE REPLACEMENT OF 40 WD WINDOW SILLS, CONTRACTOR TO VERIFY EXACT QUANTITY IN FIELD.

5. WINDOW REPLACEMENT NUMBERS ARE FOR REFERENCE ONLY, CONTRACTOR TO VERIFY EXACT QUANTITIES IN FIELD. BASIS OF

DESIGN IS THE REPLACEMENT OF ALL SINGLE PANE WINDOW ASSEMBLIES.

X

EXISTING WINDOW

TO REMAIN

A.410

A.410

A.410

F x15

1' -1

1" 5'

-8

2' - 4 1/2"

TYP

TYP

TYP

A.410

A.410

A.410

FIBERGLASS AWNING

WINDOW

LAP WEATHER BARRIER FLASHING

OVER WINDOW MOUNTING FLANGE

& INTO ROUGH OPENING (TYP)

1/4

/4"

CONT SEALANT (TYP)

REMOVE EXG WD SIDING AS REQ'D

FOR INSTALL OF NEW WINDOW

CONT BACKER ROD & SEALANT (TYP)

NEW 4 QUARTER WD TRIM (PNT)

EXG

/4"

FIBERGLASS AWNING

WINDOW

LAP WEATHER BARRIER FLASHING

OVER WINDOW MOUNTING FLANGE

& INTO ROUGH OPENING (TYP)

CONT SEALANT (TYP)

REMOVE EXG WD SIDING AS REQ'D

FOR INSTALL OF NEW WINDOW

NEW 4 QUARTER WD TRIM (PNT)

PRE FINISHED MTL DRIP EDGE

/4"

1/4

EXG

CONT BACKER ROD & SEALANT (TYP)

FIBERGLASS AWNING

WINDOW

LAP WEATHER BARRIER FLASHING

OVER WINDOW MOUNTING FLANGE

& INTO ROUGH OPENING (TYP)

CONT SEALANT (TYP)

REMOVE EXG WD SIDING AS REQ'D

FOR INSTALL OF NEW WINDOW

/4"

NEW 4 QUARTER WD TRIM (PNT)

1/4

/4"

EXG

FIBERGLASS FIXED WINDOW,

INSTALL W/ OUT NAILING FIN

CONT SEALANT (TYP)

EXG

/4"

EXG WD SILL, SCRAPE, PRIME &

PAINT TO MATCH EXG

NEW WD TRIM, MITER @ CORNERS,

FINISH & PROFILE TO MATCH EXG

FIBERGLASS FIXED

WINDOW

CONT SEALANT (TYP)

TY

P

/4"

EXG, VERIFY EXACT

CONDITION IN FIELD

CONT SEALANT, EA SIDE

(TYP)

NEW WD TRIM, MITER @ CORNERS,

FINISH & PROFILE TO MATCH EXG FIBERGLASS FIXED

WINDOW

CONT SEALANT (TYP)

/4"

EXG

CONT SEALANT, EA SIDE (TYP)

NEW WD TRIM, MITER @ CORNERS,

FINISH & PROFILE TO MATCH EXG

HE

IG

HT

WIDTH

F

2"

AS SCH

DOOR WIDTH 2"

DO

OR

HE

IG

HT

AS

SC

H

2"

CONT BACKER

ROD & SEALANT,

EA SIDE (TYP)

HM FRAME,

PNT

DOOR, RE:

SCHED

1 1/2" 4 1/4" 2"

EXG CONC WALL

PROVIDE DOUBLE

STUDS @ JAMBS

SEALANT, EA

SIDE (TYP)

HM FRAME (PNT)

DOOR, RE: SCHED

1 1/2" 4 1/4" 2"

2"

1/2"

HM DOOR, RE: SCHED

ALUM THRESHOLD, SET IN

FULL SEALANT BED

EXG CONC THRESHOLD

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

WINDOW & DOOR TYPES, DETAILS &

SCHEDULE

A.410

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 19

0' 2'

4'0' 2'

4' A.410

WINDOW ELEVATIONS1

0' 3"

6"0' 3"

6" A.410

WINDOW SILL DETAIL2

0' 3"

6"0' 3"

6" A.410

WINDOW HEAD DETAIL3

0' 3"

6"0' 3"

6" A.410

WINDOW JAMB DETAIL4

0' 3"

6"0' 3"

6" A.410

WINDOW SILL DETAIL @ F5

0' 3"

6"0' 3"

6" A.410

WINDOW JAMB DETAIL @ F7

0' 3"

6"0' 3"

6" A.410

WINDOW HEAD DETAIL @ F6

DOOR SCHEDULE

DOOR

NO.

DOOR FRAME

HDWR

SET NOTES

SIGNAGE

W H T

MATERIA

L TYPE

FIRE

RATING MATERIAL TYPE

DETAIL SIGN

TYPE TEXTJAMB HEAD SILL

101 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100

102 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100

103 2' - 6" 5' - 10" 1 3/4" HM F - HM F 11/A.410 10/A.410 12/A.410 100

0' 2'

4'0' 2'

4' A.410

DOOR TYPES8

0' 2'

4'0' 2'

4' A.410

FRAME TYPES9

0' 3"

6"0' 3"

6" A.410

INT DOOR HEAD10

0' 3"

6"0' 3"

6" A.410

INT DOOR JAMB11

0' 3"

6"0' 3"

6" A.410

HM DOOR THRESHOLD DETAIL12

CONT SEALANT PER ROOF MEMBRANE

MFR'R (TYP)

EXG COPPER COPING W/

NEW CONT SST CLEAT

LAP ROOFING MEMBRANE

DOWN FASCIA

EXG WD 2x4 TRIM SALVAGED &

REINSTALLED (PNT)

(2) PT WD 2x BLK'G

EXG VERTICAL WD SIDING & MTL

FLASHING

NEW ROOF MEMBRANE ON 1/2" SUBSTRATE

BOARD ON 2" RIGID INSULATION

EXG

ROOF MEMBRANE FLASHING STRIP

CONT CANT STRIP

WD 1x TRIM (PNT)

CONT BACKER ROD & SEALANT

WEATHER BARRIER

FLASHING FROM SHEATHING

OVER FLANGE OF EXG MTL

FLASHING

3"

SST TERM BAR

CONT SEALANT (TYP)

FULLY ADHERE ROOF MEMBRANE

TO PARAPET WALL

CONT CANT STRIP

WD BLK'G AS REQ'D BY ROOFING

MFR'R FOR INSTALLATION

NEW ROOF MEMBRANE ON

1/2" SUBSTRATE BOARD

ON 2" RIGID INSULATION

EXG

1'

- 0

ROOF MEMBRANE EXPANSION

JOINT COVER

COMPRESSIBLE ROD

COMPRESSIBLE INSULATION

CONT EDGE SEALANT PER

ROOF MEMBRANE MFR'R

CONT CANT STRIP

NEW ROOF MEMBRANE (LAP

INTO EXPANSION JOINT) ON 1/2"

SUBSTRATE BOARD ON 2" RIGID

INSULATION

PT WD 2x6 BLK'G. STAND

ON EDGE @ SIM

EXG

CONT SEALANT, PER MEMBRANE ROOF MFR'R (TYP)

NEW ROOF MEMBRANE ON 1/2" SUBSTRATE

BOARD ON 2" RIGID INSULATION

ROOF MEMBRANE CURB FLASHING,

EXTEND 3'-0" BEHIND ASPHALT SHINGLES

PRE FINISHED MTL FLASHING

FLASH ICE & WATER SHIELD OVER NEW

MEMBRANE ROOFING & OVER MTL FLASHING

NEW ASPHALT SHINGLE ROOFING

PT WD BLK'G AS REQ'D BY ROOFING MFR'R

EXG CONT ICE & WATER SHIELD UNDER

ASPHALT SHINGLE ROOFING (TYP)

4"

DRAIN LEADER, EXG

ROOF DECK, EXG

STRAINER, EXG

NEW ROOF INSULATIONWELD/ADHERE MEMBRANE

FLASHING TO ROOF MEMBRANE &

PROVIDE EDGE SEALANT PER

ROOFING MFR

RECOMMENDATIONS (ALL SIDES)

MEMBRANE FLASHING,

WRAP INTO DRAIN

2' - 0"

2' - 0"

2"

OVERFLOW ROOF DRAIN @ SIM

4"

6"

PRE FINISHED MTL WALL TO

ROOF FLASHING

ASPHALT SHINGLES ON

CONT ICE & WATER SHIELD

ON EXG ROOF SHEATHING

CONT GALV MTL CLEAT

LAP ICE & WATER SHIELD UP WALL

LAP ROOF MEMBRANE OVER WALL TO

ROOF FLASHING

PRE FINISHED MTL FLASHING W/

HEMMED EDGE

ROOF MEMBRANE FLASHING W/ CONT EDGE

SEALANT PER ROOF MEMBRANE MFR'R

ROOF MEMBRANE ON 1/2" SUBSTRATE

BOARD ON TAPERED INSULATION

6"

EXG CONC WALL

CONT SEALANT

PRE FINISHED MTL COUNTER

FLASHING

PRE FINISHED WALL TO ROOF

FLASHING

ASPHALT SHINGLES ON

CONT ICE & WATER SHIELD

ON EXG ROOF SHEATHING

CONT GALV MTL CLEAT

TAPERED INSULATION TO SLOPE

PER ROOF PLANS IN MECHANICAL

CORE ROOF AREAS

LAP ICE & WATER SHIELD UP WALL

1 1 /2"

6"

OV

ER

LA

P

(T

YP

4"

6"

EXG COPPER COPING W/

NEW CONT SST CLEAT

LAP ICE & WATER SHIELD

DOWN FASCIA

EXG WD 2x4 TRIM

EXG VERTICAL WD SIDING & MTL

FLASHING

EXG

PRE FINISHED MTL CURB TO ROOF FLASHING

CONT GALV MTL CLEAT

ASPHALT SHINGLES ON

CONT ICE & WATER SHIELD

ON EXG ROOF SHEATHING

NEW ROOF MEMBRANE ON

1/2" SUBSTRATE

BOARD ON 2" RIGID

INSULATION

PRE FINISHED MTL FLASHING

FLASH ICE & WATER SHIELD OVER NEW

MEMBRANE ROOFING & OVER MTL FLASHING

NEW ASPHALT SHINGLE ROOFING

EXG

CONT ICE & WATER SHIELD UNDER ASPHALT

SHINGLE ROOFING (TYP)

STRAINER, EXG

WELD/ADHERE MEMBRANE FLASHING TO

ROOF MEMBRANE & PROVIDE EDGE

SEALANT PER ROOFING MFR

RECOMMENDATIONS (ALL SIDES)

MEMBRANE FLASHING,

WRAP INTO DRAIN (TYP)

LAP ROOF MEMBRANE FLASHING UP CURB,

OVER ICE & WATER SHIELD & UNDER MTL

FLASHING

CONT CANT STRIP

EXG COPPER COPING W/

NEW CONT SST CLEAT

LAP ICE & WATER SHIELD

DOWN FASCIA

EXG WD 2x4 TRIM SALVAGED

& REINSTALLED (PNT)

EXG VERTICAL WD SIDING

& MTL FLASHING

EXG

PRE FINISHED MTL CURB TO ROOF FLASHING

CONT GALV MTL CLEAT

ASPHALT SHINGLES ON

CONT ICE & WATER SHIELD

ON EXG ROOF SHEATHING6"

(2) PT WD 2x4 BLK'G

WD 1x TRIM (PNT)

WEATHER BARRIER

FLASHING FROM SHEATHING

OVER FLANGE OF EXG MTL

FLASHING

CONT BACKER ROD &

SEALANT (TYP)

3"

INTERLOCK EDGE OF ROOF PANEL

WITH DRIP EDGE

GALV MTL DRIP EDGE W/ HEMMED EDGE

CONT ICE & WATER SHIELD, LAP

DOWN FASCIA

1/2" ROOF SHEATHING ON 2" RIGID

INSULATION ON (2) LAYERS 3/4" ROOF

SHEATHING, RE: STR

STANDING SEAM MTL ROOFING

WD 1x6 FASCIA TRIM (STAIN)

PRE FINISHED 4" MTL GUTTER

PRE FINISHED MTL RAFTER END CAP.

FORM FROM SINGLE PIECE OF MTL

RIVET, COLOR TO MATCH FLASHING

SHEET MTL SCREW TO FASTEN TOP,

CONCEALED BEHIND T&G SOFFIT

EXPOSED WD 4x6 RAFTER TAIL BEYOND

(STAIN)

CONT BACKER ROD & SEALANT (TYP)

CEDAR T&G SOFFIT BOARDS (STAIN)

REMOVABLE EXPANDED

MTL LEAF GUARD

STANDING SEAM MTL ROOF ON CONT ICE

& WATER SHIELD ON 1/2" ROOF

SHEATHING ON 2" RIGID INSULATION ON

(2) LAYERS 3/4" ROOF SHEATHING, RE: STR

4"

CONT 'Z' CLEAT BY ROOF MFR'R

PRE FINISHED MTL RAKE FLASHING W/

CONT CLEAT

LAP ICE & WATER SHIELD DOWN

FASCIA (TYP)

WD 1x6 FASCIA TRIM (STAIN)

BUILDING PAPER

PT WD 2x4 BLK'G

CEDAR T&G SOFFIT BOARDS (STAIN)

CONT BACKER ROD & SEALANT (TYP)

R26

TLTNEMTR

AP

E D

UCIRGAFO

ER

U

PACIFIC NORTHWEST RESEARCH STATION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

OF

Group/Firm:

Forest

Design:

Sheet Title:

Sheet

Sub Sheet:

Checked:

Date:

CORVALLIS FORESTRY

SCIENCES LABORATORY

CFSL HVAC REPAIRS & ENERGY UPGRADES

ROOF DETAILS A.411

CHAMBERLIN

P. HUMMEL

W. DUECKER

03/14/16CORVALLIS, OREGON 20

0' 3"

6"0' 3"

6" A.411

COPPER COPING DETAIL1

0' 3"

6"0' 3"

6" A.411

TERM BAR ROOF DETAIL8

0' 3"

6"0' 3"

6" A.411

ROOF EXPANSION JOINT DETAIL10

0' 3"

6"0' 3"

6" A.411

MEMBRANE TO SHINGLES ROOF DETAIL4

0' 3"

6"0' 3"

6" A.411

TYPICAL ROOF DRAIN DETAIL9

0' 3"

6"0' 3"

6" A.411

ASPHALT SHINGLE ROOF DETAIL @ DRIP EDGE7

0' 3"

6"0' 3"

6" A.411

ASPHALT SHINGLE TERMINATION DETAIL @ CONC6

0' 3"

6"0' 3"

6" A.411

LAB SCIENCES COPPER COPING DETAIL3

0' 3"

6"0' 3"

6" A.411

ROOF DRAIN DETAIL @ SHINGLES & MEMBRANE5

0' 3"

6"0' 3"

6" A.411

COPPER COPING RAKE DETAIL @ SHINGLES2

0' 3"

6"0' 3"

6" A.411

GUTTER DETAIL @ MTL ROOF12

0' 3"

6"0' 3"

6" A.411

METAL ROOF RAKE DETAIL11

PRE-MOLDED PIPE

FLASHING

CONT SEALANT (TYP)

SST CLAMPING RING

NEW ROOF MEMBRANE ON 1/2"

SUBSTRATE BOARD ON 2" MIN RIGID

INSULATION ON EXG ROOF

ROOF MEMBRANE FLASHING W/

CONT EDGE SEALANT PER

MEMBRANE MFR'R

PRE-MOLDED PIPE FLASHING

CONT SEALANT (TYP)

SST CLAMPING RING

NEW ROOF MEMBRANE ON 1/2"

SUBSTRATE BOARD ON 2" MIN

RIGID INSULATION ON EXG ROOF

STL PIPE PENETRATION, RE: STR

FUTURE RTU STRUCTURAL ATTACHMENT

MA

TC

H

EX

G

SS

T

CO

PI

NG

5"

SLOPE 1"

"A

BO

VE

FI

NI

SH

RO

OF

IN

G

LE

VE

L

STL PIPE 1 1/2 STD GUARDRAIL

(PNT), RE: STR FOR

ATTACHMENT DETAIL. OMIT @ SIM.

SST MTL COPING W/

CONT CLEATS. REPLACE EXG @ SIM.

LAP ROOFING OVER

PARAPET

PT WD 2x BLK'G

NEW ROOF MEMBRANE ON 1/2"

SUBSTRATE BOARD ON TAPERED

RIGID INSULATION, 2" @ MIN DEPTH

CO…