Specs.docx

DOCX document 877 KB Posted

Attached to
Prospect Ranger Station Water and Wastewater System Replacement
Solicitation number
AG-04N7-S-15-0016
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Amendment_No.3_SF30.pdf PDF
AmendmentNo.3_Revised_Drawings.pdf PDF
AmendmentNo.3_Summary.docx DOCX document
Amendment_No.2_SF_30.pdf PDF
AmendmentNo.1Reviseddrawing_Sheet_C8.pdf PDF
AmendmentNo.1Revised_Specs.docx DOCX document
Amendment_No.1SF_30.pdf PDF
AmendmentNo.1SummaryofChanges.docx DOCX document
Construction_RFP_ProspectRSWaterReplacementSystem.docx DOCX document
REVISED_DRAWINGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS LIST

SECTION TITLE

DIVISION 1 – GENERAL REQUIREMENTS

00301DEFINITION OF BID ITEMS
01010SUMMARY OF WORK
01330SUBMITTALS
01430CONTRACTOR QUALITY CONTROL
01570TEMPORARY CONTROLS
01770PROJECT CLOSEOUT
01785OPERATION AND MAINTENANCE MANUAL

DIVISION 2 - SITEWORK

02220ABANDON/REMOVE UTILITIES
02221SITE DEMOLITION
02318EXCAVATION AND BACKFILL FOR UTILITIES
02370SEDIMENT AND EROSION CONTROL
02500SURFACE RESTORATION
02530SANITARY SEWER
02531SANITARY SEWER MANHOLES, FRAMES AND COVERS
02540SANITARY SEWAGE TREATMENT SYSTEM
02543SEPTIC TANKS
02544SEPTIC TANK DEMOLITION
02547SUBSURFACE DISPOSAL SYSTEMS
02660WATER DISTRIBUTION
02661POLYVINYL CHLORIDE PIPE

DIVISION 3 - CONCRETE

03300 CAST-IN-PLACE CONCRETE

DIVISION 10 - SPECIALTIES

10306 PRE-FABRICATED UTILITY BUILDING SITE PREPARATION

DIVISION 11 - EQUIPMENT

11311 PUMP LIFT STATION

DIVISION 16 – ELECTRICAL

16010GENERAL TECHNICAL PROVISIONS
16050BASIC MATERIALS AND METHODS
16115SPECIALIZED ELECTRICAL MATERIALS
16119FIBERGLASS TRANSCLOSURE
16200CONDUIT AND PULL BOXES
16400UNDERGROUND CONTROL CABLE AND POWER DISTRIBUTION
16500LIGHTING
16900CONTROLS AND INSTRUMENTATION

SECTION 00301 DEFINITION OF BID ITEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The intent of this section is to explain, in general; what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in the Schedule of Items

B. The summation of all bid items under the Schedule of Items shall equal all work required by the Drawings and Specifications regardless of whether individual items of work are described under the bid item descriptions or not.

C. Work:

1. Furnishing all labor, supervision, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.

D. Payment:

1. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these Specifications, as shown on the Drawings, and as staked in the field.

2. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.

E. Determination of Quantities:

1. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.

2. Quantity Measurements:

a. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ) or Lump Sum Quantity (LSQ).

b. The Contractor shall compute the quantities for periodic progress payments; the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.

c. All Contractor measurements are subject to verification.

d. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.

e. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

3. The following measurements and calculations are used to determine contract quantities:

a. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

b. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three dimensional methods.

c. Structures shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

d. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, and under drains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipes shall be measured along center of invert.

e. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

f. For standard manufactured items--such as fence, wire, plates, rolled shapes, pipe conduits--identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

F. Unit of Measurement:

1. Payment shall be by units defined and determined according the U.S. Standard measure and by the following:

2. Cubic Yard (CY) - A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

3. Each (EA): One complete unit, which may consist of one or more parts.

4. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the item being measured. Do not measure overlaps.

5. Lump Sum (LS): One complete unit, not directly measured. The bid amount is complete payment for all work described in the contract and necessary to complete the work for the item.

6. Pound (LB): For sacked or packaged material, measurement shall be the net weight as packed by the manufacturer.

7. Square Foot (SF): Measured on a plane parallel to the surface being measured.

8. Square Yard (SY): Measured on a plane parallel to the surface being measured.

G. Method of Measurement: One of the following methods of measurement for determining final payment is designated on the Schedule of Items.

1. Designed Quantities (DQ):

These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data includes the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO

b. As a result of the CO determining that errors exist in the original design that causes a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

2. Actual Quantities (AQ):

These estimated quantities which are determined from actual measurements of completed work.

3. Lump Sum Quantities (LSQ)

These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

H. Capping and abandoning of existing water lines not specifically called out in a pay item but shown on the Drawings is incidental to the work and no separate pay item will be included for this work.

I. Providing valve keys shall be incidental to the work. Provide, at a minimum, two valve keys for each type/size of valve nut.

1.2 BID ITEM 1 & OPTIONAL ITEM 36 - MOBILIZATION

Measurement for payment for mobilization shall be on a lump sum all required basis. This work shall consist of preparatory work and operations necessary for the movement of personnel equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

Measurement and payment: Payment shall be made on a lump sum basis as follows: When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contact amount, whichever is less shall be paid. When 10 percent or more of the original contact amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, shall be paid. Upon completion of all on the project, any unpaid amount for mobilization shall be paid.

Payment shall be made at the lump sum price stated in the Schedule of Items.

1.3 BID ITEM 2 & OPTIONAL ITEM 37 – PROJECT CLOSEOUT/O&M MANUALS/ RECORD DRAWINGS

Measurement and payment for the Project Closeout, Operations and Maintenance Manuals, and Record Drawings shall be made on a lump sum basis shall include all project closeout items including the punchlist, all operations and maintenance manuals for the pump, control panels, motors, motor regulator, and other O&M manuals as required. Record drawings shall include all submittals and re-submittals of hard-copy drawings. Payment shall be made at the lump sum price stated in the Schedule of Items for “Project Closeout/O&M Manuals/ Record Drawings".

1.4 BID ITEM 3 – SITE DEMOLITION

Measurement and payment for Site Demolition shall be made on a lump sum basis as called for on the Drawings and shall include the demolition and removal of the existing water tank building, the pressure tank, electrical equipment, fire hydrants and housing, and all related items to those structures. Measurement and payment shall include disposal, haul, site work necessary to bring the water tank building site to grade, removal of concrete if necessary, and all fees related to disposal. Payment shall be made at the lump sum price stated in the Schedule of Items for “Site Demolition".

1.5 BID ITEM 4 – SITE PREPARATION

Measurement and payment for the Site Preparation shall be made on a lump sum basis as called for on the Drawings and shall include excavation, site grading, base rock, compaction, preparation for the pump house building, etc. Payment shall be made at the lump sum price stated in the Schedule of Items for “Site Preparation".

1.6 BID ITEM 5 & OPTIONAL ITEM 39 – ROCK EXCAVATION

Measurement for payment shall be made on a cubic yard basis for rock excavation. Area in cubic yards shall be computed as the actual depth of rock from the top of the rock encountered to the depth of the bottom of the pipe to the width as measured the inside pipe diameter plus 18 inches. Over excavation or excavating wider trenches shall not be paid for as additional excavation. When rock is encountered the contractor shall notify the CO immediately. The CO will note the depth of rock, the beginning and ending station that rock is encountered, and the size of the pipe. The measurement by the CO will be the pay amount. Payment shall be made at the unit price stated in the Schedule of Items for “Rock Excavation”.

1.7 BID ITEM 6 & OPTIONAL ITEM 38 – EROSION CONTROL

Measurement for payment for erosion control shall be measured on a lump sum basis and shall include all excavation, backfill, erosion control measures, monitoring of erosion control, replacement of the erosion control measures as necessary, removal of the erosion control measures at the completion of the project, restoration of the area, and other items. Payment shall be made at the unit price stated in the Schedule of Items for "Erosion Control".

1.8 BID ITEM 7 – GRAVEL SURFACE RESTORATION

Measurement for payment shall be made on a square yard basis for this bid items. Area in square yards shall be computed as the length along centerline of pipe times the allowable pay width of surface restoration. Areas which may overlap, either lengthwise or widthwise, will be included only once. Double payment for overlap areas will not be made. The pay width of each type of restoration will be limited to the actual width restored or the pay limit listed in the following table, whichever is less, unless otherwise specifically shown on the Drawings or approved in writing by the CO.

Pay Width Each Side Trench Depth* Feet of Centerline (feet)

0-4
2
4-6
3 1/2
6-8
5 1/2
8-10
7 1/2
10-12
9 1/2

* Trench depth is the depth from the ground surface to the invert of the pipe.

Any gravel restoration necessary due to the Contractor's operation, but outside the specified pay widths, shall be done at the Contractor's own expense and at no cost to the Government. The pay widths listed above shall in no way limit the width of the trench as required for safety. The above widths only define pay limits.

Payment will be made at the unit bid prices as stated in the Schedule of Items, for "Gravel Surface Restoration.” There will be no separate payment for topsoil replacement, seeding, mulching, etc. These items shall be considered incidental to the work.

1.9 BID ITEMS 8, 9, 10, 11, 12, 13, 14, 15 - ___ -INCH WATER LINE

Measurement for payment for water line shall be measured on a linear foot basis. Lengths of pipe shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, thrust blocks, pipe penetrations, fittings, unions, couplings, abandoning existing water lines, disposal and haul of excess excavated material, flexible couplings and other items, except valves, meters, pressure gauges, and sample taps, installed in the line as detailed on the Drawings. There is no specified pay depth for water lines. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Schedule of Items for " -inch Water Line" for the various sizes and types as listed.

Temporary removal and re-installation or relocation of signs, posts, etc., shall be considered incidental to the work.

There are two types of water line on this project; there are separate bid items for Schedule 40 and Schedule 80 pipe. The different pipe types are noted in the title.

1.10 BID ITEM 16 – PUMPHOUSE INTERIOR

Measurement for payment for the pumphouse interior shall be made on a lump sum basis as called for in these specifications and on the Drawings. Pumphouse interior shall include all items to make the Pumphouse interior complete except those items called for under individual bid items. Pumphouse interior components include the unit heater, exhaust fan, plug fittings, unions, wall brackets and mounting hardware, hose, hose rack, ball valves, hose bibs (including hose bibs on the building exterior and for RV sites), floor stands not associated with flow meters, pressure gauges on the piping system (not the pressure gauge in the pressure gauge assembly), tees, 1-1/2” schedule 80 PVC pipe on the building interior, reducers, flow switch, fittings, bushings, water level gauge at wells, and all other items necessary to make the Pumphouse interior complete.

Payment shall be made at the lump sum bid price stated in the Schedule of Items for "Pumphouse Interior."

1.11 BID ITEM 17 – WATER SYSTEM GATE VALVE

Measurement for payment for water system gate valves within the distribution system shall be made on a per each basis regardless of size for each valve installed and shall include the valve as specified herein, including excavation, bedding, backfill, connections, etc. Payment shall be made at the unit price stated in the Schedule of Items for "Water System Gate Valve."

1.12 BID ITEM 18 – PRESSURE GAUGE ASSEMBLY

Measurement for payment for pressure gauge assembly shall be made on a per each basis for each assembly installed. Payment shall be made at the unit price stated in the Schedule of Items for "Pressure Gauge Assembly."

1.13 BID ITEM 19 – SAMPLE TAP

Measurement for payment for the sample tap shall be made on a per each basis for each sample tap installed. Payment shall be made at the unit price stated in the Schedule of Items for "Sample Tap."

1.14 BID ITEM 20 – PRESSURE RELIEF VALVE

Measurement for payment for pressure relief valves shall be made on a per each basis for each valve installed. Payment shall be made at the unit price stated in the Schedule of Items for "Pressure Relief Valve."

1.15 BID ITEM 21 – 1-1/2- INCH SILENT CHECK VALVE

Measurement for payment for silent check valves shall be made on a per each basis for each valve installed. Payment shall be made at the unit price stated in the Schedule of Items for "1 1/2-inch Silent Check Valve."

1.16 BID ITEM 22, 23 – RESIDENTIAL WATER METER & FLOW METER

Measurement for payment for water meters, and flow meters shall be made on a per each basis regardless of size for each meter installed as shown on the Drawings. Residential water meters include meter, curb stop valve, angle valve, DCVA, vault and all other items needed to make the meters complete. Flow Meter (FM) includes the meter, meter support, connections, and all other items to make the meter complete.

Payment shall be made at the unit price stated in the Schedule of Items for "Residential Water Meter", and “Flow Meter.”

1.17 BID ITEM 24 – REDUCED PRESSURE BACKFLOW ASSEMBLY

Measurement for payment for Reduced Pressure Backflow Assembly (RPBA) shall be made on a per each basis for each RPBA installed. This item includes the RPBA unit, excavation, box, connections, FRP enclosure and all other items to make the RPBA complete. Payment shall be made at the unit price stated in the Schedule of Items for "Reduced Pressure Backflow Assembly."

1.18 BID ITEM 25 – BLOWOFF/ FLUSHING HYDRANT

Measurement for payment for Blowoffs/ Flushing Hydrant shall be made on a per each basis for each blowoff or flushing hydrant installed. This item includes the pipe, concrete, excavation, box, valves, and all other items to make the blowoff or flushing hydrant complete. Payment shall be made at the unit price stated in the Schedule of Items for "Blowoff/ Flushing Hydrant."

1.19 BID ITEM 26 – BOLLARD

Measurement for payment for Bollards shall be made on a per each basis for each bollard installed. This item includes the pipe, concrete, painting, excavation, potholing, and all other items to make the bollard complete. Payment shall be made at the unit price stated in the Schedule of Items for "Bollard."

1.20 BID ITEM 27 – PRESSURE TANKS

Measurement and payment for the Pressure Tanks shall be made on a lump sum basis as called for on the Drawings and shall include the pressure tanks, installation, connections, couplings, gauges, drains, stands, valves, unions, pressure switch, and all other items to make the pressure tanks complete. Drain hoses and hose hangers shall be incidental. Payment shall be made at the lump sum price stated in the Schedule of Items for “Pressure Tanks".

1.21 BID ITEM 28 – CONCRETE PAD

Measurement for payment for the concrete pad in front of the pumphouse, shall be made on a square foot basis for each pad installed and shall include concrete reinforcement, forms, sealant, base rock, grading, and all other items necessary to make the concrete pad complete. Payment shall be made at the unit price stated in the Schedule of Items for "Concrete Pad."

1.22 BID ITEM 29 – POWER CONNECTION

Measurement and payment for the power connection shall be made on a lump sum basis as called for on the Drawings and shall include the connection into the power panel, conduit and wiring inside the building, manual transfer switch, building penetration and wiring to 5' from the face of the building, connectors, supports, and all other items to make the power connection complete. Payment shall be made at the lump sum price stated in the Schedule of Items for "Power Connection".

1.23 BID ITEM 30 – ELECTRICAL POWER AND LIGHTS FOR BUILDING

Measurement and payment for the power and lighting for the new pumphouse building shall be made on a lump sum basis as called for on the Drawings and shall include the power panel, internal conduit, wiring, receptacles, switches, cut-off switch, penetration sealants, lights, supports, alarms, and all other items to make the power and lights complete. Payment shall be made at the lump sum price stated in the Bid Schedule of Items for "Electrical Power and Lights for Bldg".

1.24 BID ITEM 31 – PUMP CONTROL PANEL

Measurement for payment for the well pump control panel shall be made on a lump sum basis for panel installed and shall include the enclosure, power connection to the panel, programming, shop drawings, gaskets, grommets, and all other items to make the panel complete. Payment shall be made at the unit price stated in the Schedule of Items for "Pump Control Panel".

1.25 BID ITEM 32 – MOTOR STARTER

Measurement for payment for the motor controller (also called motor regulator) shall be made on a lump sum basis as called for on the Drawings including and shall include the controller, enclosure, power connection, shop drawings, gaskets, grommets and all other items to make the controller complete. Payment shall be made at the lump sum price stated in the Schedule of Items for "Motor Starter".

1.26 BID ITEM 33 – FIBERGLASS RPBA ENCLOSURE

Measurement for payment for the RPBA enclosure shall be made on a per each basis for each enclosure installed and shall include the enclosure, shop drawings, gaskets, tie- down anchorage and all other items to make the cover complete. Payment shall be made at the unit price stated in the Schedule of Items for "Fiberglass RPBA Enclosure".

1.27 BID ITEM 34 – CONDUIT

Measurement for payment for conduit shall be measured on a linear foot basis. Lengths of conduit shall be determined by measuring along the centerline of the conduit as installed from one end to the other. This item shall include all excavation, bedding, backfill, fittings, wiring, conduit, conduit markers, location wire, disposal and haul of excess excavated material, couplings and other items, except handhole pull boxes, installed in the line as detailed on the Drawings. There is no specified pay depth for conduits. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Schedule of Items for "Conduit". Temporary removal and re-installation or relocation of signs, posts, etc., shall be considered incidental to the work.

1.28 BID ITEM 35 – HANDHOLE PULL BOXES

Measurement and payment for handhole pull boxes shall be made on a per each basis as called for on the Drawings and shall include the water tight pull box and lid, excavation, backfill, disposal of any excess excavation, etc. Payment shall be made at the unit price stated in the Schedule of Items for "Handhole Pull Box".

1.29 OPTIONAL BID ITEM 40, 41 – ___-INCH SANITARY SEWER

Measurement for payment for 4 and 6-inch sanitary sewer shall be measured on a linear foot basis. Lengths of pipe shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, pipe couplings, abandoning existing sanitary sewer lines, disposal and haul of excess excavated material, and testing. There is no specified pay depth for sanitary sewer lines. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Schedule of Items for "__inch Sanitary Sewer". Temporary removal and re-installation or relocation of signs, posts, etc., shall be considered incidental to the work.

1.30 OPTIONAL BID ITEM 42 – SEWER MANHOLE

Measurement for payment for manholes shall be made on a per each basis for each manhole installed and shall include the fittings, pipe, frame and cover, concrete pad, excavation, bedding, and disposal of all excess excavation material.

Payment shall be made at the unit price stated in the Schedule of Items for "Sewer Manhole."

1.31 OPTIONAL BID ITEM 43 – SANITARY SEWER CLEANOUTS

Measurement for payment for sanitary sewer cleanouts shall be made on a per each basis for each cleanout installed and shall include the fittings, pipe, cleanout frame and cover, concrete pad, excavation, bedding, and disposal of all excess excavation material.

Payment shall be made at the unit price stated in the Schedule of Items for "Sanitary Sewer Cleanouts."

1.32 OPTIONAL BID ITEM 44 – 2-INCH FORCEMAIN

Measurement for payment for forcemain shall be measured on a linear foot basis. Lengths of pipe shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, pipe couplings, abandoning existing sanitary sewer lines, disposal and haul of excess excavated material, and testing. There is no specified pay depth for forcemains. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Schedule of Items for "2-inch Forcemain". Temporary removal and re-installation or relocation of signs, posts, etc., shall be considered incidental to the work.

1.33 OPTIONAL BID ITEM 45 – SEPTIC TANKS

Measurement for payment for septic tanks shall be made on a per each basis for each tank installed and shall include the connections, fittings, pipe, tank frame and cover, excavation, bedding, disposal of all excess excavation material, and all other items to make the tank complete. Payment shall be made at the unit price stated in the Schedule of Items for "Septic Tanks."

1.34 OPTIONAL BID ITEM 46 – EFFLUENT TREATMENT SYSTEM

Measurement and payment for the Effluent Treatment System shall be made on a lump sum basis as called for on the Drawings and shall include the excavation, installation, testing and startup, all materials necessary, connections, power connection conduit, connection to the existing power panel in building 2007, pumps as required for mixing and dosing, tanks, and all other items to make the effluent treatment system complete. Payment for this item begins at the coupling of the sanitary sewer to the treatment system and ends at the coupling to the force main at the outlet of the dosing system. Payment shall be made at the lump sum price stated in the Schedule of Items for “Effluent Treatment System"

1.35 OPTIONAL BID ITEM 47 – SEPTIC TANK DEMOLITION

Measurement and payment for the Septic Tank Demolition shall be made on a per each basis as called for on the Drawings and shall include the pumping, excavation, fill, disposal, haul, disposal fees, surface restoration, and all other items necessary to demolish the existing septic tanks. Payment shall be made at the unit price stated in the Schedule of Items for “Septic Tank Demolition".

1.36 OPTIONAL BID ITEM 48 – DISTRIBUTION BOX

Measurement for payment for the distribution box shall be made on a per each basis for each box installed and shall include the connections, fittings, pipe, frame and cover, inspection ports, excavation, bedding, disposal of all excess excavation material, and all other items to make the distribution box complete. Payment shall be made at the unit price stated in the Schedule of Items for "Distribution Box."

1.37 OPTIONAL BID ITEM 49 – 4-INCH DRAINFIELD PIPE

Measurement for payment for 4-inch drainfield pipe shall be measured on a linear foot basis. Lengths of pipe shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, pipe couplings, disposal and haul of excess excavated material, and testing.

There is no specified pay depth for drainfield pipe. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Schedule of Items for "4- inch Drainfield Pipe".

1.38 OPTIONAL BID ITEM 50 – SANITARY SEWER LIFT STATION

Measurement and payment shall be on a per each basis as called for on the drawings. Measurement shall include couplings, control panels, pumps, guide rails, pump station structure, electrical power, conduit, connection to an existing power panel within a residential building, shop drawings, calculations, valves, floats, and all other items necessary to make the pump station complete. Payment shall be made at the unit price stated on the Schedule of Items for "Sanitary Sewer Pump Station".

1.39 OPTIONAL BID ITEM 51 – ASPHALT SURFACE RESTORATION

Measurement for payment shall be made on a square yard basis for this bid items. Area in square yards shall be computed as the length along centerline of pipe times the allowable pay width of surface restoration. Areas which may overlap, either lengthwise or widthwise, will be included only once. Double payment for overlap areas will not be made. The pay width of each type of restoration will be limited to the actual width restored or the pay limit listed in the following table, whichever is less, unless otherwise specifically shown on the Drawings or approved in writing by the CO.

Pay Width Each Side Trench Depth* Feet of Centerline (feet)

0-4
2
4-6
3 1/2
6-8
5 1/2
8-10
7 1/2
10-12
9 1/2

* Trench depth is the depth from the ground surface to the invert of the pipe.

Any asphalt restoration necessary due to the Contractor's operation, but outside the specified pay widths, shall be done at the Contractor's own expense and at no cost to the Government. The pay widths listed above shall in no way limit the width of the trench as required for safety. The above widths only define pay limits.

Payment will be made at the unit bid prices as stated in the Schedule of Items, for "Asphalt Surface Restoration." There will be no separate payment for asphalt concrete joint sealing, topsoil replacement, seeding, mulching, etc. These items shall be considered incidental to the work

PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)

END OF SECTION

00301 - 14/12

DEFINITION OF BID ITEMS

Water and Wastewater Systems Prospect Ranger Station

SECTION 01010 SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

A. BASE WORK for this project consists of:

1. Installation of new waterline and related valves, fittings and connection to existing service connections;

2. Site preparation for a (Government Furnished) precast concrete building “pump house”, piping connection to two existing wells, nine pressure tanks, pipe, fittings, interior electrical systems for the building including control panels, power, transfer switch, and lighting;

3. Installation of water level gauges at both wells, installation of fiberglass enclosure for new reduced pressure backflow assembly.

4. Demolition of structures.

B. SEWAGE SYSTEM OPTION ITEM: Installation of three new 1,000 gallon septic tanks, an effluent filter treatment system, a new dosing tank and pumping system, sanitary sewer, electrical connections, conduit, and a new drainfield; demolition of existing septic tanks;

1. Erosion control and site restoration;

2. Other related items to complete the above work.

C. ASPHALT RESTORATION OPTION ITEM:

1. Restoring existing asphalt surfaces from project excavation.

D. Government Furnished Items: precast concrete building (pump house).

E. Listed below are the responsibilities for each entity involved with the building placement and preparation:

1. The Government’s responsibilities:

a. Purchase of building and installation services through supplier.

b. Coordination with supplier for all building dimensions and penetrations for water lines, electrical and exhaust fan.

c. Coordination with supplier and the Contractor for delivery date.

d. Inspection of work performed by supplier to verify building fabrication and installation.

2. Building supplier’s responsibilities:

a. Complete fabrication and delivery of the building.

b. Placement of building penetrations shown on drawings.

c. Placement of the building, including all crane work.

d. Installation of doors and door hardware.

e. Caulking, painting, etc. of building.

3. The Contractor’s responsibilities:

a. Initial site preparation.

b. Construction of aggregate building pad.

c. All survey work as required to establish horizontal and vertical building location in accordance the Drawings.

d. Provide onsite representative and surveyor (as needed) to work with the building supplier throughout the installation process to insure correct placement location.

e. All other site work adjoining the buildings including grading and aggregate surfacing as shown on the Drawings.

f. Placement of other building penetrations as required for the installation of conduit and other equipment.

g. Installation of all mechanical, electrical, and other equipment as shown on the Drawings.

h. Final building touch-up as needed after installation of all equipment.

1.2 LOCATION

A. This project is located at the Prospect Ranger Station. The Ranger Station is located on U.S. Highway 62 approximately 41 miles northeast of the City of Medford in Jackson County, Oregon.

1.3 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the project is approximately 2,650 feet above mean sea level. The construction site can experience snowfall and cold temperatures, with snow possible on the ground typically from November through March.

B. In-depth soil surveys have not been performed; however, materials in the project are excavatable, bearing primary alluvial materials and rock outcroppings. Subsurface materials could include sands, gravels, silts/clays, boulders, rock, etc. Well logs are available.

C. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property. During fire season, additional restrictions may apply to the work. Additional information regarding these restrictions can be found in Section J of this Contract.

1.4 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations, including use of project site, during construction period. Contractor's use of premises is limited by the Government's right to perform work or to retain other contractors on portions of project and by the use of the residents and workers at the site.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will not be permitted.

C. Confine storage of materials to areas as approved by the Contracting Officer (CO).

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all areas.

E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with the CO and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

F. Existing Utilities: Notify the CO and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. See Section 02318- Excavation and Backfill for Utilities

2. Interruption of Existing Utility Service: Notify the CO, 72 hours in advance of any interruption of existing utilities. Utility shut off shall be limited to 6 hours per occurrence, or as approved by CO.

1.5 FIELD VERIFICATION

A. Field verify all new and existing dimensions and new and existing utility locations/elevations affecting the work of this contract before ordering products.

PART 2 PRODUCTS NOT USED PART 3 EXECUTION NOT USED

END OF SECTION

01010 - 3/3

SUMMARY OF WORK

Water and Wastewater Systems Prospect Ranger Station

SECTION 01330 SUBMITTALS

PART 1 GENERAL

1.2 DESCRIPTION

A. The work of this section consists of submittal requirements before and during construction.

B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1.3 RELATED REQUIREMENTS

A. Closeout submittals - Section 01770.

1.4 SUBMITTAL AND APPROVAL PROCEDURES

Water and Wastewater Systems Prospect Ranger Station 01330-3/3

SUBMITTALS

A. As specified in the individual sections, forward submittals to CO at least 14 days before need for approval. Unless a different number is specified, submit three reproducible original and three copies of each shop Drawing, three copies of manufacturer's catalog sheets (cut sheets), three specimens of each sample, and three copies of all other submittals requested.

1. Shop Drawings: Include the following information with each copy of shop Drawings:

a. Firm or entity that prepared each submittal clearly at the top of each submittal.

Name and address of the prime Contractor

b. Project name.

c. Date.

d. Date of revisions (when applicable).

e. Professional Engineer’s Stamp and Signature where required.

f. Contractor's certification that shop Drawing has been checked for compliance with contract documents.

g. Number and title of appropriate Specification Section and Drawing number and detail reference as appropriate.

h. Details of fabrication, assembly and erection including connections and engagement to contiguous work.

i. Materials used and manufacturer’s information.

j. All required dimensions.

k. The term "by others" shall not be used. All work to be performed by others shall be identified by Contractor or subcontractor name, discipline, or trade.

2. Samples: Samples shall be large enough to illustrate clearly the functional characteristics.

3. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

4. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

B. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

C. Approved Equals:

1. For each item proposed as an "approved equal," submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.

D. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.

E. Submittal Numbering:

1. Number each submittal consecutively.

2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.

3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.

PART 2 PRODUCTS NOT USED PART 3 EXECUTION NOT USED

SECTION 01430 CONTRACTOR QUALITY CONTROL

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of preparing and executing a quality control program.

B. Testing for this project shall include water pipe disinfection testing and all pipe leakage testing, and start-up testing on all systems.

1 .2 SUBMITTALS

A. As specified in Section 01330.

B. Test Reports:

1. Submit Test Information Sheets with Quality Control Daily Reports when Testing has been done.

2. Submit failing test results and proposed remedial actions within two days of noted deficiency.

C. Off-Site Inspection Reports: Submit prior to shipment.

1 .3 QUALITY ASSURANCE

A. General:

1. The quality of all work shall be the responsibility of the Contractor.

2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and Drawings.

3. Test reports shall be completed by person performing the test.

4. The CO may designate locations of tests.

B. Testing Laboratory and Equipment:

5. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.

6. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with National Bureau of Standards requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.

PART 2 PRODUCTS NOT USED.

PART 3 EXECUTION

3 .1 OFF-SITE CONTROL

A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.

3 .2 ON-SITE CONTROL

A. Initial Phase:

1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.

2. Review control testing procedures to ensure compliance with contract requirements.

B. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.

3 .3 DOCUMENTATION

A. Maintain Quality Control Reports and Test Report Information Sheets of quality control activities and tests.

3 .4 ENFORCEMENT

A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer.

Water and Wastewater Systems Prospect Ranger Station 01430-2/2

CONTRACTOR QUALITY CONTROL

SECTION 01570 TEMPORARY CONTROLS

PART 1 GENERAL

1.1 DESCRIPTION

A. The work of this section consists of providing temporary controls.

PART 2 PRODUCTS NOT USED

PART 3 EXECUTION

3.1 HOUSEKEEPING

A. Keep project neat, orderly, and in a safe condition at all times.

B. Wet down or cover stockpiles and dry materials with tarps to prevent blowing dust. Covers shall be adequately anchored for all wind conditions.

C. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.

D. Utilize excavated material as soon as possible.

3.2 DISPOSAL

A. Stockpile excess excavated material (including rocks and boulders) that cannot be used in construction at staging area shown on the Drawings. Remove off National Forest Lands prior to project close-out

B. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of off Government property.

C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service property. Do not burn or bury refuse.

3.3 AIR AND WATER POLLUTION CONTROL

A. Provide and install all erosion control fencing and other measures as shown on the Drawings.

B. All chlorinated water shall be de-chlorinated and other contaminants removed prior to discharging to any storm drainage or natural waterways. All discharges of water from this project shall be approved by the Contracting Officer.

C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.

D. Do not dispose of volatile wastes or oils in storm or sanitary drains.

E. Do not allow waste materials to be washed into streams or bodies of water.

3.4 Water and Wastewater Systems Prospect Ranger Station 01570-2/2

TEMPORARY CONTROLS

SECTION 01770 PROJECT CLOSEOUT

PART 1 GENERAL

1.1 DESCRIPTION

A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.

1.2 SUBMITTALS

A. As specified in Section 01330

PART 2 PRODUCTS

2.1 CLEANING MATERIALS

A. As recommended by the manufacturer of surface to be cleaned.

PART 3 EXECUTION

3.1 CLEANING

A. Prior to project close-out, Contractor shall remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site.

3.2 PROJECT RECORD DRAWINGS

A. Maintain one complete full-size set of contract Drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all water lines, abandoned utilities, foundations, and other underground obstructions shall be identified by dimensions from permanent structures (building corners, signs, etc.).

B. Keep record Drawings current. Make record Drawings available to the CO for inspection at any time and at invoices. At the completion of the project and upon request, the CO shall review the redline markup Drawings.

C. On completion of the total project, modify Drawings to reflect the record drawing markups. Submit marked up project record drawings. Include all shop drawings, sketches, and additional Drawings that are to be included in the final set, with clear instructions showing the location of these drawings. All Drawings shall be hardcopy.

Water and Wastewater Systems Prospect Ranger Station 01770-2/2

PROJECT CLOSEOUT

3.3 CLOSEOUT SUBMITTALS

A. Submit before project close-out.

1. Project Record Drawings: As specified above.

2. Warranty Information: As specified in individual sections.

3. Spare Parts and Materials: As specified in individual sections.

4. Operations and Maintenance Manuals: As specified in section 01785.

5. All keys, locks, valve keys, spare parts and instruction materials as required by specifications or requested by the Contracting Officer.

SECTION 01785

OPERATION AND MAINTENANCE MANUAL

PART 1 GENERAL

1.1 DESCRIPTION

A. The work of this section consists of furnishing operation and maintenance data manuals.

1.2 SUBMITTALS

A. As specified in Section 01330

1.3 RELATED WORK

A. Project Record Drawings - Section 01770.

1.4 SCHEDULING

A. At start of project, begin accumulating operation and maintenance data and initiate an index. Install and index all data in binders within 30 days after delivery of items. As custom written data and test results are produced, add them to the operation and maintenance data file.

B. Keep operation and maintenance data current. Make operation and maintenance binders available to the Contracting Officer for inspection upon requests.

C. Furnish one complete set of operation and maintenance data to Contracting Officer for review.

D. Following receipt of review comments, contractor shall make corrections and deliver three completed sets of Operation and Maintenance data.

PART 2 PRODUCTS

2.1 BINDERS

A. White, commercial quality, hard back, three-ring, 2-inch maximum ring size, lever- locking type slant ring, with clear window pockets on front and side.

2.2 INDEX SYSTEM

A. Index sheet with mylar reinforced edges at binder holes and tabbed divider sheets with mylar reinforced edges and pre-printed numbered tabs aligned with numbers and title lines on index sheet.

Water and Wastewater Systems Prospect Ranger Station 01785-5/5

OPERATION AND MAINTENANCE MANUAL

PART 3 EXECUTION

3.1 FORM

A. Provide three complete sets of data.

B. Number multiple binder volumes consecutively.

C. Cover Sheet: Identify the project title, location, park, contract number, prime contractor's name and address, date of substantial completion, and binder volume number. Insert cover sheet into clear plastic view pocket on front of binder. Insert sheet with project title and "Operation and Maintenance" into side clear plastic view pocket.

D. Index System: Organize data into sections by common subjects and subsystems. Place a consecutively numbered tabbed divider sheet in front of each section. Place index sheet at the beginning of each binder, listing sections by subject name.