Schedule B - Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED_Questions_and_Answers_1-6.pdf | ||
| UPDATED_Questions_and_Answers_1-5.pdf | ||
| Amendment2_AG0109S160013.pdf | ||
| Questions_and_Answers_1-5.pdf | ||
| Amendment1_RFQ_AG0109S160013.pdf | ||
| bridge_wearing_surface_typical.pdf | ||
| Corrected_Sheet3_False_Island_Road_Maintenance_Drawings.pdf | ||
| LTF5.JPG | JPG image | |
| LTF1.JPG | JPG image | |
| LTF2.JPG | JPG image | |
| LTF4.JPG | JPG image | |
| LTF3.JPG | JPG image | |
| LTF6.JPG | JPG image | |
| BeaverBafflerFishPipe_Option3.JPG | JPG image | |
| LTF7.JPG | JPG image | |
| False_Island_Road_Maintenance_Drawings.pdf | ||
| SF-1442_AG0109S160013.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| fsss072514.pdf | ||
| Final_RFQ_False_Island_Roads.pdf | ||
| WageDeterminationAK160001.txt | TXT text file | |
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_Road_Maintenance_Drawings.pdf | ||
| fsss072514.pdf | ||
| FalseI2016_section_C_H_J_combined_updated-draft.pdf | ||
| bridge_wearing_surface_typical.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Section B - Schedule of Items
BASE ITEM
Item No. Description Quantity Unit Unit Price Extended Price
1a 15101 Mobilization 1 Lump Sum $ $
1b 60200 Culvert Cleaning and Reconditioning 30 Each $ $
1c 834(04) Ditching 8321 Lineal Foot $ $
1d 86101 Resurface Bridge Wearing Planks 3946 SF $ $
| 1e | 20404* Unclassified Borrow 4" minus , Compaction method D | 130 | Cubic yard* | $ | $ |
| Finish Method A |
1f 21106 Treatment of waterbars and barriers 1 Each $ $
1g 25101* Placed riprap, class 2, method A Onsite 3 Cubic Yard* $ $
1h 303118 Spot Blading , compaction B roller 1/2 station segments 10 Station $ $
| 1i | 6020118 Furnish and Install 18" Corrugated Plastic Pipe | 254 | Lineal Foot | $ | $ |
| Poly Pipe, Bell/Spigot Double Wall |
| 1j | 62501* Seeding, dry method (without mulch) | 0.6 | Acre* | $ | $ |
| TOTAL BASE (TOTAL 1a - 1j) | $ |
| OPTION ITEM 1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | 557(0) Reconstruct LTF | 1 | Lump Sum | $ | $ | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF | 1 | Lump Sum | 557(0 ) | Reconstruct LTF |
| TOTAL OPTION ITEM 1 | $ |
| OPTION ITEM 2 | |||||
| 3 | 86101 Resurface Bridge Wearing Planks | 650 | SF | $ | $ |
| TOTAL OPTION ITEM 2 | $ |
| OPTION ITEM 3 | |||||
| 4a | 20404 *Unclassified borrow, compaction method d, finishing method A | 40 | Cubic yard* | $ | $ |
4b 60201 Corrugated Metal Beaver Bafflers and bands 3 Each $ $
4c 60201 Bands 3 Each $ $
| 4e | 6020118 - 18" Corrugated Metal Pipe | 72 | Lineal Foot | $ | $ |
| .064" thickness for steel or | |||||
| .060" thickness for aluminum, | |||||
| method (C), 2 2/3 x 1/2" corrugations |
| 4f | 6020124 - 24" Corrugated Metal Pipe | 76 | Lineal Foot | $ | $ |
| .064" thickness for steel or | |||||
| .060" thickness for aluminum, | |||||
| method (C), 2 2/3 x 1/2" corrugations | |||||
| TOTAL OPTION ITEM 3 (total 4a - 4f) | $ |
| OPTION ITEM 4 | |||||
| 5 | 23051 Mechanical Brushing, Method A | 3.3 | Mile | $ | $ |
| TOTAL OPTION ITEM 4 | $ |
| OPTION ITEM 5 | |||||
| 6 | 86101 Resurface Bridge Wearing Planks | 970 | SF | $ | $ |
| TOTAL OPTION ITEM 5 | $ |
| OPTION ITEM 6 | |||||
| 7a | 30107* Pit run or screened aggregate, maximum size 4", | 500 | Cubic Yard* | $ | $ |
| roller compaction - compacted 12" lift 10' wide | |||||
| Finish Method 204. 13 A |
| 7b | 20101* Clearing and grubbing 75442 3 feet each side | 0.15 | Acre* | $ | $ |
| TOTAL OPTION ITEM 6 | $ |
TOTAL BASE + ALL OPTION ITEMS (Items 1+2+3+4+5+6+7) --------> $
Sheet2
| * Denotes Contract Quantities |
| B.1 Offeror’s must submit prices for all items on in the Schedule of Items to be considered responsive to this solicitation. |
| B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts |
| shall not be in addition to contract price. Include bond payments under 15101 Mobilization. |
| Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. |
| Payment will be made only for those items listed on Bid Schedules. All other work is incidental to these pay items. |