A_FERM_Solicitation.doc

DOC document 2 MB Posted

Attached to
Forest Engineering and Road Maintenance Federal contract opportunity
Solicitation number
AG-04N0-S-09-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

A. FERM - Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Forest Engineering and Road Maintenance, newest first.
File Type Posted
FERM_Awards_Attachment_09.pdf PDF
Road Side Brushing Detail Map Revision #1.pdf PDF
FERM_Q&A_Deschutes_Ochoco_May_13_2009.doc DOC document
Amendment 01 Continuation.pdf PDF
Attachment 02A Road Side Brushing Revision #1.doc DOC document
FERM_Q&A_Fremont_Wiinema_May_19_2009.doc DOC document
Attachment 02B Road Side Brushing Example.doc DOC document
P_FERM_Attachment_02_Road_Side_Brushing_Detail_Map.pdf PDF
K_FERM_10_of_11_Area_#10_District_Maintenance.pdf PDF
D_FERM_3_of_11_Area_#3_Chemult_Crescent.pdf PDF
O_FERM_Attachment_02_Road_Side_Brushing.doc DOC document
J_FERM_9_of_11_Area_#9_District_Maintenance.pdf PDF
M_FERM_Attachment_01_Road_Surface_Maintenance.doc DOC document
B_FERM_1_of_11_Area_#1_Ochoco_NF.pdf PDF
E_FERM_4_of_11_Area_#4_Paisley_Silverlake.pdf PDF
I_FERM_8_of_11_Area_#8_District_Maintenance.pdf PDF
L_FERM_11_of_11_Area_#11_District_Maintenance.pdf PDF
C_FERM_2_of_11_Area_#2_North_Deschutes.pdf PDF
R_FERM_General_Decision_Number.doc DOC document
N_FERM_Attachment_01_Road_Surface_Maintenance_Detail_Map.pdf PDF
H_FERM_7_of_11_Area_#7_District_Maintenance.pdf PDF
G_FERM_6_of_11_Area_#6_Bly_Lakeview.pdf PDF
Q_FERM_Service_Contract_Act_Wage_Rates.doc DOC document
F_FERM_5_of_11_Area_#5_Chiloquin_Klamath.pdf PDF
A_FERM_Notice.doc DOC document
S_FERM_Contractor_Performance_Data_Sheet.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

NORTH CASCADE SMOKEJUMPER BASE

R6-8-00-Q25

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
1. REQUISITION NUMBER
PAGE 1 OF 57

Offeror to complete blocks 12, 17, 23, 24, & 30

2. CONTRACT NO.
3. AWARD/

EFFECTIVE DATE

4. ORDER NUMBER
5. SOLICITATION NUMBER

AG-04N0-S-09-0004

6. SOLICITATION ISSUE DATE

May 6, 2009

7. FOR SOLICITATION
a. NAME
b. TELEPHONE (No Collect Calls)
8. OFFER DUE DATE/

LOCAL TIME 1630

INFORMATION CALL

Mark LaCroix

Cynthia B. Armour

(541) 947-6226

(541) 416-6662 June 2, 2009

9. ISSUED BY (MAIL OFFERS TO)
CODE

10. THIS ACQUISITION IS

FORMCHECKBOX

UNRESTRICTED

FORMCHECKBOX

SET-ASIDE. __% FOR

FORMCHECKBOX

SMALL BUSINESS,

FORMCHECKBOX

HUBZONE SMALL

BUSINESS

FORMCHECKBOX

8(A)

FORMCHECKBOX

SOLE SOURCE

NAICS: 237310

SIZE STANDARD: 33.5M

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED.
12. DISCOUNT TERMS

Central Oregon Acquisition Management Area

3160 NE 3rd Street

Prineville, OR 97754

FAX: (541) 416-6661

mlacroix@fs.fed.us carmour@fs.fed.us

FORMCHECKBOX

SEE SCHEDULE

FORMCHECKBOX

13a. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

FORMCHECKBOX

RFQ

FORMCHECKBOX

IFB

FORMCHECKBOX

RFP

15. DELIVER TO:
CODE
16. ADMINISTERED BY
CODE

Same as Block 9

17a. CONTRACTOR/OFFEROR
CAGE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY
CODE

DUNS#____________________

Centralized Servicing Center – Forest Service

4300 Goodfellow Blvd (FC-233)

Bldg 105E

St. Louis, MO 63120-1703

TELEPHONE:
TIN:
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

FORMCHECKBOX

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

IS CHECKED: FORMCHECKBOX

SEE ADDENDA

19.

ITEM NO,

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

CENTRAL OREGON

Forest Engineering & Road Maintenance

Awards under this solicitation will be made through issuance of a Blanket Purchase Agreement Please see the following pages. The quantities represent estimated work for a projected five years with an annual $1M Ceiling

An offeror is only required to price those work activities for which they wish to perform during contract performance. As specified herein, utilization of Service Contract Act and Davis Bacon wage rates shall be used in response to this solicitation. However, ALL pay items must be priced within each work activity in order to be responsive to this RFQ.

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)

FORMCHECKBOX

27a. solicitation incorporates by reference FAR 52.212-1, 52.212-4. FAR 52.212-3 and 52.212-5 and Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.

FORMCHECKBOX

27b. contract/purchase order incorporates by reference FAR 52.212-4. FAR 52.212-5 AND Addenda FORMCHECKBOX are FORMCHECKBOX are not attached.

28.

FORMCHECKBOX

CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ORIGINAL TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29.

FORMCHECKBOX

AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION (BLOCK 5), DATED (BLOCK 30c) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER

Mark T. Phillipp 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 1449 (Rev. 4/2002)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA ( FAR (48 CFR) 53.212

19. ITEM NO.
20. SCHEDUL OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT

Forest Engineering & Road Maintenance

Ochoco National Forest (AREA #1)

National Forest Area Boundaries

*001
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of Forest Service Road (FSR) 42 & FSR 22 junction for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
001AA
Mobilization to Intersection of FSR 42 & FSR 22 junction
ALL
LS
*002
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of FSR 42 & FSR 22 junction for pricing miles herein
20
PASS MILE
002AA
Mobilization to Intersection of FSR 42 & FSR 22 junction
ALL
LS
003
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
003AA
Road Grader w/ operator
40
HOUR
003AB
Dump Truck w/ operator
120
HOUR
003AC
Water Truck w/ operator
80
HOUR
003AD
Excavator w/ operator
120
HOUR
003AE
Backhoe w/ operator
40
HOUR
004
Asphalt Surface Treatments
004AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
004AB
430(07) - Asphalt Pavement Skin Patching
200
TON
004AC
414 – Asphalt Crack Cleaning and Sealing
3000
FEET

A. Item 004AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 10 tons over a two mile length of road.

B. Item 004AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Item 004AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

005
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
005AA
Asphalt Pavement Grinding
12000
SY

A. Item 005AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

006
Road Construction (hours based on a typical 1 mile of new road construction)
006AA
Road Grader w/ operator
80
HOUR
006AB
Dump Truck w/ operator
240
HOUR
006AC
Water Truck w/ operator
100
HOUR
006AD
Large Dozer w/ operator
160
HOUR
006AE
Excavator w/ operator
80
HOUR
006AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 006AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

007
Minor Structures (hours based on a typical 4 week construction project)
007AA
Dump Truck w/ operator
80
HOUR
007AB
Manually Operated Compactor w/ operator
40
HOUR
007AC
Excavator w/ operator
120
HOUR
007AD
Backhoe w/ operator
40
HOUR
*008
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
008AA
Dump Truck w/ operator
120
HOUR
008AB
Small Excavator w/ operator
80
HOUR
008AC
Medium Dozer w/ operator
80
HOUR
008AD
Walking Backhoe w/ operator
200
HOUR
009
Major Structures (hours based on a typical 8 week construction project)
009AA
Dump Truck w/ operator
80
HOUR
009AB
Large Dozer w/ operator
40
HOUR
009AC
Excavator w/ operator
240
HOUR
009AD
Backhoe w/ operator
80
HOUR
*010
Water Truck w/ operator
80
HOUR
*011
Belly Dump Truck w/ operator
80
HOUR
19. ITEM NO.
20. SCHEDUL OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
012
Pit Development & Rock Crushing (estimate 10,000 CY production)
012AA
Front-End Loader w/ operator
160
HOUR
012AB
Large Dozer w/ operator
160
HOUR
012AC
3-Stage Crusher w/ operator
10000
CY
*013
Hazard Tree Removal (estimate < 24” dbh)
50
EACH

Forest Engineering & Road Maintenance

Deschutes National Forest & Crooked River National Grassland (AREA #2)

Crooked River National Grassland, Sisters Ranger District, & Bend -Fort Rock Ranger District Area Boundaries

*014
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of HWY 126/97 (Redmond) for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
014AA
Mobilization to Intersection of HWY 126/97
ALL
LS
*015
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of HWY 126/97 for pricing miles herein.
20
PASS MILE
015AA
Mobilization to Intersection of HWY 126/97
ALL
LS
016
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
016AA
Road Grader w/ operator
40
HOUR
016AB
Dump Truck w/ operator
120
HOUR
016AC
Water Truck w/ operator
80
HOUR
016AD
Excavator w/ operator
120
HOUR
016AE
Backhoe w/ operator
40
HOUR
017
Asphalt Surface Treatments
017AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
017AB
430(07) - Asphalt Pavement Skin Patching
200
TON
017AC
414 – Asphalt Crack Cleaning and Sealing
3000
FEET

A. Item 017AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 017AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 017AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

018
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
018AA
Asphalt Pavement Grinding
12000
SY

A. Item 018AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

019
Road Construction (hours based on a typical 1 mile of new road construction)
019AA
Road Grader w/ operator
80
HOUR
019AB
Dump Truck w/ operator
240
HOUR
019AC
Water Truck w/ operator
100
HOUR
019AD
Large Dozer w/ operator
160
HOUR
019AE
Excavator w/ operator
80
HOUR
019AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 019AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

020
Minor Structures (hours based on a typical 4 week construction project)
020AA
Dump Truck w/ operator
80
HOUR
020AB
Manually Operated Compactor w/ operator
40
HOUR
020AC
Excavator w/ operator
120
HOUR
020AD
Backhoe w/ operator
40
HOUR
*021
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
021AA
Dump Truck w/ operator
120
HOUR
021AB
Small Dozer Excavator operator
80
HOUR
021AC
Medium Dozer w/ operator
80
HOUR
021AD
Walking Backhoe w/ operator
200
HOUR
19. ITEM NO.
20. SCHEDUL OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
022
Major Structures (hours based on a typical 8 week construction project)
022AA
Dump Truck w/ operator
80
HOUR
022AB
Large Dozer w/ operator
40
HOUR
022AC
Excavator w/ operator
240
HOUR
022AD
Backhoe w/ operator
80
HOUR
*023
Water Truck w/ operator
80
HOUR
*024
Belly Dump Truck w/ operator
80
HOUR
025
Pit Development & Rock Crushing (estimate 10,000 CY production)
025AA
Front-End Loader w/ operator
160
HOUR
025AB
Large Dozer w/ operator
160
HOUR
025AC
3-Stage Crusher w/ operator
10000
CY
*026
Hazard Tree Removal (estimate < 24” dbh )
40
HOUR

Forest Engineering & Road Maintenance

Deschutes & Fremont-Winema National Forests (AREA #3)

Crescent Ranger District & Chemult Ranger District Area Boundaries

*027
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of HWY 58/97 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
027AA
Mobilization to Intersection of HWY 58/97
ALL
LS
*028
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of HWY 58/97 for pricing miles herein.
20
PASS MILE
028AA
Mobilization to Intersection of HWY 58/97
ALL
LS
029
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
029AA
Road Grader w/ operator
40
HOUR
029AB
Dump Truck w/ operator
120
HOUR
029AC
Water Truck w/ operator
80
HOUR
029AD
Excavator w/ operator
120
HOUR
029AE
Backhoe w/ operator
40
HOUR
030
Asphalt Surface Treatments
030AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
030AB
430(07) - Asphalt Pavement Skin Patching
200
TON
030AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 030AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 030AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 030AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

031
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
031AA
Asphalt Pavement Grinding
12000
SY

A. Item 031AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

032
Road Construction (hours based on a typical 1 mile of new road construction)
032AA
Road Grader w/ operator
80
HOUR
032AB
Dump Truck w/ operator
240
HOUR
032AC
Water Truck w/ operator
100
HOUR
032AD
Large Dozer w/ operator
160
HOUR
032AE
Excavator w/ operator
80
HOUR
032AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 032AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

033
Minor Structures (hours based on a typical 4 week construction project)
033AA
Dump Truck w/ operator
80
HOUR
033AB
Manually Operated Compactor w/ operator
40
HOUR
033AC
Excavator w/ operator
120
HOUR
033AD
Backhoe w/ operator
40
HOUR
19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
*034
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
034AA
Dump Truck w/ operator
120
HOUR
034AB
Small Excavator w/ operator
80
HOUR
034AC
Medium Dozer w/ operator
80
HOUR
034AD
Walking Backhoe w/ operator
200
HOUR
035
Major Structures (hours based on a typical 8 week construction project)
035AA
Dump Truck w/ operator
80
HOUR
035AB
Large Dozer w/ operator
40
HOUR
035AC
Excavator w/ operator
240
HOUR
035AD
Backhoe w/ operator
80
HOUR
*036
Water Truck w/ operator
80
HOUR
*037
Belly Dump Truck w/ operator
80
HOUR
038
Pit Development & Rock Crushing (estimate 10,000 CY production)
038AA
Front-End Loader w/ operator
160
HOUR
038AB
Large Dozer w/ operator
160
HOUR
038AC
3-Stage Crusher w/ operator
10000
CY
*039
Hazard Tree Removal (estimate < 24” dbh )
40
HOUR

Forest Road Maintenance and Minor Construction

Fremont-Winema National Forest (AREA #4)

Paisley & Silver Lake Ranger Districts Area Boundaries

*040
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Summer Lake Rest Area for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
040AA
Mobilization to Intersection of Summer Lake Rest Area
ALL
LS
*041
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Summer Lake Rest Area for pricing miles herein.
20
PASS MILE
041AA
Mobilization to Intersection of Summer Lake Rest Area
ALL
LS
042
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
042AA
Road Grader w/ operator
40
HOUR
042AB
Dump Truck w/ operator
120
HOUR
042AC
Water Truck w/ operator
80
HOUR
042AD
Excavator w/ operator
120
HOUR
042AE
Backhoe w/ operator
40
HOUR
043
Asphalt Surface Treatments
043AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
043AB
430(07) - Asphalt Pavement Skin Patching
200
TON
043AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 043AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 043AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 043AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

044
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
044AA
Asphalt Pavement Grinding
12000
SY

A. Item 044AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

045
Road Construction (hours based on a typical 1 mile of new road construction)
045AA
Road Grader w/ operator
80
HOUR
045AB
Dump Truck w/ operator
240
HOUR
045AC
Water Truck w/ operator
100
HOUR
045AD
Large Dozer w/ operator
160
HOUR
045AE
Excavator w/ operator
80
HOUR
045AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 045AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
046
Minor Structures (hours based on a typical 4 week construction project)
046AA
Dump Truck w/ operator
80
HOUR
046AB
Manually Operated Compactor w/ operator
40
HOUR
046AC
Excavator w/ operator
120
HOUR
046AD
Backhoe w/ operator
40
HOUR
*047
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
047AA
Dump Truck w/ operator
120
HOUR
047AB
Small Excavator w/ operator
80
HOUR
047AC
Medium Dozer w/ operator
80
HOUR
047AD
Walking Backhoe w/ operator
200
HOUR
048
Major Structures (hours based on a typical 8 week construction project)
048AA
Dump Truck w/ operator
80
HOUR
048AB
Large Dozer w/ operator
40
HOUR
048AC
Excavator w/ operator
240
HOUR
048AD
Backhoe w/ operator
80
HOUR
*049
Water Truck w/ operator
80
HOUR
*050
Belly Dump Truck w/ operator
80
HOUR
051
Pit Development & Rock Crushing (estimate 10,000 CY production)
051AA
Front-End Loader w/ operator
160
HOUR
051AB
Large Dozer w/ operator
160
HOUR
051AC
3-Stage Crusher w/ operator
10000
CY
*052
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Fremont-Winema National Forest (AREA #5)

Chiloquin & Klamath Ranger Districts Area Boundaries

*053
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Intersection of FSR 3704 and Hwy 140 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
053AA
Mobilization to Intersection of Intersection of FSR 3704 and Hwy 140
ALL
LS
*054
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Intersection of FSR 3704 and Hwy 140 for pricing miles herein.
20
PASS MILE
054AA
Mobilization to Intersection of Intersection of FSR 3704 and Hwy 140
ALL
LS
055
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
055AA
Road Grader w/ operator
40
HOUR
055AB
Dump Truck w/ operator
120
HOUR
055AC
Water Truck w/ operator
80
HOUR
055AD
Excavator w/ operator
120
HOUR
055AE
Backhoe w/ operator
40
HOUR
056
Asphalt Surface Treatments
056AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
056AB
430(07) - Asphalt Pavement Skin Patching
200
TON
056AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 056AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 056AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 056AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

057
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
057AA
Asphalt Pavement Grinding
12000
SY

A. Item 057AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

058
Road Construction (hours based on a typical 1 mile of new road construction)
058AA
Road Grader w/ operator
80
HOUR
058AB
Dump Truck w/ operator
240
HOUR
058AC
Water Truck w/ operator
100
HOUR
19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
058AD
Large Dozer w/ operator
160
HOUR
058AE
Excavator w/ operator
80
HOUR
058AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 058AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

059
Minor Structures (hours based on a typical 4 week construction project)
059AA
Dump Truck w/ operator
80
HOUR
059AB
Manually Operated Compactor w/ operator
40
HOUR
059AC
Excavator w/ operator
120
HOUR
059AD
Backhoe w/ operator
40
HOUR
*060
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
060AA
Dump Truck w/ operator
120
HOUR
060AB
Small Excavator w/ operator
80
HOUR
060AC
Medium Dozer w/ operator
80
HOUR
060AD
Walking Backhoe w/ operator
200
HOUR
061
Major Structures (hours based on a typical 8 week construction project)
061AA
Dump Truck w/ operator
80
HOUR
061AB
Large Dozer w/ operator
40
HOUR
061AC
Excavator w/ operator
240
HOUR
061AD
Backhoe w/ operator
80
HOUR
*062
Water Truck w/ operator
80
HOUR
*063
Belly Dump Truck w/ operator
80
HOUR
064
Pit Development & Rock Crushing (estimate 10,000 CY production)
064AA
Front-End Loader w/ operator
160
HOUR
064AB
Large Dozer w/ operator
160
HOUR
064AC
3-Stage Crusher w/ operator
10000
CY
*065
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering and Road Maintenance

Fremont-Winema National Forest (AREA #6)

Bly & Lakeview Ranger Districts Area Boundaries

*066
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Quartz Mountain Summit on Hwy 140 for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
066AA
Mobilization to Intersection of Quartz Mountain Summit on Hwy 140
ALL
LS
*067
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Quartz Mountain Summit on Hwy 140 for pricing miles herein.
20
PASS MILE
067AA
Mobilization to Intersection of Quartz Mountain Summit on Hwy 140
ALL
LS
068
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
$
068AA
Road Grader w/ operator
40
HOUR
068AB
Dump Truck w/ operator
120
HOUR
068AC
Water Truck w/ operator
80
HOUR
068AD
Excavator w/ operator
120
HOUR
068AE
Backhoe w/ operator
40
HOUR
069
Asphalt Surface Treatments
069AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
069AB
430(07) - Asphalt Pavement Skin Patching
200
TON
069AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 069AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 069AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 069AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

070
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
070AA
Asphalt Pavement Grinding
12000
SY

A. Item 070AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
071
Road Construction (hours based on a typical 1 mile of new road construction)
071AA
Road Grader w/ operator
80
HOUR
071AB
Dump Truck w/ operator
240
HOUR
071AC
Water Truck w/ operator
100
HOUR
071AD
Large Dozer w/ operator
160
HOUR
071AE
Excavator w/ operator
80
HOUR
071AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 071AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

072
Minor Structures (hours based on a typical 4 week construction project)
072AA
Dump Truck w/ operator
80
HOUR
072AB
Manually Operated Compactor w/ operator
40
HOUR
072AC
Excavator w/ operator
120
HOUR
072AD
Backhoe w/ operator
40
HOUR
*073
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
073AA
Dump Truck w/ operator
120
HOUR
073AB
Small Excavator w/ operator
80
HOUR
073AC
Medium Dozer w/ operator
80
HOUR
073AD
Walking Backhoe w/ operator
200
HOUR
074
Major Structures (hours based on a typical 8 week construction project)
074AA
Dump Truck w/ operator
80
HOUR
074AB
Large Dozer w/ operator
40
HOUR
074AC
Excavator w/ operator
240
HOUR
074AD
Backhoe w/ operator
80
HOUR
*075
Water Truck w/ operator
80
HOUR
*076
Belly Dump Truck w/ operator
80
HOUR
077
Pit Development & Rock Crushing (estimate 10,000 CY production)
077AA
Front-End Loader w/ operator
160
HOUR
077AB
Large Dozer w/ operator
160
HOUR
077AC
3-Stage Crusher w/ operator
10000
CY
*078
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Prineville District, Bureau of Land Management (BLM) (AREA #7)

Deschutes Zone (See attachement for Area Boundaries)

*079
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Culver for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
$
$
079AA
Mobilization to Culver
ALL
LS
*080
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Culver for pricing miles herein.
20
PASS MILE
080AA
Mobilization to Culver
ALL
LS
081
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
081AA
Road Grader w/ operator
40
HOUR
081AB
Dump Truck w/ operator
120
HOUR
081AC
Water Truck w/ operator
80
HOUR
081AD
Excavator w/ operator
120
HOUR
081AE
Backhoe w/ operator
40
HOUR
082
Asphalt Surface Treatments
082AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
082AB
430(07) - Asphalt Pavement Skin Patching
200
TON
082AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 082AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 082AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 082AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT

24. AMOUNT

083
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
083AA
Asphalt Pavement Grinding
12000
SY

A. Item 083AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

084
Road Construction (hours based on a typical 1 mile of new road construction)
084AA
Road Grader w/ operator
80
HOUR
$
$
084AB
Dump Truck w/ operator
240
HOUR
084AC
Water Truck w/ operator
100
HOUR
084AD
Large Dozer w/ operator
160
HOUR
084AE
Excavator w/ operator
80
HOUR
084AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 084AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

085
Minor Structures (hours based on a typical 4 week construction project)
085AA
Dump Truck w/ operator
80
HOUR
085AB
Manually Operated Compactor w/ operator
40
HOUR
085AC
Excavator w/ operator
120
HOUR
085AD
Backhoe w/ operator
40
HOUR
*086
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
086AA
Dump Truck w/ operator
120
HOUR
086AB
Small Excavator w/ operator
80
HOUR
086AC
Medium Dozer w/ operator
80
HOUR
086AD
Walking Backhoe w/ operator
200
HOUR
087
Major Structures (hours based on a typical 8 week construction project)
087AA
Dump Truck w/ operator
80
HOUR
087AB
Large Dozer w/ operator
40
HOUR
087AC
Excavator w/ operator
240
HOUR
087AD
Backhoe w/ operator
80
HOUR
*088
Water Truck w/ operator
80
HOUR
*089
Belly Dump Truck w/ operator
80
HOUR
090
Pit Development & Rock Crushing (estimate 10,000 CY production)
090AA
Front-End Loader w/ operator
160
HOUR
090AB
Large Dozer w/ operator
160
HOUR
090AC
3-Stage Crusher w/ operator
10000
CY
*091
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Prineville District, BLM (AREA #8)

John Day Basin Zone (See attachement for Area Boundaries)

*092
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Kimberly for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
092AA
Mobilization to Kimberly
ALL
LS
*093
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Kimberly for pricing miles herein.
20
PASS MILE
093AA
Mobilization to Kimberly
ALL
LS
094
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
094AA
Road Grader w/ operator
40
HOUR
094AB
Dump Truck w/ operator
120
HOUR
094AC
Water Truck w/ operator
80
HOUR
094AD
Excavator w/ operator
120
HOUR
094AE
Backhoe w/ operator
40
HOUR
095
Asphalt Surface Treatments
095AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
095AB
430(07) - Asphalt Pavement Skin Patching
200
TON
095AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 095AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 095AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 095AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
096
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
096AA
Asphalt Pavement Grinding
12000
SY

A. Item 096AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

097
Road Construction (hours based on a typical 1 mile of new road construction)
097AA
Road Grader w/ operator
80
HOUR
097AB
Dump Truck w/ operator
240
HOUR
097AC
Water Truck w/ operator
100
HOUR
097AD
Large Dozer w/ operator
160
HOUR
097AE
Excavator w/ operator
80
HOUR
097AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 097AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

098
Minor Structures (hours based on a typical 4 week construction project)
098AA
Dump Truck w/ operator
80
HOUR
098AB
Manually Operated Compactor w/ operator
40
HOUR
098AC
Excavator w/ operator
120
HOUR
098AD
Backhoe w/ operator
40
HOUR
*099
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
099AA
Dump Truck w/ operator
120
HOUR
099AB
Small Excavator w/ operator
80
HOUR
099AC
Medium Dozer w/ operator
80
HOUR
099AD
Walking Backhoe w/ operator
200
HOUR
100
Major Structures (hours based on a typical 8 week construction project)
100AA
Dump Truck w/ operator
80
HOUR
100AB
Large Dozer w/ operator
40
HOUR
100AC
Excavator w/ operator
240
HOUR
100AD
Backhoe w/ operator
80
HOUR
*101
Water Truck w/ operator
80
HOUR
*102
Belly Dump Truck w/ operator
80
HOUR
103
Pit Development & Rock Crushing (estimate 10,000 CY production)
103AA
Front-End Loader w/ operator
160
HOUR
103AB
Large Dozer w/ operator
160
HOUR
103AC
3-Stage Crusher w/ operator
10000
CY
*104
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Prineville & Lakeview District, BLM (AREA #9)

North Lakeview Zone (See attachement for Area Boundaries)

*105
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Christmas Valley for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
105AA
Mobilization to Christmas Valley
ALL
LS
*106
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Christmas Valley for pricing miles herein.
20
PASS MILE
106AA
Mobilization to Intersection of Christmas Valley
ALL
LS
107
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
107AA
Road Grader w/ operator
40
HOUR
107AB
Dump Truck w/ operator
120
HOUR
107AC
Water Truck w/ operator
80
HOUR
107AD
Excavator w/ operator
120
HOUR
107AE
Backhoe w/ operator
40
HOUR
108
Asphalt Surface Treatments
108AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
108AB
430(07) - Asphalt Pavement Skin Patching
200
TON
19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
108AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 108AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 108AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 108AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

109
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
109AA
Asphalt Pavement Grinding
12000
SY

A. Item 109AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

110
Road Construction (hours based on a typical 1 mile of new road construction)
110AA
Road Grader w/ operator
80
HOUR
110AB
Dump Truck w/ operator
240
HOUR
110AC
Water Truck w/ operator
100
HOUR
110AD
Large Dozer w/ operator
160
HOUR
110AE
Excavator w/ operator
80
HOUR
110AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 110AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

111
Minor Structures (hours based on a typical 4 week construction project)
111AA
Dump Truck w/ operator
80
HOUR
111AB
Manually Operated Compactor w/ operator
40
HOUR
111AC
Excavator w/ operator
120
HOUR
111AD
Backhoe w/ operator
40
HOUR
*112
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
112AA
Dump Truck w/ operator
120
HOUR
112AB
Small Excavator w/ operator
80
HOUR
112AC
Medium Dozer w/ operator
80
HOUR
112AD
Walking Backhoe w/ operator
200
HOUR
113
Major Structures (hours based on a typical 8 week construction project)
113AA
Dump Truck w/ operator
80
HOUR
113AB
Large Dozer w/ operator
40
HOUR
113AC
Excavator w/ operator
240
HOUR
113AD
Backhoe w/ operator
80
HOUR
*114
Water Truck w/ operator
80
HOUR
*115
Belly Dump Truck w/ operator
80
HOUR
116
Pit Development & Rock Crushing (estimate 10,000 CY production)
116AA
Front-End Loader w/ operator
160
HOUR
116AB
Large Dozer w/ operator
160
HOUR
116AC
3-Stage Crusher w/ operator
10000
CY
*117
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Lakeview District, BLM (AREA #10)

South Lakeview Zone (See attachement for Area Boundaries)

*118
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Plush for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
118AA
Mobilization to Plush
ALL
LS
*119
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Plush for pricing miles herein.
20
PASS MILE
119AA
Mobilization to Plush
ALL
LS
120
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
120AA
Road Grader w/ operator
40
HOUR
120AB
Dump Truck w/ operator
120
HOUR
120AC
Water Truck w/ operator
80
HOUR
120AD
Excavator w/ operator
120
HOUR
120AE
Backhoe w/ operator
40
HOUR
121
Asphalt Surface Treatments
121AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
121AB
430(07) - Asphalt Pavement Skin Patching
200
TON
121AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 121AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 121AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 121AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

122
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
122AA
Asphalt Pavement Grinding
12000
SY

A. Item 122AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

123
Road Construction (hours based on a typical 1 mile of new road construction)
123AA
Road Grader w/ operator
80
HOUR
123AB
Dump Truck w/ operator
240
HOUR
123AC
Water Truck w/ operator
100
HOUR
123AD
Large Dozer w/ operator
160
HOUR
123AE
Excavator w/ operator
80
HOUR
123AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 123AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

124
Minor Structures (hours based on a typical 4 week construction project)
124AA
Dump Truck w/ operator
80
HOUR
124AB
Manually Operated Compactor w/ operator
40
HOUR
124AC
Excavator w/ operator
120
HOUR
124AD
Backhoe w/ operator
40
HOUR
*125
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
125AA
Dump Truck w/ operator
120
HOUR
125AB
Small Dozer w/ operator
80
HOUR
125AC
Medium Dozer w/ operator
80
HOUR
125AD
Walking Backhoe w/ operator
200
HOUR
126
Major Structures (hours based on a typical 8 week construction project)
126AA
Dump Truck w/ operator
80
HOUR
126AB
Large Dozer w/ operator
40
HOUR
126AC
Excavator w/ operator
240
HOUR
126AD
Backhoe w/ operator
80
HOUR
*127
Water Truck w/ operator
80
HOUR
*128
Belly Dump Truck w/ operator
80
HOUR
129
Pit Development & Rock Crushing (estimate 10,000 CY production)
129AA
Front-End Loader w/ operator
160
HOUR
129AB
Large Dozer w/ operator
160
HOUR
129AC
3-Stage Crusher w/ operator
10000
CY
*130
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

Forest Engineering & Road Maintenance Lakeview District, BLM (AREA #11)

Klamath Zone (See attachement for Area Boundaries)

*131
Road Surface Maintenance per Attachment 01 specs. Assume 5 miles per job at Dairy for pricing miles herein. (estimate for 14 ft wide, single lane travelway including both shoulders)
20
MILE
131AA
Mobilization to Dairy
ALL
LS
*132
Roadside Brushing per Attachment 02 specs. Assume 2 miles per job at Dairy for pricing miles herein.
20
PASS MILE
132AA
Mobilization to Intersection of Dairy
ALL
LS
133
Road Reconstruction & Decommissioning (hours based on a typical 4 week construction project)
133AA
Road Grader w/ operator
40
HOUR
133AB
Dump Truck w/ operator
120
HOUR
133AC
Water Truck w/ operator
80
HOUR
133AD
Excavator w/ operator
120
HOUR
133AE
Backhoe w/ operator
40
HOUR
19. ITEM O.
20. SCHEDUL OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
134
Asphalt Surface Treatments
134AA
404(01) - Asphalt Pavement Pothole Patching
30
TON
134AB
430(07) - Asphalt Pavement Skin Patching
200
TON
134AC
414 – Asphalt Crack Cleaning and Sealing
3,500
FEET

A. Item 134AA for 404 Asphalt Pavement Pothole Patching shall assume 30 mile haul & 5 tons over a two mile length of road.

B. Items 134AB for 430 Asphalt Pavement Skin Patching shall assume 30 mile haul & 10 tons with a two inch lift.

C. Items 134AC for 414 Asphalt Crack Cleaning and Sealing shall assume 30 mile haul & 600 feet over a two mile length of road.

Also, the quotes for these line items shall contain all equipment, labor, and materials necessary to complete the task

135
Asphalt Pavement Grinding (hours based on a typical 1 mile project)
135AA
Asphalt Pavement Grinding
12000
SY

A. Item 122AA for Asphalt Pavement Grinding shall assume 2 in thickness, maximum particle size 1”. Processed material will be left in place.

136
Road Construction (hours based on a typical 1 mile of new road construction)
136AA
Road Grader w/ operator
80
HOUR
$
$
136AB
Dump Truck w/ operator
240
HOUR
136AC
Water Truck w/ operator
100
HOUR
136AD
Large Dozer w/ operator
160
HOUR
136AE
Excavator w/ operator
80
HOUR
136AF
403(12) – Hot Asphalt Concrete Paving
500
TON

A. Item 136AF for 403 Hot Asphalt Concrete Pavement shall assume 30 mile haul and 500 tons with a two inch lift. State of Oregon Asphalt Concrete Pavement, Class level 2.

137
Minor Structures (hours based on a typical 4 week construction project)
137AA
Dump Truck w/ operator
80
HOUR
137AB
Manually Operated Compactor w/ operator
40
HOUR
137AC
Excavator w/ operator
120
HOUR
137AD
Backhoe w/ operator
40
HOUR
*138
Stream Restoration & Rehab (hours based on a typical 6 week construction project)
138AA
Dump Truck w/ operator
120
HOUR
138AB
Small Excavator w/ operator
80
HOUR
138AC
Medium Dozer w/ operator
80
HOUR
138AD
Walking Backhoe w/ operator
200
HOUR
139
Major Structures (hours based on a typical 8 week construction project)
139AA
Dump Truck w/ operator
80
HOUR
139AB
Large Dozer w/ operator
40
HOUR
139AC
Excavator w/ operator
240
HOUR
139AD
Backhoe w/ operator
80
HOUR
*140
Water Truck w/ operator
80
HOUR
*141
Belly Dump Truck w/ operator
80
HOUR
142
Pit Development & Rock Crushing (estimate 10,000 CY production)
142AA
Front-End Loader w/ operator
160
HOUR
142AB
Large Dozer w/ operator
160
HOUR
142AC
3-Stage Crusher w/ operator
10000
CY
*143
Hazard Tree Removal (estimate < 24” dbh)
40
HOUR

* The asterisk next to the pay item denotes the requirement to pay Service Contract Act Wages. All other pay items shall utilize the attached Davis Bacon Wage Determination for loaded labor rates.

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

FORMCHECKBOX

RECEIVED

FORMCHECKBOX

INSPECTED

FORMCHECKBOX

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________

32b. SIGNATURE OF AUTHORIZED GOVT. REPRESENTATIVE
32c. DATE
32.d PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32.e MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32.f TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32.g E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED CORRECT FOR
36. PAYMENT
37. CHECK NUMBER

FORMCHECKBOX

COMPLETE FORMCHECKBOX

PARTIAL FORMCHECKBOX

FINAL

FORMCHECKBOX

PARTIAL FORMCHECKBOX

FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD)
42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 4/2002) BACK

DESCRIPTION OF SUPPLIES/SERVICES IDENTIFIED IN BLOCK 20

This description includes a list of the types and scope of work that the equipment found in Block 20 may be required to perform in any of the areas designated within this contract. The list is representative but not inclusive of all work that may be required by task order. Orders will most often be issued on a lump sum quantity basis or as identified within the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP03)” http://www.wfl.fha.dot.gov/design/specs/fp03.htm. This is NOT a Time and Materials Task Order contract but rather a Blanket Purchase Agreement. The hourly pricing requested will be utilized for price evaluation purposes in selecting a “Best Value” contractor. However, the Government shall terminate any successful contractor’s contract should their BPA Call’s lump sum pricing not be a reflective derivation of the pricing they propose herein.

a.

Road Surface Maintenance:

Road Maintenance work will consist of routine work necessary to maintain the Federal Road System in a functioning condition providing safe public access, protecting the transportation facility investment and adjacent environmental resources.

Work is generally confined within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Further specifications are provided as Attachment 01.

Mobilization includes cost to mobilize the equipment necessary to complete the tasks listed in Attachment 01; for evaluation of award, cost for mobilization shall include a road grader, water truck, backhoe and a service truck to the point listed in the Schedule for each area.

b.

Roadside Brushing:

Roadside brushing consists of cutting all vegetative growth, including trees and other vegetation above the ground, along the roadsides of the Federal Road System in order to maintain the desired road width and provide for safe public access. Further specifications are provided as Attachment 02.

Mobilization includes cost to mobilize the equipment necessary to complete the tasks listed in Attachment 02; for evaluation of award, cost for mobilization shall include a brush cutter to the point listed in the Schedule for each area.

c.

Road Reconstruction & Decommissioning:

Road reconstruction work will involve roadway restoration of existing roads.

Possible Performance Activities: Clearing, excavation, restoration or placement of bituminous, aggregate and native surfaces, drainage installation, drainage maintenance and repair, bridge maintenance and repair, cut and fill slope stabilization, erosion control measures, traffic control, and sign installation.

Road decommissioning will involve closing and/or obliteration of existing roads.

Possible Performance Activities: Excavating and removal of drainage pipes (various sizes), ripping, re-contouring, placement of mineral/woody material, installation of surface drainage (including waterbars, drain dips, rock fords and cross-drains) and access blocking features.

d.

Asphalt Surface Treatments:

Asphalt surface treatments will involve traveled way and parking lot restoration of bituminous surfaces.

Possible Performance Activities: Placement of Bituminous Concrete Pavement (Not to exceed 1,000 tons), surface treatments include asphalt patches, slurry seal coat and tack or emulsion coat for application of chips for a chip seal surface, and necessary surface preparation needed prior to application of asphalt surface treatment.

e.

Asphalt Pavement Grinding:

This work will involve grinding the existing bituminuous surface in place, re-grading the roadway and shoulders, and compacting the aggregate surface.

Possible Performance Activities: Hauling, processing, blading, watering, and compaction.

f.

Road Construction:

Road construction will be limited to two miles or less. This work will involve all construction activities normally associated with new road construction. The exception to this is, limited drilling and shooting will be anticipated, side slopes will not consistently exceed 60 % and not more than 80% of excavated material shall be designated for end haul. Blasting plans shall be provided when necessitated by project requirements.

Possible Performance Activities: Signing (traffic control), Safety, Construction Staking, Clearing, Earthwork, Drainage (surface, sub-surface, drainage pipe), Aggregate Placement (base and surfacing, riprap, pit run), Hot-Mix Asphalt Placement, Watering, Erosion Control Measures, and rock crushing for aggregate.

g.

Minor Structures:

Miscellaneous construction work is that which requires the use of similar manpower and equipment normally associated with standard road construction/reconstruction and maintenance activities.

Possible Performance Activities: Clearing, excavation, trenching, placement/repair road/trail, repair of curb sections, fences, and guardrail, removal of existing structures, concrete placement (quantities not exceeding 10 cy, including forming and finishing), structural embankments and buttresses, gate installation and repair, cattleguard installation and repair, and stock pond cleaning and restoration.

h.

Stream Restoration and Rehab:

Stream restoration and rehabilitation consists of maintaining sustainable stream channel function for hydraulic flow and aquatic organism habitat.

Possible Performance Activities: Placing rip rap to stabilize banks or to prevent head cutting, construction of a variety of in-stream structures using both rocks and logs, reshaping stream banks, relocation of stream channel, and mechanical transplanting of riparian vegetation.

i.

Major Structures:

Construction of major structures will be limited to four structures or less. This work will involve all construction activities normally associated with road structure construction, including fish passage structures.

Possible Performance Activities: Fish Passage Structures including Pre-cast Box Culverts and Corrugated Metal and associated in-stream structures (Spans from 5 to 20 ft), clearing and grubbing, excavation and compaction, concrete placement, and installation of water diversions.

j.

Pit Development and Crushing:

Pit development and crushing consists of all construction activities normally associated with development of a new or existing material source (aggregate, pitrun, riprap, etc…) and the production of a specified aggregate material.

Possible Performance Activities: Clearing and grubbing, stripping of topsoil, removing overburden, drilling and blasting of material source, screening/sorting of material, rock crushing, stockpiling of materials, construction of access roads and conduction restoration activities.

k.

Hazard Tree Removal:

Hazard tree removal consists of all activities normally associated with the felling of designated hazard trees.

l.

Equipment and Labor Descriptions:

Equipment shall be in good operating condition, of modern design, with a competent, qualified operator. All equipment, except trucks, shall be equipped with rollover protection canopies.

Minimum equipment specifications for applicable work activity groupings are as follows:

1. Road Grader:

a. Engine rating of at least 155 hp (base power, all gears, gross).

b. Blade assembly dimensions at least 14 ft by 24 inch.

2. Dump Truck:

a. Engine rating at least 350 hp.

b. Dump box with at least 10 cubic yard struck capacity.

3. Belly Dump Truck:

a. Engine rating at least 300 hp.

b. Dump box with at least 20 cubic yard struck capacity.

4. Water Truck:

a. Engine rating at least 300 hp, with a minimum capacity of 3,000 gallons.

b. Watertight tank with adequate capacity to efficiently complete projects.

c. Equipped to provide positive, uniform control of specified water application rate.

d. Equipped with air gap or positive anti-siphon device between the water source and the vehicle.

e. Inside-cab operating controls

5. Medium Dozer:

a. Net engine power at least 90 hp to a maximum of 185 hp

b. Equipped with a six (6) way blade at least 8 feet in length and rear-mounted ripper with 3 or more teeth with a ripping depth of 12 inches or more.

6. Large Dozer:

a. Net engine power at least 185 hp

b. Equipped with rear-mounted ripper with 3 or more teeth with a ripping depth of 12 inches or more.

7. Small Excavator:

a. Weight class at least 18,000 lbs.

b. Net engine power at least 55 to 125 hp

c. Bucket with at least 0.25 cubic yard struck capacity

8. Excavator:

a. Weight class at least 41,000 lbs.

b. Net engine power at least 120 to 240 hp.

c. Bucket with at least 1.1 cubic yard struck capacity

9. Mechanical Brush Cutter:

a. Able to cut up to 20 feet from edge of road.

b. Able to operate from existing road surface without damaging road surface.

c. Cutting head able to cut to within 4 inches of ground surface.

10. Front End Loader:

a. Engine rating at least 75 hp.

b. Bucket with at least 3.0 cubic yard struck capacity.

11. Backhoe Loader:

a. Engine rating of at least 78 hp.

b. Loading bucket

12. Walking Backhoe/Excavator:

a. Four (4) independently hydraulic powered adjustable legs and power driven wheels) with opposable thumb on buck and cable winch with 360o rotation working ability.

b. One Bucket, with digging teeth and hydraulic thumb designed to handle boulders and logs, 18-24".

c. Ability to operate in 5 feet of water and work on 1:1 slope.

d. Diesel engine with a minimum power (Net)…