Attachment_2_baldmtn_plans.pdf
PDF 12 MB Posted
- Solicitation number
- AG-02RC-S-10-0022
About this file
Attachment 2 - Plans Sheets
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_4_8.11.10.doc | DOC document | |
| Attachment_M9.1_amend_4_baldmtn_plans.pdf | ||
| Attachment_A_amendment_3_wage_rate.docx | DOCX document | |
| amendment_3_8.5.10.doc | DOC document | |
| amendment_2_8.4.10.doc | DOC document | |
| Attachment_A_amendment_2_rev_found_detail.pdf | ||
| Amendment_1_bald_mtn.docx.docm | DOCM document | |
| return_forms_bald_mtn.doc | DOC document | |
| Attachment_3_baldmtn_CSIspecs.pdf | ||
| AG-0281-S-10-0022_complete.doc | DOC document | |
| Attachment_1_wage_rates.docx | DOCX document | |
| attachment_4_Idaho_wrk_comp_cert_.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Priest River
Albeni Hwy
Sandpoint
Ponderay
48°19'53"N 116°41'38"W
Lake Pend OreilleP en in su la R oa d to Spokane, WA to Bonners Ferry to Missoula, MT to Coeur d' Alene to Coolinto Priest Lake
Bald Mountain
BALD MT. RD.
W
BLDG. SITE LOCATION
B A
L D
M O
U N
T A
IN
R
E
PE
A T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S
D E
PA
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E
ST
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I
H
T
AIA
O
T
ETA
IF DA
AR985227
O
STRUCTURAL DRAWINGS
EXPLANATION OF SYMBOLS
DRAWING INDEX
ARCHITECTURAL DRAWINGS
COVER COVER SHEET
ELECTRICAL DRAWINGS
PROJECT TEAM
ARCHITECTURAL ABBREVIATIONS
2 31
TYPICAL SHEET LAYOUT
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B.O. BOTTOM OF
BD BOARD
BLDG BUILDING
BL KG BLOCKING
BM
BRG BEARING
BTWN BETWEEN
BUR
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
EAST
EA EACH
EJ EXPANSION JOINT
EL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
F LR FLOOR
FND FOUNDATION
FR FRAME
FT FEET/FOOT OR FIRE TREATED
FOOTING
GA GAUGE OR GAGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE/INSULATED/INSULATION
INT INTERIOR
INV INVERT
JT JOINT
KIT KITCHEN
L
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LP LOW POINT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PL PLATE
P LAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR OR REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.P. TOP OF PLATE
T . O . S . TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL TILE
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
@ AT
AB ANCHOR BOLT
ABOVEABV
NUMBER OR POUND
BEAM OR BENCHMARK
BUILT UP ROOF
CORNER GUARD
FTNG
LONG / LENGTH
ELEVATION
HEATING/VENTILATION
& AIR CONDITIONING
OUTSIDE DIAMETER OR
OVERFLOW DRAIN
BALD MOUNTAIN REPEATER AND
GENERATOR BUILDING REPLACEMENT
GRID LINE NUMBER
DETAIL TAG -
DETAIL NUMBER
PAGE LOCATION
INTERIOR ELEVATION TAG
DETAIL NUMBERS (4)
PAGE LOCATION
HEIGHT - ELEVATION
SPOT LOCATION
DOOR TAG
BUILDING.DOOR-NUMBER
DETAIL : PAGE
PHOTO TAG
ROOM NAME
ROOM NUMBER
0'-0"
T.O.C.
1.01
A
SECTION TAG -
DETAIL NUMBER
PAGE LOCATION
ELEVATION TAG -
DETAIL NUMBER
PAGE LOCATION
KEYNOTE TAG
DEMOLITION NOTE TAG
WALL TYPE TAGT1
A4.1
A5.1
13:A9.1
59.01
WINDOW TAG
BUILDING.WINDOW-NUMBER
1/8" = 1'-0"
A2.1 : A3.1
DETAIL
SHEET OF ORIGIN
DETAIL POSITION
ON SHEET
SHEET WHERE DETAIL
APPEARS
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS
THROUGH FIELD VERIFICATION & EXISTING PLAN REVIEW, HOWEVER, THE CONDITION OF
THE UNPROTECTED STRUCTURES IS CONTINUALLY CHANGING. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, & COORDINATE WITH
THE EXPECTED WORK BEFORE CONSTRUCTION/ ORDERING/ INSTALLATION & NOTIFY
CONTRACTING officer IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY
EXISTS.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE
CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES &
TECHNIQUES FOR THE EXTENT & TYPE OF WORK DESCRIBED HEREIN. FIELD VERIFY ALL
CONDITIONS & COORDINATE WITH ANTICIPATED WORK PRIOR TO CONSTRUCTION.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS
AS PRESCRIBED BY THE 2009 INTERNATIONAL BUILDING CODE, INTERNATIONAL
MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, UNIFORM FIRE CODE, AMERICAN
NATIONAL STANDARDS, THE AMERICANS WITH DISABILITIES ACT, & ANY APPLICABLE
LOCAL CODES & REGULATIONS.
4. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS
INFORMATION.
5. DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD; IF A
DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING officer
IMMEDIATELY FOR WRITTEN CLARIFICATION.
6. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE
YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S) SHALL REPLACE
ALL DEFECTIVE PARTS & SUPPLIES AT THEIR COST.
7. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS, & LABOR REQUIRED TO COMPLETE
THE WORK INDICATED WITH ALL ACCESSORIES, FINISHES, & SYSTEMS NECESSARY OR
APPLICABLE TO ENSURE A COMPLETE & FUNCTIONAL BUILDING UPON COMPLETION.
8. CONTRACTOR TO REFER TO ALL DRAWINGS INDICATED ON THIS COVER SHEET FOR
DESCRIPTION OF WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL
REQUIREMENTS OF THE DRAWINGS & THE WORK OF ANY & ALL EMPLOYEES,
SUB-CONTRACTORS, SUB-SUB-CONTRACTORS OR ANY PERSON OR TRADE PARTICIPATING
IN ANY ASPECT OF THE WORK OUTLINED.
9. ANY ITEM SHOWN OR REFERENCED IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL
INSTANCES.
10. PROVIDE & MAINTAIN ALL NECESSARY BARRICADES, FLAGMEN, SINGAGE, & TEMPORARY
STRUCTURES NECESSARY TO FACILITATE SAFE ACCESS & TRAVEL TO THE GENERAL
PUBLIC.
11. CONTRACTOR SHALL COORDINATE ALL SIZES OF EXISTING OPENINGS WITH THE
REQUIREMENTS FOR ANY NEW WORK.
12. ALL NEW FINISHES SHALL ALIGN WITH ADJOINING SURFACES UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE SMOOTH, EVEN TRANSITIONS FROM ONE SURFACE TO
ANOTHER.
13. ALL DAMAGED OR DETERIORATED BUILDING ELEMENTS SHALL BE REPAIRED OR REPLACED
IN-KIND TO PROVIDE A SOUND & VISUALLY COMPLETE FINISH STRUCTURE.
14. THE ARCHITECT HAS FINAL AUTHORITY OF DETERMINATION OVER ALL ASPECTS RELATED
TO APPEARANCE & FINISH.
D2.1 D4.1 A2.1 A4.1 A5.1 A9.1
DEMO PLANS & REFLECTED CEILING PLANS
DEMO ELEVATIONS
FLOOR PLANS & REFLECTED CEILING PLANS
EXTERIOR ELEVATIONS & PHOTOS
BUILDING SECTIONS AND DETAILS
DOOR SCHEDULE NOTES AND DETAILS
ELECTRICAL FLOOR PLANS
ELECTRICAL DETAILS
E2.1 E9.1
GENERAL NOTES & TYPICAL DETAILS
SOUTH GENERATOR - DETAILS, FOUNDATION & ROOF PLANS
NORTH REPEATER - DETAILS, FOUNDATION & ROOF PLANS
S1.0 S2.1 S2.2
BONNER COUNTY - IDAHO 83856
US DEPARTMENT OF AGRICULTURE
IDAHO PANHANDLE NATIONAL FOREST
SANDPOINT RANGER DISTRICT
CONTACT: MIKE SHOUP
208.765.7204
BEAUDETTE CONSULTING ENGINEERS, INC.
131 WEST MAIN
MISSOULA, MONTANA 59802
406.721.7315
RM_#
ROOM_NAME
COVER
C O
V E R
S H
E E T
A&E ARCHITECTS, P.C.
222 NORTH HIGGINS
MISSOULA, MONTANA 59802
406.721.5643 406.721.1887
MORRISON MAIERLE, INC.
3011 PALMER STREET
MISSOULA, MONTANA 59808
406.542.8880
OWNER: ARCHITECT:
STRUCTURAL: MECHANICAL/ELECTRICAL:
GENERAL PROJECT NOTES
D A
T E
/1
/2
I
SS
U
E D
F O
R
FI
N
A L R
E V
IE
W
P R O
JE
C
T N
O
.0
S
E T N
O
VICINITY MAP
MECHANICAL DRAWINGS
MECHANICAL FLOOR PLANS
MECHANICAL SCHEDULES & DETAILS
M2.1 M9.1
SITE MAP
NORTH
1" = 200'
NORTH REPEATER BLDG.
SOUTH GENERATOR BLDG.
26'-0"+
100 amp
T
100 amp
T R A N S F E R
S W
IT
C H
G E N E R A T O R
T
T
DEMO LEGEND:
DEMO WALLS OR
DEMO BUILT
ELEMENT
EXISTING WALLS OR
BUILT ELEMENT TO
REMAIN
EXISTING DOOR,
FRAME, AND
HARDWARE TO BE
REMOVED.
D2.1
D E M
O L
IT
IO
N
P L A
N S A
N D
R E F L E C
T E D
C E
IL
IN
G
P L A
N S
1/2" = 1'-0"
1/2" = 1'-0"
D2.1 : D2.1
18 REFLECTED CEILING DEMO PLAN
D2.1 : D2.1
REPEATER BLDG. DEMOLITION PLAN8
D2.1 : D2.1 1/2" = 1'-0"
REFLECTED CEILING DEMO PLAN20
D2.1 : D2.1 1/2" = 1'-0"
GENERATOR BLDG. DEMOLITION PLAN10
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I H
T
AIA
O
T
ETA
IF DA
AR985227
O
DEMO KEYNOTES
EXISTING EQUIPMENT OR SYSTEM TO REMAIN - CONTRACTOR TO INSURE PROTECTION THROUGHOUT THE COURSE
OF DEMOLITION TO INSURE UNINTERRUPTED OPERATION DURING DEMOLITION ACTIVITIES - TYPICAL.
REMOVE EXTERIOR CEMENTITIOUS WALL BD. FINISH IN ITS ENTIRETY - PROTECT EXISTING CMU WALL
CONSTRUCTION THAT WILL REMAIN.
REMOVE PORTION OF EXISTING CMU WALL AND SAW CUT EXITING CONCRETE CURB TO ACCOMMODATE OPENING TO
NEW ROOF ACCESS. COORDINATE REMOVAL AND RELOCATION OF SERVICES WITH NEW CONSTRUCTION.
REMOVE AND SALVAGE EXISTING STEEL DUTCH DOOR AND HARDWARE - PREPARE FOR REINSTALLATION AT NEW
LOCATION. DEMO EXISTING SWEEP IN ITS ENTIRETY - PREPARE DOOR FOR NEW SWEEP.
COORDINATE REMOVAL AND REPLACEMENT OF ALL ELECTRICAL OUTLETS, CONDUIT, PANELS & MISC. ELECTRICAL
EQUIPMENT ASSOCIATED WITH NEW DISTRIBUTION SYSTEM - COORDINATE RE-ROUTING ELEC. TO ACCOMMODATE
NEW OPENINGS. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
PROTECT EXISTING TRANSMITTER CABLE THAT WILL REMAIN OPERATIONAL THROUGHOUT DEMOLITION WORK.
REMOVE FIBER CEILING BOARD IN ITS ENTIRETY. CEILING FINISH IS ANTICIPATED TO BE AN ASBESTOS CONTAINING
MATERIAL, TAKE APPROPRIATE HAZMAT ABATEMENT PROCEDURES.
REMOVE EXISTING LIGHT FIXTURE, FLUORESCENT LAMPS, CONDUIT AND WIRING IN ITS ENTIRETY. REFER TO
ELECTRICAL DRAWINGS FOR MORE INFORMATION.
REMOVE AND SALVAGE VENTILATION FANS AND ASSOCIATED EQUIPMENT - PREPARE FOR REINSTALLATION ON NEW
ROOF SYSTEM. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
REMOVE EXISTING 'D' RING CABLE MANAGEMENT SYSTEM IN ITS ENTIRETY. PROVIDE TEMPORARY SUPPORTS FOR
CABLES TO REMAIN OPERATIONAL THROUGHOUT DEMOLITION WORK.
REMOVE EXISTING EXHAUST FAN, THERMOSTAT, CONDUIT AND ASSOCIATED EQUIPMENT IN THEIR ENTIRETY - REFER
TO MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFO.
REMOVE EXISTING TIN ROOF FINISH, STRUCTURE, WOOD FASCIA, SOFFIT BOARDS AND ANY OR ASSOCIATED
MATERIALS IN THEIR ENTIRETY. PREPARE FOR NEW STRUCTURAL ROOF SYSTEM. REFER TO STRUCTURAL DRAWINGS
FOR MORE INFO.
REMOVE EXISTING MTL. VENTILATION SHROWD IN ITS ENTIRETY - PREPARE AREA FOR NEW VENTILATION LOUVER.
REFER TO MECHANICAL DRAWINGS FOR MORE INFO.
TYP.
TYP.
TYP.
TYP.
6A
6B
6C
6D
7:A 4.1
8:D 2.1
6:A4.1
14 REMOVE EXISTING 3 HOLE CABLE SLEEVE ON EXTERIOR WALL - REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
GENERAL PROJECT NOTES
1. DO NOT SCALE DRAWINGS.
2. COORDINATE DEMOLITION WORK AND BELOW GRADE UTILITY WORK WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL DRAWINGS.
3. REMOVE EXISTING MATERIALS AND FINISHES NOTED OR REQUIRED TO COORDINATE WITH NEW CONSTRUCTION.
4. ITEMS DESIGNATED FOR DEMOLITION SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
5. REMOVE ALL ABANDONED PLUMBING, MECHANICAL, AND ELECTRICAL ITEMS IN THEIR ENTIRETY. REMOVE
MISCELLANEOUS SCREWS AND NAILS FROM WOODWORK IN PREPARATION FOR NEW CONSTRUCTION AND FINISH.
6. (ASBESTOS) FIBERBOARD CEILING IS THOUGHT TO BE PRESENT, COORDINATE APPROPRIATE HAZMAT PROCEDURES
WITH CONTRACTING OFFICER. REMOVE CEILING IN ITS ENTIRETY AND RE-INSULATE NEW ROOF AND STRUCTURE
WITH FIBERGLASS BATT INSULATION TO A MINIMUM OF R-50.
7. LEAD BASED PAINTS ARE ANTICIPATED TO BE PRESENT. TAKE NECESSARY PRECAUTIONS.
8. PROVIDE BLOCKING AT ALL NEW AND RELOCATED ELECTRICAL PANELS, CABINETRY, SHELVING SUPPORTS, AND
MECHANICAL DEVICES.
9. RADIO EQUIP. GENERATOR, ELECTRICAL AND ALL OTHER ASSOCIATED EQUIP. SHALL NOT BE LEFT UNSECURED
DURING THE DEMO WORK. CONSTRUCT A BUILDING PERIMETER FIRST, TO THE POINT THAT THE BUILDINGS CAN BE
SECURED. IF BUILDING CANNOT BE SECURED, A 24 HOUR PER DAY GUARD IS REQUIRED.
10. ROOF DEMOLITION AND NEW ROOF CONSTRUCTION SHOULD BE COORDINATED IN ORDER TO INSURE THAT WORK IS
COMPLETED IN 1 DAY. IT IS ESSENTIAL BOTH THE BUILDINGS REMAIN WEATHER TIGHT IN ORDER TO PROTECT
EXISTING EQUIPMENT THAT WILL REMAIN OPERATIONAL DURING ENTIRE PHASE OF DEMOLITION AND
CONSTRUCTION.
11. CONTRACTOR SHALL PROTECT EXISTING EQUIPMENT IN BOTH THE REPEATER AND GENERATOR BUILDINGS AT ALL
TIMES. PROVIDE A DETAILED PROTECTION PLAN TO THE CONTRACTING OFFICER FOR APPROVAL WITHIN 14 DAYS
AFTER THE NOTICE HAS BEEN GIVEN TO PROCEED WITH WORK.
REMOVE EXISTING BASE BOARD HEATING UNIT, THERMOSTAT AND ASSOCIATED ELECTRICAL IN ITS
ENTIRETY. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
D4.1
18A
18B
18C
18D
8:D2.1
D4.1
D4.1
D4.1
D4.1
D4.1
D4.1
D4.1
NORTH NORTH
GENERATOR BUILDING
NORTH
REPEATER BUILDING
NORTH
TYP.
2 2
REMOVE AND SALVAGE EXISTING GENERATOR FLUE AND HARDWARE - PREPARE FOR REINSTALLATION AT NEW
LOCATION.
17 REMOVE EXISTING CABLE TOP COVER AND STL. ANGLE HARDWARE IN ITS ENTIRETY.
D4.1
D E M
O L
IT
IO
N
E L E V
A T
IO
N S
11 12
D4.1 : D2.1
1 DEMO NORTH ELEVATION
1/4"=1'-0"
DEMO EAST ELEVATION2 DEMO SOUTH ELEVATION3
4 DEMO WEST ELEVATION
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I H
T
AIA
O
T
ETA
IF DA
AR985227
O
D4.1 : D2.1 1/4"=1'-0" D4.1 : D2.1 1/4"=1'-0" D4.1 : D2.1 1/4"=1'-0"
REPEATER BUILDING REPEATER BUILDING REPEATER BUILDING REPEATER BUILDING
REPEATER BUILDING DEMOLITION INTERIOR ELEVATIONS
D4.1 : D2.1 1/4"=1'-0"
DEMO EAST ELEVATION DEMO SOUTH ELEVATIONDEMO NORTH ELEVATION
D4.1 : D2.1 1/4"=1'-0" D4.1 : D2.1 1/4"=1'-0"D4.1 : D2.1 1/4"=1'-0"
GENERATOR BUILDING GENERATOR BUILDINGGENERATOR BUILDING
EXISTING PROPANE GAS SERVICE FOR GENERATOR TO REMAIN - CONTRACTOR TO
PROTECT AND MAINTAIN SERVICE DURING DEMO WORK.
EXISTING PROPANE TANK TO REMAIN - CONTRACTOR TO INSURE PROTECTION DURING
COURSE OF WORK.
EXISTING ELECTRICAL MAIN SERVICE BOX TO REMAIN - CONTRACTOR TO INSURE
PROTECTION DURING COURSE OF WORK.
# EXISTING KEYNOTE LEGEND
A. NORTH ELEVATION B. EAST ELEVATION C. SOUTH ELEVATION D. WEST ELEVATION
18 GENERATOR BUILDING DEMOLITION INTERIOR ELEVATIONS
D4.1 : D2.1 1/4"=1'-0"
A. NORTH ELEVATION B. EAST ELEVATION C. SOUTH ELEVATION D. WEST ELEVATION
DEMO KEYNOTES#
2 2
5 5
7 77
5 5
REMOVE ABANDONED GENERATOR FLUE AND ANY MISCELLANEOUS FASTENERS IN THEIR ENTIRETY - INFILL
EXISTING HOLE W/CONCRETE FILL.
REMOVE EXISTING EXTERIOR MTL. LOUVER IN ITS ENTIRETY.
REMOVE EXISTING WALL MOUNT HANGERS AND MISC. FASTENERS FROM EXISTING CEMENT
BOARD IN THEIR ENTIRETY.
16 GENERATOR BUILDING DEMO WEST ELEVATION
D4.1 : D2.1 1/4"=1'-0"
EXISTING EQUIPMENT OR SYSTEM TO REMAIN - CONTRACTOR TO INSURE PROTECTION THROUGHOUT THE COURSE
OF CONSTRUCTION TO ENSURE UNINTERRUPTED OPERATION DURING DEMOLITION ACTIVITIES - TYPICAL.
REMOVE EXTERIOR CEMENTITIOUS WALL BD. FINISH IN ITS ENTIRETY - PROTECT EXISTING CMU WALL
CONSTRUCTION THAT WILL REMAIN.
REMOVE PORTION OF EXISTING CMU WALL AND SAW CUT EXITING CONCRETE CURB TO ACCOMMODATE OPENING
TO NEW ROOF ACCESS. COORDINATE REMOVAL AND RELOCATION OF SERVICES WITH NEW CONSTRUCTION.
REMOVE AND SALVAGE EXISTING STEEL DUTCH DOOR AND HARDWARE - PREPARE FOR REINSTALLATION AT NEW
LOCATION. DEMO EXISTING SWEEP IN ITS ENTIRETY - PREPARE DOOR FOR NEW SWEEP.
COORDINATE REMOVAL AND REPLACEMENT OF ALL ELECTRICAL OUTLETS, CONDUIT, PANELS & MISC. ELECTRICAL
EQUIPMENT ASSOCIATED WITH NEW DISTRIBUTION SYSTEM - COORDINATE RE-ROUTING ELEC. TO ACCOMMODATE
NEW OPENINGS. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
REMOVE AND SALVAGE VENTILATION FANS AND ASSOCIATED EQUIPMENT - PREPARE FOR REINSTALLATION ON NEW
ROOF SYSTEM. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
REMOVE FIBER CEILING BOARD IN ITS ENTIRETY. CEILING FINISH IS ANTICIPATED TO BE AN ASBESTOS
CONTAINING MATERIAL, TAKE APPROPRIATE HAZMAT ABATEMENT PROCEDURES.
REMOVE EXISTING EXHAUST FAN, THERMOSTAT, CONDUIT AND ASSOCIATED EQUIPMENT IN THEIR ENTIRETY -
REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFO.
CONTRACTOR SHALL REMOVE EXISTING TIN ROOF FINISH, STRUCTURE, WOOD FASCIA, SOFFIT BOARDS AND ANY
OR ASSOCIATED MATERIALS IN THEIR ENTIRETY. PREPARE FOR NEW STRUCTURAL ROOF SYSTEM. REFER TO
STRUCTURAL DRAWINGS FOR MORE INFO.
REMOVE EXISTING MTL. SHROWD AND LOUVER IN ITS ENTIRETY - PREPARE AREA FOR NEW VENTILATION LOUVER.
REFER TO MECHANICAL DRAWINGS M2.1 FOR MORE INFORMATION.
REMOVE EXISTING CABLE SLEEVE ON EXTERIOR WALL, CONCRETE FILL EXISTING HOLES IN CMU WALLS - REFER TO
ELECTRICAL DRAWINGS FOR MORE INFO.
REMOVE EXISTING BASE BOARD HEATING UNIT, THERMOSTAT AND ASSOCIATED ELECTRICAL IN ITS ENTIRETY.
REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
REMOVE AND SALVAGE EXISTING GENERATOR FLUE AND HARDWARE - PREPARE FOR REINSTALLATION AT NEW
LOCATION.
GENERAL PROJECT NOTES
1. DO NOT SCALE DRAWINGS.
2. COORDINATE DEMOLITION WORK AND BELOW GRADE UTILITY WORK WITH STRUCTURAL,
MECHANICAL, AND ELECTRICAL DRAWINGS.
3. REMOVE EXISTING MATERIALS AND FINISHES NOTED OR REQUIRED TO COORDINATE WITH
NEW CONSTRUCTION.
4. ITEMS DESIGNATED FOR DEMOLITION SHALL BE REMOVED FROM THE SITE AND DISPOSED
OF BY THE CONTRACTOR.
5. REMOVE ALL ABANDONED PLUMBING, MECHANICAL, AND ELECTRICAL ITEMS IN THEIR
ENTIRETY. REMOVE MISCELLANEOUS SCREWS AND NAILS FROM WOODWORK IN
PREPARATION FOR NEW CONSTRUCTION AND FINISH.
6. (ASBESTOS) FIBERBOARD CEILING IS THOUGHT TO BE PRESENT, COORDINATE APPROPRIATE
HAZMAT PROCEDURES WITH CONTRACTING OFFICER. REMOVE CEILING IN ITS ENTIRETY
AND RE-INSULATE NEW ROOF AND STRUCTURE WITH FIBERGLASS BATT INSULATION TO A
MINIMUM OF R-50.
7. LEAD BASED PAINTS ARE ANTICIPATED TO BE PRESENT. TAKE NECESSARY PRECAUTIONS.
8. PROVIDE BLOCKING AT ALL NEW AND RELOCATED ELECTRICAL PANELS, CABINETRY,
SHELVING SUPPORTS, AND MECHANICAL DEVICES.
9. RADIO EQUIP. GENERATOR, ELECTRICAL AND ALL OTHER ASSOCIATED EQUIP. SHALL NOT BE
LEFT UNSECURED DURING THE DEMO WORK. CONSTRUCT A BUILDING PERIMETER FIRST,
TO THE POINT THAT THE BUILDINGS CAN BE SECURED. IF BUILDING CANNOT BE SECURED,
A 24 HOUR PER DAY GUARD IS REQUIRED.
10. ROOF DEMOLITION AND NEW ROOF CONSTRUCTION SHOULD BE COORDINATED IN ORDER
TO INSURE THAT WORK IS COMPLETED IN 1 DAY. IT IS ESSENTIAL BOTH THE BUILDINGS
REMAIN WEATHER TIGHT IN ORDER TO PROTECT EXISTING EQUIPMENT THAT WILL REMAIN
OPERATIONAL DURING ENTIRE PHASE OF DEMOLITION AND CONSTRUCTION.
11. CONTRACTOR SHALL PROTECT EXISTING EQUIPMENT IN BOTH THE REPEATER AND
GENERATOR BUILDINGS AT ALL TIMES. PROVIDE A DETAILED PROTECTION PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL WITHIN 14 DAYS AFTER THE NOTICE HAS BEEN
GIVEN TO PROCEED WITH WORK.
EXISTING ELECTRICAL MAIN SERVICE CABLE TO REMAIN OPERATIONAL THROUGHOUT
CONSTRUCTION - CONTRACTOR TO INSURE PROTECTION DURING COURSE OF WORK.
COORDINATE REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL GROUND(S) WITH CONTRACTING OFFICER
AND ELECTRICAL. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
18 1818
7 7
REMOVE EXISTING GROUND BUS BAR - PREPARE AREA TO RECEIVE NEW GROUND BUS BAR IN SAME LOCATION.
REFER TO ELECTRICAL DRAWINGS FRO MORE INFO.
REMOVE EXISTING 'D' RING CABLE MANAGEMENT SYSTEM IN ITS ENTIRETY. PROVIDE TEMPORARY SUPPORTS FOR
CABLES TO REMAIN OPERATIONAL THROUGHOUT DEMOLITION WORK.
20 REMOVE EXISTING CABLE TOP COVER AND STL. ANGLE HARDWARE IN ITS ENTIRETY.
20 20
6 6
100 amp
DISCNT.
T
100 amp
T R A N S F E R
S W
IT
C H
G E N E R A T O R
TT
LEGEND:
NEW DOOR
NEW WALL OR
NEW BUILT
ELEMENT
EXISTING WALLS OR
BUILT ELEMENT TO
REMAIN
A2.1
F L O
O R
P L A
N S A
N D
R E F L E C
T E D
C E
IL
IN
G
P L A
N S
A2.1 : A2.1
18 REPEATER BLDG. REFLECTED CEILING PLAN
A2.1 : A2.1
REPEATER BUILDING PLAN8
A2.1 : A2.1
REFLECTED CEILING PLAN20
A2.1 : A2.11/2" = 1'-0"
GENERATOR BUILDING PLAN10
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I H
T
AIA
O
T
ETA
IF DA
AR985227
O
KEYNOTES#
NEW PRE-ENGINEERED METAL LADDER - LADDER MUST MEET 1000# PER RUNG LOAD RATING WITH
MANUFACTURER'S STANDARD PRE-FINISHED LADDER. INSURE THAT LADDER MEETS ALL OSHA AND FOREST
SERVICE SAFETY REQUIREMENTS - TYP.
NEW FRAMED OPENING FOR ROOF HATCH ABOVE. REFER TO STRUCTURAL DRAWINGS FOR MORE INFO.
NEW INSULATED HOLLOW METAL DOOR WITH FULLY WELDED H.M. MASONRY FRAME AT EXISTING CMU WALL (GROUT
SOLID) - PAINT. PROVIDE FULL WEATHER STRIPING, BRUSH SWEEP AND THRESHOLD. REFER TO A9.1 DOOR
SCHEDULE FOR MORE INFO.
REINSTALL SALVAGED METAL DUTCH DOOR AND FRAME AT EXTERIOR OF NEW METAL STUD WALL CONSTRUCTION -
PROVIDE NEW DOOR SWEEP AND STRUCTURAL TUBE STEEL FRAME IN EXTERIOR OF METAL STUD WALL - REFER TO
A9.1 AND STRUCTURAL DRAWINGS FOR MORE INFO. INSURE RODENT PROOF INSTALLATION - FINISH W/ INDUSTRIAL
ENAMEL TYPE PAINT.
METAL STUDS @ 16" O.C W/ EXTERIOR SHEATHING AND 12" CORRUGATED PRE-FINISHED MTL. WALL PANEL -
PROVIDE FULL R-19 FIBERGLASS BATT INSULATION AND VAPOR BARRIER.
NEW 6" WIDE X 10" HIGH CONCRETE STEM WALL AT NEW METAL STUD FRAMED WALL. REFER TO STRUCTURAL FOR
MORE INFORMATION.
ACCESS TO NEW LADDER AND ROOF HATCH ADDITION - CONTRACTOR SHALL INSTALL A NEW CONCRETE SLAB AND
WRAP NEW OPENING WITH MTL. ANGLE AND PLATE JAMBS NEW CONCRETE SLAB. INSURE A CLEAN, PLUMB
OPENING - PAINT W/ INDUSTRIAL GRADE ENAMEL.
EXISTING CMU WALL TO REMAIN - CONTRACTOR TO INSURE PROTECTION THROUGHOUT THE COURSE OF
CONSTRUCTION - TYP.
REINSTALL SALVAGED ROOF VENTILATION FANS AND ASSOCIATED EQUIPMENT ON NEW ROOFING SYSTEM.
PROVIDE ANIMAL PROOF SCREENING AT EXTERIOR (VERITCAL INSTALLATION ONLY) REFER TO MECHANICAL
DRAWING FOR MORE INFO.
NEW 4" DEEP CEILING MOUNTED CABLE TRAY UNIT - INSURE THAT INSTALLATION IS COMPLIANT WITH ALL
EQUIPMENT SERVED - REFER TO SPECIFICATIONS FOR MORE INFO.
NEW TUBE STEEL FRAME AT REINSTALLED METAL DUTCH DOOR. REFER TO STRUCTURAL DRAWINGS FOR MORE INFO.
A5.1
A5.1
1/2" = 1'-0"
1/2" = 1'-0"
1 2 3 1 2
A
B
C
A
B
1 2
A
B
1 2 3
A
B
C
11'-512" 4'-6"
15'-1112"
11'-512"
1 1
NEW INDUSTRIAL STRIP LUMINAIRE. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.10
NEW 3'-0" X 2'-6" PRE-ENGINEERED ROOF HATCH W/ CURB OPTION MODIFICATION FOR METAL ROOFS AND KEYED
CYLINDER OR EQUAL. REFER TO A9.1 FOR MORE INFO.
NEW PRE-FINISHED 12" CORRUGATED MTL. ROOFING OVER APPROVED PLYWOOD FINISH OVER NEW METAL ROOF
STRUCTURE - COORDINATE FINISH INSTALLATION AT EXPOSED AREAS OF WALL ABOVE (E) CMU - TYP. REFER TO A5.1
AND STRUCTURAL DRAWINGS FOR MORE INFO.
1'-1012"3'-0"
3'-0" 1'-012"
E Q
E Q
NORTH
NORTH
1/2" = 1'-0"
NORTH
GENERATOR BLDG.
NORTH
NEW ELECTRICAL EQUIPMENT SPECIFIED. REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.17
17 17
A5.1
A5.1
A5.1
A5.1
TYP.
A5.1
TYP.
EXISTING EQUIPMENT OR SYSTEM TO REMAIN - CONTRACTOR TO INSURE PROTECTION THROUGHOUT THE COURSE
OF NEW WORK TO INSURE UNINTERRUPTED OPERATION DURING DEMOLITION ACTIVITIES - TYPICAL.
GENERAL PROJECT NOTES
1. DO NOT SCALE DRAWINGS.
2. COORDINATE DEMOLITION WORK AND BELOW GRADE UTILITY WORK WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL DRAWINGS.
3. REMOVE EXISTING MATERIALS AND FINISHES NOTED OR REQUIRED TO COORDINATE WITH NEW CONSTRUCTION.
4. ITEMS DESIGNATED FOR DEMOLITION SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
5. REMOVE ALL ABANDONED PLUMBING, MECHANICAL, AND ELECTRICAL ITEMS IN THEIR ENTIRETY. REMOVE
MISCELLANEOUS SCREWS AND NAILS FROM WOODWORK IN PREPARATION FOR NEW CONSTRUCTION AND FINISH.
6. (ASBESTOS) FIBERBOARD CEILING IS THOUGHT TO BE PRESENT, COORDINATE APPROPRIATE HAZMAT PROCEDURES
WITH CONTRACTING OFFICER. REMOVE CEILING IN ITS ENTIRETY AND RE-INSULATE NEW ROOF AND STRUCTURE
WITH FIBERGLASS BATT INSULATION TO A MINIMUM OF R-50.
7. LEAD BASED PAINTS ARE ANTICIPATED TO BE PRESENT. TAKE NECESSARY PRECAUTIONS.
8. PROVIDE BLOCKING AT ALL NEW AND RELOCATED ELECTRICAL PANELS, CABINETRY, SHELVING SUPPORTS, AND
MECHANICAL DEVICES.
9. RADIO EQUIP. GENERATOR, ELECTRICAL AND ALL OTHER ASSOCIATED EQUIP. SHALL NOT BE LEFT UNSECURED
DURING THE DEMO WORK. CONSTRUCT A BUILDING PERIMETER FIRST, TO THE POINT THAT THE BUILDINGS CAN BE
SECURED. IF BUILDING CANNOT BE SECURED, A 24 HOUR PER DAY GUARD IS REQUIRED.
10. ROOF DEMOLITION AND NEW ROOF CONSTRUCTION SHOULD BE COORDINATED IN ORDER TO INSURE THAT WORK IS
COMPLETED IN 1 DAY. IT IS ESSENTIAL BOTH THE BUILDINGS REMAIN WEATHER TIGHT IN ORDER TO PROTECT
EXISTING EQUIPMENT THAT WILL REMAIN OPERATIONAL DURING ENTIRE PHASE OF DEMOLITION AND
CONSTRUCTION.
11. CONTRACTOR SHALL PROTECT EXISTING EQUIPMENT IN BOTH THE REPEATER AND GENERATOR BUILDINGS AT ALL
TIMES. PROVIDE A DETAILED PROTECTION PLAN TO THE CONTRACTING OFFICER FOR APPROVAL WITHIN 14 DAYS
AFTER THE NOTICE HAS BEEN GIVEN TO PROCEED WITH WORK.
2 2
REINSTALL SALVAGED GENERATOR FLUE AND HARDWARE ON NEW ROOF SYSTEM.
PROTECT EXISTING TRANSMITTER CABLE THAT WILL REMAIN OPERATIONAL THROUGHOUT NEW WORK.18
NEW 12" INTERIOR PLY WD WALL FINISH.19
NEW CEILING MOUNTED UNIT HEATER, THERMOSTAT AND ASSOCIATED ELECTRICAL SYSTEMS. REFER TO
ELECTRICAL AND MECHANICAL DRAWINGS FOR MORE INFO.
NEW EXHAUST FAN AT EXTERIOR OF NEW METAL STUD FRAMED WALL. REFER TO ELECTRICAL AND MECHANICAL
DRAWINGS FOR MORE INFO.
NEW WEATHER PROOF/ SHIELDED CABLE TRAY. REFER TO SPECIFICATIONS FOR MORE INFO.22
NEW CABLE SLEEVE ON EXTERIOR WALL, FLASH AND SEAL ACCORDINGLY TO ENSURE WEATHERTIGHT
INSTALLATION - REFER TO ELECTRICAL DRAWINGS FOR MORE INFO.
16 16
16 16
16 16
6 6
A9.1
18 18
4'-114"
VERIFY
4'-114"
VERIFY
A9.1
A9.1
A9.1
6"
6"
NEW 12" x 12" MOTORIZED LOUVER/DAMPNER AT EXISTING OPENING. ENSURE THAT EXISTING OPENING IS
APPROPRIATE SIZE TO ACCOMMODATE NEW SYSTEM AND ADJUST ACCORDINGLY. REFER TO ELECTRICAL AND
MECHANICAL DRAWINGS FOR MORE INFO.
SIM.
NEW OUTSIDE CONDENSING UNIT ON 4" CONCRETE HOUSING PAD. NEW REFRIGERANT LINES SET PER MANUF.
WRITTEN INSTRUCTIONS THRU NEW MTL. AND EXISTING CMU WALL, ENSURE WEATHERTIGHT INSTALLATION.
REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR MORE INFO.
A4.1
A4.1
A4.1
A4.1
A4.1
A4.1
A4.1
A4.1
NEW WALL MOUNTED INDOOR AIR CONDITIONING UNIT. REFER TO ELECTRICAL AND MECHANICAL FOR MORE
INFO.
A4.1
E X
T E R
IO
R E
L E V
A T
IO
N
S A
N D
P H
O T O
S
16 18
19 20
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I H
T
AIA
O
T
ETA
IF DA
AR985227
O
NEW PRE-FINISHED METAL PANEL (12" CORRUGATED w/ EXPOSED FASTENER
INSTALLATION) - INSTALL PER MANUFACTURERS STANDARD INSTALLATION DETAILS AND
INSTRUCTIONS OVER APPROVED PLY WD. SHEATHING OVER NEW STRUCTURAL FRAMING.
A4.1 : A2.1
WEST ELEVATION
1/4"=1'-0"
REPEATER BUILDING
SOUTH ELEVATION
REPEATER BUILDING
A4.1 : A2.1 1/4"=1'-0" 1/4"=1'-0"
EXISTING EAST ELEVATION
REPEATER BUILDING
NORTH ELEVATION
1/4"=1'-0"
REPEATER BUILDING
WEST ELEVATION
REPEATER BUILDING
SOUTH ELEVATION
REPEATER BUILDING
EXISTING EAST ELEVATION
REPEATER BUILDING
NORTH ELEVATION
REPEATER BUILDING
GENERATOR BUILDING WEST ELEVATION
1/4"=1'-0"
SOUTH ELEVATION
GENERATOR BUILDING
1/4"=1'-0"1/4"=1'-0"
EXISTING EAST ELEVATION
GENERATOR BUILDING
NORTH ELEVATION
1/4"=1'-0"
GENERATOR BUILDING
SOUTH ELEVATION
GENERATOR BUILDING
N.T.S. N.T.S.
EXISTING WEST ELEVATION
GENERATOR BUILDING
NORTH ELEVATION
N.T.S.
GENERATOR BUILDING
EXISTING COMMUNICATION AND
POWER CABLES TO REMAIN,
PROTECT DURING NEW WORK.
A4.1 : A2.1 A4.1 : A2.1
A4.1 : D4.1 N.T.S. N.T.S.N.T.S.N.T.S.
KEYNOTES#
NEW REPEATER BLDG. ADDITION ACCESS TO LADDER AND ROOF HATCH. REFER TO PLAN
A2.1 FOR MORE INFORMATION.
REINSTALLED EXISTING GENERATOR FLUE WITH NEW ROOF OPENING - PROVIDE NEW
FLASHING AND ANIMAL PROOF SCREENING. COORDINATE INSTALLATION WITH NEW
ROOF IN ORDER TO MINIMIZE GENERATOR DOWN TIME.
NEW CABLE MANAGEMENT SYSTEM AND SLEEVE, PROTECT DURING NEW WORK AND
ENSURE INSTALLATION COMPLIANT WITH ALL EQUIPMENT SERVED - TYP.
1 1
M
IN
2.5
2.5
2 2
3 3
M
IN
7 7
EXISTING PROPANE SERVICE PIPE TO REMAIN. CONTRACTOR TO VERIFY NEW 10"
CONCRETE CURB HEIGHT AND CONCEAL IN NEW STEEL WALL FRAMING. PROTECT
DURING NEW WORK.
EXISTING PROPANE TANK TO REMAIN - PROTECT DURING NEW WORK.
EXISTING ELECTRICAL MAIN SERVICE BOX TO REMAIN - PROTECT DURING DEMOLITION
WORK.
# EXISTING KEYNOTE LEGEND
GENERAL PROJECT NOTES
1. DO NOT SCALE DRAWINGS.
2. COORDINATE DEMOLITION WORK AND BELOW GRADE UTILITY WORK WITH STRUCTURAL,
MECHANICAL, AND ELECTRICAL DRAWINGS.
3. REMOVE EXISTING MATERIALS AND FINISHES NOTED OR REQUIRED TO COORDINATE
WITH NEW CONSTRUCTION.
4. ITEMS DESIGNATED FOR DEMOLITION SHALL BE REMOVED FROM THE SITE AND DISPOSED
OF BY THE CONTRACTOR.
5. REMOVE ALL ABANDONED PLUMBING, MECHANICAL, AND ELECTRICAL ITEMS IN THEIR
ENTIRETY. REMOVE MISCELLANEOUS SCREWS AND NAILS FROM WOODWORK IN
PREPARATION FOR NEW CONSTRUCTION AND FINISH.
6. (ASBESTOS) FIBERBOARD CEILING IS THOUGHT TO BE PRESENT, COORDINATE
APPROPRIATE HAZMAT PROCEDURES WITH CONTRACTING OFFICER. REMOVE CEILING IN
ITS ENTIRETY AND RE-INSULATE NEW ROOF AND STRUCTURE WITH FIBERGLASS BATT
INSULATION TO A MINIMUM OF R-50.
7. LEAD BASED PAINTS ARE ANTICIPATED TO BE PRESENT. TAKE NECESSARY PRECAUTIONS.
8. PROVIDE BLOCKING AT ALL NEW AND RELOCATED ELECTRICAL PANELS, CABINETRY,
SHELVING SUPPORTS, AND MECHANICAL DEVICES.
9. RADIO EQUIP. GENERATOR, ELECTRICAL AND ALL OTHER ASSOCIATED EQUIP. SHALL NOT
BE LEFT UNSECURED DURING THE DEMO WORK. CONSTRUCT A BUILDING PERIMETER
FIRST, TO THE POINT THAT THE BUILDINGS CAN BE SECURED. IF BUILDING CANNOT BE
SECURED, A 24 HOUR PER DAY GUARD IS REQUIRED.
10. ROOF DEMOLITION AND NEW ROOF CONSTRUCTION SHOULD BE COORDINATED IN ORDER
TO INSURE THAT WORK IS COMPLETED IN 1 DAY. IT IS ESSENTIAL BOTH THE BUILDINGS
REMAIN WEATHER TIGHT IN ORDER TO PROTECT EXISTING EQUIPMENT THAT WILL
REMAIN OPERATIONAL DURING ENTIRE PHASE OF DEMOLITION AND CONSTRUCTION.
11. CONTRACTOR SHALL PROTECT EXISTING EQUIPMENT IN BOTH THE REPEATER AND
GENERATOR BUILDINGS AT ALL TIMES. PROVIDE A DETAILED PROTECTION PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL WITHIN 14 DAYS AFTER THE NOTICE HAS BEEN
GIVEN TO PROCEED WITH WORK.
NEW CABLE SLEEVE AND WEATHER PROOF/ SHIELDED CABLE TRAY. REFER TO
SPECIFICATIONS FOR MORE INFO.
NEW 3'-0" X 2'-6" PRE-ENGINEERED ROOF HATCH W/ CURB AND SLOPED ROOF OPTION
MODIFICATION FOR METAL ROOFS AND KEYED CYLINDER OR EQUAL. COLOR TO BE
SELECTED BY CONTRACTING OFFICER.
NEW PRE-ENGINEERED METAL LADDER - LADDER MUST MEET 1000# PER RUNG LOAD
RATING WITH MANUFACTURER'S STANDARD PRE-FINISHED LADDER. INSURE THAT
LADDER MEETS ALL OSHA AND FOREST SERVICE SAFETY REQUIREMENTS - TYP.
REINSTALL SALVAGED METAL DUTCH DOOR AND FRAME AT EXTERIOR OF NEW METAL
STUD WALL CONSTRUCTION - PROVIDE NEW DOOR SWEEP AND STRUCTURAL TUBE STEEL
FRAME IN EXTERIOR OF METAL STUD WALL - REFER TO A9.1 AND STRUCTURAL DRAWINGS
FOR MORE INFO. INSURE RODENT PROOF INSTALLATION - FINISH W/ INDUSTRIAL
ENAMEL TYPE PAINT.
NEW PRE-FINISHED 12" CORRUGATED MTL. ROOFING OVER APPROVED PLYWOOD
SHEATHING OVER NEW METAL ROOF STRUCTURE - COORDINATE FINISH INSTALLATION
AT EXPOSED AREAS OF WALL ABOVE (E) CMU - TYP. REFER TO A5.1 AND STRUCTURAL
DRAWINGS FOR MORE INFO.
REINSTALL SALVAGED ROOF VENTILATION FANS AND ASSOCIATED EQUIPMENT W/ NEW
ROOF OPENING AND FLASHING. PROVIDE ANIMAL PROOF SCREENING AT EXTERIOR
(VERITCAL INSTALLATION ONLY) REFER TO MECHANICAL DRAWINGS FOR MORE INFO.
NEW AND EXISTING ELECTRICAL AND MECHANICAL CONDUIT AND CABLES IN NEW
STRUCTURAL WALL FRAMING WHERE POSSIBLE. COORDINATE WITH CONTRACTING
OFFICER - REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FROM MORE
INFORMATION.
2.5
2.5
REMOVE ABANDONED
GENERATOR FLUE AND ANY
MISCELLANEOUS FASTENERS
IN THEIR ENTIRETY - INFILL
EXISTING HOLE W/
CONCRETE FILL.
REMOVE EXISTING CABLE SLEEVE
ON EXTERIOR WALL, CONCRETE
FILL EXISTING HOLES IN CMU
WALLS.
REMOVE AND SALVAGE
EXISTING GENERATOR FLUE
AND HARDWARE, SALVAGE FOR
REINSTALLATION.
REMOVE EXTERIOR
CEMENTITIOUS WALL BD.
FINISH IN ITS ENTIRETY -
PROTECT EXISTING CMU WALL
CONSTRUCTION THAT WILL
REMAIN.
REMOVE AND SALVAGE EXISTING
STEEL DUTCH DOOR AND
HARDWARE, SALVAGE FOR
REINSTALLATION.
REMOVE EXISTING TIN ROOF
FINISH, STRUCTURE, WOOD
FASCIA, SOFFIT BOARDS AND ANY
OR ASSOCIATED MATERIALS IN
THEIR ENTIRETY. PREPARE FOR
NEW STRUCTURAL ROOF SYSTEM.
REMOVE EXISTING MTL.
SHROWD & LOUVER IN
THEIR ENTIRETY.
A4.1 : D4.1 A4.1 : D4.1A4.1 : D4.1
A4.1 : A2.1 A4.1 : A2.1 A4.1 : A2.1
A4.1 : A2.1 A4.1 : D4.1 A4.1 : D4.1 A4.1 : D4.1
NEW EXHAUST FAN AND FLASHING AT EXTERIOR OF NEW METAL STUD FRAMED WALL.
REFER TO MECHANICAL DRAWINGS FOR MORE INFO.
11 11
M
IN
REMOVE AND SALVAGE
VENTILATION FANS AND
ASSOCIATED EQUIPMENT -
PREPARE FOR REINSTALL.
REMOVE EXTERIOR CEMENTITIOUS
WALL BD. FINISH IN ITS ENTIRETY
- PROTECT EXISTING CMU WALL
CONSTRUCTION THAT WILL
REMAIN.
REMOVE AND SALVAGE
EXISTING STEEL DUTCH
DOOR AND HARDWARE,
SALVAGE FOR
REINSTALLATION.
REMOVE EXISTING MTL.
VENTILATION SHROWD IN
ITS ENTIRETY.
REMOVE EXISTING CABLE TOP
COVER AND STL. ANGLE
HARDWARE IN ITS ENTIRETY.
N.T.S.
EXISTING EAST ELEVATION
GENERATOR BUILDING
A4.1 : D4.1
REMOVE EXISTING MTL.
SHROWD & LOUVER IN
THEIR ENTIRETY.
EXISTING ELEC.
SERVICE TO REMAIN.
CONCEAL WITHIN NEW
MTL. FRAMED WALL.
EXIST. ELEC. SERVICE
TO REMAIN. CONCEAL
WITHIN NEW MTL.
FRAMED WALL.
REMOVE AND SALVAGE
VENTILATION FANS AND
ASSOCIATED EQUIPMENT -
PREPARE FOR REINSTALL.
REMOVE EXIST. MTL.
GRILLE IN ITS ENTIRETY
NEW 12" x 12" MOTORIZED LOUVER/DAMPNER AT EXISTING OPENING. ENSURE THAT
EXISTING OPENING IS APPROPRIATE SIZE TO ACCOMMODATE NEW SYSTEM AND ADJUST
ACCORDINGLY. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
NEW OUTSIDE CONDENSING UNIT ON 4" CONCRETE HOUSING PAD. NEW REFRIGERANT
LINES SET PER MANUF. WRITTEN INSTRUCTIONS - ENSURE WEATHERTIGHT
INSTALLATION. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR MORE INFO.
A5.1
B U
IL
D
IN
G
S E C
T
IO
N S A
N D
D E T
A
IL
S
A5.1 : A2.1
16 18 REPEATER ADDITION
REFERENCE 1/2" = 1'-0"
REFERENCE
SOUTH GENERATOR BUILDING
9 NORTH REPEATER BUILDING SECTION
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I H
T
AIA
O
T
ET
A
IF
DA
AR985227
O
1/2" = 1'-0"
BEARING
ELEV. = 107'-4"
FINISH FLOOR
ELEV. = 100'-0"
T.O. FOUNDATION
ELEV. = 100'-10"
BEARING
ELEV. = 109'-7-3/8"
FINISH FLOOR
ELEV. = 100'-0"
T.O. FOUNDATION
ELEV. = 100'-10"
BEARING
ELEV. = 107'-4"
BEARING
ELEV. = 110'-7-3/8"
2.5
2.5
1 2 3
1 2
BEARING
ELEV. = 110' 7-3/8"
BEARING
ELEV. = 107'-4"
BEARING
ELEV. = 107'-4"
T.O. NEW FOUNDATION
ELEV. = 100'-10"
FINISH FLOOR
ELEV. = 100'-0"
SIM.
(N) PRE-ENGINEERED
MTL. LADDER - FACTORY
FINISHED - COLOR AS
SELECTED BY OWNER'S
REPRESENTATIVE
(E) CMU WALL - COORDINATE (N)
OPENING - WRAP OPENING WITH
(N) MTL. ANGLES - PAINTED.
(N) EXPANSION JOINT AT
INTERSECTION OF (E) AND (N)
CONC. SLABS
(N) PRE-ENGINEERED ROOF HATCH WITH CURB
OPTION MODIFICATION FOR METAL ROOFS &
KEYED CYLINDER OR EQUAL. COLOR AS SELECTED
BY OWNER'S REPRESENTATIVE
(N) PRE-FINISHED METAL PANEL (12"
CORRUGATED w/ EXPOSED FASTENER
INSTALLATION) - INSTALL PER
MANUFACTURERS STANDARD INSTALLATION
DETAILS AND INSTRUCTIONS o/ T&G PLY WD.
SHEATHING o/ (N) 12" STRUCTURAL FRAMING
PER PLAN W/ R-50 BLOWN-IN FIBERGLASS
INSUL. & PLYWOOD CEILING FINISH. REFER
TO STRUCT. FOR MORE INFO.
(N) PRE-ENGINEERED
MTL. LADDER - FACTORY
FINISHED - COLOR AS
SELECTED BY OWNER'S
REPRESENTATIVE
(N) 12" PLY WD. FINISH @ NEW FRAMED
WALL EXPOSED TO INT. - TYP.
PROVIDE NEW P.T. 2x6 WD. CLOSURE
BETWEEN (N) WALL AND EXISTING CMU
WALL - ALL LOCATIONS
(N) PRE-FINISHED METAL PANEL (12"
CORRUGATED w/ EXPOSED FASTENER
INSTALLATION) - INSTALL PER
MANUFACTURERS STANDARD INSTALLATION
DETAILS AND INSTRUCTIONS o/ PLY WD.
SHEATHING o/ (N) STRUCTURAL FRAMING
(N) PRE-FINISHED METAL PANEL
(12" CORRUGATED w/ EXPOSED
FASTENER INSTALLATION) -
INSTALL PER MANUFACTURERS
STANDARD INSTALLATION DETAILS
AND INSTRUCTIONS.
(N) 6" MTL STUDS @ 16" O.C. -
TYP. PROVIDE FULL R-19 BATT
INSUL WITH (N) 6 MIL. CONT.
VAPOR BARRIER TO INTERIOR
FACE OF STUDS- TYP.
(N) 12" APPROVED PLY WD.
WALL FINISH @ AREA OF
(N) STUD FRAMING - TYP.
PROVIDE (N) P.T. 2x6 WD.
CLOSURE @ TOP OF CMU
WALL - TYP.
(N) 2x P.T. WD EAVE - WRAP W/
PRE-FINISHED MTL. FLASHING - TYP.
(N) PRE-FINISHED MTL.
DRIP EDGE
P.T. CLOSURE
BLOCKING
NOTE:
CONTRACTOR SHALL PROVIDE ALL
NECESSARY BLOCKING AND FINISH
TO ENSURE RODENT PROOF
CONSTRUCTION UPON
COMPLETION - TYPICAL.
M
IN
(N) REINFORCED THICKENED CONC.
SLAB o/ V.B. AND GRAVEL BASE
COURSE - TYP. SEE: STRUCT. FOR
MORE INFO.
(N) PRE-ENGINEERED MTL.
LADDER - CONTRACTOR
SHALL COORDINATE AND
PROVIDE ALL NECESSARY
BLOCKING REQUIRED.
WALL SECTION AT NEW
(N) CONC.
FOUNDATION- REFER
TO STRUCT. FOR MORE
INFO.
WALL SECTION TYP.
1-1/2" = 1'-0"A5.1 : A2.11-1/2" = 1'-0"
4" CRUSHED GRAVEL.
UNDISTURBED SOIL
COMPACTED BACKFILLED
SOIL.
FINISH FLOOR
ELEV. = 100'-0"
T.O. NEW FOUNDATION
ELEV. = 100'-10"
T.O. EXIST. FOUNDATION
ELEV. = 100'-3"
(N) AIR INFILTRATION BARRIER
OVER APPROVED PLYWOOD
SHEATHING
(N) 3'-0" X 2'-6" PRE-ENGINEERED ROOF HATCH W/
CURB OPTION MODIFICATION FOR SLOPED METAL
ROOFS. REFER TO A9.1 FOR MORE INFO.
(N) PRE-FINISHED CLOSURE
TRIM.
(E) CMU BLOCK CONCRETE
PATCH AND SEAL ALL HOLES
OR SIGNIFICANT CRACKS.
BENT BEARING PLATE TO
MATCH ROOF SLOPE.
TYPICAL ROOF CONSTRUCTION
- (N) PRE-FINISHED METAL PANEL (12" CORRUGATED w/
EXPOSED FASTENER INSTALLATION) - INSTALL PER MANUF.
STANDARD INSTALLATION DETAILS AND INSTRUCTIONS
- (N) 30# ROOFING FELT
- (N) APPROVED 3 4" T&G PLY WD. SHEATHING
- (N) 12" STRUCTURAL FRAMING PER PLAN
- (N) R-50 BLOWN-IN FIBERGLASS INSULATION
- (N) CONTINUOUS 6 MIL. VAPOR BARRIER
- (N) 12" APPROVED PLYWOOD CEILING FINISH.
(N) 12" DOUBLE HEADER PER
STRUCTURAL
TYPICAL ROOF CONSTRUCTION
- (N) PRE-FINISHED METAL PANEL (12" CORRUGATED w/
EXPOSED FASTENER INSTALLATION) - INSTALL PER
MANUF. STANDARD INSTALLATION DETAILS AND
INSTRUCTIONS
- (N) 30# ROOFING FELT
- (N) APPROVED 3 4" T&G PLY WD. SHEATHING
- (N) 12" STRUCTURAL FRAMING PER STRUCTURAL
- (N) R-50 BLOWN-IN FIBERGLASS INSULATION
- (N) 12" APPROVED PLYWOOD CEILING FINISH.
(REFER TO STRUCTURAL FOR MORE INFO.)
(N) 3'-0" X 2'-6" PRE-ENGINEERED
ROOF HATCH W/ CURB OPTION
MODIFICATION. REFER TO A9.1
FOR MORE INFO.
(N) DOUBLE
HEADER PER
STRUCTURAL
T.O. EXIST. FOUNDATION
ELEV. = 100'-3"
T.O. EXIST. FOUNDATION
ELEV. = 100'-3"
(E) CONC. SLAB AND CURB
NEW CONT. 6 MIL. VAPOR
BARRIER AND APPROVE PLY.
WD. CEILING FINISH OVER
STRUCTURAL ROOF FRAMING
(N) 2x P.T. WD EAVE - WRAP W/
PRE-FINISHED MTL. FLASHING - TYP.
(N) PRE-FINISHED MTL.
DRIP EDGE
(N) CONCRETE SLAB AND
THICKENED EDGE W/
REINFORCING PER
STRUCTURAL" o/ VAPOR
BARRIER OVER CRUSHED
GRAVEL.
A9.1
D O
O R
S C
H E D
U L E
N O
T E S A
N D
D E T A
IL
S
1/2" = 1'-0"
SCALEREFERENCE
16 DETAIL
SCALE
17 DETAIL
REFERENCE SCALE
18 DETAIL
REFERENCE
B A
L D
M O
U N
T A
IN
R
E P E A
T E R
G E N
E R A
T O
R B
U
IL
D
IN
G S
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09039.00
12.14.09
U S D
E P A
R T
M E N
T O
F A
G R
IC
U L T
U R
E
N O
R T
H E R N
R E G
IO
N
ID
A
H O
P A
N H
A N
D L E N
A T
IO
N A
L F
O R E S T
CONSTRUCTION
DOCUMENTS
H
S
A & E ARCHITECTS P.C.
CHRISTOPHER R. MARTISON
IDAHO
D
MISSOULA
E C
N
ES
I L
E C
T
CRA
I
H
T
AIA
O
T
ETA
IF DA
AR985227
O
1 EXTERIOR - 1 HR RATED
HINGE
LOCK SET
CLOSER
THRESHOLD
SWEEP
Only
Only
Only
Only
STANLEY
CORBIN RUSSWIN
NORTON
PEMKO
PEMKO
FBB199 4-1/2 X 4-1/2 NRP
ML 2010 - ESB
78 B/D PA
18061 DP
STAINLESS STEEL
ALUM
ALUM
14_1A
EXTERIOR DOOR SILL19
EXTERIOR DOOR HEAD
EXTERIOR DOOR JAMB14
NEW CONCRETE
FOUNDATION AT ENTRY -
REFER TO STRUCTURAL FOR
MORE INFO.
2" PLY WOOD INTERIOR
SHEATHING.
NEW INSULATED HOLLOW METAL
DOOR AND MASONRY MTL.
WELDED FRAME PER SCHEDULE.
AIR INFILTRATION
BARRIER OVER APPROVED
PLY WD. PER STRUCTURAL EXISTING 2X8 DOOR HEADER
AT EXISTING OPENING.
EXISTING CMU BLOCK
WALL TO REMAIN.
NEW ALUMINUM
THRESHOLD PER SCHEDULE
1-1/2" = 1'-0"
20 ROOF HATCH
A2.1 : A9.1
WALL SECTION
EXISTING CMU BLOCK
TO REMAIN. PATCH
AND REPAIR HOLES
AND CRACKS.
(N) PRE-FINISHED METAL PANEL
(12" CORRUGATED w/ EXPOSED
FASTENER INSTALLATION)
(N) PRE-FINISHED METAL
CORNER FLASHING,
EXPOSED FASTENERS AND
SEALANT TAPE.
DOOR KEYNOTES#
CONTRACTOR TO SALVAGE & RE-USE EXISTING STEEL DOOR UNIT AND
HARDWARE. REFER TO DETAIL 16/A9.1 FOR MORE INFO.
COORDINATE HEAD & JAMB CONDITION WITH NEW CORRUGATED
METAL SIDING. PROVIDE ALL CLOSER & FLASHING AS REQUIRED.
A9.2 : A9.2
DOOR TYPES LEGEND
TYPE "A"
EXISTING DUTCH STEEL DOOR
TYPE "B"
NEW INSULATED HOLLOW METAL DOOR
3'-2" 2'-10"
1/2" = 1'-0"
(N) APPROVED PLY WOOD
SHEATHING PER STRUCTURAL
OVER METAL STUDS AT 16" O.C.
(N) R-19 BATT INSULATION
AIR INFILTRATION BARRIER.
(N) 6 MIL. VAPOR BARRIER
ON INSIDE FACE OF METAL
FRAMING.
DOOR HARDWARE SCHEDULE#
A2.1 : A9.1
A2.1 : A9.1
A2.1 : A9.1
1-1/2" = 1'-0"
1-1/2" = 1'-0"
A2.1 : A9.1 1" = 1'-0"
VERIFY
EXISTING
E X
IS
T
IN
G
V E R
IF
Y
EXISTING DUTCH STEEL
DOOR AND FRAME. REFER
TO DETAIL 16/A9.1 FORM
MORE INFORMATION
PLUG WELD EXISTING BOLT
HOLES ON EXISTING STEEL
FRAME - FIELD WELD.
PROVIDE NEW SECURITY
TYPE FOREST SERVICE
ISSUED PAD LOCK.
PROVIDE NEW NEOPRENE SWEEP
ON INTERIOR FACE OF DOOR.
REFER TO DETAIL 19/A9.1 FOR
MORE INFO.
20 DOOR FRAME TYPE LEGEND
A2.1 : A9.1 1-1/2" = 1'-0"
NEW INSULATED HOLLOW
METAL DOOR - PAINT.
REFER TO DETAIL 16/A9.1
AND SPECS. FOR MORE
INFO.
MASONRY TYPE 6-3/4"
WIDE FULLY WELDED
HOLLOW METAL DOOR
FRAME. REFER TO DETAIL
16/A9.1 AND SPECS FOR
MORE INFO.
TYPE "B"
NEW INSULATED HOLLOW METAL DOOR
VERIFY ROUGH OPENING TO ENSURE NEW DOOR R.O. SIZE - MODIFY AS
REQUIRED.
NEW TUBE STEEL FRAME EA.
SIDE AT REINSTALLED
METAL DUTCH DOOR.
REFER TO STRUCTURAL
DRAWINGS FOR MORE INFO.
(E) REINSTALLED SALVAGED METAL DUTCH DOOR
AND FRAME AT EXTERIOR OF NEW METAL STUD
WALL CONSTRUCTION.
(N) SECURITY TYPE FOREST
SERVICE ISSUED PAD LOCK.
TYPICAL CORNER FRAMING -
REFER TO STRUCTURAL FOR
MORE INFO.
BLOCK OUT NEW THICKENED
EDGE CONCRETE SLAB TO
ALLOW NEW NEOPRENE SWEEP
ON EXISTING DOOR - REFER TO
DETAIL 19/A9.1 FOR MORE
INFO.
EXISTING CONC. SLAB
NEW CONC. SLAB
MASONRY TYPE 6-3/4" WIDE
FULLY WELDED HOLLOW METAL
DOOR FRAME. SEE SPECS FOR
MORE INFO.
(N) INSULATED HOLLOW METAL
DOOR. SEE SPECIFICATIONS FOR
MORE INFO.
WRAP DOOR JAMBS WITH 14"
MTL. PLATE ALL SIDES - PAINT.
(N) METAL STUDS AT 16" O.C.
REFER TO STRUCTURAL
DRAWING FOR MORE INFO.
(N) PRE-FINISHED METAL
PANEL (12" CORRUGATED w/
EXPOSED FASTENER
INSTALLATION)
NEW DOUBLE HEADER
UNPUNCHED. REFER TO
STRUCT. FOR MORE INFO.
REINSTALLED SALVAGED
METAL DUTCH DOOR
AND FRAME.
4" MTL. PLATE WRAPPED
ENTIRE WIDTH OF DOOR
JAMBS - PAINT.
V.B. ON INTERIOR FACE OF
METAL FRAMING.
3'-3"
VERIFY
NEW TUBE STEEL FRAME EA.
SIDE AT REINSTALLED
METAL DUTCH DOOR.
NEW INSULATED HOLLOW METAL
DOOR AND MASONRY MTL.
WELDED FRAME PER SCHEDULE.
(N) PRE-FINISHED METAL PANEL
(12" CORRUGATED w/ EXPOSED
FASTENER INSTALLATION)
(N) PRE-FINISHED METAL
FLASHING CLOSURE, EXPOSED
FASTENERS AND SEALANT TAPE
EA. SIDE OF DOOR.
(N) FLASHING CLOSURE,
EXPOSED FASTENERS AND
SEALANT TAPE EA. SIDE OF
DOOR.
REINSTALLED SALVAGED
METAL DUTCH DOOR
AND FRAME.
(N) METAL STUDS AT 16" O.C.
REFER TO STRUCTURAL
DRAWING FOR MORE INFO.
EXISTING CONCRETE SLAB.
REINSTALLED SALVAGED
METAL DUTCH DOOR,
INSURE RODENT PROOF
INSTALLATION.
BLOCK OUT NEW CONC.
SLAB TO ALLOW FOR
NEW NEOPRENE SWEEP.
NEW INSULATED HOLLOW METAL
DOOR AND DOOR SWEEP PER
SCHEDULE.
INSIDE AND OUTSIDE
HANDLES W/ PADLOCK
HASPS
ARM GUIDE BRACKET
HOLD OPEN ARM WITH
NYLON ROLLER
CONTINUOUS GASKET
COVER.
SLAM LATCH
COVER LINER
VINYL GRIP
LOCK STRIKE AND
PADLOCK HASP
FRAME W/
CAPFLASHING
1" RIGID
FIBERBOARD
INSULATION.
LIFTING MECHANISM W/
REINFORCED COMPOSITE
TUBES AND ELECTROCOATED
COMPRESSION SPRINGS
PROVIDE MANUF. SLOPED
ROOF CURB KIT FOR 2.5 TO
12 SLOPE. REFER TO ROOF
FRAMING PLAN FOR MORE
INFO.
3'-1"
2'-6"
INSIDE AND OUTSIDE
HANDLES W/
PADLOCK HASPS
INSIDE AND OUTSIDE
HANDLES W/
PADLOCK HASPS
1" THK. FIBERGLASS
INSULATED COVER.
FLASHING SYSTEM
REPAIR ANY DAMAGE ON SALVAGED DOOR - REMOVE ANY PEELING OR
DAMAGED PAINT, RUST, OR OTHER CONTAMINATION. PREP &
PREPAINT W/ MANUFACTURERS HIGHEST QUALITY METAL ENAMEL
PAINT. COLOR TO BE SELECTED BY CONTRACTING OFFICER.
GENERAL FLASHING NOTE:
ALL FLASHING SHALL BE PROVIDE PRE-FINISHED
BY MTL. ROOF AND WALL PANEL MANUFACTURER.
PROVIDE ALL NECESSARY RECCO9MMNED
CLOSURES, TRIMS, AND FLASHING FOR PROPER
INSTALLATION.