3-096813_FL_-_TILE_CARPETING_RevAmendment2.pdf

PDF 81 KB Posted

Attached to
Spring Mountain Visitor Gateway Project Federal contract opportunity
Solicitation number
AG-0261-S-12-0008
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

3

View the file

Other files for this federal contract opportunity

Other files attached to Spring Mountain Visitor Gateway Project, newest first.
File Type Posted
Amend_003_-_AG-0261-S-12-0008.pdf PDF
4-Above_ground_rotor_head_installation.pdf PDF
12-C700_Sh45_RevAmendment2.pdf PDF
15-E101_Sh292_RevAmendment2.pdf PDF
11-A704_Sh254_RevAmendment2.pdf PDF
13-C617_Sh182_RevAmendment2.pdf PDF
17-E800_Sh303_RevAmendment2.pdf PDF
9-A611_Sh248_RevAmendment2.pdf PDF
14-E002_Sh282_RevAmendment2.pdf PDF
5-A101_Sh193_RevAmendment2.pdf PDF
7-A221_Sh207_RevAmendment2.pdf PDF
Amend_002_-_AG-0261-S-12-0008.pdf PDF
2-ConstructionCostEstimateBreakdown_RevAmendment2.xlsx XLSX spreadsheet
18-ForestServiceGrading.pdf PDF
6-A114_Sh200_RevAmendment2.pdf PDF
10-A612_Sh249_RevAmendment2.pdf PDF
8-A320_Sh229_RevAmendment2.pdf PDF
16-E701_Sh302_RevAmendment2.pdf PDF
1-Schedule_of_Items_RevAmendment2.pdf PDF
Amend_001_-_AG-0261-S-12-0008.pdf PDF
Site_Visit_Attendees_List.PDF PDF
ATT_2.docx DOCX document
Informational_Purposes_Only.docx DOCX document
ATT_5_-_Spring_Mountain_Visitor_Gateway_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
01-31-2013_Spring_Mountain_Visitor_Solicitation.pdf PDF
ATT_1.docx DOCX document
ATT3_-_WD_NV4.pdf PDF
ATT_4_-_Past_Performance_Questionnaire.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order 5 - 100% 9/28/2012

TILE CARPETING 096813 - 1

USDA FOREST SERVICE R-4

SPRING MOUNTAINS VISITOR GATEWAY

SECTION 096813 - TILE CARPETING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 and 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes tufted carpet tile and installation.

B. Related Requirements:

1. Section 096513 "Resilient Base and Accessories" for resilient wall base and accessories installed with carpet tile.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to carpet tile installation including, but not limited to, the following:

a. Review delivery, storage, and handling procedures.

b. Review ambient conditions and ventilation procedures.

c. Review subfloor preparation procedures.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include manufacturer's written data on physical characteristics, durability, and fade resistance.

2. Include installation recommendations for each type of substrate.

B. Shop Drawings: Show the following:

1. Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet tiles.

2. Carpet tile type, color, and dye lot.

3. Type of subfloor.

TILE CARPETING 096813 - 2

4. Type of installation.

5. Pattern of installation.

6. Pattern type, location, and direction.

7. Pile direction.

8. Type, color, and location of insets and borders.

9. Type, color, and location of edge, transition, and other accessory strips.

10. Transition details to other flooring materials.

C. Samples: For each of the following products and for each color and texture required. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.

1. Carpet Tile: Full-size Sample.

2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch- long Samples.

D. Product Schedule: For carpet tile. Use same designations indicated on Drawings.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Sample Warranty: For special warranty.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the following:

1. Methods for maintaining carpet tile, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.

2. Precautions for cleaning materials and methods that could be detrimental to carpet tile.

1.7 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10 sq. yd..

1.8 QUALITY ASSURANCE

A. Installer Qualifications: An experienced installer who is certified by the International Certified Floorcovering Installers Association oar can demonstrate compliance with its certification program requirements.

B. Fire-Test-Response Ratings: Where indicated, provide carpet tile identical to those of assemblies tested for fire response according to NFPA 253 by a qualified testing agency.

TILE CARPETING 096813 - 3

C. MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for work specified in this section. All work will be included in the Lump Sum prices for items as listed in the Schedule of Bid Items:

1. Visitor Services Building

2. Education Building.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Comply with CRI 104.

1.10 FIELD CONDITIONS

A. Comply with CRI 104 for temperature, humidity, and ventilation limitations.

B. Environmental Limitations: Do not deliver or install carpet tiles until spaces are enclosed and weathertight, wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at occupancy levels during the remainder of the construction period.

C. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to bond with adhesive and concrete slabs have pH range recommended by carpet tile manufacturer.

D. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items.

1.11 WARRANTY

A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.

1. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure of substrate, vandalism, or abuse.

2. Failures include, but are not limited to, more than 10 percent edge raveling, snags, runs, dimensional stability and delamination.

3. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CARPET TILE: CPT-1

A. Basis-of-Design Product: Subject to compliance with requirements, provide: LEES, A Premonition Modular, GT075 Color Psychic #201, or comparable product:

B. Pattern: Premonition Modula #GT075

C. Color: Psychic #201.

TILE CARPETING 096813 - 4

D. Construction: Tufted.

E. Surface Texture: Textured patterned loop.

F. Gage: 1/12 (47 rows per 10 cm).

G. Density: 6140.

H. Weight Density: 135,080.

I. Sustainable Content: Contains a minimum 35% pre-consumer recycled content by total weight.

J. Stitches per inch: 11.6 per inch.

K. Finished Pile Thickness: .123”.

L. Dye Method: Yarn Dyed.

M. Backing Material: EcoFlex ICT.

N. Face Yarn: Duracolor Premium Nyslon with Antron .

O. Fiber Technology: Duracolor by LEES Stain Resistant System, Passes GSA requirements for permanent stain resistant carpet.

P. Face Weight: 22 oz. per sq. yd..

Q. Size/Width: 24” x 24”.

R. Protective Treatment: DuraTech.

S. Installation Method: Monolithic.

T. Static: 3.0 kv when tested under the Standard Shuffle Test 70 degrees Fahrenheit – 20% R.H.

U. Flammability: Passes DOC-FF-1-70 Pill Test.

V. Flooring Radiant Panel Test: Meets NFPA Class 1 when tested under ASTM E-648 Glue Down.

W. Smoke Density: NBS Smoke Changer NFPA-258-Less than 450 Flaming Mode.

2.2 INSTALLATION ACCESSORIES

A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.

B. Adhesives: Water-resistant, mildew-resistant, nonstaining, pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation.

TILE CARPETING 096813 - 5

1. Adhesives shall have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet tile performance. Examine carpet tile for type, color, pattern, and potential defects.

B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:

1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by carpet tile manufacturer.

2. Subfloor finishes comply with requirements specified in Section 033000 "Cast-in-Place Concrete" for slabs receiving carpet tile.

3. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. General: Comply with CRI 104, Section 6.2, "Site Conditions; Floor Preparation," and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile installation.

B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.

C. Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by carpet tile manufacturer.

D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.

3.3 INSTALLATION

A. General: Comply with CRI 104, Section 14, "Carpet Modules," and with carpet tile manufacturer's written installation instructions.

B. Installation Method: As recommended in writing by carpet tile manufacturer.

TILE CARPETING 096813 - 6

C. Maintain dye lot integrity. Do not mix dye lots in same area.

D. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.

E. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.

F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on finish flooring as marked on subfloor. Use nonpermanent, nonstaining marking device.

G. Install pattern parallel to walls and borders.

3.4 CLEANING AND PROTECTION

A. Perform the following operations immediately after installing carpet tile:

1. Remove excess adhesive, seam sealer, and other surface blemishes using cleaner recommended by carpet tile manufacturer.

2. Remove yarns that protrude from carpet tile surface.

3. Vacuum carpet tile using commercial machine with face-beater element.

B. Protect installed carpet tile to comply with CRI 104, Section 16, "Protecting Indoor Installations."

C. Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.

END OF SECTION 096813

File details come from the government source that posted it. Updated .