Amendment1_RFQ_AG0109S160013.pdf
PDF 84 KB Posted
- Attached to
- False Island Road System Repair and Maintenance
- Solicitation number
- AG-0109-S-16-0013
About this file
SF30 - Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED_Questions_and_Answers_1-6.pdf | ||
| UPDATED_Questions_and_Answers_1-5.pdf | ||
| Amendment2_AG0109S160013.pdf | ||
| Questions_and_Answers_1-5.pdf | ||
| bridge_wearing_surface_typical.pdf | ||
| Corrected_Sheet3_False_Island_Road_Maintenance_Drawings.pdf | ||
| LTF5.JPG | JPG image | |
| LTF1.JPG | JPG image | |
| LTF2.JPG | JPG image | |
| LTF4.JPG | JPG image | |
| LTF3.JPG | JPG image | |
| LTF6.JPG | JPG image | |
| BeaverBafflerFishPipe_Option3.JPG | JPG image | |
| LTF7.JPG | JPG image | |
| False_Island_Road_Maintenance_Drawings.pdf | ||
| SF-1442_AG0109S160013.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| Schedule_of_Items.xlsx | XLSX spreadsheet | |
| fsss072514.pdf | ||
| Final_RFQ_False_Island_Roads.pdf | ||
| WageDeterminationAK160001.txt | TXT text file | |
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_MAF_Construction_Drawings-Option1.pdf | ||
| False_Island_Road_Maintenance_Drawings.pdf | ||
| fsss072514.pdf | ||
| FalseI2016_section_C_H_J_combined_updated-draft.pdf | ||
| bridge_wearing_surface_typical.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0109-S-16-0013
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JUNEAU AK 99802
709 WEST 9TH STREET
ALASKA REGIONAL OFFICE
05/19/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/11/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
LIST OF CHANGES:
Quote due date : 24-MAY-16 changed to 26-MAY-16
This amendment is issued to update the period of performance, add one document to the solicitation package, correct one document, provide a record of questions and answers to vendor questions and extend the date/time for receipt of quotes by 2 days.
1. Section F, Page 5, FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR
1984) Alternate I (APR 1984), sentence 1 is revised to read as follows:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARI MEINERS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-0109-S-16-0013/000001
"The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31 2016."
2. The document titled
"bridge_wearing_surface_typical.pdf" was provided with the draft documents posted to FBO on May 6, 2016. This document was inadvertently omitted when the final RFQ was posted on May 12, 2016.
It is hereby added to the solicitation package.
3. A replacement Sheet 3 of 6 to the False
Island Road Maintenance Drawing Package is provided.
4. Questions and answers are provided as an attachment to this amendment.
5. The date and time for receipt of quotations is extended through Thursday, May 26, 2016 at
2:00 p.m. Alaska Time.
Period of Performance: 07/01/2016 to 10/31/2016
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110