B._22_42_00-Fixtures_(1).pdf

PDF 17 KB Posted

Attached to
Baker Compound Work Center Building
Solicitation number
AG-04M3-S-15-0015
Issued by

About this file

B. Fixtures

View the file

Other files

File Type Posted
A._Amendment02.pdf PDF
C._PreBidMeetingAttendees.pdf PDF
Amendment1.PDF PDF
D._Bidders_Package.docx DOCX document
B._FinalSpecifications.pdf PDF
A._Baker_CompoundRFP.PDF PDF
C._BidDocDrawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Baker Work Center 11/17/14 22 42 00 - 1 COMMERCIAL PLUMBING FIXTURES

SECTION 22 42 00

COMMERCIAL PLUMBING FIXTURES

PART 1 GENERAL

1.1 SUMMARY

A. Work Included: Providing of all plumbing fixtures, fixture trim, cleanouts and appurtenances as shown or required.

B. Product Certification: Provide only products certified for use in the State of Oregon.

1.2 SUBMITTALS

A. Provide submittals in accordance with Section 22 00 00.

B. Submittals shall include manufacturer's catalog literature for all products used.

1.3 OPERATION AND MAINTENANCE DATA

A. Provide O&M data in accordance with Section 22 00 00.

B. O&M data shall include:

1. Manufacturer's literature.

2. Maintenance instructions.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Vitreous China Fixtures: American Standard or approved equal.

B. Flush Valves: Sloan, Zurn or approved equal

C. Fixture Trim: As noted in description.

D. Shower Enclosures: Fiber-Fab, Aquaglass, Lasco or approved equal.

E. Clothes Washer Box: Guy Gray or approved equal.

F. Floor Drains: Jay R. Smith, Watts Ancon, Wade or Zurn.

G. Cleanouts: Jay R. Smith, Wade, Watts Ancon or Zurn.

H. Carriers: Jay R. Smith, Zurn or approved equal.

I. Priming Valves: Precision Plumbing

J. Domestic Hot Water Circulating Pumps: Bell & Gossett, Grundfos or approved equal

K. Water Hammer Arrestors: Smith or Precision Plumbing Products.

L. Supplies and Stops: Speedway, McQuire, Zurn or Eastman.

Baker Work Center 11/17/14 22 42 00 - 2 COMMERCIAL PLUMBING FIXTURES

2.2 DESCRIPTION

A. Water Closet (WC-1): ABA

1. American Standard “Colorado Right Height” Model 3541.001, white vitreous china, wall mounted, ABA compliant, flushometer, elongated bowl, siphon jet action 1.6 gpf low consumption toilet. Mount at ABA compliant height.

2. Sloan ROYAL model 111-1.28 Low Consumption, exposed water closet flushometer for wall hung top spud bowls..

3. Olsonite model 10SSCT open front, solid white plastic, seat with cover for elongated bowl with stainless steel hinge posts.

B. Urinal (U-1): ABA

1. American Standard “Washbrook” Model 6590.001, White vitreous china, wall mounted, top spud, ABA compliant, flushometer, 0.5 gpf, flushing rim, siphon jet.

Mount at ABA height.

2. Sloan model 186-0.5, exposed urinal, manual flush-o-meter 0.5 gpf flush valve, ¾” top spud, vandal resistant cap, ABA compliant handle, sweat solder adapter, cast set screw wall flange.

C. Lavatory (L-1):

1. American Standard “Ohio” model 0439.004US, countertop, front overflow, 20”x17-

3/8”x6” deep, oval, white vitreous china, 4” center holes, ABA compliant, self-rimming, faucet ledge.

2. American Standard “Reliant 3”, model 7385.003_V05, single control lavatory faucet.

Indexed metal lever handle, 3 hole application, 4” center set holes, cast brass waterway, grid drain, plated flange and stopper, Vandal resistant, non-aerated 0.5 gpm flow rate @ 60 psi, Chrome finish.

D. Lavatory (L-2): ABA

1. American Standard “Missouri” model 0436.004US, front overflow. Wall hung, semi-pedestal, oval, white vitreous china, 4” center holes, self-rimming, counter top lavatory.

2. American Standard “Reliant 3”, model 7385.003_V05, single control lavatory faucet.

Indexed metal lever handle, 3 hole application, 4” center set holes, cast brass waterway, grid drain, plated flange and stopper, 0.5 gpm flow rate @ 60 psi, Chrome finish.

3. Pre-formed manufactured insulation kit for trap, waste and water supplies.

4. Refer to Architectural drawings for ABA mounting height.

E. Sink (S-1): ABA

1. Elkay, model LRADQ1517 x 6.5 deep, Single Bowl Sink, counter mount, seamless, 18 gauge stainless steel

2. Delta ”HDF” model 400LF-HDF Single handle, kitchen faucet, cast brass body, finish, deck mount, 3 hole, 8” o.c. 1.5 gpm, adjustable limit stops. Model 400 series hose and spray attachment.

F. Shower (SH-1): ABA

1. Fiber-Fab model 38H1FW: One–piece shower, fiberglass, gel coat, 38” x 38-1/4” x

80-3/4” dimensions, acrylic, grab bar, anti-slip floor, fold-down seat, “L” shaped stainless steel grab bar.

2. Moen Commercial, 8342EP15, 1.5 GPM, heavy duty, pressure balancing, brass shower valve, hand shower with vacuum breaker, hose and stainless steel combination slide bar, lever blade handle.

3. Fiber-Fab V140NC: solid brass, polished chrome finish shower drain.

Baker Work Center 11/17/14 22 42 00 - 3 COMMERCIAL PLUMBING FIXTURES

G. Shower (SH-2): ABA Ready

1. Fiber-Fab #38BFFW: One–piece shower, fiberglass, gel coat, 38” x 38-1/4” x 80-

3/4” dimensions, acrylic. ADA ready, but does not include seat or grab bar.

2. Moen Commercial, 8375EP15, 1.5 GPM, heavy duty, pressure balancing, forged brass shower valve, lever blade handle.

3. Fiber-Fab V140NC: solid brass, polished chrome finish shower drain.

H. Service Sink (SS-1):

1. Fiat model FL-7, Molded Stone, Floor standing, single tub, white, baked enamel legs. Provide for deck type faucet w/ 8” center set with spout.

2. Delta “Teck” model 26C3232 deck mount faucet. Inlets on 8” centers, chrome finish.

I. Clothes Washer Box (CWB-1):

Guy Gray Model BB-200 or BB-200TS, recessed combination fixture for waste and hot and cold water supply, 16 gauge steel with epoxy finish, 2” outlet.

J. Valve Box (VB-1):

Guy Gray BIM875 recessed valve box for refrigerator ice maker. 18ga steel.

K. Hose Bibb (HB-1): Woodford model 67 Freezeless, backflow protected, automatic drain down, wall hydrant. Provide with loose key.

L. Pressure Reducing Valve (PRV-1): Watts series 223S, high capacity water pressure reducing valve. Bronze body construction, enlarged diaphragm, spring cage and seat.

Outlet pressure set to 50psi.

M. Supplies and Stops: Flexible supplies with loose key angle stops to wall with canopy flanges and all exposed surfaces chrome plated.

N. Priming Valves: Precision Plumbing Products, Inc., Oregon P1 or P2.

O. Traps:

1. Exposed Traps: 17-gauge chrome plated tubing adjustable P-trap with slip bushing.

2. Concealed or Below Grade: Coated cast iron P-trap, recessed screw joint or to match cast iron pipe.

3. Support Rims: Stainless steel rims, if sink not furnished with integral rim.

P. Heat Trace Control Panel (HT-1): Protherm DCP 15 series dual, digital, process controller. Pre-wired and pre-tested in a NEMA 12 polyester enclosure, Illuminated on/off switch, provide with power cord and twist lock plug, Hinged cover. Coordinate electrical connection with electrical contractor.

PART 3 EXECUTION

3.1 INSTALLATION

A. Provide plumbing fixture trim where applicable on fixture.

B. Plumbing Fixtures:

1. Plumbing Fixtures Mounting Heights: All fixtures standard rough-in catalogued heights unless specified or shown otherwise on the architectural drawings.

2. Floor Drains: Set top flush with finished floor unless noted otherwise on the architectural drawings.

Baker Work Center 11/17/14 22 42 00 - 4 COMMERCIAL PLUMBING FIXTURES

C. Priming Valves:

1. Floor drain and Floor Sink traps primed with priming valves with 3/8" copper pipe.

2. Six traps maximum primed from one priming valve.

3. Where priming valves are installed in finished rooms, conceal in wall and provide access door.

4. Install shutoff valve ahead of priming valve.

D. Water Hammer Arrestors (WHA-1): Sioux Chief, Precision Products or Watts, with piston and O-ring construction, having PDI #WH-201, ASSE #1010 and ANSI #A112.26.1M certification.

1. Provide where shown and where recommended by Plumbing Drainage Institute

2. Furnish access panel to allow repair or replacement.

3. Install in horizontal or vertical position, but never upside down.

4. Install in line with water flow direction if possible..

E. Drawings are diagrammatic and may not show all required cleanouts and fittings. Provide additional required items at no additional cost.

END OF SECTION

File details come from the government source that posted it. Updated .