UPDATED_Questions_and_Answers_1-6.pdf

PDF 60 KB Posted

Attached to
False Island Road System Repair and Maintenance
Solicitation number
AG-0109-S-16-0013
Issued by

About this file

Updated Questions and Answers

View the file

Other files

File Type Posted
UPDATED_Questions_and_Answers_1-5.pdf PDF
Amendment2_AG0109S160013.pdf PDF
Questions_and_Answers_1-5.pdf PDF
Amendment1_RFQ_AG0109S160013.pdf PDF
bridge_wearing_surface_typical.pdf PDF
Corrected_Sheet3_False_Island_Road_Maintenance_Drawings.pdf PDF
LTF5.JPG JPG image
LTF1.JPG JPG image
LTF2.JPG JPG image
LTF4.JPG JPG image
LTF3.JPG JPG image
LTF6.JPG JPG image
BeaverBafflerFishPipe_Option3.JPG JPG image
LTF7.JPG JPG image
False_Island_Road_Maintenance_Drawings.pdf PDF
SF-1442_AG0109S160013.pdf PDF
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
Schedule_of_Items.xlsx XLSX spreadsheet
fsss072514.pdf PDF
Final_RFQ_False_Island_Roads.pdf PDF
WageDeterminationAK160001.txt TXT text file
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
False_Island_Road_Maintenance_Drawings.pdf PDF
fsss072514.pdf PDF
FalseI2016_section_C_H_J_combined_updated-draft.pdf PDF
bridge_wearing_surface_typical.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

False Island Road Maintenance Questions and Answers

UPDATE 5/23/2016

AG-0109-S-16-0013

1 | P a g e

Q1. On sheet 4 of 7, there is no log diameter listed.

A1. Diameters of logs are show on the sheet 5 notes

Q2. What is the distance from LTF to logs?

A2. The distance is not known but is being investigated. Additional information will be provided in a subsequent amendment.

UPDATE: The closest logs/trees are approximately 1.4 miles from the LTF/MAF. Other locations are 2.25 and 3.25 miles. The closest location (1.4 miles) would require road work to obtain as it is on a closed out/water barred system. It is estimated that access to this location will take approximately 2 hours of excavator machine time. The other locations (2.25 and 3.25 miles) would not require any road work to access.

Q3. Will we be able to shovel logs with excavator?

A3. Yes.

Q4. Sheet 3 of 6 has no description, item number, method of measurement or unit.

A4. A corrected set of drawings has been provided as an attachment.

Q5. What is the spec for the beaver bafflers listed in Option Item #3?

A5. FSSS 602- Culverts & Drains Add the following:

Beaver Baffles

Fencing shall be installed in a configuration that fits on the inlet of the culvert constructed in a basket of rectangular or circular shape that extends a minimum of twice the pipe diameter upstream of the culvert. A larger opening shall be constructed on the upstream end of the basket with an eight inch diameter opening. Fencing shall be 2” x 4” ½ gauge galvanized welded wire fastened with 8 gauge galvanized wire fastened with galvanized nuts, bolts or clamps. Structure shall be held in place with 4 pieces of number 5 rebar embed in the stream bed a minimum of 3 feet in gravel or drilled into rock.

UPDATE:

Specification for the beaver bafflers listed in Option Item #3 is changed to read as follows:

Baffles to prevent beaver blocking culvert inlets shall be constructed of short sections of culvert of the same diameter and material of the culvert. The baffle shall be constructed by cutting the culvert at a 45 degree angle and welding the pieces to make a 90 degree angle.

The baffle shall be joined with a coupling band onto the inlet of the culvert according to AASHTO M36 or M196. The baffle shall be attached so that the culvert opening is sloped toward the stream bottom.

False Island Road Maintenance Questions and Answers

UPDATE 5/23/2016

AG-0109-S-16-0013

2 | P a g e

Q6a. Is there a float or boat facility at False Island?

Q6b. Is there any beach landing at Sitkoh Bay?

A6a/b. There is a Forest Service airplane float facility at False Island, which boats are generally not permitted to use. There is an old LTF at Sitkoh Bay operated in 2013-2014 by Sealaska. It was used in 2015 to load and unload materials and heavy equipment. There is also an undeveloped beach gravel road/ramp at Sitkoh Bay suitable for small skiffs (e.g. Lund) and inflatables alongside the LTF. Both are higher tide level dependent.