Questions_and_Answers_1-5.pdf
PDF 53 KB Posted
- Attached to
- False Island Road System Repair and Maintenance
- Solicitation number
- AG-0109-S-16-0013
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED_Questions_and_Answers_1-6.pdf | ||
| UPDATED_Questions_and_Answers_1-5.pdf | ||
| Amendment2_AG0109S160013.pdf | ||
| Amendment1_RFQ_AG0109S160013.pdf | ||
| bridge_wearing_surface_typical.pdf | ||
| Corrected_Sheet3_False_Island_Road_Maintenance_Drawings.pdf | ||
| LTF5.JPG | JPG image | |
| LTF1.JPG | JPG image | |
| LTF2.JPG | JPG image | |
| LTF4.JPG | JPG image | |
| LTF3.JPG | JPG image | |
| LTF6.JPG | JPG image | |
| BeaverBafflerFishPipe_Option3.JPG | JPG image | |
| LTF7.JPG | JPG image | |
| False_Island_Road_Maintenance_Drawings.pdf | ||
| SF-1442_AG0109S160013.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| Schedule_of_Items.xlsx | XLSX spreadsheet | |
| fsss072514.pdf | ||
| Final_RFQ_False_Island_Roads.pdf | ||
| WageDeterminationAK160001.txt | TXT text file | |
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_Road_Maintenance_Drawings.pdf | ||
| fsss072514.pdf | ||
| FalseI2016_section_C_H_J_combined_updated-draft.pdf | ||
| bridge_wearing_surface_typical.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
False Island Road Maintenance Questions and Answers
AG-0109-S-16-0013
1 | P a g e
Q1. On sheet 4 of 7, there is no log diameter listed.
A1. Diameters of logs are show on the sheet 5 notes
Q2. What is the distance from LTF to logs?
A2. The distance is not known but is being investigated. Additional information will be provided in a subsequent amendment.
Q3. Will we be able to shovel logs with excavator?
A3. Yes.
Q4. Sheet 3 of 6 has no description, item number, method of measurement or unit.
A4. A corrected set of drawings has been provided as an attachment.
Q5. What is the spec for the beaver bafflers listed in Option Item #3?
A5. FSSS 602- Culverts & Drains Add the following description:
Beaver Baffles
Fencing shall be installed in a configuration that fits on the inlet of the culvert constructed in a basket of rectangular or circular shape that extends a minimum of twice the pipe diameter upstream of the culvert. A larger opening shall be constructed on the upstream end of the basket with an eight inch diameter opening. Fencing shall be 2” x 4” ½ gauge galvanized welded wire fastened with 8 gauge galvanized wire fastened with galvanized nuts, bolts or clamps. Structure shall be held in place with 4 pieces of number 5 rebar embed in the stream bed a minimum of 3 feet in gravel or drilled into rock.
File details come from the government source that posted it. Updated .