The file's text, extracted by GovTribe without its formatting.
PAGE
NORTH CASCADE SMOKEJUMPER BASE
R6-8-00-Q25
| SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS |
| 1. REQUISITION NUMBER |
| PAGE 1 OF 57 |
Offeror to complete blocks 12, 17, 23, 24, & 30
| 2. CONTRACT NO. |
| 3. AWARD/ |
EFFECTIVE DATE
| 4. ORDER NUMBER |
| 5. SOLICITATION NUMBER |
AG-04N0-S-09-0004
6. SOLICITATION ISSUE DATE
May 6, 2009
| 7. FOR SOLICITATION |
| a. NAME |
| b. TELEPHONE (No Collect Calls) |
| 8. OFFER DUE DATE/ |
LOCAL TIME 1630
INFORMATION CALL
Mark LaCroix
Cynthia B. Armour
(541) 947-6226
(541) 416-6662 June 2, 2009
| 9. ISSUED BY (MAIL OFFERS TO) |
| CODE |
10. THIS ACQUISITION IS
FORMCHECKBOX
UNRESTRICTED
FORMCHECKBOX
SET-ASIDE. __% FOR
FORMCHECKBOX
SMALL BUSINESS,
FORMCHECKBOX
HUBZONE SMALL
BUSINESS
FORMCHECKBOX
8(A)
FORMCHECKBOX
SOLE SOURCE
NAICS: 237310
SIZE STANDARD: 33.5M
| 11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED. |
| 12. DISCOUNT TERMS |
Central Oregon Acquisition Management Area
3160 NE 3rd Street
Prineville, OR 97754
FAX: (541) 416-6661
mlacroix@fs.fed.us carmour@fs.fed.us
FORMCHECKBOX
SEE SCHEDULE
FORMCHECKBOX
13a. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
FORMCHECKBOX
RFQ
FORMCHECKBOX
IFB
FORMCHECKBOX
RFP
Same as Block 9
| 17a. CONTRACTOR/OFFEROR |
| CAGE |
FACILITY CODE
| 18a. PAYMENT WILL BE MADE BY |
| CODE |
DUNS#____________________
Centralized Servicing Center – Forest Service
4300 Goodfellow Blvd (FC-233)
Bldg 105E
St. Louis, MO 63120-1703
| TELEPHONE: |
| TIN: |
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK |
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
IS CHECKED: FORMCHECKBOX
SEE ADDENDA
19.
ITEM NO,
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
CENTRAL OREGON
Forest Engineering & Road Maintenance
Awards under this solicitation will be made through issuance of a Blanket Purchase Agreement Please see the following pages. The quantities represent estimated work for a projected five years with an annual $1M Ceiling
An offeror is only required to price those work activities for which they wish to perform during contract performance. As specified herein, utilization of Service Contract Act and Davis Bacon wage rates shall be used in response to this solicitation. However, ALL pay items must be priced within each work activity in order to be responsive to this RFQ.
(Use Reverse and/or Attach Additional Sheets as Necessary)
| 25. ACCOUNTING AND APPROPRIATION DATA |
| 26. TOTAL AWARD AMOUNT (For Govt. Use Only) |
FORMCHECKBOX
27a. solicitation incorporates by reference FAR 52.212-1, 52.212-4. FAR 52.212-3 and 52.212-5 and Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.
FORMCHECKBOX
27b. contract/purchase order incorporates by reference FAR 52.212-4. FAR 52.212-5 AND Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.
28.
FORMCHECKBOX
| CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ORIGINAL TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. |
| 29. |
FORMCHECKBOX
AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION (BLOCK 5), DATED (BLOCK 30c) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
| 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) |
| 30c. DATE SIGNED |
| 31b. NAME OF CONTRACTING OFFICER |
Mark T. Phillipp 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 1449 (Rev. 4/2002)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA ( FAR (48 CFR) 53.212
| 19. ITEM NO. |
| 20. SCHEDUL OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
Forest Engineering & Road Maintenance
Ochoco National Forest (AREA #1)
National Forest Area Boundaries
| *001 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of Forest Service Road (FSR) 42 & FSR 22 junction for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 001AA |
| Mobilization to Intersection of FSR 42 & FSR 22 junction |
| ALL |
| LS |
| *002 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of FSR 42 & FSR 22 junction for pricing miles herein |
| 20 |
| PASS MILE |
| 002AA |
| Mobilization to Intersection of FSR 42 & FSR 22 junction |
| ALL |
| LS |
| 003 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 003AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 003AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 003AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 003AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 003AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 004 |
| Asphalt Surface Treatments |
| 004AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 004AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 004AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3000 |
| FEET |
A. Item 004AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 10 tons over a two mile length of road.
B. Item 004AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Item 004AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 005 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 005AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 005AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 006 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 006AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 006AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 006AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 006AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 006AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 006AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 006AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 007 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 007AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 007AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 007AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 007AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *008 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 008AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 008AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 008AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 008AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 009 |
| Major Structures (hours based on a typical 8 week construction project) |
| 009AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 009AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 009AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 009AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *010 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *011 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 19. ITEM NO. |
| 20. SCHEDUL OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 012 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 012AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 012AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 012AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *013 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 50 |
| EACH |
Forest Engineering & Road Maintenance
Deschutes National Forest & Crooked River National Grassland (AREA #2)
Crooked River National Grassland, Sisters Ranger District, & Bend -Fort Rock Ranger District Area Boundaries
| *014 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of HWY 126/97 (Redmond) for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 014AA |
| Mobilization to Intersection of HWY 126/97 |
| ALL |
| LS |
| *015 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of HWY 126/97 for pricing miles herein. |
| 20 |
| PASS MILE |
| 015AA |
| Mobilization to Intersection of HWY 126/97 |
| ALL |
| LS |
| 016 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 016AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 016AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 016AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 016AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 016AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 017 |
| Asphalt Surface Treatments |
| 017AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 017AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 017AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3000 |
| FEET |
A. Item 017AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 017AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 017AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 018 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 018AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 018AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 019 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 019AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 019AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 019AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 019AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 019AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 019AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 019AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 020 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 020AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 020AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 020AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 020AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *021 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 021AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 021AB |
| Small Dozer Excavator operator |
| 80 |
| HOUR |
| 021AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 021AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 19. ITEM NO. |
| 20. SCHEDUL OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 022 |
| Major Structures (hours based on a typical 8 week construction project) |
| 022AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 022AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 022AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 022AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *023 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *024 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 025 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 025AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 025AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 025AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *026 |
| Hazard Tree Removal (estimate < 24” dbh ) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance
Deschutes & Fremont-Winema National Forests (AREA #3)
Crescent Ranger District & Chemult Ranger District Area Boundaries
| *027 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of HWY 58/97 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 027AA |
| Mobilization to Intersection of HWY 58/97 |
| ALL |
| LS |
| *028 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of HWY 58/97 for pricing miles herein. |
| 20 |
| PASS MILE |
| 028AA |
| Mobilization to Intersection of HWY 58/97 |
| ALL |
| LS |
| 029 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 029AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 029AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 029AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 029AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 029AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 030 |
| Asphalt Surface Treatments |
| 030AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 030AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 030AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 030AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 030AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 030AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 031 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 031AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 031AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 032 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 032AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 032AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 032AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 032AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 032AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 032AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 032AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 033 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 033AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 033AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 033AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 033AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| *034 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 034AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 034AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 034AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 034AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 035 |
| Major Structures (hours based on a typical 8 week construction project) |
| 035AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 035AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 035AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 035AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *036 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *037 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 038 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 038AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 038AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 038AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *039 |
| Hazard Tree Removal (estimate < 24” dbh ) |
| 40 |
| HOUR |
Forest Road Maintenance and Minor Construction
Fremont-Winema National Forest (AREA #4)
Paisley & Silver Lake Ranger Districts Area Boundaries
| *040 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Summer Lake Rest Area for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 040AA |
| Mobilization to Intersection of Summer Lake Rest Area |
| ALL |
| LS |
| *041 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Summer Lake Rest Area for pricing miles herein. |
| 20 |
| PASS MILE |
| 041AA |
| Mobilization to Intersection of Summer Lake Rest Area |
| ALL |
| LS |
| 042 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 042AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 042AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 042AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 042AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 042AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 043 |
| Asphalt Surface Treatments |
| 043AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 043AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 043AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 043AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 043AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 043AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 044 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 044AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 044AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 045 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 045AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 045AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 045AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 045AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 045AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 045AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 045AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 046 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 046AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 046AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 046AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 046AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *047 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 047AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 047AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 047AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 047AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 048 |
| Major Structures (hours based on a typical 8 week construction project) |
| 048AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 048AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 048AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 048AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *049 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *050 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 051 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 051AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 051AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 051AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *052 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Fremont-Winema National Forest (AREA #5)
Chiloquin & Klamath Ranger Districts Area Boundaries
| *053 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of FSR 3704 and Hwy 140 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 053AA |
| Mobilization to Intersection of Intersection of FSR 3704 and Hwy 140 |
| ALL |
| LS |
| *054 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of FSR 3704 and Hwy 140 for pricing miles herein. |
| 20 |
| PASS MILE |
| 054AA |
| Mobilization to Intersection of Intersection of FSR 3704 and Hwy 140 |
| ALL |
| LS |
| 055 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 055AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 055AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 055AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 055AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 055AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 056 |
| Asphalt Surface Treatments |
| 056AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 056AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 056AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 056AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 056AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 056AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 057 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 057AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 057AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 058 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 058AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 058AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 058AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 058AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 058AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 058AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 058AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 059 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 059AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 059AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 059AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 059AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *060 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 060AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 060AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 060AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 060AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 061 |
| Major Structures (hours based on a typical 8 week construction project) |
| 061AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 061AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 061AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 061AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *062 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *063 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 064 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 064AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 064AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 064AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *065 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering and Road Maintenance
Fremont-Winema National Forest (AREA #6)
Bly & Lakeview Ranger Districts Area Boundaries
| *066 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Quartz Mountain Summit on Hwy 140 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 066AA |
| Mobilization to Intersection of Quartz Mountain Summit on Hwy 140 |
| ALL |
| LS |
| *067 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Quartz Mountain Summit on Hwy 140 for pricing miles herein. |
| 20 |
| PASS MILE |
| 067AA |
| Mobilization to Intersection of Quartz Mountain Summit on Hwy 140 |
| ALL |
| LS |
| 068 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| $ |
| 068AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 068AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 068AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 068AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 068AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 069 |
| Asphalt Surface Treatments |
| 069AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 069AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 069AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 069AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 069AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 069AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 070 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 070AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 070AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 071 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 071AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 071AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 071AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 071AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 071AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 071AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 071AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 072 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 072AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 072AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 072AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 072AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *073 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 073AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 073AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 073AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 073AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 074 |
| Major Structures (hours based on a typical 8 week construction project) |
| 074AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 074AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 074AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 074AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *075 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *076 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 077 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 077AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 077AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 077AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *078 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Prineville District, Bureau of Land Management (BLM) (AREA #7)
Deschutes Zone (See attachement for Area Boundaries)
| *079 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Culver for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| $ |
| $ |
| 079AA |
| Mobilization to Culver |
| ALL |
| LS |
| *080 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Culver for pricing miles herein. |
| 20 |
| PASS MILE |
| 080AA |
| Mobilization to Culver |
| ALL |
| LS |
| 081 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| 081AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 081AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 081AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 081AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 081AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 082 |
| Asphalt Surface Treatments |
| 082AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 082AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 082AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 082AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 082AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 082AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
24. AMOUNT
| 083 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 083AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 083AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 084 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 084AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| $ |
| $ |
| 084AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 084AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 084AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 084AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 084AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 084AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 085 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 085AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 085AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 085AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 085AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *086 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 086AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 086AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 086AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 086AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 087 |
| Major Structures (hours based on a typical 8 week construction project) |
| 087AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 087AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 087AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 087AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *088 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *089 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 090 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 090AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 090AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 090AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *091 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Prineville District, BLM (AREA #8)
John Day Basin Zone (See attachement for Area Boundaries)
| *092 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Kimberly for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 092AA |
| Mobilization to Kimberly |
| ALL |
| LS |
| *093 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Kimberly for pricing miles herein. |
| 20 |
| PASS MILE |
| 093AA |
| Mobilization to Kimberly |
| ALL |
| LS |
| 094 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| 094AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 094AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 094AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 094AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 094AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 095 |
| Asphalt Surface Treatments |
| 095AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 095AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 095AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 095AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 095AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 095AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 096 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 096AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 096AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 097 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 097AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 097AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 097AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 097AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 097AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 097AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 097AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 098 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 098AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 098AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 098AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 098AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *099 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 099AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 099AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 099AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 099AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 100 |
| Major Structures (hours based on a typical 8 week construction project) |
| 100AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 100AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 100AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 100AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *101 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *102 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 103 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 103AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 103AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 103AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *104 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Prineville & Lakeview District, BLM (AREA #9)
North Lakeview Zone (See attachement for Area Boundaries)
| *105 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Christmas Valley for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 105AA |
| Mobilization to Christmas Valley |
| ALL |
| LS |
| *106 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Christmas Valley for pricing miles herein. |
| 20 |
| PASS MILE |
| 106AA |
| Mobilization to Intersection of Christmas Valley |
| ALL |
| LS |
| 107 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| 107AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 107AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 107AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 107AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 107AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 108 |
| Asphalt Surface Treatments |
| 108AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 108AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 108AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 108AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 108AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 108AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 109 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 109AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 109AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 110 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 110AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 110AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 110AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 110AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 110AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 110AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 110AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 111 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 111AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 111AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 111AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 111AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *112 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 112AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 112AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 112AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 112AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 113 |
| Major Structures (hours based on a typical 8 week construction project) |
| 113AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 113AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 113AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 113AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *114 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *115 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 116 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 116AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 116AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 116AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *117 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Lakeview District, BLM (AREA #10)
South Lakeview Zone (See attachement for Area Boundaries)
| *118 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Plush for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 118AA |
| Mobilization to Plush |
| ALL |
| LS |
| *119 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Plush for pricing miles herein. |
| 20 |
| PASS MILE |
| 119AA |
| Mobilization to Plush |
| ALL |
| LS |
| 120 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| 120AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 120AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 120AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 120AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 120AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 121 |
| Asphalt Surface Treatments |
| 121AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 121AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 121AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 121AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 121AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 121AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 122 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 122AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 122AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 123 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 123AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| 123AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 123AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 123AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 123AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 123AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 123AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 124 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 124AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 124AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 124AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 124AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *125 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 125AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 125AB |
| Small Dozer w/ operator |
| 80 |
| HOUR |
| 125AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 125AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 126 |
| Major Structures (hours based on a typical 8 week construction project) |
| 126AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 126AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 126AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 126AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *127 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *128 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 129 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 129AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 129AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 129AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *130 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
Forest Engineering & Road Maintenance Lakeview District, BLM (AREA #11)
Klamath Zone (See attachement for Area Boundaries)
| *131 |
| Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Dairy for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders) |
| 20 |
| MILE |
| 131AA |
| Mobilization to Dairy |
| ALL |
| LS |
| *132 |
| Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Dairy for pricing miles herein. |
| 20 |
| PASS MILE |
| 132AA |
| Mobilization to Intersection of Dairy |
| ALL |
| LS |
| 133 |
| Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project) |
| 133AA |
| Road Grader w/ operator |
| 40 |
| HOUR |
| 133AB |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 133AC |
| Water Truck w/ operator |
| 80 |
| HOUR |
| 133AD |
| Excavator w/ operator |
| 120 |
| HOUR |
| 133AE |
| Backhoe w/ operator |
| 40 |
| HOUR |
| 19. ITEM O. |
| 20. SCHEDUL OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
| 134 |
| Asphalt Surface Treatments |
| 134AA |
| 404(01) - Asphalt Pavement Pothole Patching |
| 30 |
| TON |
| 134AB |
| 430(07) - Asphalt Pavement Skin Patching |
| 200 |
| TON |
| 134AC |
| 414 – Asphalt Crack Cleaning and Sealing |
| 3,500 |
| FEET |
A. Item 134AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.
B. Items 134AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.
C. Items 134AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.
Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task
| 135 |
| Asphalt Pavement Grinding (hours based on a typical 1 mile project) |
| 135AA |
| Asphalt Pavement Grinding |
| 12000 |
| SY |
A. Item 122AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.
| 136 |
| Road Construction (hours based on a typical 1 mile of new road construction) |
| 136AA |
| Road Grader w/ operator |
| 80 |
| HOUR |
| $ |
| $ |
| 136AB |
| Dump Truck w/ operator |
| 240 |
| HOUR |
| 136AC |
| Water Truck w/ operator |
| 100 |
| HOUR |
| 136AD |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 136AE |
| Excavator w/ operator |
| 80 |
| HOUR |
| 136AF |
| 403(12) – Hot Asphalt Concrete Paving |
| 500 |
| TON |
A. Item 136AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.
| 137 |
| Minor Structures (hours based on a typical 4 week construction project) |
| 137AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 137AB |
| Manually Operated Compactor w/ operator |
| 40 |
| HOUR |
| 137AC |
| Excavator w/ operator |
| 120 |
| HOUR |
| 137AD |
| Backhoe w/ operator |
| 40 |
| HOUR |
| *138 |
| Stream Restoration & Rehab (hours based on a typical 6 week construction project) |
| 138AA |
| Dump Truck w/ operator |
| 120 |
| HOUR |
| 138AB |
| Small Excavator w/ operator |
| 80 |
| HOUR |
| 138AC |
| Medium Dozer w/ operator |
| 80 |
| HOUR |
| 138AD |
| Walking Backhoe w/ operator |
| 200 |
| HOUR |
| 139 |
| Major Structures (hours based on a typical 8 week construction project) |
| 139AA |
| Dump Truck w/ operator |
| 80 |
| HOUR |
| 139AB |
| Large Dozer w/ operator |
| 40 |
| HOUR |
| 139AC |
| Excavator w/ operator |
| 240 |
| HOUR |
| 139AD |
| Backhoe w/ operator |
| 80 |
| HOUR |
| *140 |
| Water Truck w/ operator |
| 80 |
| HOUR |
| *141 |
| Belly Dump Truck w/ operator |
| 80 |
| HOUR |
| 142 |
| Pit Development & Rock Crushing (estimate 10,000 CY production) |
| 142AA |
| Front-End Loader w/ operator |
| 160 |
| HOUR |
| 142AB |
| Large Dozer w/ operator |
| 160 |
| HOUR |
| 142AC |
| 3-Stage Crusher w/ operator |
| 10000 |
| CY |
| *143 |
| Hazard Tree Removal (estimate < 24” dbh) |
| 40 |
| HOUR |
* The asterisk next to the pay item denotes the requirement to pay Service Contract Act Wages. All other pay items shall utilize the attached Davis Bacon Wage Determination for loaded labor rates.
| 19. ITEM NO |
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED
FORMCHECKBOX
INSPECTED
FORMCHECKBOX
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________
| 32b. SIGNATURE OF AUTHORIZED GOVT. REPRESENTATIVE |
| 32c. DATE |
| 32.d PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32.e MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32.f TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
32.g E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED CORRECT FOR |
| 36. PAYMENT |
| 37. CHECK NUMBER |
FORMCHECKBOX
COMPLETE FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE REC’D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV. 4/2002) BACK
DESCRIPTION OF SUPPLIES/SERVICES IDENTIFIED IN BLOCK 20
This description includes a list of the types and scope of work that the equipment found in Block 20 may be required to perform in any of the areas designated within this contract. The list is representative but not inclusive of all work that may be required by task order. Orders will most often be issued on a lump sum quantity basis or as identified within the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP03)” http://www.wfl.fha.dot.gov/design/specs/fp03.htm. This is NOT a Time and Materials Task Order contract but rather a Blanket Purchase Agreement. The hourly pricing requested will be utilized for price evaluation purposes in selecting a “Best Value” contractor. However, the Government shall terminate any successful contractor’s contract should their BPA Call’s lump sum pricing not be a reflective derivation of the pricing they propose herein.
a.
Road Surface Maintenance:
Road Maintenance work will consist of routine work necessary to maintain the Federal Road System in a functioning condition providing safe public access, protecting the transportation facility investment and adjacent environmental resources.
Work is generally confined within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Further specifications are provided as Attachment 01.
Mobilization includes cost to mobilize the equipment necessary to complete the tasks listed in Attachment 01; for evaluation of award, cost for mobilization shall include a road grader, water truck, backhoe and a service truck to the point listed in the Schedule for each area.
b.
Roadside Brushing:
Roadside brushing consists of cutting all vegetative growth, including trees and other vegetation above the ground, along the roadsides of the Federal Road System in order to maintain the desired road width and provide for safe public access. Further specifications are provided as Attachment 02.
Mobilization includes cost to mobilize the equipment necessary to complete the tasks listed in Attachment 02; for evaluation of award, cost for mobilization shall include a brush cutter to the point listed in the Schedule for each area.
c.
Road Reconstruction & Decommissioning:
Road reconstruction work will involve roadway restoration of existing roads.
Possible Performance Activities: Clearing, excavation, restoration or placement of bituminous, aggregate and native surfaces, drainage installation, drainage maintenance and repair, bridge maintenance and repair, cut and fill slope stabilization, erosion control measures, traffic control, and sign installation.
Road decommissioning will involve closing and/or obliteration of existing roads.
Possible Performance Activities: Excavating and removal of drainage pipes (various sizes), ripping, re-contouring, placement of mineral/woody material, installation of surface drainage (including waterbars, drain dips, rock fords and cross-drains) and access blocking features.
d.
Asphalt Surface Treatments:
Asphalt surface treatments will involve traveled way and parking lot restoration of bituminous surfaces.
Possible Performance Activities: Placement of Bituminous Concrete Pavement (Not to exceed 1,000 tons), surface treatments include asphalt patches, slurry seal coat and tack or emulsion coat for application of chips for a chip seal surface, and necessary surface preparation needed prior to application of asphalt surface treatment.
e.
Asphalt Pavement Grinding:
This work will involve grinding the existing bituminuous surface in place, re-grading the roadway and shoulders, and compacting the aggregate surface.
Possible Performance Activities: Hauling, processing, blading, watering, and compaction.
f.
Road Construction:
Road construction will be limited to two miles or less. This work will involve all construction activities normally associated with new road construction. The exception to this is, limited drilling and shooting will be anticipated, side slopes will not consistently exceed 60 % and not more than 80% of excavated material shall be designated for end haul. Blasting plans shall be provided when necessitated by project requirements.
Possible Performance Activities: Signing (traffic control), Safety, Construction Staking, Clearing, Earthwork, Drainage (surface, sub-surface, drainage pipe), Aggregate Placement (base and surfacing, riprap, pit run), Hot-Mix Asphalt Placement, Watering, Erosion Control Measures, and rock crushing for aggregate.
g.
Minor Structures:
Miscellaneous construction work is that which requires the use of similar manpower and equipment normally associated with standard road construction/reconstruction and maintenance activities.
Possible Performance Activities: Clearing, excavation, trenching, placement/repair road/trail, repair of curb sections, fences, and guardrail, removal of existing structures, concrete placement (quantities not exceeding 10 cy, including forming and finishing), structural embankments and buttresses, gate installation and repair, cattleguard installation and repair, and stock pond cleaning and restoration.
h.
Stream Restoration and Rehab:
Stream restoration and rehabilitation consists of maintaining sustainable stream channel function for hydraulic flow and aquatic organism habitat.
Possible Performance Activities: Placing rip rap to stabilize banks or to prevent head cutting, construction of a variety of in-stream structures using both rocks and logs, reshaping stream banks, relocation of stream channel, and mechanical transplanting of riparian vegetation.
i.
Major Structures:
Construction of major structures will be limited to four structures or less. This work will involve all construction activities normally associated with road structure construction, including fish passage structures.
Possible Performance Activities: Fish Passage Structures including Pre-cast Box Culverts and Corrugated Metal and associated in-stream structures (Spans from 5 to 20 ft), clearing and grubbing, excavation and compaction, concrete placement, and installation of water diversions.
j.
Pit Development and Crushing:
Pit development and crushing consists of all construction activities normally associated with development of a new or existing material source (aggregate, pitrun, riprap, etc…) and the production of a specified aggregate material.
Possible Performance Activities: Clearing and grubbing, stripping of topsoil, removing overburden, drilling and blasting of material source, screening/sorting of material, rock crushing, stockpiling of materials, construction of access roads and conduction restoration activities.
k.
Hazard Tree Removal:
Hazard tree removal consists of all activities normally associated with the felling of designated hazard trees.
l.
Equipment and Labor Descriptions:
Equipment shall be in good operating condition, of modern design, with a competent, qualified operator. All equipment, except trucks, shall be equipped with rollover protection canopies.
Minimum equipment specifications for applicable work activity groupings are as follows:
1. Road Grader:
a. Engine rating of at least 155 hp (base power, all gears, gross).
b. Blade assembly dimensions at least 14 ft by 24 inch.
2. Dump Truck:
a. Engine rating at least 350 hp.
b. Dump box with at least 10 cubic yard struck capacity.
3. Belly Dump Truck:
a. Engine rating at least 300 hp.
b. Dump box with at least 20 cubic yard struck capacity.
4. Water Truck:
a. Engine rating at least 300 hp, with a minimum capacity of 3,000 gallons.
b. Watertight tank with adequate capacity to efficiently complete projects.
c. Equipped to provide positive, uniform control of specified water application rate.
d. Equipped with air gap or positive anti-siphon device between the water source and the vehicle.
e. Inside-cab operating controls
5. Medium Dozer:
a. Net engine power at least 90 hp to a maximum of 185 hp
b. Equipped with a six (6) way blade at least 8 feet in length and rear-mounted ripper with 3 or more teeth with a ripping depth of 12 inches or more.
6. Large Dozer:
a. Net engine power at least 185 hp
b. Equipped with rear-mounted ripper with 3 or more teeth with a ripping depth of 12 inches or more.
7. Small Excavator:
a. Weight class at least 18,000 lbs.
b. Net engine power at least 55 to 125 hp
c. Bucket with at least 0.25 cubic yard struck capacity
8. Excavator:
a. Weight class at least 41,000 lbs.
b. Net engine power at least 120 to 240 hp.
c. Bucket with at least 1.1 cubic yard struck capacity
9. Mechanical Brush Cutter:
a. Able to cut up to 20 feet from edge of road.
b. Able to operate from existing road surface without damaging road surface.
c. Cutting head able to cut to within 4 inches of ground surface.
10. Front End Loader:
a. Engine rating at least 75 hp.
b. Bucket with at least 3.0 cubic yard struck capacity.
11. Backhoe Loader:
a. Engine rating of at least 78 hp.
b. Loading bucket
12. Walking Backhoe/Excavator:
a. Four (4) independently hydraulic powered adjustable legs and power driven wheels) with opposable thumb on buck and cable winch with 360o rotation working ability.
b. One Bucket, with digging teeth and hydraulic thumb designed to handle boulders and logs, 18-24".
c. Ability to operate in 5 feet of water and work on 1:1 slope.
d. Diesel engine with a minimum power (Net)…