17-E800_Sh303_RevAmendment2.pdf
PDF 308 KB Posted
- Attached to
- Spring Mountain Visitor Gateway Project Federal contract opportunity
- Solicitation number
- AG-0261-S-12-0008
About this file
17
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNATION: PANEL VS-A PROJECT NAME: MIDDLE KYLE COMPLEX LOCATION: VISITOR SERVICES
VOLTAGE: 208Y/120V - 3 Ph - 4 Wire BUS RATING(A): 400 MAIN(A): Breaker SCCR(KA): 35 AVAILABLE FAULT(A): 23339 MOUNTING: Surface ENCLOSURE: NEMA 1 NOTES:
NOTES DESCRIPTION DEMAND CATEGORY VA BKR A/P CIRCUIT # PHASE CIRCUIT # BKR A/P VA DEMAND CATEGORY DESCRIPTION NOTES
MEN'S HAND DRYER NEquipment 1500 20/1 1 A 2 15/3 1273 NEquipment HRV-1
WOMEN'S HAND DRYER NEquipment 1500 20/1 3 B 4 1273
113/114/115/116 RCPTS NReceptacles 720 20/1 5 C 6 1273
106/107 RCPTS NReceptacles 1080 20/1 7 A 8 25/3 1273 NEquipment CDP-1
106 RCPTS NReceptacles 360 20/1 9 B 10 1273
106 KITCHEN EQUIP NEquipment 1200 20/1 11 C 12 1273
106 RCPTS NReceptacles 720 20/1 13 A 14 25/3 1273 NEquipment CDP-2
111/112/108/EXT RCPTS NReceptacles 900 20/1 15 B 16 1273
110 RACK RCPT NEquipment 2000 30/1 17 C 18 1273
110 RCPTS NReceptacles 720 20/1 19 A 20 15/3 552 NEquipment RWP-1
110 RCPTS NReceptacles 720 20/1 21 B 22 552
105/108/109/EXT RCPTS NReceptacles 1080 20/1 23 C 24 552
RETAIL 105 FLOORBOXES NReceptacles 720 20/1 25 A 26 15/3 552 NEquipment RWP-2
104/105 RCPTS NReceptacles 720 20/1 27 B 28 552
INFORMATION 104 RCPTS NReceptacles 720 20/1 29 C 30 552
101/102/EXT RCPTS NReceptacles 1080 20/1 31 A 32 70/3 3074 NEquipment WWHP-1
102 FLOORBOXES (EXHIBITS) NReceptacles 720 20/1 33 B 34 3074
102/103/EXT RCPTS NReceptacles 900 20/1 35 C 36 3074
LIGHTING CONTROL PANEL NEquipment 500 20/1 37 A 38 15/3 1130 NEquipment SMP-1 / SMP-2 / SMP-3
STORAGE 108 RCPTS NReceptacles 900 20/1 39 B 40 1130
101 DOOR OPERATORS NEquipment 1000 20/1 41 C 42 1130
101 DOOR OPERATOR NEquipment 500 20/1 43 A 44 25/2 2162 NEquipment ACCU-1
OFFICE 106 RCPTS NReceptacles 720 20/1 45 B 46 2162
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 47 C 48 20/1 1350 NEquipment DDC / TP-1 / RHWP-1 / TS / FS
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 49 A 50 20/1 SPARE SPARE
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 51 B 52 20/1 SPARE SPARE
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 53 C 54 20/1 SPARE SPARE
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 55 A 56 25/3 2000 NEquipment EWH-1
OFFICE 106 FRIDGE NEquipment 800 20/1 57 B 58 2000
PAPER TOWEL DISPENSERS NEquipment 500 20/1 59 C 60 2000
LS-2 LIFT STATION NEquipment 2906 60/3 61 A 62 70/3 3074 NEquipment WWHP-2
2906 63 B 64 3074
2906 65 C 66 3074
VALLEY RESTROOM NEquipment 500 20/1 67 A 68 90/3 4996 NEquipment WWHP-3
FACP NEquipment 500 20/1 69 B 70 4996
LIGHTING INVERTER INV-VS NLighting 30/1 71 C 72 4996
LCP-VS r17 r20 NLighting 1313 20/1 73 A 74 20/1 540 NReceptacles 102 FLOORBOXES (EXHIBITS)
LCP-VS r18 r19 r22 NLighting 1299 20/1 75 B 76 20/1 500 NEquipment INTERPRETIVE CEILING AUDIO SYSTEM
LCP-VS r21 r23 r24 NLighting 723 20/1 77 C 78 20/1 250 NEquipment UH-1/2/3/4/5
LCP-VS r3 r6 r7 r8 NLighting 705 20/1 79 A 80 80/3 PV PROVISION (SPACE)
VISITOR SERVICES LIGHTING NLighting 685 20/1 81 B 82
VISITOR SERVICES LIGHTING NLighting 505 20/1 83 C 84
DEMAND CATEGORY Aph(VA) Bph(VA) Cph(VA) TOTAL
TOTAL CONNECTED LOAD
VA: 106195
NEquipment 28266 28066 29404 85735 AMPS: 300.7
NReceptacles 4096 4187 3377 11660
NLighting 3725 3665 1535 8925
TOTAL DESIGN LOAD
VA: 106320
AMPS: 300.5
DESIGN LOAD: 36087 35917 34316 106320
DESIGNATION: PANEL EB-A PROJECT NAME: MIDDLE KYLE COMPLEX LOCATION: EDUCATION BUILDING
VOLTAGE: 208Y/120V - 3 Ph - 4 Wire BUS RATING(A): 400 MAIN(A): 400 SCCR(KA): 42 AVAILABLE FAULT(A): 41616 MOUNTING: Surface ENCLOSURE: NEMA 1 NOTES:
NOTES DESCRIPTION DEMAND CATEGORY VA BKR A/P CIRCUIT # PHASE CIRCUIT # BKR A/P VA DEMAND CATEGORY DESCRIPTION NOTES
203/204/205/202 EXT RCPTS NReceptacles 1080 20/1 1 A 2 40/2 4150 NEquipment EWH-2
201 MICROWAVE NEquipment 1200 20/1 3 B 4 4150
201 COUNTERTOP RCPTS NReceptacles 720 20/1 5 C 6 30/1 3500 NEquipment EWH-3
201/EXT RCPTS NReceptacles 1080 20/1 7 A 8 20/1 500 NEquipment TP-2
201 PROJECTOR SCREEN NEquipment 500 20/1 9 B 10 20/1 500 NEquipment DDC PANEL
201 FLOORBOXES/PROJECTOR NEquipment 1200 20/1 11 C 12 20/1 500 NEquipment LIGHTING CONTROL PANEL
205 RACK RECEPTACLE NEquipment 2000 30/1 13 A 14 15/3 552 NEquipment HRV-2
205 RCPT NReceptacles 360 20/1 15 B 16 552
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 17 C 18 552
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 19 A 20 15/3 870 NEquipment RWP-2 / RWP-3 / RWP-4
MOTORIZED VENT ACTUATORS NEquipment 500 20/1 21 B 22 870
PAPER TOWEL DISPENSER NEquipment 100 20/1 23 C 24 870
FACP NEquipment 500 20/1 25 A 26 15/3 552 NEquipment CDP-4 / CDP -4
SOUTH AMPHITHEATRE NReceptacles 180 20/1 27 B 28 552
EAST AMPHITHEATRE NReceptacles 180 20/1 29 C 30 552
IRRIGATION CONTROLLER NEquipment 500 20/1 31 A 32 15/3 841 NEquipment RWP-5 / RWP-6 / RWP-2
SPARE 20/1 33 B 34 841
SPARE 20/1 35 C 36 841
SPARE 20/1 37 A 38 60/3 2042 NEquipment WWHP-4
SOUTH AMPHITHEATRE NEquipment 750 50/3 39 B 40 2042
750 41 C 42 2042
750 43 A 44 20/1 SPARE
EAST AMPHITHEATRE NEquipment 750 50/3 45 B 46 20/1 NLighting LIGHTING INVERTER INV-EB
750 47 C 48 20/1 1105 NLighting LCP-EB r5
750 49 A 50 20/1 1105 NLighting LCP-EB r6
SPARE 20/1 51 B 52 20/1 904 NLighting LCP-EB r7 (RESTROOM)
SPARE 20/1 53 C 54 20/1 954 NLighting LCP-EB r8
LS-1 LIFT STATION NEquipment 2906 60/3 55 A 56 20/1 1023 NLighting LCP-EB r3 r9 r10 r14 r16
2906 57 B 58 20/1 140 NLighting PICNIC AREAS LTG
2906 59 C 60 20/1 160 NLighting EDUCATION BUILDING LTG
SPARE 20/1 61 A 62 20/1 SPARE
SPARE 20/1 63 B 64 20/1 SPARE
SPARE 20/1 65 C 66 20/1 SPARE
SPARE 20/1 67 A 68 20/1 SPARE
SPARE 20/1 69 B 70 20/1 SPARE
SPARE 20/1 71 C 72 20/1 SPARE
SPARE 20/1 73 A 74 20/1 SPARE
SPARE 20/1 75 B 76 20/1 SPARE
SPARE 20/1 77 C 78 20/1 SPARE
SPARE 20/1 79 A 80 20/1 SPARE
SPARE 20/1 81 B 82 20/1 SPARE
SPARE 20/1 83 C 84 20/1 SPARE
DEMAND CATEGORY Aph(VA) Bph(VA) Cph(VA) TOTAL
TOTAL CONNECTED LOAD
VA: 57815
NReceptacles 2160 540 900 3600 AMPS: 182.7
NEquipment 17413 16113 15063 48589
NLighting 2954 1305 2774 7033
TOTAL DESIGN LOAD
VA: 59222
AMPS: 187.6
DESIGN LOAD: 22527 17958 18737 59222
DESIGNATION: PANEL VS-INV PROJECT NAME: MIDDLE KYLE COMPLEX LOCATION: VISITOR SERVICES
VOLTAGE: 208Y/120V - 3 Ph - 4 Wire BUS RATING(A): 30 MAIN(A): 30 SCCR(KA): 10 AVAILABLE FAULT(A): 7396 MOUNTING: Surface ENCLOSURE: NEMA 1 NOTES:
NOTES DESCRIPTION DEMAND CATEGORY VA BKR A/P CIRCUIT # PHASE CIRCUIT # BKR A/P VA DEMAND CATEGORY DESCRIPTION NOTES
LCP-VS r1 r2 r4 NLighting 942 20/1 1 A 2 20/1 SPARE SPARE
LCP-VS r15 r16 r25 NLighting 948 20/1 3 B 4 20/1 SPARE SPARE
DEMAND CATEGORY Aph(VA) Bph(VA) Cph(VA) TOTAL
TOTAL CONNECTED LOAD
VA: 1890
NLighting 1178 1185 0 2363 AMPS: 7.9
TOTAL DESIGN LOAD
VA: 2363
AMPS: 9.9
DESIGN LOAD: 1178 1185 0 2363
DESIGNATION: PANEL EB-INV PROJECT NAME: MIDDLE KYLE COMPLEX LOCATION: EDUCATION BUILDING
VOLTAGE: 208Y/120V - 3 Ph - 4 Wire BUS RATING(A): 20 MAIN(A): 20 SCCR(KA): 10 AVAILABLE FAULT(A): 5653 MOUNTING: Surface ENCLOSURE: NEMA 1 NOTES:
NOTES DESCRIPTION DEMAND CATEGORY VA BKR A/P CIRCUIT # PHASE CIRCUIT # BKR A/P VA DEMAND CATEGORY DESCRIPTION NOTES
LCP-EB r1 r4 r15 NLighting 235 20/1 1 A 2 20/1 SPARE SPARE
SPARE SPARE 20/1 3 B 4 20/1 SPARE SPARE
DEMAND CATEGORY Aph(VA) Bph(VA) Cph(VA) TOTAL
TOTAL CONNECTED LOAD
VA: 235
NLighting 294 0 0 294 AMPS: 2.0
TOTAL DESIGN LOAD
VA: 294
AMPS: 2.4
DESIGN LOAD: 294 0 0 294
MAIN(A): 400
REVISIONS
| 111292E800.dwg |
| Layout1 |
File details come from the government source that posted it. Updated .