Solicitation Attachments 1 through 4. 06/21/2012 POSTING 2 OF 2. The solicitation's attachments are unchanged from amendment -02. This posting 2 is Attachments 1 through 4. Document 1 is the solicitation to be used for offeror proposals AG-0116-S-12-0061-06.

View the file

Other files for this federal contract opportunity

Other files attached to Coon Cove LTF Access Road Reconditioning, newest first.
File Type Posted
2012_07_02_clarification_AG-0116-S-12-0061.pdf PDF
AG-0116-S-12-0061-07.pdf PDF
AG-0116-S-12-0061-06_fbo.pdf PDF
AG-0116-S-12-0061_mod_-05.pdf PDF
AG-0116-S-12-0061-04.pdf PDF
AG-0116-S-12-0061-03.pdf PDF
AG-0116-S-12-0061-02_w_replacement_pages.pdf PDF
AG-0116-S-12-0061-02_conformed_.pdf PDF
AG-0116-S-12-0061-01_replacement_pages_.pdf PDF
AG-0116-S-12-0061-01_conformed_.pdf PDF
AG-0116-S-12-0061_fbo.pdf PDF
Coon dwgs combined.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

��
���������������
�������������������
��

General Decision Number: AK120001 04/20/2012 AK1

Superseded General Decision Number: AK20100001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 02/03/2012 3 02/10/2012 4 02/17/2012 5 04/13/2012 6 04/20/2012

ASBE0097-001 01/01/2011

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 36.11 15.26

ASBE0097-002 01/01/2011

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 36.11 15326

BOIL0502-002 07/01/2011

Rates Fringes

BOILERMAKER......................$ 42.70 24.86

��
���������������

BRAK0001-002 07/01/2011

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 37.39 17.60 Tile & Terrazzo Finisher.........$ 31.78 17.60

CARP1501-001 09/01/2011

Rates Fringes

MILLWRIGHT.......................$ 33.89 18.23

CARP2520-003 07/01/2010

Rates Fringes

Diver Stand-by....................$ 39.80 18.73 Tender......................$ 38.80 18.73 Working.....................$ 79.60 18.73 Piledriver Carpenter...................$ 35.49 18.73 Piledriver; Skiff Operator and Rigger..................$ 34.49 18.73 Sheet Stabber...............$ 35.49 18.73 Welder......................$ 41.05 18.73

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2011

Rates Fringes

CARPENTER

Carpenter...................$ 35.49 20.38 Lather/Drywall Applicator...$ 35.49 20.38

��
���������������

ELEC1547-004 04/01/2012

Rates Fringes

CABLE SPLICER....................$ 39.77 3%+$21.93

Electrician;Technician...........$ 38.02 3%+$21.93

ELEC1547-005 04/01/2012

Line Construction

Rates Fringes

CABLE SPLICER....................$ 49.92 3%+$24.08

Linemen (Including Equipment Operators, Technician)...........$ 48.17 3%+24.08 Powderman........................$ 46.17 3%+$24.08

TREE TRIMMER.....................$ 33.62 3%+$18.58

ELEV0019-002 01/01/2012

Rates Fringes

ELEVATOR MECHANIC................$ 49.035 23.535+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day

ENGI0302-002 01/01/2012

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.43 19.00

GROUP 1A....................$ 39.19 19.00

GROUP 2.....................$ 36.66 19.00

GROUP 3.....................$ 35.94 19.00

GROUP 4.....................$ 29.73 19.00

TUNNEL WORK

GROUP 1....................$ 41.17 19.00

GROUP 1A...................$ 43.11 19.00

GROUP 2....................$ 40.33 19.00

GROUP 3....................$ 39.53 19.00

GROUP 4....................$ 32.70 19.00

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors; Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells;

Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck

��
���������������

type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration;

Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader;

Mucking Machines: Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley; Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine;

Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine;

Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer

GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes,excavators with all attachments, draglines, clamshells-over 3 yards, (b) Tower cranes;Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.;Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor (finish:

when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w. and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types; Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).

GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under;

Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, Elevating Grader, Dumor and similar; Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder;

Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum; Bombardier (tack or tow rig); Boring Machine; Brooms-power; Bump Cutter; Compressor; Farm tractor;

Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders:

(a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or 100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

��
���������������

IRON0751-003 08/01/2011

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 33.40 23.16

FENCE, BARRIER AND

GUARDRAIL INSTALLERS........$ 29.90 23.16

GUARDRAIL LAYOUT MAN........$ 30.64 23.16

HELICOPTER, TOWER...........$ 34.40 23.16

LABO0341-005 07/01/2011

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 29.00 20.02

GROUP 2.....................$ 30.00 20.02

GROUP 3.....................$ 30.90 20.02

GROUP 3A....................$ 34.18 20.02

GROUP 3B....................$ 35.01 20.02

GROUP 4.....................$ 18.57 20.02

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 31.90 20.02

GROUP 2....................$ 33.00 20.02

GROUP 3....................$ 33.99 20.02

GROUP 3A...................$ 37.60 20.02

GROUP 3B...................$ 38.51 20.02

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 29.00 20.02

GROUP 2.....................$ 30.00 20.02

GROUP 3.....................$ 30.90 20.02

GROUP 3A....................$ 34.18 20.02

GROUP 3B....................$ 35.01 20.02

GROUP 4.....................$ 18.57 20.02

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 31.90 20.02

GROUP 2....................$ 33.00 20.02

GROUP 3....................$ 33.99 20.02

GROUP 3A...................$ 37.60 20.02

GROUP 3B...................$ 38.51 20.02

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Diggers; Dump Man;

��
���������������

Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro- Seeder Nozzleman; Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders;

Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills);

Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer; Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler; Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills;

hydraulic drills); Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang; Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers; Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills;

hydraulic drills); Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

��
���������������

PAIN1959-001 07/01/2011

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 29.17 18.47

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 29.67 18.47

PAIN1959-002 07/01/2011

SOUTH OF THE 63RD PARALLEL

Rates Fringes

Painters:

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 26.98 18.22 Machine Taper/Drywall.......$ 28.18 18.22 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.48 16.22

PAIN1959-003 07/01/2011

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 34.09 17.28

PAIN1959-004 07/01/2011

Rates Fringes

FLOOR LAYER: Carpet.............$ 30.52 12.39

PAIN1959-006 07/01/2011

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 34.09 17.23

��
���������������

PLAS0867-001 02/01/2012

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 33.93 19.07 South of the 63rd parallel..$ 33.68 19.07

PLAS0867-004 02/01/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 33.68 19.07 South of the 63rd parallel..$ 33.43 19.07

PLUM0262-002 01/01/2012

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 36.02 23.82

PLUM0367-002 07/01/2011

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 36.98 18.72

PLUM0375-002 07/01/2011

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 39.71 18.45

* PLUM0669-002 04/01/2012

Rates Fringes

SPRINKLER FITTER.................$ 41.23 21.52

ROOF0190-002 06/01/2011

Rates Fringes

ROOFER

NORTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a SOUTH OF THE 63RD PARALLEL..$ 28.50 2.44 + a

��
���������������

FOOTNOTE:

a. Employers are to supply employees with comprehensive medical insurance.

Employer is responsible to cover, at minimum one-half (1/2) of the individual premium. The individual will be responsible for the remaining premium.

SHEE0023-003 06/01/2010

South of the 63rd Parallel

Rates Fringes

Sheet Metal Worker...............$ 38.84 18.35

SHEE0023-004 07/02/2010

North of the 63rd Parallel

Rates Fringes

Sheet Metal Worker...............$ 42.98 18.56

TEAM0959-003 09/01/2011

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 37.77 16.43

GROUP 1A....................$ 39.04 16.43

GROUP 2.....................$ 36.51 16.43

GROUP 3.....................$ 35.69 16.43

GROUP 4.....................$ 35.11 16.43

GROUP 5.....................$ 34.35 16.43

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment;

Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics; Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles; Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers;

Partsman; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster; Tireman (light duty);

Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear

��
���������������
�������������������
���

axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons;

Foam Distributor Truck/dual axle; Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle;

Fire Truck/Ambulance Driver; Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle;

Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards; Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

��
���������������

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:

SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

��
���������������
�������������������
���

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Forest Service

Supplemental Specification

(FSSS)

Coon Cove LTF Access Road Reconditioning

Attachment 2 to

Solicitation AG-0116-S-12-0061

May 14, 2012

Coon�Cove�LTF�Access�Road�Reconditioning� Attachment�2,�FSSS� AG�0116�S�12�0061� p.�2�of�81�

Table of Contents

Table of Contents ............................................................................................................................ 2�

Preface ............................................................................................................................................. 6�

101 - Terms, Format, and Definitions ............................................................................................. 7�

101.01 Meaning of Terms ........................................................................................................... 7�

101.03 Abbreviations. ................................................................................................................. 7�

101.04 Definitions....................................................................................................................... 7�

102 - Bid, Award, and Execution of Contract .............................................................................. 10�

102 Bid, Award, and Execution of Contract ............................................................................. 10�

103 - Scope of Work ..................................................................................................................... 11�

Deletions ................................................................................................................................... 11�

104 - Control of Work................................................................................................................... 12�

Deletions ................................................................................................................................... 12�

104.06 Use of Roads by Contractor .......................................................................................... 12�

105 - Control of Material .............................................................................................................. 13�

105.02 Material Sources. .......................................................................................................... 13�

105.02(a) Government-provided sources. ................................................................................. 13�

105.05 Use of Material Found in the Work. ............................................................................. 13�

106 - Acceptance of Work ............................................................................................................ 14�

106.01 Conformity with Contract Requirements. ..................................................................... 14�

106.07 Delete ............................................................................................................................ 16�

107 - Legal Relations and Responsibility to the Public ................................................................ 17�

107.05 Responsibility for Damage Claims. .............................................................................. 17�

107.06 Contractor’s Responsibility for Work. .......................................................................... 17�

107.09 Legal Relationship of the Parties. ................................................................................. 17�

107.10 Environmental Protection. ............................................................................................ 17�

108 - Prosecution and Progress ..................................................................................................... 19�

108 Delete. ................................................................................................................................ 19�

109 - Measurement and Payment .................................................................................................. 20�

109 Deletions ............................................................................................................................ 20�

AG�0116�S�12�0061� p.�3�of�81�

109.02 Measurement Terms and Definitions. ........................................................................... 20�

155 - Schedules for Construction Contracts ................................................................................. 21�

155 Delete. ................................................................................................................................ 21�

156 - Public Traffic ....................................................................................................................... 22�

157 - Soil Erosion Control ............................................................................................................ 25�

157.03 General .......................................................................................................................... 25�

171 - Weed and Disease Prevention ............................................................................................. 26�

201 - Clearing and Grubbing ........................................................................................................ 28�

201.02 Material: ........................................................................................................................ 28�

201.01 Description .................................................................................................................... 28�

201.04 Clearing. (c) .................................................................................................................. 28�

201.04 Clearing. ........................................................................................................................ 29�

201.06 Disposal......................................................................................................................... 29�

203 - Removal of Structures and Obstructions ............................................................................. 30�

203.01 Description. ................................................................................................................... 30�

203.04 Removing Material. ...................................................................................................... 30�

204 - Excavation and Embankment .............................................................................................. 31�

204.06 Roadway Excavation. ................................................................................................... 43�

204.10 Embankment Construction............................................................................................ 43�

204.11 Compaction. .................................................................................................................. 43�

204.13 Sloping, Shaping, and Finishing. .................................................................................. 44�

Table 204-2 Construction tolerances. ....................................................................................... 44�

205 - Rock Blasting ...................................................................................................................... 46�

205.03 Regulations ................................................................................................................... 46�

205.06 Preblast condition survey and vibration monitoring and control. ................................. 46�

205.07 Test Blasting. ................................................................................................................ 46�

205.08 Blasting. ........................................................................................................................ 46�

209 - Structure Excavation and Backfill ....................................................................................... 47�

209.10 Backfill. ......................................................................................................................... 47�

209.11 Compacting. .................................................................................................................. 47�

Table 209-1 Sampling and Testing Requirements .................................................................... 48�

AG�0116�S�12�0061� p.�4�of�81�

251 - Riprap .................................................................................................................................. 49�

251.03 General. ........................................................................................................................ 49�

301 - Untreated Aggregate Courses .............................................................................................. 51�

301 Title Change. ...................................................................................................................... 51�

301.01 Work. ............................................................................................................................ 51�

301.02 Material. ........................................................................................................................ 51�

301.03 General. ......................................................................................................................... 51�

301.04 Mixing and Spreading. .................................................................................................. 52�

301.05 Compacting ................................................................................................................... 52�

301.06 Surface Tolerance. ........................................................................................................ 53�

Table 301-1—Acceptance Sampling and Testing Requirements. ............................................ 54�

301.08 (b) .................................................................................................................................. 55�

303 - Road Reconditioning ........................................................................................................... 56�

303.01 Work. ............................................................................................................................ 56�

303.10 Measurement ................................................................................................................. 56�

303.10 Measurement ................................................................................................................. 57�

556 - Bridge Railing...................................................................................................................... 58�

557 - Timber Structures ................................................................................................................ 59�

571 - Prefabricated Bridges .......................................................................................................... 61�

571.12........................................................................................................................................ 65�

571.13........................................................................................................................................ 65�

602 - Culverts and Drains ............................................................................................................. 67�

602.03 General. ......................................................................................................................... 67�

617 - Guardrail .............................................................................................................................. 68�

625 - Turf Establishment .............................................................................................................. 69�

625.03 General. ........................................................................................................................ 69�

625.04 Preparing Seedbed. ....................................................................................................... 71�

625.11 Measurement. ................................................................................................................ 71�

635 - Temporary Traffic Control .................................................................................................. 73�

635.03 General. ......................................................................................................................... 73�

651 - Development of Pits & Quarries ......................................................................................... 74�

AG�0116�S�12�0061� p.�5�of�81�

703 - Aggregate ............................................................................................................................. 76�

703.05 Subbase, Base, Surface Course, and Screened Aggregate. .......................................... 76�

718 - Traffic Signing and Marking Material................................................................................. 81�

718.05 Aluminum Panels .......................................................................................................... 81�

AG�0116�S�12�0061� p.�6�of�81�

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

AG�0116�S�12�0061� p.�7�of�81�

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

AG�0116�S�12�0061� p.�8�of�81�

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

AG�0116�S�12�0061� p.�9�of�81�

Figure 101-1—Illustration of road structure terms.

AG�0116�S�12�0061� p.�10�of�81�

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

AG�0116�S�12�0061� p.�11�of�81�

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

AG�0116�S�12�0061� p.�12�of�81�

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

AG�0116�S�12�0061� p.�13�of�81�

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

AG�0116�S�12�0061� p.�14�of�81�

106 - Acceptance of Work

106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to

106.05 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

AG�0116�S�12�0061� p.�15�of�81�

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

AG�0116�S�12�0061� p.�16�of�81�

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

AG�0116�S�12�0061� p.�17�of�81�

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

� Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

� Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

� Exact time and location of spill including a description of the area involved.

� Containment procedures.

� Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

� Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

AG�0116�S�12�0061� p.�18�of�81�

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

AG�0116�S�12�0061� p.�19�of�81�

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

AG�0116�S�12�0061� p.�20�of�81�

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

AG�0116�S�12�0061� p.�21�of�81�

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

AG�0116�S�12�0061� p.�22�of�81�

156 - Public Traffic

156.00_nat_us_04_17_2007

Delete Section 156 in its entirety and replace with the following:

Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Construction sign panels 633

Retro-reflectiv…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .