Amendment 01 Continuation.pdf
PDF 245 KB Posted
- Attached to
- Forest Engineering and Road Maintenance Federal contract opportunity
- Solicitation number
- AG-04N0-S-09-0004
About this file
Amendment 01 FERM
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NO,
PAGE OF
5. PROJECT NO. (lf applicable)
PAGES
ISSUED BY
Ochoco National Forest 3160 NE Third St.
Prineville, OR 97754
7. ADMINISTERED BY (lf other than ltem 6)
Ochoco National Forest 3160 NE Third St.
Prineville, OR 97754
(No., street, county, State, and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO
AG-04N0-S-09-0004
05/06/2009
1OB. DATED
ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITA
X fne above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers I is extended, [l is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing ltems 8 and 15, and returning I copies of the amendment (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT lN REJECTION OF YOUR OFFER. lf by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (lf required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
A. THIS CHANGE ORDER IS ISSUED fO: (Specify
THE CONTRACT ORDER NO. IN ITEM 1OA.
B. THE ABOVE NUMBERED CONTRACT/ORDER lS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH lN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
TH IS SUPPLEMENTAL AGREEMENT
type of modffication and authority)
E. IMPORTANT: Contractor I is not, I is required to sign this document and return ! copies to the issuing office.
14. DESCRfPTfON OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
The purpose of this amendment is to correct errors found in solicitation # AG-04N0-S-09-0004 and attach the Questions and Answers resulting from the Pre-proposal conferences held in Prineville and Klamath Falls.
(1 )ChangetheUni ts inB lock22ot theSF1449to"EACH"f rom"HOUR"for l tems026,039,052,065,078,091, 104,117, 130, and 143 for Hazard tree removal.
(2) The following description for Pit Development & Rock Crushing shall be utilized for pricing and is hereby provided as follows: The pay item is for "A 3-stage Grusher with operator shall assume production of 10,000 cy of FP03 gradation E (3/4" Base Rock - specification 703) aggregate. Assume an existing material source cleared of overburden which will require drill and shoot. Source is located 50 miles from the Zone Midpoint of each area."
in ltem 9A or 10A. as heretofore and in full force and effect.
AND TITLE OF
Cynthia B. Armour - Gontracting Officer
0512212009
NSN 7540-01-152-8070
Previous edition unusable
ANDARD 30 (REV. 10€3)
Prescribed by GSA tr n u u
IT MODIFIES THE CONTRAGT/ORDER NO. AS DESCRIBED IN ITEM 14.
15C. DATE SIGNED
authorized to
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - CONTINUATION SHEET - SOLICITATION #AG-O4NO-S.O9.OOO4 2oI 2
(3) "The Questions and Answers for (l) The Prineville Meeting held on May 13, 2009 and (2) The Klamath Falls Meeting held on May 19,2009 are attached hereto with.
(a) The revised specifications, associated diagram, and a representative picture for the Brushing Pay Items and Attachment O2 is hereby revised and replaced as follows and as an attachment to this Amendment:
(4a) All pay items referring to Roadside Brushing are hereby revised as fol lows: The f irst sentence is changed FROM: "Road Side Brushing per Attachment 02 specs." TO: "Road Side Brushing per Attachment 02, O2A, and 028."
(4b) "b. Roadside Brushins" which is under DESCRIPTION OF SUPPLIES/SERVICES IDENTIFIED lN BLOCK 2O, the last sentence in the f i rst paragraph should be replaced with the fol lowing:
Further specif icat ions are provided as Attachment 02, O2A, and O2B
(4c) The Attachment O2A Road Side Brushing Revision #1 and the Road Side Brushing Detai l Map Revision #1 hereby replaces the or iginal at tachment 02 ident i f ied in the current sol ic i tat ion "List of Attached Dcouments, Exhibi ts, and other Attachments" as Attachments 4 and 5 respect ively.
(4d) Attachment O2B Road Side Brushing Example is now also incorporated into the sol ic i tat ion and provides a depict ion of the current average roadside condit ions in which to ut i l ize for an interested offerors quote.
File details come from the government source that posted it. Updated .