Amendment 01 Continuation.pdf

PDF 245 KB Posted

Attached to
Forest Engineering and Road Maintenance Federal contract opportunity
Solicitation number
AG-04N0-S-09-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Amendment 01 FERM

View the file

Other files for this federal contract opportunity

Other files attached to Forest Engineering and Road Maintenance, newest first.
File Type Posted
FERM_Awards_Attachment_09.pdf PDF
Road Side Brushing Detail Map Revision #1.pdf PDF
FERM_Q&A_Deschutes_Ochoco_May_13_2009.doc DOC document
Attachment 02A Road Side Brushing Revision #1.doc DOC document
FERM_Q&A_Fremont_Wiinema_May_19_2009.doc DOC document
Attachment 02B Road Side Brushing Example.doc DOC document
I_FERM_8_of_11_Area_#8_District_Maintenance.pdf PDF
L_FERM_11_of_11_Area_#11_District_Maintenance.pdf PDF
C_FERM_2_of_11_Area_#2_North_Deschutes.pdf PDF
R_FERM_General_Decision_Number.doc DOC document
N_FERM_Attachment_01_Road_Surface_Maintenance_Detail_Map.pdf PDF
P_FERM_Attachment_02_Road_Side_Brushing_Detail_Map.pdf PDF
K_FERM_10_of_11_Area_#10_District_Maintenance.pdf PDF
D_FERM_3_of_11_Area_#3_Chemult_Crescent.pdf PDF
O_FERM_Attachment_02_Road_Side_Brushing.doc DOC document
J_FERM_9_of_11_Area_#9_District_Maintenance.pdf PDF
M_FERM_Attachment_01_Road_Surface_Maintenance.doc DOC document
B_FERM_1_of_11_Area_#1_Ochoco_NF.pdf PDF
A_FERM_Solicitation.doc DOC document
E_FERM_4_of_11_Area_#4_Paisley_Silverlake.pdf PDF
H_FERM_7_of_11_Area_#7_District_Maintenance.pdf PDF
G_FERM_6_of_11_Area_#6_Bly_Lakeview.pdf PDF
Q_FERM_Service_Contract_Act_Wage_Rates.doc DOC document
F_FERM_5_of_11_Area_#5_Chiloquin_Klamath.pdf PDF
A_FERM_Notice.doc DOC document
S_FERM_Contractor_Performance_Data_Sheet.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO,

PAGE OF

5. PROJECT NO. (lf applicable)

PAGES

ISSUED BY

Ochoco National Forest 3160 NE Third St.

Prineville, OR 97754

7. ADMINISTERED BY (lf other than ltem 6)

Ochoco National Forest 3160 NE Third St.

Prineville, OR 97754

(No., street, county, State, and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO

AG-04N0-S-09-0004

05/06/2009

1OB. DATED

ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITA

X fne above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers I is extended, [l is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing ltems 8 and 15, and returning I copies of the amendment (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT lN REJECTION OF YOUR OFFER. lf by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (lf required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

A. THIS CHANGE ORDER IS ISSUED fO: (Specify

THE CONTRACT ORDER NO. IN ITEM 1OA.

B. THE ABOVE NUMBERED CONTRACT/ORDER lS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH lN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

TH IS SUPPLEMENTAL AGREEMENT

type of modffication and authority)

E. IMPORTANT: Contractor I is not, I is required to sign this document and return ! copies to the issuing office.

14. DESCRfPTfON OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this amendment is to correct errors found in solicitation # AG-04N0-S-09-0004 and attach the Questions and Answers resulting from the Pre-proposal conferences held in Prineville and Klamath Falls.

(1 )ChangetheUni ts inB lock22ot theSF1449to"EACH"f rom"HOUR"for l tems026,039,052,065,078,091, 104,117, 130, and 143 for Hazard tree removal.

(2) The following description for Pit Development & Rock Crushing shall be utilized for pricing and is hereby provided as follows: The pay item is for "A 3-stage Grusher with operator shall assume production of 10,000 cy of FP03 gradation E (3/4" Base Rock - specification 703) aggregate. Assume an existing material source cleared of overburden which will require drill and shoot. Source is located 50 miles from the Zone Midpoint of each area."

in ltem 9A or 10A. as heretofore and in full force and effect.

AND TITLE OF

Cynthia B. Armour - Gontracting Officer

0512212009

NSN 7540-01-152-8070

Previous edition unusable

ANDARD 30 (REV. 10€3)

Prescribed by GSA tr n u u

IT MODIFIES THE CONTRAGT/ORDER NO. AS DESCRIBED IN ITEM 14.

15C. DATE SIGNED

authorized to

FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - CONTINUATION SHEET - SOLICITATION #AG-O4NO-S.O9.OOO4 2oI 2

(3) "The Questions and Answers for (l) The Prineville Meeting held on May 13, 2009 and (2) The Klamath Falls Meeting held on May 19,2009 are attached hereto with.

(a) The revised specifications, associated diagram, and a representative picture for the Brushing Pay Items and Attachment O2 is hereby revised and replaced as follows and as an attachment to this Amendment:

(4a) All pay items referring to Roadside Brushing are hereby revised as fol lows: The f irst sentence is changed FROM: "Road Side Brushing per Attachment 02 specs." TO: "Road Side Brushing per Attachment 02, O2A, and 028."

(4b) "b. Roadside Brushins" which is under DESCRIPTION OF SUPPLIES/SERVICES IDENTIFIED lN BLOCK 2O, the last sentence in the f i rst paragraph should be replaced with the fol lowing:

Further specif icat ions are provided as Attachment 02, O2A, and O2B

(4c) The Attachment O2A Road Side Brushing Revision #1 and the Road Side Brushing Detai l Map Revision #1 hereby replaces the or iginal at tachment 02 ident i f ied in the current sol ic i tat ion "List of Attached Dcouments, Exhibi ts, and other Attachments" as Attachments 4 and 5 respect ively.

(4d) Attachment O2B Road Side Brushing Example is now also incorporated into the sol ic i tat ion and provides a depict ion of the current average roadside condit ions in which to ut i l ize for an interested offerors quote.

File details come from the government source that posted it. Updated .