Schedule_of_Items.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
False Island Road System Repair and Maintenance
Solicitation number
AG-0109-S-16-0013
Issued by

About this file

Schedule B - Schedule of Items

View the file

Other files

File Type Posted
UPDATED_Questions_and_Answers_1-6.pdf PDF
UPDATED_Questions_and_Answers_1-5.pdf PDF
Amendment2_AG0109S160013.pdf PDF
Questions_and_Answers_1-5.pdf PDF
Amendment1_RFQ_AG0109S160013.pdf PDF
bridge_wearing_surface_typical.pdf PDF
Corrected_Sheet3_False_Island_Road_Maintenance_Drawings.pdf PDF
LTF5.JPG JPG image
LTF1.JPG JPG image
LTF2.JPG JPG image
LTF4.JPG JPG image
LTF3.JPG JPG image
LTF6.JPG JPG image
BeaverBafflerFishPipe_Option3.JPG JPG image
LTF7.JPG JPG image
False_Island_Road_Maintenance_Drawings.pdf PDF
SF-1442_AG0109S160013.pdf PDF
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
fsss072514.pdf PDF
Final_RFQ_False_Island_Roads.pdf PDF
WageDeterminationAK160001.txt TXT text file
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
False_Island_MAF_Construction_Drawings-Option1.pdf PDF
False_Island_Road_Maintenance_Drawings.pdf PDF
fsss072514.pdf PDF
FalseI2016_section_C_H_J_combined_updated-draft.pdf PDF
bridge_wearing_surface_typical.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Section B - Schedule of Items

BASE ITEM

Item No. Description Quantity Unit Unit Price Extended Price

1a 15101 Mobilization 1 Lump Sum $ $

1b 60200 Culvert Cleaning and Reconditioning 30 Each $ $

1c 834(04) Ditching 8321 Lineal Foot $ $

1d 86101 Resurface Bridge Wearing Planks 3946 SF $ $

1e20404* Unclassified Borrow 4" minus , Compaction method D130Cubic yard*$$
Finish Method A

1f 21106 Treatment of waterbars and barriers 1 Each $ $

1g 25101* Placed riprap, class 2, method A Onsite 3 Cubic Yard* $ $

1h 303118 Spot Blading , compaction B roller 1/2 station segments 10 Station $ $

1i6020118 Furnish and Install 18" Corrugated Plastic Pipe254Lineal Foot$$
Poly Pipe, Bell/Spigot Double Wall
1j62501* Seeding, dry method (without mulch)0.6Acre*$$
TOTAL BASE (TOTAL 1a - 1j)$
OPTION ITEM 1
2557(0) Reconstruct LTF1Lump Sum$$1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF1Lump Sum557(0 )Reconstruct LTF
TOTAL OPTION ITEM 1$
OPTION ITEM 2
386101 Resurface Bridge Wearing Planks650SF$$
TOTAL OPTION ITEM 2$
OPTION ITEM 3
4a20404 *Unclassified borrow, compaction method d, finishing method A40Cubic yard*$$

4b 60201 Corrugated Metal Beaver Bafflers and bands 3 Each $ $

4c 60201 Bands 3 Each $ $

4e6020118 - 18" Corrugated Metal Pipe72Lineal Foot$$
.064" thickness for steel or
.060" thickness for aluminum,
method (C), 2 2/3 x 1/2" corrugations
4f6020124 - 24" Corrugated Metal Pipe76Lineal Foot$$
.064" thickness for steel or
.060" thickness for aluminum,
method (C), 2 2/3 x 1/2" corrugations
TOTAL OPTION ITEM 3 (total 4a - 4f)$
OPTION ITEM 4
523051 Mechanical Brushing, Method A3.3Mile$$
TOTAL OPTION ITEM 4$
OPTION ITEM 5
686101 Resurface Bridge Wearing Planks970SF$$
TOTAL OPTION ITEM 5$
OPTION ITEM 6
7a30107* Pit run or screened aggregate, maximum size 4",500Cubic Yard*$$
roller compaction - compacted 12" lift 10' wide
Finish Method 204. 13 A
7b20101* Clearing and grubbing 75442 3 feet each side0.15Acre*$$
TOTAL OPTION ITEM 6$

TOTAL BASE + ALL OPTION ITEMS (Items 1+2+3+4+5+6+7) --------> $

Sheet2

* Denotes Contract Quantities
B.1 Offeror’s must submit prices for all items on in the Schedule of Items to be considered responsive to this solicitation.
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts
shall not be in addition to contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Payment will be made only for those items listed on Bid Schedules. All other work is incidental to these pay items.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .