A. AMENDMENT. 8 pages. This amendment changes some pay item information. These are reflected in the replacement pages attached to the SF-30 as follows Solicitation pages 3 4 5 8.1 and 24. This amendment also provides an entirely new Attachment 3 (Worklist) dated 24 MAY 2012 with two pages. A conformed solicitation incorporating changes from both Amendment -01 an Amendment -02 will be posted on FedBizOpps simultaneously with this document offerors are encouraged to use this new conformed and.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2012_07_02_clarification_AG-0116-S-12-0061.pdf | ||
| AG-0116-S-12-0061-07.pdf | ||
| AG-0116-S-12-0061-06_fbo.pdf | ||
| attachments_1-4_fbo.pdf | ||
| AG-0116-S-12-0061_mod_-05.pdf | ||
| AG-0116-S-12-0061-04.pdf | ||
| AG-0116-S-12-0061-03.pdf | ||
| AG-0116-S-12-0061-02_conformed_.pdf | ||
| AG-0116-S-12-0061-01_conformed_.pdf | ||
| AG-0116-S-12-0061-01_replacement_pages_.pdf | ||
| AG-0116-S-12-0061_fbo.pdf | ||
| Coon dwgs combined.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation AG‐0116‐S‐12‐0061‐02 Coon Cove LTF Access Road Reconditioning p. 3 of 30
Section B Supplies or Services and Prices/Costs
ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
001 Coon Cove LTF Access Road 1 JOB $________ $________ Reconditioning Base Work As described in Section C and other sections of this contract along with drawings and specifications
The below‐listed pay items are established for the purpose of progress payments under the contract clause at FAR 52.232‐5, Payments Under Fixed‐Price Construction Contracts. The sum of the pay item amounts shall not exceed the line item amount above.
PAY ITEMS
15101, Mobilization
QTY UNIT UNIT PRICE AMOUNT
1 LS $________ $________
20301, Removal of log stringer bridge
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
* 20404, Borrow excavation , placement method 1 (CQ)
QTY UNIT UNIT PRICE AMOUNT
1,300 CY $________ $________
30301, Reconditioning of roadbed, compaction A
QTY UNIT UNIT PRICE AMOUNT
4.30 MI $________ $________
55606, Bridge approach railing Type II Class A, W beam
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
57101, Prefabricated bridge superstructure— design, fabricate, deliver, and install
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
57106, Prefabricated bridge substructure— fabricate, deliver, and install
QTY UNIT UNIT PRICE AMOUNT
1 LS $________ $________
Coon Cove LTF Access Road Reconditioning p. 4 of 30
ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
60201‐18, 18" corrugated metal pipe 0.064" thickness for steel or 0.060" thickness for aluminum, method (C), 2 2/3 x 1/2" corrugations
QTY UNIT UNIT PRICE AMOUNT
344 LF $________ $________
60201‐24, 24" corrugated metal pipe 0.064" thickness for steel or 0.060" thickness for aluminum, method (C), 2 2/3 x 1/2" corrugations
QTY UNIT UNIT PRICE AMOUNT
120 LF $________ $________
60201‐48, 48" corrugated metal pipe 0.079 thickness for steel or method (C), 2 2/3 x 1/2" corrugations 0.079 thickness for steel or method (C), 3 x 1" corrugations
QTY UNIT UNIT PRICE AMOUNT
80 LF $________ $________
* 62501, Seeding, dry method (without mulch) (CQ)
QTY UNIT UNIT PRICE AMOUNT
1.70 AC $________ $________
65101, Pit development
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
807(2), Medium Sized Crawler Excavator with Operator
8.0 HR $________ $________
* An asterisk above indicates a Contract Quantity (CQ). See FP‐03 §109.02.
Note 1: Payment for bond premiums shall not be in addition to contract price. The Contractor shall include bond premiums in pay item 15101 Mobilization.
Note 2: The quantities shown above are approximate unless designated as a contract quantity. The Contractor shall limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized. See FP‐03 §109.05.
Coon Cove LTF Access Road Reconditioning p. 5 of 30
101 OPTION 1 1 JOB $________ $________
On the 8334000 Road as described in Section C and other
* 20404, Borrow Excavation, Placement Method 1 (CQ)
QTY UNIT UNIT PRICE AMOUNT
3,000 CY $________ $________
60201‐36, 36" corrugated metal pipe 0.064" thickness for steel or 0.060" thickness for aluminum, method (C), 2 2/3 x 1/2" corrugations
QTY UNIT UNIT PRICE AMOUNT
110 LF $________ $________
60201‐48, 48" corrugated metal pipe 0.064" thickness for steel or 0.060" thickness for aluminum, method (C), 2 2/3 x 1/2" corrugations
160 LF $________ $________
102 OPTION 2 1 JOB $________ $________
On the 8334000 Road as described in Section C and other
PAY ITEM
30103, Crushed Aggregate type base, grading C‐1 compaction B
1.70 MI $________ $________
Coon Cove LTF Access Road Reconditioning p. 8.1 of 30
108 OPTION 8 1 JOB $________ $________
On the 8334000 Road as described in Section C and other
* 20404, Borrow Excavation, placement method 1 (CQ)
QTY UNIT UNIT PRICE AMOUNT
500 CY $________ $________
55606, Bridge Approach Railing, Type II Class A, W beam
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
57101, Prefabricated bridge superstructure—design, fabricate, deliver, and install
QTY UNIT UNIT PRICE AMOUNT
1 EA $________ $________
57106, Prefabricated Bridge Substructure — fabricate, deliver, and install
1 LS $________ $________
Coon Cove LTF Access Road Reconditioning p. 24 of 30
Section J List of Attachments
Attachment Number of No. Title Pages 1 Wage Determination 12
AK120001 04/20/2012 AK1
2 Forest Service Supplemental Specification 81 May 14, 2012 3 Work List 2 May 24,2012 4 Drawings 15 May 23, 2012 (pp. 1-2), May 14, 2012 (pp. 3-15)
NOTE: IN COMPLIANCE WITH THE PAPER REDUCTION ACT, SECTIONS K, L, AND M,
WHICH APPLY ONLY TO THE SOLICITATION PHASE, ARE NOT DUPLICATED AFTER
CONTRACT AWARD. HOWEVER, SECTION K WILL BE INCORPORATED BY REFERENCE
INTO THE RESULTING CONTRACT.
"The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, DC 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.”
Road�No From�MP To�MP Work�Description
BASE�BID
8300000 12.571 � Existing�Rock�Pit���Small�stockpile�available�for�this� project.
8330000 0.00
Work�begins�at�the�Intersection�with�NFSR� 8300000�at�MP�15.969.��Road�was�reconditioned�in� 2011.
� 0.00 4.502 400�CY
Place��400�CY�Unclassified�Borrow�Excavation,�as� marked�by�the�Contracting�Officer
MP�0.649,�
MP�2.047,�
MP�3.645
Existing�Rock�Pits�available�for�development.��
4.500 Work�ends�at�MP�4.5.��Intersection�with�8334000
8334000 0.00 � � Work�begins�at�Intersection�with�NFSR�8330000��
MP�4.502
0.00 4.300 4.30 Begin�Roadway�reconditioning�includes�brushing,�� clean�ditches�and�catch�basins
� 0.00 4.300 400�CY
Place��400�CY�Unclassified�Borrow�Excavation,�as� marked�by�the�Contracting�Officer
344�LF
Install�ten�18"�cmp�as�marked�by�the�Contracting� Officer
120.00 Remove�four�existing�cmps,�Install�two�24"�cmp�as� marked�by�the�Contracting�officer
8�HRS
Ditchline�excavation����rock�outcrops.��Medium� Sized�Crawler�Excavator�with�operator.��As�marked� by�the�Contracting�Officer
� 3.400 1�ea.
Remove�existing�24�ft�log�stringer�bridge.��Install�60� ft�modular�bridge�w/�approach�rails.��Fish�Stream��� timing�restrictions.�
500�cy Place��500�CY�Unclassified�Borrow�Excavation,�for� bridge�approaches
0.00 4.300 Work�ends�at�the�Coon�Cove�LTF�MP�4.300
Coon�Cove�LTF�Access�Road�Reconditioning
Page�1
Solicitation AG-0116-S-12-0061 Amendment -02
Attachment 3 / Worklist May 24, 2012
p. 1 of 2
OPTION�1 � � � �
0.00 4.300 3000�CY
Place��3000�CY�Unclassified�Borrow�Excavation,�as� marked�by�the�Contracting�Officer
110�LF
Remove�two�existing�cmps,�Install�two�36"�cmp's� as�marked�by�the�Contracting�officer
160�LF
Remove�three�existing�cmps,�Install�three�48"� cmp's�as�marked�by�the�Contracting�officer
OPTION�2
8334000 0.00 1.700 1.70 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
OPTION�3
8334000 1.70 3.400 1.70 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
OPTION�4
8334000 3.40 4.300 0.90 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
OPTION�5
8330000 0.00 1.700 1.70 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
OPTION�6
8330000 1.70 3.400 1.70 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
OPTION�7
8330000 3.40 4.500 1.10 Place�6�Inch�Crushed�Aggregate�Base�Grading�C,�as� marked�by�the�Contracting�Officer.
2.923
70�ft�MBS�bridge.��Install�new�sills,�backwalls,�steel� rails,�and�approach�rails.��Fish�Stream���timing� restrictions.
OPTION�8
8334000 � 3.250 1�ea.
Remove�existing�two�36"�cmp's.��Install�60�ft� modular�bridge�w/�approach�rails.��Fish�Stream��� timing�restrictions.�
� 500�cy Place��500�CY�Unclassified�Borrow�Excavation,�for� bridge�approaches