ATT_5-_Fire_Station_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
MK Administrative Site - Kyle Canyon Fire Station Project Federal contract opportunity
Solicitation number
AG-0261-S-13-0068
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

ATT 5 - Cost Estimate Breakdown Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to MK Administrative Site - Kyle Canyon Fire Station Project, newest first.
File Type Posted
Amend_0003-_AG-0261-S-13-0068.pdf PDF
S-13-0068_Fire_Station_Amendment_0002.pdf PDF
Amend_0001_-_ATT_1_-_Replacment_Pages_014100_CQC.pdf PDF
Amend_0001_-_AG-0261-S-13-0068.pdf PDF
Amend_0001_-_ATT_-3_-KyleCanyonAdminSiteGeotechReport.pdf PDF
Amend_0001_-ATT_2_-_Replacment_Page221105-2.pdf PDF
ATT_1_-_MiddleKyleAdminSpecsFinal.6.08.2013.pdf PDF
ATT_3_-_WD_NV4_-_Building_05-03-13.pdf PDF
ATT_4_-_Past_Performance_Questionnaire.pdf PDF
S-13-0068_Fire_Station_RFP.pdf PDF
ATT_6_-_FIRE_PLAN.pdf PDF
ATT_2_-_Signed583.KyleFire.7.16.2013.FINAL.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACH 5 -MK Administrative Site - Kyle Canyon Fire Station Project AG-0261-S-13-0068
CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
501Fire Station BuildingLS1
010250-1Construction StakingLS1
011900-1MobilizationLS1
022340-1Road and Parking Area Obliteration (Native Surfacing)SF7,880
26460Dumpster PadEA2
033545-2Exterior Concrete Driveway Slabs (6" Thick Slabs)SF832
101400-1Regulatory SignsEA9
101415-1Site ID SignEA1
129400-1Family Unit--SingleEA8
129400-2Family Unit--DoubleEA1
133402-1Utility Box - 48 Inch CMP with Combination Air Release ValveEA1
133402-2Utility Box - 84 Inch Precast Concrete with Pressure Reducing ValveEA1
133402-3Utility Box - 72 Inch Precast Concrete with Water MeterEA1
221100-1Pipeline - 6" HDPE, SDR 11 Including Trench, Fittings and BackfillLF1,070
221100-2Pipeline - 4" HDPE, SDR 11 Including Trench, Fittings and BackfillLF310
221100-3Pipeline - 3" HDPE, SDR 11 Including Trench, Fittings and BackfillLF20
221100-4Pipeline - 2" HDPE, SDR 11 Including Trench, Fittings and BackfillLF1,420
221100-5Hydrant - Post TypeEA1
221100-6Truck Filling StationEA1
221102-1Curb Valve and Box -6-inch PolyEA2
221102-2Curb Valve and Box - 3-inch PolyEA1
221102-3Curb Valve and Box - 2-inch PolyEA5
221102-4Curb Valve and Box - 1-inch PolyEA1
221105-2Hydrant - Type DEA9
221300-1Sewerline - Gravity, 4-inch PVC, SDR 35, Including Trench and CleanoutsLF1,500
221300-2Drainfield #1 - Includes Distribution BoxEA1
221300-3Drainfield #2 - Includes Distribution BoxEA1
221300-4Septic Tank & Installation - 750 Gallon (Concrete)EA1
221300-5Septic Tank & Installation - 1200 Gallon (Concrete)EA1
221300-6Septic Tank & Installation - 2500 Gallon (Concrete)EA1
231126-1LPG TankLS1
231126-2LPG Fuel Service Lines, 1" Diameter and AppertenancesLF135
260500-1Electrical System, Includes Entrance Station Electrical, Parking Control Equipment, and TelecommunicationsEA1
312000-1Special Bedding (Water and Sewer Pipe)CY160
312000-2Pipe Zone Material (Water and Sewer Pipe)CY320
312100-1Project Site Preparation and GradingEA1
321200-1Hot Mix Asphalt Paving - Roads and ParkingSF1,582
321204-2Crushed Aggregate -- See Specification For Grading Type (For Roads, Parking Lots and Spurs)CY1,800
322640-1Parking Striping - 4-inch Wide (Reflectorized White)LF235
322640-2Accessible Parking SymbolsEA2
332228-2Galvanized Culvert (Roads and Paths) - 18-inch Corrugated Metal Pipe w/ Painted Ends (16 Gage, 2 2/3"x1/2" Corrugations)LF38
332228-3Galvanized Culvert (Roads and Paths) - 24-inch Corrugated Metal Pipe w/ Painted Ends (16 Gage, 2 2/3"x1/2" Corrugations)LF56
323116-1Road Closure Gates -- 32 Foot (Double Leaf, 16 Foot each leaf)EA1
323116-2Road Closure Gates -- 24 Foot (Double Leaf, 12 Foot each leaf)EA1
Option #A: Fuel Facility Relocation
033545-3Exterior Concrete Slabs (6" Thick Reinforced Slabs)SF337
260500-2Fuel Facility Relocation ElectricalEA1
339999-1Fuel Facility RelocationLS1
Option #B: Paving Fire Station Parking & Approaches
321200-2Hot Mix Asphalt Paving - Roads and ParkingSF21,530
322640-2Parking Striping - 4-inch Wide (Reflectorized White)LF460
Option #C: Paving Main Road, Bunkhouse Road, & Bunkhouse Parking area
321200-3Hot Mix Asphalt Paving - Roads and ParkingSF32,465
322640-3Parking Striping - 4-inch Wide (Reflectorized White)LF240
Option #D: Security Fencing & Gates
323119-1Ornamental Metal Security Fence with 2 - 4 ft. Single Leaf Swing GatesLF1,106
323119-2Ornamental Metal Rolling Gate - 32 Foot with Hardware and Electronic Gate OpenerEA3
323119-3Ornamental Metal Swing Gate - 32 Foot (Double Leaf, 16 ft. Each Leas)EA1
Option #E: Paving RV Loop Road and Spurs
321200-4Hot Mix Asphalt Paving - Roads and ParkingSF20,506
Option #F: Video Surveillance System
282300Video Surveillance SystemEA1
Option #G: Construct Helipad and Access Road
33010Helipad Appurtenances (Wind Sock, etc.)LS1
033540-3Exterior Concrete Slabs (6" Thick Reinforced Slabs)SF2,500
312000-2Site Preparation and Grading - Helipad and Access RoadLS1
321204-2Crushed Aggregate Surfacing for Helipad and Access RoadCY208
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.