Change+Order+Form.docx

DOCX document 46 KB Posted

Attached to
Trail Repair & Maintenance Services
Contract number
187-BITC
Issued by
North Dakota

About this file

This document is a Change Order Form template for State Contract #187 related to Trail Repair & Maintenance Services. The form appears to be a standardized document designed to facilitate modifications to an existing state contract, with designated sections for project details, change request description, recommendations, impact analysis, and approval signatures.

While specific details about the contract's full scope are limited in this document, the form suggests this is a state-level contract for trail maintenance and repair services. The template provides a structured approach for proposing and documenting changes to the contract, including sections for analyzing potential impacts on cost, scope, schedule, and quality. The form requires comprehensive documentation of change requests, including rationale, potential solutions, and formal approval from designated authorities.

View the file

Other files

File Type Posted
Contract+Amendment+1+Signed+5-23-2023.pdf PDF
Task+Order+Request.docx DOCX document
Amendment+2+-+Bitco+-+signed.pdf PDF
Bitco+Contract+Signed+5-5-2023.pdf PDF
State+Contract+187+Summary.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

Working Document - Add-To or Expand Fields As-Needed

CHANGE ORDER FORM

STATE CONTRACT #187 TRAIL REPAIR & MAINTENANCE SERVICES POOL

Project Name:
Date of Request:
Task Order Number:
Change Order Number:

Requested By:

Request Description

Reasons/Goals for Change

Recommendations (Include recommendations by the party that is bringing the change request forward. There is a potential for multiple recommendations for solutions based on analysis.)

Impacts on Cost, Scope, Schedule, Quality (For each recommendation, a narrative of the impacts to CSSQ should be included.)

Solution (Define the most appropriate solution to attain the desired objective. This is determined by the approving authority.)

Approval Signature(s) and Date(s). The project manager will identify the appropriate approval body and forward for final approval.

Signature

Date

Signature

Date

Signature

Date