AG OEM SOW _Attachments 3_12_25.pdf
PDF 2 MB Posted
- Attached to
- Groundwater Extraction and Treatment Unit
- Solicitation number
- 5-B176-Q-00412-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Statement of Work (SOW) for the manufacture and delivery of a Groundwater Treatment Plant (GTP) system for Argonne National Laboratory at a site in Agra, Kansas. The project involves fabricating a pre-engineered 20-foot shipping container-style building with a complete groundwater extraction and treatment system, including a QED E-Z Stacker air stripper model 2.4P, three submersible well pumps, flowmeters, variable frequency drives, control panels, and associated piping and electrical components. The system is designed to extract groundwater from three wells, treat it to remove volatile organic compounds (specifically carbon tetrachloride and chloroform), and discharge treated water to Turner Creek, with a target treatment flow rate of 10 gallons per minute and a goal of reducing carbon tetrachloride concentrations from 350 ppb to less than 1 ppb.
The SOW specifies detailed technical requirements for the equipment, including materials, instrumentation, performance parameters, and installation specifications. The Original Equipment Manufacturer (OEM) is responsible for preparing shop drawings, manufacturing the building and system components, factory testing, providing operation and maintenance manuals, and delivering the complete system to the site. Key deliverables include comprehensive documentation, a PLC/HMI interface-based control panel with remote accessibility, and compliance with various industry standards such as AWWA, ANSI, NEC, and IBC. The project is part of a remedial action plan to address groundwater contamination at the former Commodity Credit Corporation site, with work to be completed by January 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum and Acknowledgement Doc.doc | DOC document | |
| ANL-70 Request for Quotation.doc | DOC document | |
| PARIS_G4-345035 Instructions for Bidders.docx | DOCX document | |
| ANL-70B Reps and Certs Long-14-FEB-2025.PDF | ||
| Appendix D8C-12-DEC-2023.PDF | ||
| Appendix A-71COM-13-FEB-2023.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Argonne National Laboratory Statement of Work
Manufacture of Treatment System Components and Groundwater Treatment Building Agra, Kansas January 2025
1.0 Background
Argonne National Laboratory (Argonne) is assisting the U.S. Department of Agriculture (USDA) in the implementation of a Corrective Action Plan (CAP; Argonne 2024) to address groundwater contamination at a site in Agra, Kansas. The remedial action (RA) identified in the CAP will employ a pump and treat system, extracting groundwater from three wells followed by volatile organic compound (VOC) removal by air stripping with tray aeration, and effluent discharge.
Additional information pertaining to the approved RA can be found in the Corrective Action Study (CAS; Argonne 2018) for this Site and the associated Corrective Action Decision issued by the Kansas Department of Health and Environment (KDHE 2021).
A Final Remedial System Engineering Design – Agra, Kansas has been prepared for the USDA and Argonne by HydroGeoLogic Inc. (HGL) that defines the technical specifications and construction requirements for the remedial system (HGL; April 2022). Specific references to the CAP and HGL documents are provided in this Statement of Work (SOW) where relevant to the activities that are to be conducted under this SOW.
2.0 Scope
This document serves as the SOW for the manufacture and/or provision of the groundwater extraction and treatment system (GETS) components to be packaged by an Original Equipment Manufacturer (OEM), to form a complete groundwater treatment plant (GTP) for the RA.
The OEM will house the GTP in a “treatment building” (or “GTP building”) to be manufactured by the OEM. Piping will be installed by Others (RA Contractor) from the individual extraction wells to the GTP building and connected inside the building to a manifold header. Electrical and communication conduits and wiring will also be installed by Others (RA Contractor) from the individual extraction wells to the GTP building and connected to the GETS power and control panels.
Untreated groundwater from the extraction wells will flow through an air-stripping treatment unit in the GTP building, then discharge to the surface via piping (provided by Others) to a nearby natural drainageway.
The GETS components to be manufactured/provided as part of the GTP shall include the following: air stripper unit (equipped with tray aeration and blower); air stripper discharge pump;
bag filters; a sequestrant addition system for scaling/fouling prevention; downhole water level sensing transducers, downhole submersible pumps with wiring and flexible discharge hose;
variable frequency drives (VFDs); interior piping and electrical wiring; flowmeters;
instrumentation, and air stripper/GETS control system to facilitate both onsite and remote (via internet) operation and monitoring.
Statement of Work, Construction Services, Remedial System Engineering Design, Agra, Kansas
The GTP building shall include the following: structural features to be provided in accordance with the Design Drawings and Technical Specifications discussed below; an electrical/power panel; treatment building lighting (interior and exterior), heating and ventilation components; and other electrical service components (interior and exterior receptacles).
Argonne requires lump sum pricing for the manufacture of the GTP system components and GTP building.
The OEM shall be responsible for preparing shop drawings and submittals and the fabrication of the GTP components, GTP building, and all required interior equipment, GETS/air stripper control system, and piping including the manifold header piping with individual well lines fitted with all required flow meters, strainers, sample ports, etc. as specified in the pertinent Design Drawings and Technical Specifications of the Remedial System Engineering Design (HGL; April 2023) that are provided as Attachments 1 and 2 to this SOW.
General Specification 01 33 00 (Submittal Procedures) was developed as a comprehensive document outlining requirements to be followed by all contractors performing activities in conjunction with the RA at Agra. Sections in this Specification and the included Submittal Register template that are not relevant to this SOW have been struck-through by Argonne in red in the OEM-specific version of 01 33 00 provided in Attachment 2.
The design, manufacture, and delivery of the GTP system and GTP building (the Work) to be provided by the OEM consists of the following general tasks:
1. Task 001 – Preparation of Draft and Final Shop Drawings of the GTP system, Related GETS components, and GTP building
2. Task 002 – Manufacture of the GTP System, Related GETS Components, and GTP Building
3. Task 003 – Manufacture of the Control and Electrical/Power Panels
4. Task 004 – Provide Instrumentation for the GTP System
5. Task 005 – Proof Testing and Certification of the GTP System
6. Task 006 – Transportation/Delivery of the GTP System and GTP Building
7. Task 007 – Virtual and/or Onsite Startup Assistance
8. Task 008 – Documentation and Final Acceptance
Details of these tasks are provided in Section 4.0 of this SOW.
3.0 Objectives
The objective of this Work is to provide a complete and operational groundwater treatment plant (GTP) that meets the requirements of the groundwater pump-and-treat remedy defined in the CAP (Argonne 2024) and in the Design Drawings, Technical Specifications, and related Permits.
In addition to the project-specific requirements defined in the Design Drawings and Technical
Specifications, (Section 2.0), industry standard practice shall be followed. Industry standards and guidance applicable to this project include, but are not limited to, those established by the following:
American Water Works Association (AWWA) American National Standards Institute (ANSI) National Electrical Code (NEC) International Building Code (IBC) American Society of Mechanical Engineers (ASME) Any applicable state and local codes
4.0 Tasks
To achieve the objective of this Work, the OEM shall be responsible for the following:
1. Provide all labor, equipment, and materials necessary to design, manufacture, and deliver the GTP system, related GETS components, and GTP building described in accordance with the contract documents and Tasks as defined below. All materials used in the treatment system components and GTP building must be procured in accordance with the Buy America Act (in the attached Federal Flowdowns).
2. Provide draft shop drawings to Argonne for review and approval. Based on Argonne comments, review and provide final shop drawings to Argonne.
3. Complete and deliver the GTP system, related components, and GTP building described in this SOW in accordance with the Contract Documents including, without limitation, this SOW and all documents incorporated by reference into it.
4. Proof testing and certification of the complete system to the extent technically possible before delivery.
5. Communicate with Argonne (and/or a technical representative(s) designated by Argonne) on a bi-weekly basis to discuss progress of the equipment manufacture to ensure adherence to project schedule.
This section provides a description of the specific Tasks associated with the above responsibilities, and is intended to supplement the Technical Specifications (Attachment 2) and the Design Drawings (Attachment 1) defined in Section 2.0 of this SOW. Bid Item designations are in parentheses and reference where the OEM shall include costs on the bid form.
4.1 Preparation of Draft and Final Shop Drawings of GTP System, Related GETS
Components, and GTP Building (Task 001)
The OEM shall prepare and submit draft and final shop drawings, certifications, submittals, licenses, schedules, and product data, required for completion of the GTP system, related components, and GTP building as referenced in the SOW, and the attached Design Drawings and Technical Specifications (Attachments 1 and 2). The draft shop drawings and product data shall be submitted to Argonne within 14 days of the notice to proceed. Argonne comments shall be incorporated into the final shop drawings, which shall be submitted to Argonne within 7 days of receiving Argonne comments on the draft shop drawings.
4.2 Manufacture of the GTP System, Related GETS Components, and GTP Building
(Task 002)
The OEM shall provide all labor, technical services, supervision, materials, tools, equipment, supplies, transportation, and articles necessary for manufacture of the GTP and related components, and the GTP building. The supplied equipment is to include, but is not limited to, components defined in Section 2.0 of this SOW, and as indicated in the Design Drawings (Attachment 1) and defined in the Technical Specifications (Attachment 2; specifically in Sections 13 34 19 PREFABRICATED EQUIPMENT BUILDING – GROUNDWATER TREATMENT SYSTEM, 40 05 13 PIPELINES, LIQUID PROCESS PIPING, and Section 44
42 13 AIR STRIPPER SYSTEM AND ASSOCIATED EQUIPMENT).
Pumping well transducers and associated control wiring, the downhole pumps with electrical wiring and flexible discharge hose, and VFDs shall be provided as indicated in the Design Drawings and in accordance with the Technical Specifications. The pumping well level transducers and pumps will be installed by Others (RA Contractor or Electrical Subcontractor).
4.3 Manufacture of Control and Electrical/Power Panels (Task 003) supplies, transportation, and articles necessary for manufacture of the (combined) air stripper and GETS control panel and the GTP building power panel. The air stripping/GETS control panel shall be provided for the operation and control of the air stripper and the overall GETS process equipment in accordance with the Design Drawings and Technical Specifications (specifically in Sections 13 34 19 PREFABRICATED EQUIPMENT BUILDING – GROUNDWATER TREATMENT SYSTEM and 44 42 13 AIR STRIPPER SYSTEM AND ASSOCIATED EQUIPMENT). The OEM shall factory-test the air stripper/GETS control panel and all connections to the system motors, instrumentation and related components as a complete assembly prior to delivery to the Site.
The GTP building power panel shall be provided as indicated in the Design Drawings and in accordance with the Technical Specifications (specifically in Section 13 34 19
PREFABRICATED EQUIPMENT BUILDING – GROUNDWATER TREATMENT
SYSTEM). This panel shall provide power to components associated with the GTP building and GETS which include, but are not limited to, the air stripping equipment, downhole submersible pumps and VFDs, air stripper/GETS control panel, GTP building lights, receptacles, and HVAC components.
4.4 Provide Instrumentation for the GTP System (Task 004)
supplies, transportation, and articles necessary for provision of the GTP instrumentation and control components indicated in the Design Drawings and in accordance with the Technical Specifications (specifically in Section 13 34 19 PREFABRICATED EQUIPMENT BUILDING
– GROUNDWATER TREATMENT SYSTEM and Section 44 42 13 AIR STRIPPER SYSTEM AND ASSOCIATED EQUIPMENT). The supplied equipment is to include, but is not limited to, VFDs for the individual extraction wells, all flow meters, pressure/level transmitters, pressure indicators (gauges), and level switches. All equipment shall be installed by the OEM prior to shipment with the exception of the pumping well level transducers and associated control wiring and the downhole pumps, which will be provided by the OEM for installation by Others (RA Contractor or Electrical Subcontractor).
4.5 Proof Testing and Certification of the GTP System (Task 005) supplies, transportation, and articles necessary for proof testing and certification of the assembled GTP system and building, to the extent technically possible before shipment. Argonne and/or its technical representative reserves the right to visit the OEM’s shop to witness proof testing and certification of the system prior to shipment.
4.6 Transportation/Delivery of the GTP System and GTP Building (Task 006) supplies, transportation, and articles necessary for transportation of the assembled GTP system, related GETS components, and GTP building discussed in this SOW and detailed in the Design Drawings and the Technical Specifications. Delivery to the GTP location at the Site shall be coordinated with Argonne, the RA Contractor, and the property owner(s). The GTP system, related components, and GTP building shall be delivered to the Site in good working order and in undamaged condition. During delivery the OEM shall maintain control of personnel, vehicles, equipment, and materials while on site. All wrapping materials, boxes, bags, and trash shall be containerized and disposed of after delivery to avoid unsightly appearances. The OEM is responsible for any damage that occurs to the equipment during transportation and damaged equipment shall be replaced or repaired by the OEM within three (3) working days.
4.7 Virtual and/or On-Site Startup Assistance (Task 007)
The OEM shall provide assistance during start-up by phone and email interactions. As an optional bid item, if requested, the OEM shall travel to the Site to assist with commissioning and startup of the treatment system once installed.
4.8 Documentation and Final Acceptance (Task 008)
The OEM shall prepare and submit a final operation and maintenance (O&M) manual specific to the operation of the GTP system and GTP building as constructed. In addition to instructions on the operation of the system, the O&M manual shall include all component O&M manuals, vendor contact information for all equipment and consumable supplies, and as-built drawings of the complete Agra GTP system.
Final acceptance of the GTP system and GTP building will be contingent on inspections of the equipment at the end of the startup/shakedown period and review of the required final documents.
The inspections and document reviews will be conducted by Argonne and/or a designated Argonne Representative.
5.0 Delivery
The GTP system, related components, and the GTP building shall be delivered in accordance with requirements defined in Section 4.6 of this SOW.
All documentation deliverables that are required, and other associated requirements, are provided throughout the individual Technical Specifications referenced in Section 2.0 of this SOW. Section 01 33 00 SUBMITTALS (in Attachment 2) provides submittal requirements, and a summary list of required submittals for approval is provided in the Submittal Register included at the end of that Section.
6.0 Government-Furnished Property
No Governmental Furnished Property (GFP) shall be provided for this Work.
7.0 Security
There are no special security requirements for this Work.
8.0 Place of Performance
The place of performance for the majority of this Work shall be provided at the OEM’s manufacturing facilities or home office.
Delivery of the GTP system, related components, and GTP building shall be provided to the Site in Agra, KS. The specific locations of extraction wells, the GTP and building, and associated piping etc., are indicated in the Design Drawings, specifically in Drawings C-01 and C-02.
9.0 Period of Performance
TBD.
Attachment 1 - Design Drawings
G-01 Cover Sheet G-02 General Notes, Abbreviations, and Legend C-01 Existing Site Plan C-02 Site Layout Plan C-03 Well Vault Details C-05 Civil Details P-01 Groundwater Extraction and Treatment System P&ID P-02 Groundwater Treatment Effluent Piping P&ID M-01 Groundwater Treatment Building General Arrangement
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
SHEET SHEET NAME
G-01 COVER SHEET
G-02 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
C-01 EXISTING SITE PLAN
C-02 SITE LAYOUT PLAN
C-03 WELL VAULT DETAILS
C-04 TRENCHING DETAILS
C-05 CIVIL DETAILS
P-01 GROUNDWATER EXTRACTION/TREATMENT SYSTEM P&ID
P-02 GROUNDWATER TREATMENT DISCHARGE PIPING P&ID
M-01 GROUNDWATER TREATMENT BUILDING GENERAL ARRANGEMENT
FINAL DESIGN DRAWINGS
REMEDIAL SYSTEM ENGINEERING DESIGN
AGRA, PHILLIPS COUNTY, KANSAS
PREPARED FOR ARGONNE NATIONAL LABORATORY
CONTRACT: DE-AC02-06CH11357
G-01
PHILLIPS
COUNTY
C O
VE
R
S H
EE
T
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
8/
/2
R F
KANSAS
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E
N G
IN
EE
R
IN
G D
ES
IG
N
LIMITS OF DISTURBANCE
ESTIMATED GWRR RIGHT-OF-WAY
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
G-02
G
EN
ER
AL
N O
TE
S, A
BB
R
EV
IA
TI
O N
S, AN
D L
EG
EN
D
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
8/
/2
R F
S
OE OE
T T T
DETAIL
TITLE
SCALE
SHEET
POWER POLE
EXTRACTION WELL VAULT
QUICK DISCONNECT FITTING
SAMPLE POINT
BALL VALVE
CHECK VALVE
REDUCER
UNION
REMOVABLE CAP
SOLENOID VALVE
GROUNDWATER TREATMENT
SYSTEM CONTROL PANEL
DRAINAGE PORT
OVERHEAD POWER LINE
UNDERGROUND COMMUNICATION LINE
LIMITS OF DISTURBANCE
GWRR RIGHT-OF-WAY
GRAVEL
SAND
CALLOUT
EXPOSED SOIL
ABBREVIATIONS
ANL ARGONNE NATIONAL LABORATORY
DPI DIFFERENTIAL PRESSURE INDICATOR
DPSH DIFFERENTIAL PRESSURE SWITCH HIGH
FI FLOW INDICATOR
GWRR GENESEE WYOMING RAILROAD
GWTP GROUNDWATER TREATMENT PLANT
HDPE HIGH DENSITY POLYETHYLENE
HS HAND SWITCH
LAHH LEVEL ALARM HIGH HIGH
LS LEVEL SWITCH
LT TRANSMITTER
PI PRESSURE INDICATOR
PSH PRESSURE SWITCH HIGH
PSL PRESSURE SWITCH LOW
PVC POLYVINYL CHLORIDE
SP SAMPLE PORT
VR VOLTAGE RELAY
LEGEND GENERAL NOTES
1. LOCATIONS OF ALL EXISTING UTILITIES AND STRUCTURES ARE BASED
ON THE BEST AVAILABLE INFORMATION AND NOT WARRANTED TO BE
EXACT, NOR IS IT WARRANTED THAT ALL ARE SHOWN. CONTRACTOR
SHALL VERIFY UTILITY LOCATIONS PRIOR TO INTRUSIVE ACTIVITIES.
2. THE CONTRACTOR SHALL BECOME SATISFIED AS TO THE CONDITIONS
EXISTING WITHIN EACH AREA, THE TYPE OF EQUIPMENT REQUIRED TO
PERFORM THE WORK, AND THE CHARACTER AND QUALITY OF THE
SUBSURFACE MATERIALS TO BE ENCOUNTERED IN SO FAR AS THIS
INFORMATION IS REASONABLY ASCERTAINABLE FROM AN INSPECTION
OF THE SITE, AS WELL AS INFORMATION PRESENTED BY THE
CONTRACT DRAWINGS AND SPECIFICATION 31 00 00 EARTHWORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING
ALL EXISTING SITE IMPROVEMENTS OR STRUCTURES. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO SATISFY THEMSELVES THAT ALL
THE EXISTING SITE IMPROVEMENTS WHETHER SHOWN ON THESE
CONTRACT DRAWINGS OR NOT HAVE BEEN PROPERLY LOCATED.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT SAFETY
INCLUDING BUT NOT LIMITED TO TRENCHING, BACKFILL, AND
COMPACTION.
5. THE ARGONNE NATIONAL LAB (ANL) WILL OBTAIN THE ACCESS
AGREEMENTS NECESSARY TO PROVIDE SITE ACCESS FOR
INSTALLATION OF THE REMEDIATION SYSTEM. THE CONTRACTOR IS
NOT TO PERFORM WORK ON ANY PROPERTIES WITHOUT AN ACCESS
AGREEMENT.
6. THE CONTRACTOR SHALL LIMIT THEIR ACTIVITIES TO WITHIN THE
WORK AREAS SHOWN ON THE CONTRACT DRAWINGS. WORK
CONDUCTED OUTSIDE OF WORK AREAS, IF REQUIRED, SHALL BE
COORDINATED WITH ANL.
7. THE CONTRACTOR SHALL RESTORE ALL DAMAGED AREAS TO THEIR
ORIGINAL CONDITION. ALL EXCESS MATERIAL AND SOIL SHALL BECOME
THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE PREPARED
AS REQUIRED PRIOR TO USE ON SITE OR FOR DISPOSAL AT AN
APPROVED OFF-SITE FACILITY.
8. THE TERM "ACCEPTABLE" SHALL MEAN WRITTEN ACCEPTANCE TO BE
RECEIVED FROM ANL BEFORE WORK IS STARTED.
9. ANY DEVIATIONS FROM THE CONTRACT DRAWINGS OR
SPECIFICATIONS MUST BE ACCEPTED IN WRITING PRIOR TO THE WORK
BEING DONE AS PER SPECIFICATION 01 33 00 SUBMITTAL
PROCEDURES. ANY DEVIATIONS PERFORMED WITHOUT ACCEPTANCE
WILL NOT BE PAID FOR AND MAY BE REQUIRED TO BE REDONE AT THE
CONTRACTOR'S EXPENSE.
10. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE CONTRACT
DOCUMENTS AT THE WORK SITE AS SPECIFIED IN SPECIFICATION 01 33
00.
11. SEE INDIVIDUAL SHEETS FOR ADDITIONAL ABBREVIATIONS, SYMBOLS,
LEGENDS, DETAILS, AND NOTES.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SITE
SECURITY FOR THE CONTRACTOR'S FACILITIES AND EQUIPMENT
WITHIN THE LIMITS OF THE CONTRACT.
13. TRENCHING AND BACKFILL ACTIVITIES SHALL BE PERFORMED IN
ACCORDANCE WITH THE REQUIREMENTS OF THE PERFORMANCE
WORK STATEMENT, SPECIFICATION 31 00 00, AND THE CONTRACTOR'S
APPROVED SITE HEALTH AND SAFETY PLAN. APPROPRIATE HEALTH
AND SAFETY MEASURES AND TRAINING WILL BE REQUIRED AT THE
PROJECT SITE. ALL ONSITE WORK MUST COMPLY WITH GWRR
REQUIREMENTS.
RESTORATION PLAN NOTES
(REFER TO SPECIFICATION 32 92 19 SEEDING FOR ADDITIONAL INFORMATION)
1. UPON COMPLETION OF FINISH GRADING, SCARIFY OR TILL THE GROUND
SURFACE TO A MINIMUM OF 3 INCHES TO ALLEVIATE COMPACTION.
TILLAGE SHALL BE DONE PARALLEL TO THE CONTOUR.
2. PERMANENT SEEDING (PS) WILL BE USED TO ACHIEVE FINAL
STABILIZATION OF THE SITE AND SHALL BE NATIVE GRASS OR TURF
SIMILAR TO WHAT IS EXTANT AT THE SITE. NO SEEDING WILL BE
REQUIRED IN CROP AREAS.
3. FOR CONVENTIONAL SEEDING, SEEDING SHALL BE DONE ON A FRESHLY
PREPARED SEEDBED. USE A DRILL, ROTARY SEEDER, OTHER
MECHANICAL SEEDER, OR HAND SEEDING TO DISTRIBUTE THE SEED
UNIFORMLY OVER THE AREA TO BE TREATED. COVER THE SEED
LIGHTLY WITH 1/8 TO 1/4 INCH OF SOIL FOR SMALL SEED AND 1/2 INCH
FOR LARGE SEED.
4. USE OF FERTILIZER, MULCH, AND WATER ARE NOT REQUIRE, ALTHOUGH
THEY ARE RECOMMENDED AS A ONE-TIME USE FOR SEED TO
ESTABLISH.
5. ANY RESEEDING AND MAINTENANCE REQUIRED SHALL BE PERFORMED
BY THE O&M CONTRACTOR TO BE DETERMINED BY ANL.
ELECTRICAL/COMMUNICATION PULL BOX
ROTAMETER / FLOW INDICATOR
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E
N G
IN
EE
R
IN
G D
ES
IG
N
GAS GAS GAS GAS GAS GAS GAS UNDERGROUND GAS LINE
OUTFALL PIPING
TRENCHING LIMITS
M
AI
N S
T.
O E
O E
O E
O E
O E
OE
OE
GW4
GW1
LDB4
LDB5
LDB3
LDB1GW3
MW-PGW6
MW-J
GW2
LDB2
LIMITS OF DISTURBANCE
TO AGRA
PRO-AG COOP
EXISTING
TREATMENT
BUILDING
EXISTING TREATMENT
BUILDING FENCE
GENESEE & WYOMING RAILROAD RAIL LINES
ROW CROPS
NOTES:
1. LOCATION AND CONDITION OF EXISTING SITE FEATURES ARE ESTIMATES.
REMEDIAL ACTION CONTRACTOR SHOULD VERIFY CONDITION AND
LOCATION OF ALL EXISTING SITE IMPROVEMENTS.
2. EXISTING TREATMENT BUILDING SHALL BE REMOVED AND REPLACED WITH
NEW GROUNDWATER TREATMENT PLANT (GWTP).
3. EXISTING POWER DROP IS FROM THE POWER POLE ADJACENT TO THE
EXISTING TREATMENT BUILDING.
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS T
T T
T T
T T
T T
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
MONITORING WELL LARGE DIAMETER BOREHOLE
APPROXIMATE LOCATION
OF EXISTING SVE LINES
ESTIMATED GWRR RIGHT-OF-WAY
RESIDENTIAL
DRIVEWAYS
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
C-01
EX
IS
TI
N
G S
IT
E
PL
AN
1"=40'
N
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
8/
/2
R F
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E
N G
IN
EE
R
IN
G D
ES
IG
N
M
AI
N S
T.
O E
O E
O E
O E
OE
GW4
GW1
LDB4
GWEX5
GWEX3
LDB1
GW3
MW-PGW6
MW-J
GW2
GWEX2
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
T T
T T
T T
T
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
SW TREATMENT SYSTEM
BUILDING CORNER
N: 39.763947
E: -99.118872 ROW WARNING SIGN
N:39.763922 E:-99.118653
ROW WARNING SIGN
N:39.763925 E:-99.117456
LIMIT OF DISTURBANCE IS 30 FEET NORTH AND 10
FEET SOUTH OF PIPE ALIGNMENT TYPICAL FOR ALL
35.1951MINIMUM OFFSET = 35'
MILEPOST 272.54
N:39.763889 E:-99.117222
OFFSET AT ROAD = 50'
A C-04
TRENCH SHALL BE PLACED
AT LOCATION OF EXISTING
SVE LINES
A C-04
DRIVEWAY
DRIVEWAY
O E
O E
O E
O E
O E
O E
O E
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
G
AS
G
AS
G
AS
T T
T
T T
T G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
35.1951MINIMUM OFFSET = 35'
B
C-04
B
C-04
71.1478OUTFALL OFFSET ~70'
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
C-02
SI
TE
L
AY
O U
T
PL
AN
1"=140'
N
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E N
G
IN
EE
R
IN
G
D
ES
IG
N
8/
/2
R F
1"=40'
N
BOTTOMTOP
NOTES:
1. OUTFALL PIPING SHALL BE INSTALLED USING HORIZONTAL BORING TECHNIQUES UNDER ROAD RIGHT OF WAYS AND FOR THE CONNECTION
TO THE OUTFALL STRUCTURE.
2. IT IS RECOMMENDED THE REMAINDER OF THE OUTFALL PIPING BE INSTALLED USING HORIZONTAL BORING TECHNIQUES; HOWEVER, USE
OF OPEN TRENCHING METHODS IS ALSO ACCEPTABLE.
3. IF POSSIBLE, THE EXISTING 3-INCH PVC CONDUITS FROM THE SVE SYSTEM CAN BE USED FOR COMMUNICATION AND ELECTRICAL LINES TO
THE WELLS. IF USED, THEY WOULD NEED TO BE CONNECTED TO THE TREATMENT BUILDING
4. THE RA CONTRACTOR IS RESPONSIBLE FOR CONTACTING UTILITY COMPANIES TO COORDINATE UTILITY CROSSINGS. SOFT DIGGING
TECHNIQUES MAY BE USED TO LOCATE THE UTILITY IF REQUESTED BY THE UTILITY COMPANY.
5. EXISTING GRADE NEAR OUTFALL TO TURNER CREEK IS APPROXIMATELY 1:1 OR 1:1.5. SLOPE BORING TO ACCOMMODATE STEEP GRADE
NEAR CREEK.
6. THE OUTFALL STRUCTURE AND PIPING SHOULD BE INSTALLED THROUGH THE EXISTING CLEARING IN THE TREES NEAR TURNER CREEK.
7. RESTORATION AND SEEDING IS REQUIRED FOR ALL AREAS DISTURBED ALONG THE CONVEYANCE AND OUTFALL PIPELINES.
RETAIN LOCATION OF POWER POLE. METER AND ELECTRIC MAST MAY BE MOVED TO NEW BUILDING.
ROUTING TO WELLS MAY BE FIELD FIT TO AVOID IMPACT TO EXISTING WELLS
ELECTRICAL AND COMMUNICATIONS PULL BOXES TO BE INSTALLED MIDWAY AND AS NEEDED
GRAVEL PAD WITH TREATMENT BUILDING
MONITORING WELL LARGE DIAMETER BOREHOLE
C
EN
TE
R
S T.
M
AI
N S
T.
TURNER CREEK
END BORING
OUTFALL STRUCTURE
N:39.764022 E:-99.125656
END BORING
ROW WARNING SIGN
N:39.763906 E:-99.123103
END BORING
START BORING
ROW WARNING SIGN
N:39.763889 E:-99.119081
START BORING
ROW WARNING SIGN
N:39.763906 E:-99.122822
START BORING
ROW WARNING SIGN
N:39.76390 E:-99.124408
EXTRACTION WELL
FORMER TREATMENT BUILDING AND FENCING SHALL BE REMOVED AND AREA RESTORED.
DETAIL
EXTRACTION WELL SCHEMATIC
NTS
A C-03
ELECTRICALLY POWERED
SUBMERGED PUMP
SCHEMATIC
NOT TO SCALE
GROUND SURFACE
WITHIN VAULT
DETAIL
EXTRACTION WELLHEAD VAULT PLAN (SHOWN WITHOUT COVER)
NTS
B C-03
DETAIL
EXTRACTION WELLHEAD VAULT PLAN "SECTION A-A"
NTS
C C-03
SCHEMATICS
NOT TO SCALE
SCHEMATIC
NOT TO SCALE
TOTAL DEPTH:
GWEX 2,3,5 - 63 FT. BGS
SEE NOTE 8
NOTES:
(FOR ADDITIONAL INFORMATION SEE SPECIFICATION 40 05 13 PIPELINES, LIQUID PROCESS
PIPING)
1. USE MINIMUM 1/8" NYLON COATED TYPE 304 STAINLESS STEEL WIRE ROPE. ATTACH
TO EYELET ON TOP OF PUMP AND TO THE FLANGED WELL SEAL. USE STAINLESS
THREADED CONNECTOR QUICK LINKS, THIMBLES AND WIRE ROPE CLIPS TO ATTACH
THE WIRE ROPE TO THE PUMP.
2. SET METAL VAULT OVER EXTRACTION WELL CASING AND 2, 2-INCH DIAMETER
CONDUITS AS INDICATED. GWEX 2, 3, AND 5 ARE INSTALLED IN EXISTING 8-INCH WELL
CASINGS. BACKFILL VAULT AS SPECIFIED ON NOTE 5.
3. WATER LINE CONNECTION TO WELLS SHALL BE WITH A 2-INCH, 304 STAINLESS STEEL
PITLESS ADAPTER AQUA SCIENCE MODEL P-200-SS OR EQUIVALENT. ADAPTER SHALL
BE INSTALLED BELOW THE FROST LEVEL OF 48" BGS.
4. INSTALL WATER DISCHARGE AND ELECTRIC SUPPLY WITH VALVES AND FITTINGS AS
SHOWN ON SHEET P-01 AND AS RECOMMENDED BY THE ELECTRIC GROUNDWATER
PUMP SUPPLIER. WATER HOSE SHALL BE GOODYEAR, HORIZON, GENERAL PURPOSE,
SYNTHETIC RUBBER HOSE, 200 PSI AND -40 F TO 190 F TEMPERATURE RANGE RATED
OR EQUAL.
5. BACKFILL AROUND VAULT USING CLEAN, COMPACTED NATIVE SOILS IN LOOSE LIFTS,
NOT TO EXCEED 8". USE 3/4 INCH, CLEAN GRAVEL WHEN BACKFILLING INSIDE VAULT.
6. ADD 1-INCH THICK LAYER OF RIGID INSULATION TO BOTTOM OF ACCESS LID.
7. INFLUENT LINE SHALL CONNECT TO THE PITLESS ADAPTER BELOW THE FROST LEVEL
OF 48" BGS.
8. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING THE WELL CASING DOWN TO
ITS FINAL ELEVATION.
1/8" NYLON COATED SS WIRE ROPE (SEE NOTE 1)
1" ID FLEXIBLE WATER DISCHARGE HOSE (SEE NOTE 4)
INSULATED ELECTRIC SUPPLY LINE (SEE NOTE 4)
NEMA 4X ELECTRICAL J-BOX
METAL WELL VAULT WITH TRAFFIC RATED WATERPROOF ACCESS HATCH
TO GROUNDWATER
TREATMENT BLDG.
2" SDR 11 HDPE INFLUENT PIPE. SEE
TYPICAL TRENCH SECTIONS, SHEET
C-04, SEE NOTE 7
UP TO 2" SCH 80 PVC
TRANSDUCER CABLE CONDUIT
COMPACTED IMPERVIOUS BACKFILL
MATERIALS, TYP. AROUND ENTIRE VAULT
(SEE NOTE 5)
FIRM UNDISTURBED EARTH
2" SCH 80 PVC
ELECTRIC SUPPLY CONDUIT
PITLESS ADAPTER
(SEE NOTE 3)
1'-6"
1'-6"
8" DIAMETER WELL CASING
LEAVE WELL EXTENDED 3"
ABOVE FLOOR OF VAULT
NEMA 4X ELECTRICAL J-BOX
2" SCH 80 PVC ELECTRIC
SUPPLY CONDUIT EXTEND
6" ABOVE VAULT FLOOR
TO REMEDIAL
EQUIPMENT BLDG.
2" SDR 11 HDPE INFLUENT PIPE. SEE TYP.
TRENCH SECTIONS, SHEET C-04 AND SITE
PLAN, SHEET C-02
UP TO 2" PVC SCH 80 COMMUNICATION
CONDUIT INTO VAULT (NOTE 2)
EXTEND 2" PVC SCH 80 ELECTRICAL
CONDUIT 6" ABOVE VAULT FLOOR
3" 9" 6"
6"
3"
4.5"
Centerline
Centerline
Centerline Centerline
TRANSDUCER CABLE
GWEX 2, 3, 5
Centerline 4.5"
FLANGED WELL SEAL
SEE DRAWING P-01
TRANSDUCER CABLE
TO GROUNDWATER
TREATMENT BLDG.
TRANSDUCER
VAULT WALLS
CABLES, PIPING, AND
WIRING TO PUMP -
SEE NOTE 1
CONCRETE PAD - EXTENDS MIN 12" OUTSIDE EXTRACTION WELL VAULT AND/OR MIN 12" OUTSIDE VAULT OF ADJACENT EXISTING MONITORING WELL IF ONE IS PRESENT, x MIN 4" THICK
48" MIN.
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
C-03
W
EL
L
VA
U
LT
D
ET
AI
LS
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E N
G
IN
EE
R
IN
G
D
ES
IG
N
8/
/2
R F
GEOTEXTILE FABRIC, GEOGRID
STABILIZATION FABRIC
GRAVEL PAD
GROUND
SURFACE
VARIES
SEE M-01
BUILDING GRAVEL PAD A
C-05SCALE: 1"=1'
GROUND
SURFACE
0'-6"
PIPING BLOCKOUT PLAN VIEW C
C-05SCALE: NTS'
PIPING BLOCKOUT SIDE VIEW LOOKING NORTH B
C-05SCALE: NTS'
SLOPE - NOTE 2
2' WIDE X 3' LONG X 6" THICK STONE DIAMETER D50=6"
APRON PAD WITH GEOTEXTILE FABRIC LINER, EXTEND
PAD UNDER END OF PIPE TO STABILIZE APRON, NOTE 4
FIELD-ENGINEER A COVERING OF WIRE MESH TO ALLOW
FLOW WHILE PREVENTING ENTRY BY RODENTS AND INSECTS
2" SDR 11 HDPE OUTFALL PIPING, NOTE 2
FLOW LINE, NOTE 3
FIRM, UNDISTURBED SOIL
FIRM, UNDISTURBED SOIL
2" HDPE OUTFALL STRUCTURE D
C-05SCALE: NTS'
NOTES:
1. EXTEND RIP RAP ABOVE OUTFALL STRUCTURE 1 FOOT ON EACH
SIDE AND 3 FEET IN LENGTH TO FACILITATE PROTECTION OF THE
OUTFALL STRUCTURE.
2. SLOPE BORED LENGTH OF 2" HDPE PIPE SO IT DOES NOT
PROTRUDE FROM GROUND SURFACE PRIOR TO OUTFALL
STRUCTURE.
3. FLOW LINE IS ANTICIPATED TO BE AS CLOSE TO NATURAL FLOW
LINE OF TURNER CREEK AS POSSIBLE.
4. GEOTEXTILE FABRIC SHALL BE USED UNLESS IT IS UNFEASIBLE TO
DO SO.
STONE RIP RAP DIAMETER D50=6" WITH
GEOTEXTILE FABRIC LINER, NOTE 1
STRIP AND REMOVE TOPSOIL/ORGANIC
MATERIAL AND ROLL SUBGRADE PRIOR TO
INSTALLING BUILDING GRAVEL PAD
NATIVE BACKFILL
48"
6"
INFLUENT PIPING
SAND
GROUND
SURFACE
6" MIN.
ELECTRICAL/COMM PIPING
EFFLUENT PIPING
STEEL CONTAINER WALL
BUILDING FLOORBLOCKOUT IN FLOOR
BLOCKOUT POSITION TO BE
DETERMINED BY BUILDING
FABRICATOR
2' x 3' BLOCKOUT FOR
PIPE PENETRATIONS
48"
NON-SHRINK GROUT
FILL BLOCKOUT WITH
NON-SHRINK GROUT
SOUTHEAST BUILDING
CORNER
N
MIN. DIMENSION
BETWEEN PIPES IS 6"
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
C-05
C
IV
IL
D
ET
AI
LS
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E N
G
IN
EE
R
IN
G
D
ES
IG
N
8/
/2
TURNER CREEK
OUTFALL STRUCTURE
GROUND SURFACE
2" HDPE
2" PVC
1/2" SP
FM-004
PI
10X
1" DRAIN
2" PVC
TO DWG. P-01
2"X3/4" RED.
3/4"x2" RED.
FROM DWG. P-01
AIR STRIPPER
TREATMENT
BLDG. PIPING
FIELD PIPING
BUILDING EXTERIOR
NOTES:
1. FLOWMETER MUST BE ON LIST OF APPROVED METERS FROM THE
KANSAS DEPARTMENT OF AGRICULTURE.
2"x1" RED.
PVC TO HDPE FLANGE
BUILDING FLOOR
SEE
NOTE 1
FT-104
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
P-02
G R
O U
N D
W
AT
ER
T
R
EA
TM
EN
T D
IS
C
H
AR
G E
PI
PI
N G
P &I
D
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E N
G
IN
EE
R
IN
G
D
ES
IG
N
8/
/2
4-TRAY AIR STRIPPER
1'x1'X0.5' FLOOR SUMP
SEQUESTRANT
ADDITION POINT
GRAVEL
SEE DETAIL A C-05
HEATER
FLOOR-LEVEL
LOUVER W/SCREEN
FLOOR-LEVEL
LOUVER W/SCREEN
EXHAUST FAN
1. TREATMENT BUILDING SHALL BE PAINTED,
RE-PURPOSED 20'X8' SHIPPING CONTAINER
PREFABRICATED AND DELIVERED TO THE PROJECT
SITE.
2. TREATMENT BUILDING SHALL BE HEATED, AND
VENTILATED.
3. POWER SUPPLIED IS 3-PHASE, 200 AMP, 120/277
VOLT. TRANSFORMER AND ELECTRICAL SERVICE
WEATHERHEAD MUST BE IN ACCORDANCE WITH
LOCAL STANDARDS AND REQUIREMENTS
4. ALL EXPOSED, ABOVE GROUND WATER PIPING
SHALL BE HEAT TRACED ACCORDING TO
MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS.
5. STEEL, SCREW-IN, GROUND ANCHORS, NO LESS
THAN 48" IN LENGTH, SHALL BE INSTALLED AT EACH
CORNER OF THE TREATMENT BUILDING. ANCHORS
SHALL BE PLACED ADJACENT TO THE BUILDING
AND MAY BE INSTALLED AT UP TO 15 DEGREES
FROM VERTICAL TO ALLOW PLACEMENT AS CLOSE
AS POSSIBLE TO MINIMIZE TRIPPING HAZARDS
ONCE INSTALLED.
6. ANCHORS INSTALLED AT THE BUILDING CORNERS
SHALL BE CONNECTED TO THE TREATMENT
BUILDING USING A MINIMUM 3/8" DIAMETER
CORROSION RESISTANT METAL CABLE WITH A
MINIMUM OF TWO WIRE-ROPE CLIPS PER
CONNECTION POINT.
7. PROVIDE BLOCKOUT IN THE STEEL ENCLOSURE
FOR PIPE PENETRATIONS AS INDICATED, WITH
PIPES ENTERING AND EXITING THE BUILDING
THROUGH THE FLOOR BLOCKOUT. BLOCKOUT
SHALL BE FILLED WITH NON-SHRINK GROUT.
BLOCKOUT LOCATION TO BE DETERMINED BY
BUILDING FABRICATOR
8. GRAVEL LOT SHALL BE GRADED TO DRAIN.
9. BUILDING TO BE INSTALLED LEVEL IN BOTH
DIRECTIONS TO ENSURE LEAK DETECTION SYSTEM
WORKS AS DESIGNED
NOTES: 32"X6" BLOCKOUT,
AND DETAIL C C-05
TRENCHING TO
CONTINUE UNTIL
BORING CAN BE MET 8.0'
20.0'
6.0'
27.0'
3.0'
12.0'
13.0'
APPROXIMATELY 35'
ACCESS TO
MAIN ST.
2'x3' BLOCKOUT IN FLOOR, SEE NOTE 7 AND DETAILS
B AND C ON C-05
CONTROL
PANEL SO
LI
C
IT
AT
IO
N
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
AP
PR
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
H G
L
1 2 3 4 5
D
C
B
A
M-01
G R
O U
N D
W
AT
ER
T
R
EA
TM
EN
T
BU
IL
D
IN
G
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
AN
SI
B
AN
SI
B
KSAN
G T
8/
/2
01D
E-
AC
-0
6C H
8/
/2
Fo rm er C
C C
.U
SD
A Ag ra F ac ilit y
KM
S.
dw g
1"=3'
N
FI
N
AL
R
EM
ED
IA
L
SY
ST
EM
E
N G
IN
EE
R
IN
G D
ES
IG
N 8/
/2
Attachment 2 - Technical Specifications
01 11 00 Summary of Work (excerpt) 01 33 00 Submittal Procedures (OEM specific) 13 34 19 Prefabricated Equipment Building – Groundwater Treatment System 40 05 13 Pipelines, Liquid Process Piping 44 42 13 Air Stripper System and Associated Equipment
FINAL REMEDIAL SYSTEM ENGINEERING DESIGN AGRA, KANSAS
TABLE OF CONTENTS REV 0
TECHNICAL SPECIFICATIONS
August 22, 2022
Division Section Title Pages
DIVISION 01
01 11 00 5 01 33 00 16 01 35 29.13
GENERAL REQUIREMENTS
SUMMARY OF WORK
SUBMITTAL PROCEDURES (OEM specific)
HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES 8
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 3
01 78 00 CLOSEOUT SUBMITTALS 4
DIVISION 13 SPECIAL CONSTRUCTION
13 34 19 PREFABRICATED EQUIPMENT BUILDING –
GROUNDWATER TREATMENT SYSTEM 9
DIVISION 31 EARTHWORK
31 00 00 EARTHWORK 8
DIVISION 40 PROCESS INTERCONNECTIONS
40 05 13 PIPELINES, LIQUID PROCESS PIPING 19
DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 13 AIR STRIPPER SYSTEM AND ASSOCIATED EQUIPMENT 4
END OF TABLE OF CONTENTS
Issued for Construction on Monday, August 22, 2022 by Royce Face, P.E.
Kansas Professional Engineer License #PE13303 rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out rsedivy Cross-Out
Line rsedivy Line rsedivy Line rsedivy Line rsedivy Line
Remedial System Engineering Design Agra, KS
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
(excerpt) 8/22
1.2.1 Project Background
A. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) (Site) is located in Agra, Phillips County, Kansas. The Site is located on the east side of Main Street on the Genesee and Wyoming Railroad (GWRR) right-of-way just north of the tracks in Agra, KS and the area to be disturbed during this project is expected to be under an acre, see below.
B. The Site has been under investigation since the Kansas Department of Health and Environment (KDHE) discovered carbon tetrachloride in the groundwater in 1985. Carbon tetrachloride concentrations have consistently exceeded the Maximum Contaminant Level (MCL). KDHE installed multiple monitoring wells between 1987 and 1998 to further study the carbon tetrachloride contamination of the groundwater. CCC/USDA continued the study between 1995 to present with various tests and an Interim Measure taking place to study and partially remove some of the of carbon tetrachloride in groundwater and soils.
1.2.2 Location
The work is located at an unaddressed parcel of land north of Agra on Main Street just north of the GWRR in Agra, KS and is a less than 1-acre parcel of land. The parcel is an elongated irregular shape that primarily runs east-west between a well field and a groundwater treatment plant (GTP) and east-west from the GTP to Turner Creek, as indicated on the Contract Drawings. The area where work will be conducted is all along the parcel.
1.2.3 Applicable or Relevant and Appropriate Requirements (ARARs)
Argonne National Lab on behalf of CCC/USDA completed the Corrective Action Study (CAS) in 2018 which recommended cleanup levels based on chemical-specific ARARs as stated in Section 4.2.2 and subsequent sections of the Agra CAS. The cleanup levels were officially established in Section 4.2.2 of the Agra CAS.
Section 01 11 00 Page 2
1.2.3.1 Clean Up Goals
The 2018 CAS clean up goals for groundwater contaminants of concern to meet RAOs are listed in Table 1.
Table 1 Contaminants of Concern Groundwater Cleanup Levels (µg/L)
VOCs
Carbon tetrachloride 5
Chloroform 80
1.2.4 Selected Remedy
A. The 2018 CAS indicated that the treatment process would include installation of 3 groundwater extraction wells to extract the contaminated groundwater and convey it to a constructed groundwater treatment system for treatment. It was anticipated that the extracted groundwater would be treated by an aeration system installed within the treatment building and sized to accommodate the long-term flow rate(s) determined from the extraction well test pumping. In the Final Basis of Design in 2022 it was recommended that the aeration system consist of a 4-tray aeration system to accommodate the long-term flow rates from the test pumping.
B. The selected remedy for treatment of carbon tetrachloride and chloroform in the groundwater at the Site consists of: (1) constructing an extraction/treatment system to extract groundwater from the area of highest groundwater contamination to prevent further migration, (2) treating contaminated groundwater, (3) discharging treated water to Agra Lake by way of Turner Creek west of the treatment building, and (4) performing long-term monitoring. A remedial design was prepared for implementing a groundwater extraction and treatment system for the Site.
Design Drawings are provided with the Contract Documents.
-- End of Section --
Section 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
8/22
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
A. Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
B. SD-01 Preconstruction Submittals
a. Submittals that are required prior to or commencing with the start of work on site. Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.
b. Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
C. SD-02 Shop Drawings
a. Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
b. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
c. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
D. SD-03 Product Data
a. Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
b. Samples of warranty language when the contract requires extended product warranties.
E. SD-05 Design Data
a. Design calculations, mix designs, analyses or other data pertaining to a part of work.
b. Design submittals, design substantiation submittals and extensions of design submittals.
rsedivy Cross-Out rsedivy Cross-Out
Section 01 33 00 Page 2
F. SD-06 Test Reports
a. Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
b. Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
c. Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
G. SD-07 Certificates
a. Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
b. Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
H. SD-08 Manufacturer's Instructions
a. Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
I. SD-10 Operation and Maintenance Data
a. Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
b. Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
c. Data incorporated in an operations and maintenance manual or control system.
J. SD-11 Closeout Submittals
a. Special requirements necessary to properly close out a contract. For example, Record Drawings and as-built drawings.
Section 01 33 00 Page 3
1.1.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.1.3 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.2 SUBMITTALS
ANL approval is required for submittals with an "A" designation; submittals not having an "A" designation are for information only “FIO”. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Construction Management Plan (see Section 01 11 00); A
Site Safety and Health Plan; A
Submittal Register
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Argonne National Lab (ANL) Approved (A)
A. ANL approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the ANL.
B. ANL approval is required for any variations from the Solicitation or the
Accepted Proposal and for other items as designated by the ANL.
1.3.2 For Information Only
Submittals not requiring ANL approval will be for information only.
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Submittal Format
1.4.2.1 Format of SD-01 Preconstruction Submittals
A. When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
B. Provide data in the unit of measure used in the contract documents.
rsedivy Cross-Out rsedivy Cross-Out
Section 01 33 00 Page 4
1.4.2.2 Format for SD-02 Shop Drawings
A. Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required. Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.
a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.
b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
B. Present shop drawings sized 11 by 17 inches as part of the bound volume for submittals if hard copies are requested by ANL. Present larger drawings in sets. Submit an electronic copy of drawings in PDF format.
1.4.2.2.1 Drawing Identification
A. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph
IDENTIFYING SUBMITTALS.
B. Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block.
Place the ANL contract number in the margin, immediately below the title block, for each drawing.
C. Reserve a sufficiently sized blank space on the right-hand side of each sheet for the ANL disposition stamp.
1.4.2.3 Format of SD-03 Product Data
A. Present product data submittals for each section as a complete, bound volume. Include a table of contents, listing the page and catalog item numbers for product data. Submit an electronic copy in PDF format.
B. Indicate, by prominent notation, each product that is being submitted;
indicate the specification section number and paragraph number to which it pertains.
1.4.2.3.1 Product Information
A. Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information and format as required for submission of SD-07 Certificates.
B. Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.
Section 01 33 00 Page 5
1.4.2.3.2 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the ANL's Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.4.2.3.3 Data Submission
A. Collect required data submittals for each specific material, product, unit of work, or system into a single submittal that is marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of the construction effort.
B. Submit the manufacturer's instructions before installation.
1.4.2.4 Format of SD-05 Design Data
Provide design data and certificates on 8 1/2 by 11 inch paper. Submit an electronic copy in PDF format. If ANL requests a hard copy, provide a complete bound volume.
1.4.2.5 Format of SD-06 Test Reports
A. Provide reports on 8 1/2 by 11 inch paper. Submit an electronic copy in
PDF format. If ANL requests a hard copy, provide a complete bound volume.
B. By prominent notation, indicate each report in the submittal. Indicate the specification number and paragraph number to which each report pertains.
1.4.2.6 Format of SD-07 Certificates
Provide certificates on 8 1/2 by 11 inch paper. Submit an electronic copy in PDF format. If ANL requests a hard copy, provide a complete bound volume.
1.4.2.7 Format of SD-08 Manufacturer's Instructions
A. Present manufacturer's instructions submittals for each section electronic PDF format. If ANL requests a hard copy, provide as a complete, bound volume. Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry, and technical-society publication references. If supplemental information is needed to clarify the manufacturer's data, submit it as specified for SD-07 Certificates.
B. Submit the manufacturer's instructions before installation.
Section 01 33 00 Page 6
1.4.2.7.1…
This is the start of the file's text. The full file is on GovTribe.