AF66 Schedule of Material Submittals.xlsx

XLSX spreadsheet 92 KB Posted

Attached to
RPR HVAC Gym 312 Federal contract opportunity
Solicitation number
FA557520R0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains a schedule of material submittals for the federal contract opportunity to repair HVAC systems at Gym 312 at Moron Air Base in Spain. The schedule lists 166 line items specifying materials, equipment, plans, reports, certifications, and other documentation that must be submitted by the contractor to the Air Force for review and approval. Key submittals include construction schedules, waste management and environmental protection plans, demolition and disposal plans, concrete and steel materials testing, piping and ductwork plans, control systems programming, fire protection equipment, and electrical and communications wiring diagrams. All submittals are due prior to installation or final inspection as indicated, with civil engineering providing feedback within specified return periods. The schedule requires adherence to Spanish local sourcing preferences and European conformity assessments where applicable.

View the file

Other files for this federal contract opportunity

Other files attached to RPR HVAC Gym 312, newest first.
File Type Posted
03 QUUG 16-1022_Especificaciones SP V2.pdf PDF
Solicitation Amendment FA557520R00010003 SF 30 (2).pdf PDF
15 QUUG 16-1022 AF66 Schedule of Material Submittals.xlsx XLSX spreadsheet
03 QUUG 16-1022_Specifications EN V2.pdf PDF
Amendment 0002 SF 30.pdf PDF
01 11 02 - Condiciones Especiales - R1.pdf PDF
01 11 02 - Special Conditions - R1.pdf PDF
Questions and Answers.pdf PDF
Amendment 0001 SF 30.pdf PDF
Statement of Work (English).pdf PDF
Drawings.pdf PDF
Solicitation FA557520R0001.pdf PDF
Statement of Work (Spanish).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 16-1022PROJECT TITLE

RPR GYM HVAC, 312

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
1Transit Control Plan1Prior to event-15
2Access Route Plan1NTP+10
3Construction Schedule1NTP+7
4Progress Schedule (AF FORM 3064)1DNTP+10
5Waste & construction debris management certificate1NTP+7
6Work Plan1NTP+7
7Mobility Plan1NTP+7
8Quality Control Plan1CNTP+15
9Enviromental Protection Plan1CNTP+15
10As-Built drawings1Works acceptance+15
11Spatial Data1As-Built approval+10
12Key Personnel and Personnel Listing1NTP+15
13Safety Program1CNTP+15
14Warranty letter1Works acceptance+15
15O&M Manuals1Works acceptance+15
SECTION 02 41 10
16Demolition plan1Before any work execution
17Management and disposal plan of the waste1Before any work execution
18Manager of waste from demolition and construction1Prior to FI
19Authorized dump or treatment and recovery plant1Prior to FI
20Delivery and disposal certicate of waste1Prior to FI
SECTION 03 30 00
21Inspection certificate of concrete batch plant1Before any work execution
22Concrete test program1Before any work execution
23Concrete control test1Before any work execution
24Concrete control test1Lab issuance +1
25Implementation plan1Before any work execution
SECTION 04 20 00
26Building bricks1Before any work execution
27Concrete masonry unit (CMU)1Before any work execution
28Mortar1Before any work execution
29Sand1Before any work execution
30Cement1Before any work execution
SECTION 05 12 00
31Erection Plan1Before any work execution
32Welding procedures and qualifications1Before any work execution
33Steel and cold formed steel1Before any work execution
34Steel framing accesories1Before any work execution
SECTION 07 92 00
35Sealant and accessories1Before any work execution
36Primer for sealant1Before any work execution
SECTION 08 11 00
37Doors1Before any work execution
38Frames1Before any work execution
39Accessories1Before any work execution
SECTION 08 71 00
40Hadrware items11Before any work execution
41Master Key Program1Before any work execution
SECTION 09 23 00
42Gypsum plaster1Before any work execution
SECTION 09 29 00
43Gypsum boards111Before any work execution
44Accesories11Before any work execution
SECTION 09 30 00
45Floor tiles, wall tiles, joint profiles, adhesives, joint grounting11Before any work execution
SECTION 09 90 00
46Coating and/or product furnished11Before any work execution
SECTION 22 00 00
47PVC piping1Before any work execution
48Steel piping1Before any work execution
49Copper piping1Before any work execution
50Ball valve1Before any work execution
SECTION 22 33 30.00 10
51Complete installation1Before any work execution
52Complete installation1Prior to FI
53Hidronic network balacing1Prior to FI
54Solar Collectors1Before any work execution
55Solar Storage tank1Before any work execution
56Pumps1Before any work execution
57Pipes1Before any work execution
58Solar expansion vessel1Before any work execution
59Solar heat dissipater1Before any work execution
603 way valve for solar system1Before any work execution
61Pipe accessories1Before any work execution
62Chemical water treatment1Before any work execution
SECTION 23 00 00
63Complete installations1Before any work execution
64Complete installations1Prior to FI
65Reversible chillers11Before any work execution
66Air handling units11Before any work execution
67Split Units11Before any work execution
68Exterior Package Air Conditioning Units11Before any work execution
69Diesel Boiler11Before any work execution
70Pumps11Before any work execution
71Expansion vessel11Before any work execution
72Inertia Tanks11Before any work execution
73DHW production tank11Before any work execution
74Water to water plate heat exchangers11Before any work execution
75Automatic Control Valves1Before any work execution
76K-flow valve1Before any work execution
77Steel pipe1Before any work execution
78Pipe accesories1Before any work execution
79Indicating Devices1Before any work execution
80Chemical water treatment1Before any work execution
81Piping system1Before any work execution
82Piping system11Prior to FI
SECTION 23 07 00
83Domestic cold water piping insulation.1Before any work execution
84Domestic hot water piping insulation1Before any work execution
85Solar DHW insulation1Before any work execution
86Hydronic water for HVAC systems insulation1Before any work execution
87Piping aluminum jacket1Before any work execution
88Duct insulation1Before any work execution
89Duct aluminum jacket1Before any work execution
SECTION 23 09 00
90General BMS and control systems11Before any work execution
91General BMS and control systems11111Prior to FI
92Automation server (Additive item 2)111Before any work execution
93Power supply (Additive item 2)111Before any work execution
94I/O modules (Additive item 2)111Before any work execution
95Advanced display (Additive item 2)111Before any work execution
96Programable Logic Controller (Basic Control)111Before any work execution
97Wiring and conduits111Before any work execution
98Sensors and Instrumentation111Before any work execution
99Output Devices111Before any work execution
100User Input devices111Before any work execution
101Space Sensor Module/Thermostat (Basic Control)111Before any work execution
102Room controllers (Additive item 2)111Before any work execution
SECTION 23 30 13
103Complete Installation11Before any work execution
104Complete Installation11Prior to FI
105Metal ducts11Before any work execution
106Circular Flexible Ducts11Before any work execution
107Duct Accesories11Before any work execution
108Circular Diffussers11Before any work execution
109Air Grilles11Before any work execution
110Air dampers and flow regulators11Before any work execution
111Boiler chimney11Before any work execution
112Fire Damper11Before any work execution
113Duct Smoke Detector11Before any work execution
114Quality certification from ITEL1Before any work execution
115Quality certification from ITEL11Prior to FI
116Cleaning report11Prior to FI
117Video recording and photos11Prior to FI
SECTION 26 20 00
118Conduit and fittings (one of each type).111Before any work execution
119Outlet boxes and covers.111Before any work execution
120Junction and pull boxes.111Before any work execution
121Wires and cables.111Before any work execution
122Emergency Shut-off Push Button.111Before any work execution
123Emergency Shut-off Push Button.1Prior to FI
124Circuit Breakers and auxiliary trip coils.111Before any work execution
125Circuit Breakers and auxiliary trip coils.1Prior to FI
126Panelboards.111Before any work execution
127Panelboards.1Prior to FI
128Surge Protective Devices.111Before any work execution
129Surge Protective Devices.1Prior to FI
130Transformers for actuators.111Before any work execution
131Transformers for actuators.1Prior to FI
132Safety switches.111Before any work execution
133Safety switches.1Prior to FI
134Labels.11Before any work execution
135Network Analyzer.111Before any work execution
136Network Analyzer.1Prior to FI
137Intersystem Bonding Termination.111Before any work execution
138Intersystem Bonding Termination.1Prior to FI
139Devices Subject to Manual Operation11Prior to FI
1401000 V Wiring test1Prior to FI
141Ground-Fault Interrupter Receptacle Test1Prior to FI
142Complete installation11Before any work execution
143Complete installation11FI-15
SECTION 28 46 21.13
144Complete instalation1Before any work execution
145Complete instalation11Prior to FI
146Wiring111Before any work execution
147Duct smoke sensor111Before any work execution
SECTION 31 05 19
148Geotextile CE compilance1Before any work execution
SECTION 32 11 24
149Control of source material11Prior to FI
150CE compilance1Before any work execution
SECTION 32 11 34
151Control of source material11Prior to FI
152CE compilance1Before any work execution
SECTION 32 12 16
153Mineral filler1Prior to FI
154Agregates1Prior to FI
155Binders1Before any work execution
156CE compilance1Before any work execution
SECTION 32 17 23
157Declaration of performance11Before any work execution
SECTION 33 40 00
158Drainage pipes1Before any work execution
159Post-installation inspection reports1Prior to FI
160Elastomerics seals1Before any work execution
161Placing pipes1Before any work execution
SECTION 33 71 02.00 20
162Inspection pits11Before any work execution
163Bare copper conductor11Before any work execution
164Copper clad steel rod11Before any work execution
SECTION 33 71 19
165Electrical nonmetallicc underground ducts1Before any work execution
166Electrical nonmetallicc underground ducts1Prior to FI

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 16-1022TÍTULO DE PROYECTO:
RPR GYM HVAC, 312SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
1Plan de Control de Tránsito1Antes del evento-15
2Plan de ruta de acceso1NTP+10
3Programa de construcción1NTP+7
4Programa de progreso (AF FORM 3064)1DNTP+10
5Certificado de gestión de residuos y escombros1NTP+7
6Plan de Trabajo1NTP+7
7Plan de mobilidad1NTP+7
8Plan de Control de Calidad1CNTP+15
9Plan de protección ambiental1CNTP+15
10Planos "As-built"1Aceptación de los trabajos +15
11Datos Espaciales1Aprobación As-Built+10
12Personal Clave y Listado de personal1NTP+15
13Plan de seguridad1CNTP+15
14Carta de Garantía1Aceptación de los trabajos +15
15Manuales de Operación y Mantenimiento1Aceptación de los trabajos +15
SECTION 02 41 10
16Plan de demoliciones1Antes de cualquier trabajo
17Plan de gestión y eliminación de los residuos1Antes de cualquier trabajo
18Gestor de residuos de construcción y demolición1Antes de la Inspección final
19Vertedero autorizado o planta de tratamiento y valorización de residuos.1Antes de la Inspección final
20Certificados de depósitos de residuos procedentes de la construcción y demolición.1Antes de la Inspección final
SECTION 03 30 00
21Certificado de inspección de la central de fabricación del hormigón1Antes de cualquier trabajo
22Plan de Ensayos de Control del Hormigón1Antes de cualquier trabajo
23Ensayos de Control del Hormigón1Antes de cualquier trabajo
24Ensayos de Control del Hormigón1Emisión del laboratorio +1
25Plan de puesta en obra1Antes de cualquier trabajo
SECTION 04 20 00
26Ladrillos1Antes de cualquier trabajo
27Bloques de hormigón1Antes de cualquier trabajo
28Morteros1Antes de cualquier trabajo
29Arenas1Antes de cualquier trabajo
30Cemento1Antes de cualquier trabajo
SECTION 05 12 00
31Plan de Montaje1Antes de cualquier trabajo
32Procedimientos y cualificaciones para soldadura1Antes de cualquier trabajo
33Acero y acero deformado en frío1Antes de cualquier trabajo
34Accesorios estructuras de acero1Antes de cualquier trabajo
SECTION 07 92 00
35Sellantes y accesorios1Antes de cualquier trabajo
36Imprimación para sellantes1Antes de cualquier trabajo
SECTION 09 23 00
37Pastas de yeso1Antes de cualquier trabajo
SECCIÓN 08 11 00
38Puertas1Antes de cualquier trabajo
39Cercos1Antes de cualquier trabajo
39Accesorios1Antes de cualquier trabajo
40SECCIÓN 08 71 00
40Cerrajería11Antes de cualquier trabajo
41Programa1Antes de cualquier trabajo
SECTION 09 29 00
42Placas de yeso111Antes de cualquier trabajo
43Accesorios para placas de yeso11Antes de cualquier trabajo
SECTION 09 30 00
44Azulejos y losetas cemrámicas11Antes de cualquier trabajo
SECTION 09 90 00
45Pinturas11Antes de cualquier trabajo
SECTION 22 00 00
46Tuberías de PVC1Antes de cualquier trabajo
47Tuberías de acero1Antes de cualquier trabajo
48Tuberías de cobre1Antes de cualquier trabajo
49Valvulas de bola1Antes de cualquier trabajo
SECTION 22 33 30.00 10
50Instalación completa1Antes de cualquier trabajo
51Instalación completa1Antes de la Inspección final
52Equilibrado de la red hidráulica1Antes de la Inspección final
53Colectores solares1Antes de cualquier trabajo
54Acumulador solar1Antes de cualquier trabajo
55Bombas1Antes de cualquier trabajo
56Tuberías1Antes de cualquier trabajo
57Vaso de expansión solar1Antes de cualquier trabajo
58Disipador solar1Antes de cualquier trabajo
59Válvulas de tres vías (pircuitos solar)1Antes de cualquier trabajo
60Accesorios de tuberías1Antes de cualquier trabajo
61Tratamiento químico de agua1Antes de cualquier trabajo
SECTION 23 00 00
62Instalación completa1Antes de cualquier trabajo
63Instalación completa1Antes de la Inspección final
64Enfriadoras reversibles11Antes de cualquier trabajo
65Unidades de tratamiento de aire11Antes de cualquier trabajo
66Equipos partidos de expansión directa (Splits)11Antes de cualquier trabajo
67Equipos compactos de aire acondicionado11Antes de cualquier trabajo
68Caldera diesel11Antes de cualquier trabajo
69Bombas11Antes de cualquier trabajo
70Vasos de expansión11Antes de cualquier trabajo
71Depósitos de inercia11Antes de cualquier trabajo
72Depósitos ACS11Antes de cualquier trabajo
73Intercambiadores de placas11Antes de cualquier trabajo
74Válvulas de control automáticas1Antes de cualquier trabajo
75Válvulas K-Flow1Antes de cualquier trabajo
76Tubería de acero1Antes de cualquier trabajo
77Accesorios de tuberías1Antes de cualquier trabajo
78Dispositivos indicadores1Antes de cualquier trabajo
79Tratamiento químico de agua1Antes de cualquier trabajo
80Sistemas de tuberías1Antes de cualquier trabajo
81Sistemas de tuberías11Antes de la Inspección final
SECTION 23 07 00
82Aislamiento de tuberías de agua fría1Antes de cualquier trabajo
83Aislamiento de tuberías de ACS1Antes de cualquier trabajo
84Aislamiento de tuberías de Solar térmica1Antes de cualquier trabajo
85Aislamiento de tuberías de Climatización1Antes de cualquier trabajo
86Revestimiento de aluminio para tuberías1Antes de cualquier trabajo
87Aislamiento de conductos1Antes de cualquier trabajo
88Revestimiento de aluminio para conductos1Antes de cualquier trabajo
SECTION 23 09 00
89Sistemas de control y BMS11Antes de cualquier trabajo
90Sistemas de control y BMS11111Antes de la Inspección final
91Controladores tipo Automation Server (Elemento adicional 2)111Antes de cualquier trabajo
92Modulos de fuente de alimentación (Elemento adicional 2)111Antes de cualquier trabajo
93Módulos de entradas/salidas (Elemento adicional 2)111Antes de cualquier trabajo
94Visor Avanzado (Elemento adicional 2)111Antes de cualquier trabajo
95Controlador Lógico Programable (Control Básico)111Antes de cualquier trabajo
96Cableado y canalización111Antes de cualquier trabajo
97Sensores e instrumentación111Antes de cualquier trabajo
98Dispositivos de Salida111Antes de cualquier trabajo
99Dispositivos de entrada de usuario111Antes de cualquier trabajo
100Módulo sensor de espacio / Termostato (Control Básico)111Antes de cualquier trabajo
101Controladores de habitación (Elemento adicional 2)1111Antes de cualquier trabajo
SECTION 23 30 13
102Instalación completa11Antes de cualquier trabajo
103Instalación completa11Antes de la Inspección final
104Conductos metálicos11Antes de cualquier trabajo
105Conducto circular flexible11Antes de cualquier trabajo
106Accesorios de conducto11Antes de cualquier trabajo
107Difusores circulares11Antes de cualquier trabajo
108Rejillas de aire11Antes de cualquier trabajo
109Compuertas de aire y reguladores de caudal11Antes de cualquier trabajo
110Chimenea de caldera11Antes de cualquier trabajo
111Compuertas cortafuegos11Antes de cualquier trabajo
112Detector de humo para conducto11Antes de cualquier trabajo
113Certificación de calidad de ITEL1Antes de cualquier trabajo
114Certificación de calidad de ITEL11Antes de la Inspección final
115Informe de limipeza de conductos11Antes de la Inspección final
116Grabación de video y fotografías11Antes de la Inspección final
SECTION 26 20 00
117Canalización y accesorios (cada tipo)111Antes de cualquier trabajo
118Tapas y cajas de mecanismos111Antes de cualquier trabajo
119Cajas de derivación y registro111Antes de cualquier trabajo
120Cableado111Antes de cualquier trabajo
121Pulsador de paro de emergencia111Antes de cualquier trabajo
122Pulsador de paro de emergencia1Antes de la Inspección final
123Interruptores automáticos y contactos auxiliares111Antes de cualquier trabajo
124Interruptores automáticos y contactos auxiliares1Antes de la Inspección final
125Cuadros eléctricos111Antes de cualquier trabajo
126Cuadros eléctricos1Antes de la Inspección final
127Protección contra sobretensiones111Antes de cualquier trabajo
128Protección contra sobretensiones1Antes de la Inspección final
129Transformadores para actuadores111Antes de cualquier trabajo
130Transformadores para actuadores1Antes de la Inspección final
131Interruptor en carga111Antes de cualquier trabajo
132Interruptor en carga1Antes de la Inspección final
133Etiquetado11Antes de cualquier trabajo
134Analizadores de redes111Antes de cualquier trabajo
135Analizadores de redes1Antes de la Inspección final
136Pueta a tierra y conexión equipotencial111Antes de cualquier trabajo
137Pueta a tierra y conexión equipotencial1Antes de la Inspección final
138Dispositivos sujetos a operación manual11Antes de la Inspección final
139Pruebas de cablado de 1000V1Antes de la Inspección final
140Pruebas del sistemas de puesta a tierra1Antes de la Inspección final
141Instalación completa11Antes de cualquier trabajo
142Instalación completa11Inspección final -15
SECTION 28 46 21.13
143Instalación completa1Antes de cualquier trabajo
144Instalación completa11Antes de la Inspección final
145Cableado111Antes de cualquier trabajo
146Detector de humo para conducto111Antes de cualquier trabajo
SECTION 31 05 19
147Cumplimiento CE1Antes de cualquier trabajo
SECTION 32 11 24
148Control del origen del material11Antes de la Inspección final
149Cumplimiento CE1Antes de cualquier trabajo
SECTION 32 11 34
150Control del origen del material11Antes de la Inspección final
151Cumplimiento CE1Antes de cualquier trabajo
SECTION 32 12 16
152Polvo mineral1Antes de la Inspección final
153Áridos1Antes de la Inspección final
154Ligantes hidrocarbonados1Antes de cualquier trabajo
155Cumplimiento CE1Antes de cualquier trabajo
SECTION 32 17 23
156Declaración de conformidad11Antes de cualquier trabajo
SECTION 33 40 00
157Tuberías de drenaje1Antes de cualquier trabajo
158Informe de inspección posterior a la instalación1Antes de la Inspección final
159Sellantes elastoméricos1Antes de cualquier trabajo
160Colocación de la tubería1Antes de cualquier trabajo
SECTION 33 71 02.00 20
161Arquetas de inspección11Antes de cualquier trabajo
162Conductores de puesta a tierra11Antes de cualquier trabajo
163Picas de tierra11Antes de cualquier trabajo
SECTION 33 71 19
164Conductossubterráneos eléctricos no metálicos1Antes de cualquier trabajo
165Conductossubterráneos eléctricos no metálicos1Antes de la Inspección final