Amd_2_-_AG-04GG-S-17-0009.pdf

PDF 58 KB Posted

Attached to
PONDEROSA HALL RECONSTRUCTION Federal contract opportunity
Solicitation number
AG-04GG-S-17-0009
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to PONDEROSA HALL RECONSTRUCTION, newest first.
File Type Posted
Amd_2_-_Atch_2_-_Conformed_RFP_-_AG-04GG-S-17-0009.pdf PDF
Amd_2_-_Atch_1_-_Ponderosa_Asbestos__Lead_Report.pdf PDF
Amd_2_-_Atch_3_-_Conformed_Atch_1_-2_Specifications.pdf PDF
Minutes_from_site_visit_-_Ponderosa_.pdf PDF
Site_Visit_Handout.pdf PDF
Amd_0001_-_AG-04GG-S-17-0009.pdf PDF
Atch_6_Past_Performance_Data_Sheet.docx DOCX document
Atch_5_Fire_clauses_r6-fs-6300-52.pdf PDF
AG-04GG-S-17-0009.pdf PDF
Atch_3_-_Drawings.pdf PDF
Atch_4_Wage_Decision_OR160025.pdf PDF
Atch_1_-2_Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0002:

1) Provides changes/results from Asbestos and Lead Based Paint testing

2) Extends proposal due date to 2:00 PM PDT April 25, 2017 See page 2 for details.

Please acknowledge receipt of this amendment on page 2 of the SF1442 in your proposal.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

1. CONTRACT ID CODE

3. EFFECTIVE DATE

04/05/2017

4. REQUISITION/PURCHASE REQUISITION NUMBER

(X)

FACILITY CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 3

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 04GG 7. ADMINISTERED BY (If other than Item 6) CODE

DESCHUTES NTL FOREST

63095 DESCHUTES MARKET ROAD

BEND OR 97701

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

AG-04GG-S-17-0009

9B. DATED (SEE ITEM 11)

01/23/2017

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

AG-04GG-S-17-0009 Page 2 of 3 Amendment -0002 April 5, 2017

1. The purpose of this amendment to:

1) Provide changes/results from Asbestos and Lead Based Paint testing

2) Extends proposal due date

2. The Ponderosa Asbestos & Lead Paint Report is provided as an attachment to this amendment. The Statement of Work and Specifications are changes as noted below to reflect the results of that report.

3. SOW (page 4 of RFP) is changed to read as follows:

Existing painted surfaces on this building are known to have lead-containing paint. They must be treated in accordance with LBP guidelines and work procedures outlined by the Oregon Health Authority for Renovation, Repair and Painting and in OAR 333-070-0075 to 333-070- 0160 as well as the Oregon CCB regulations in OAR 812-007-0000 to 812-007-0025 and 812- 007-0300 to 812-007-0374. Contractors must possess an Oregon LBPR contractor’s license in order to be considered for this project. See attached Asbestos and Lead Paint Survey Report.

Existing gypsum wallboard/joint compound within the building is known to contain asbestos.

The known ACM’s are encapsulated within existing paint and sealed. However, any disturbance of the ACM’s will require full compliance with all laws and regulations concerning asbestos fibers and construction. Asbestos abatement professionals and procedures may be required for some portions of the work. See attached Asbestos and Lead Paint Survey Report.

4. Specification 06 16 00- 2 is changed to read as follows:

3.02 ASBESTOS CONTAINING MATERIAL & LEAD BASED PAINT

A. Existing gypsum wallboard/joint compound is an Asbestos Containing Material (ACM). It is also coated with Lead Based Paint (LBP). See attached Asbestos and Lead Paint Survey Report.

B. When working around existing gypsum wallboard and joint compound, apply all materials in a manor so as not to disturb existing ACM and LBP materials. Over spread existing materials with joint compound so that all finish disturbance is performed on only newly applied, non-ACM and LBP materials. DO NOT DISTURB in any way the existing ACM and LBP surfaces.

AG-04GG-S-17-0009 Page 3 of 3 Amendment -0002 April 5, 2017

5. Proposal due date is extended until 2:00 PDT, Tuesday, April 25, 2017.

Attachments:

1. Ponderosa Asbestos & Lead Paint Report, dated March 2017

2. Conformed RFP

3. Conformed Specifications

File details come from the government source that posted it. Updated .