amendment_2_8.4.10.doc
DOC document 63 KB Posted
- Solicitation number
- AG-02RC-S-10-0022
About this file
Amendment - 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_4_8.11.10.doc | DOC document | |
| Attachment_M9.1_amend_4_baldmtn_plans.pdf | ||
| Attachment_A_amendment_3_wage_rate.docx | DOCX document | |
| amendment_3_8.5.10.doc | DOC document | |
| Attachment_A_amendment_2_rev_found_detail.pdf | ||
| Amendment_1_bald_mtn.docx.docm | DOCM document | |
| return_forms_bald_mtn.doc | DOC document | |
| Attachment_3_baldmtn_CSIspecs.pdf | ||
| Attachment_2_baldmtn_plans.pdf | ||
| AG-0281-S-10-0022_complete.doc | DOC document | |
| Attachment_1_wage_rates.docx | DOCX document | |
| attachment_4_Idaho_wrk_comp_cert_.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| TWO (2) |
| 8.04.2010 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA-Forest Service Idaho Montana Acquisition Zone
3815 Schreiber Way
Couer d’Alene, ID 83815 Same as block 6
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-02RC-S-10-0022 bald mtn. reptr.
9B. DATED (SEE ITEM 11)
7.09.2010
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Questions were posed concerning the fondation – See attachment A to this amendment for the detail sketch provided.
Solicitation closing date is extended to August, 13, 2010 3:00 pm PDtime.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| William Standley |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment Two – AG-02RC-S-10-0022
Questions #1: Referring to Drawings S1.0 Detail 20 and A5.1 Details 9,16,18,19 to pour the new foundation would require undermining the existing foundation sacrificing the structural integrity of the existing CMU wall and slab. It appears that the existing foundations are poured on exposed ledge and in some areas around the buildings, the existing building slabs extend beyond the existing exterior walls. Demolition by jackhammer again would sacrifice the structural integrity of wall and slab. To accomplish the installation of the new foundation looks a little shaky.
Question #2: Is a new foundation other than the new area to be added onto the repeater building necessary? Energy efficiency is obviously a concern, but a new light gauge framed wall and roof system could be supported from the existing CMU wall.
Answer provided by A&E design firm.
#1. Essentially, the new wall does not need to undermine the existing footing. It simply needs to bear on solid rock and then be doweled into the existing slab/footing. See attached detail.
#2. This footing and new frame wall support or provide bearing for the new roof structure. We do not want to support the new framing off the existing CMU walls since the existing CMU wall construction does not seem consistent. Some cells are grouted, some are not.
See Attachment A to this amendment for detail sketch provided.