AmendmentNo.3_Summary.docx

DOCX document 24 KB Posted

Attached to
Prospect Ranger Station Water and Wastewater System Replacement
Solicitation number
AG-04N7-S-15-0016
Issued by

About this file

Amendment No. 3 - Summary of changes

View the file

Other files

File Type Posted
Amendment_No.3_SF30.pdf PDF
AmendmentNo.3_Revised_Drawings.pdf PDF
Amendment_No.2_SF_30.pdf PDF
AmendmentNo.1Reviseddrawing_Sheet_C8.pdf PDF
AmendmentNo.1Revised_Specs.docx DOCX document
Amendment_No.1SF_30.pdf PDF
AmendmentNo.1SummaryofChanges.docx DOCX document
Construction_RFP_ProspectRSWaterReplacementSystem.docx DOCX document
REVISED_DRAWINGS.pdf PDF
Specs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROSPECT RANGER STATION

WATER AND WASTEWATER SYSTEM REPLACEMENT

Solicitation AG-04N7-S-15-0016 Summary of Amendment No. 3

Find the following items providing clarification, revisions, or supplement information to the original solicitation documents:

1. Drawing Sheet E2 - Revised sheet notes from 4” PVC to 1”PVC.

2. Drawing Sheet E6 – Revised circuit 11 from a 4 inch raceway to a 1 inch raceway.

File details come from the government source that posted it. Updated .