Amend_0003-_AG-0261-S-13-0068.pdf
PDF 109 KB Posted
- Attached to
- MK Administrative Site - Kyle Canyon Fire Station Project Federal contract opportunity
- Solicitation number
- AG-0261-S-13-0068
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S-13-0068_Fire_Station_Amendment_0002.pdf | ||
| Amend_0001_-_AG-0261-S-13-0068.pdf | ||
| Amend_0001_-_ATT_1_-_Replacment_Pages_014100_CQC.pdf | ||
| Amend_0001_-_ATT_-3_-KyleCanyonAdminSiteGeotechReport.pdf | ||
| Amend_0001_-ATT_2_-_Replacment_Page221105-2.pdf | ||
| ATT_1_-_MiddleKyleAdminSpecsFinal.6.08.2013.pdf | ||
| ATT_3_-_WD_NV4_-_Building_05-03-13.pdf | ||
| ATT_4_-_Past_Performance_Questionnaire.pdf | ||
| S-13-0068_Fire_Station_RFP.pdf | ||
| ATT_6_-_FIRE_PLAN.pdf | ||
| ATT_5-_Fire_Station_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| ATT_2_-_Signed583.KyleFire.7.16.2013.FINAL.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. /3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 08/13/2013
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
SW IDAHO-NEVADA ACQUISTION CENTER
1249 S VINNELL WAY STE 200
BOISE, ID 83709-1663
CONTRACTING OFFICER - USDA ,USFS, SWINAC
c/o SPRING MTNS. NATIONAL REC. AREA
4701 N. TORREY PINES DRIVE
LAS VEGAS, NV 89130
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0261-S-13-0068
9B. DATED (SEE ITEM 11)
07/17/2013
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Project Title: MK Administrative Site – Kyle Canyon Fire Station Project
Purpose of Amendment: To answer questions posed by vendors.
Receipt of Offers: The date, time, and receipt of proposals remain unchanged. The place for receipt of offers remains the same.
Acknowledgment: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for receipt of offers (see Block 19 of the Solicitation, Offer, and Award, Standard Form 1442).
cept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Margaret S. Schafer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
08/13/2013
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 AG-0261-S-13-00.86– MK Administrative Site – Kyle Canyon Fire Station Project
1. The purpose of this Amendment is to respond to last minute questions posed by Vendors.
Question 1 -Specifications call out for all masonry units to be decorative block from Buehner Block or Government approved equal. Buehner Block is based in Salt Lake City, UT and will be using materials that are native to the area to produce these decorative units. The colors called out may not be possible to match with local materials. Please advise.
Answer 1 - Other color boards by other manufacturers may be substituted for those offered by Buehner. Approved manufacturer’s full color spectrum shall be provided for consideration and approval during the submittal process.
Question 2 - Specifications call out for all masonry units to be a Lightweight Density Classification. Lightweight aggregates will have to be imported to Clark County as they are not a native material. Clark County block manufacturers produce Medium weight Density Classification units.
Will this be acceptable? Please advise.
Answer 2 - Medium Density Classification units will be accepted as an alternate, conditional to structural performance criteria.
Question 3 -The dimensions given on this sheet are not masonry block modular on about 90% of the masonry block walls. This will result in a large number of cut units to get to the dimensions called out. What is the minimum cut dimension the Architect and Structural Engineer will allow on this project? Please advise.
Answer 3 - The building was dimensioned for even structural gridlines and doors/windows were centered in rooms and sized for standard door/window dimensions. Any block less than 6” should be discussed with the COR or run through the submittal shop drawing process.
Opening locations may be able to adjust slightly to lessen impacts to block layouts but other important factors may govern on case-by-case basis.
2. All other terms and conditions remain unchanged.
Project Title: MK Administrative Site – Kyle Canyon Fire Station Project
File details come from the government source that posted it. Updated .