This is Addendum No. 1 to a Request for Information issued by the Connecticut Military Department for the Camp Hartell CSMS Compressor Replacement project (ITB 25MIL23702). The addendum clarifies key project details and does not modify the original bid due date of July 30, 2026 at 10:00 a.m. EDT. The project scope encompasses removal of two existing air compressors and replacement with one building air compressor, two breathing air compressors, associated specialty work, power connections, and temporary compressor provisions during the transition. The addendum addresses prospective bidders' inquiries regarding equipment reuse and building management system contact information. Contractors are required to acknowledge receipt of all addenda on the bid proposal form; failure to do so may result in bid disqualification.
The addendum confirms that existing storage receiver tanks will be reused as both the wet tank and dry tank for the new system, eliminating the need for new tank procurement. Contact information for building management services has been provided as Universal Building Controls. No pricing terms, set-asides, or funding amounts are disclosed in this addendum document. All prospective bidders must acknowledge receipt of this addendum as a condition of bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Connecticut 6030
Military Department Bid Addendum
PROJECT No. 25MIL23702 July 23, 2026
ADDENDUM NO. 1
PROJECT NAME: Camp Hartell CSMS Compressor Replacement
SUBJECT: Request For Information Responses
Original Bid Due Date / Time: July 30, 2026 10:00 AM
The bid due date and time are not changed by this Addendum
To: Prospective Bid Proposers:
This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this project referenced above. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form. Failure to do so may subject Bid Proposers to disqualification.
Addendum Item 1:
REQUEST FOR INFORMATION RESPONSES IN BOLD:
1. Are we using the existing storage receiver tanks for the new wet tank and the new dry tank?
Yes, the existing tanks are being reused for a wet tank and a dry tank.
2. Do you have the contact name and number for your BMS building?
Universal Building Controls Contact.
CONTRACTOR SHALL ACKNOWLEDGE RECEIPT OF THIS
ADDENDUM ON THE BID FORM
END OF ADDENDUM NO. 1
Very Respectfully, Denisa Dede Procurement & Contracting Officer Connecticut Military Department